Filtered by: District: District 3 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 12, 2026 | 66T09 | IroquoisDistrict 3 | Various sizes of Class B pavement patching pavement striping and aggregate wedge shoulders at the Sheldon Weight Station approximately 1.9 miles east of US Route 52 (N) in Sheldon, Iroquois County. | — | Executed | Iroquois Paving Corporation $388,737 · | ||
| Jun 12, 2026 | 66T10 | LaSalleDistrict 3 | Removal and replacement of the fabric reinforced elastomeric troughs and associated hardware at Structure No. 050-0219 carrying F.A.S. Route 268A (CH 15) over the Illinois River approximately 0.4 mile south of US 6 (Marseilles) in LaSalle County. | — | Executed | Riber Construction, Inc. $236,720 · | ||
| Jun 12, 2026 | 66T11 | LaSalleDistrict 3 | Washing all components of Structure No. 050-0079 carrying F.A.P. Route 46 (IL 251) over the Illinois River and CSX Railroad approximately 0.1 mile south of US 6 (Peru) in LaSalle County. This includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and elastomeric troughs. | — | Executed | All States Painting, Inc. $58,232 · | ||
| Jun 12, 2026 | 66T12 | GrundyDistrict 3 | Washing all components of the structure which includes all structural steel (beams, girders, diaphragms, beari Project is located at Structure No. 032-0099 carrying F.A.P. Route 326 (IL 47) over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 (Morris) in Grundy County. This work consists of washing all components of the structure which includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and el | — | Executed | All States Painting, Inc. $57,414 · | ||
| Jun 12, 2026 | 66T29 | FordDistrict 3 | Class B pavement patching of mainline pavement This project is located on F.A.P. Route 681 (IL 116), Section (115, 116)PP, beginning at Iroquois County Line to Livingston County Line. This project consists of Class B pavement patching of mainline pavement. 6.0 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $372,960 · | ||
| Jun 12, 2026 | 66T32 | LivingstonDistrict 3 | Herbicide, seeding, landscaping, and maintenance for this pollinator project located along FAI 55 (I-55) at the Limestone Rest Area sites south of Pontiac, IL. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $764,070 · | ||
| Jun 12, 2026 | 66T36 | VariousDistrict 3 | One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds. | — | Executed | Kujo, Inc. $2,101,221 · | ||
| Jun 12, 2026 | 66T39 | LaSalleDistrict 3 | Pavement patching and joint repair along I-39 at the following interchanges in LaSalle County: Tonica (SB only), IL 71, IL 251, Oglesby, I-80, and US 34. 3.06 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $2,815,825 · | ||
| Jun 12, 2026 | 66T40 | VariousDistrict 3 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated within the right-of-way of the Interstate Routes, including, but not limited to, medians; inside and outside areas adjacent to exit and entrance ramps at various interchanges; interchange gore areas between mainline and ramps; and inside and outside of on/off ramps at rest areas within District 3 on interstates I-180, I-39, | — | Executed | The Final Connection, Inc. $153,733 · | ||
| Jun 12, 2026 | 66T41 | GrundyLivingstonDistrict 3 | Litter picking on interstate I-55, throughout Livingston and Grundy Counties in District 3. | — | Executed | The Final Connection, Inc. $49,729 · | ||
| Jun 12, 2026 | 66T42 | FordIroquoisKankakeeDistrict 3 | Litter picking_on interstate I-57, throughout Ford, Iroquois, and Kankakee Counties. | — | Executed | The Final Connection, Inc. $75,170 · | ||
| Jun 12, 2026 | 66T45 | LaSalleDistrict 3 | Class B patching at the concrete section of FAP 603 (US 52) over I-39, beginning 0.47 miles west of I-39 (Station 191+44) and ending 0.35 miles east of I-39 (Station 234+23), and also includes the entrance and exit ramps at the interchange in LaSalle County. 4,500 feet gross length. | — | Executed | G. M. Sipes Construction, Inc. $639,792 · | ||
| Jun 12, 2026 | 66T60 | VariousDistrict 3 | Removal and proper disposal of medium (6-15 inch diameter) and large (greater than 15 inch diameter) trees, tree trimming, clearing of undesirable bushes, and the maintenance of old growth oak trees along state-maintained routes of Bureau, La Salle, Livingston, and Grundy counties. Work will be limited to occur between October 1, 2026 and March 31st, 2027 due to Threatened and Endangered Species (TandE). | — | Executed | Homer Tree Service, Inc. $769,735 · | ||
| Jun 12, 2026 | 87851 | KankakeeDistrict 3 | Replace the bridge carrying CH 14 over Trim Creek located 3.3 miles south of IL 17. | — | Executed | Riber Construction, Inc. $1,225,921 · | ||
| Jun 12, 2026 | 87859 | IroquoisDistrict 3 | Resurfacing of E 980N Road from IL 99 to the west corporate limits of Milford. | — | Executed | Iroquois Paving Corporation $3,970,513 · | ||
| Jun 12, 2026 | 87895 | IroquoisDistrict 3 | Resurface 800 N Road from I-57 ramps to US 45. | — | Executed | Iroquois Paving Corporation $967,933 · | ||
| Jul 31, 2026 | 66M85 | LivingstonDistrict 3 | Deck replacement (SN 053-0149) on IL 23 at the BNSF RR and Vermilion River, 0.8 miles south of the LaSalle County Line. | — | Executed | ICC Group Inc. $9,933,000 · | ||
| Jul 31, 2026 | 66N23 | LivingstonDistrict 3 | Removal and replacement of the existing culvert structure (SN 053-2548) carrying IL 116 over_a stream located 5.6 miles west of I-55 in Livingston County. Additional work includes roadway resurfacing, guardrail placement,_and slope and ditch grading. | — | Executed | Riber Construction, Inc. $615,314 · | ||
| Jul 31, 2026 | 66P22 | BureauDistrict 3 | Repairing the Red Covered Bridge (SN 006-0134) on TR 246 (Old Dad Joe_Trail), over Big Bureau Creek, approximately 0.5 mile west of IL-26 in Bureau County. Repairs include roof replacement, truss replacement, floor beam replacement, and other items needed to restore the bridge to its original condition. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,257,661 · | ||
| Jul 31, 2026 | 66T13 | BureauLaSalleDistrict 3 | Milling, resurfacing,_pavement marking, and aggregate construction on a frontage north of I-80 beginning at a dead end (L.M. 0.00) in Bureau County and ending approximately 85 feet west of Plank Rd. in LaSalle County. 1.36 miles gross length. | — | Executed | Advanced Asphalt Company $729,412 · | ||
| Jul 31, 2026 | 66T14 | BureauLaSalleDistrict 3 | Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle County and IL 26 and Backbone Rd in Bureau County. | — | Active | |||
| Jul 31, 2026 | 66T15 | LaSalleDistrict 3 | Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May Rd and IL 251 in LaSalle County. | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $1,096,580 · | ||
| Jul 31, 2026 | 66T21 | FordDistrict 3 | Class D pavement patching of mainline pavement on F.A.S. Route 2482 (IL 165), beginning at IL 47 and 165 (L.M. 0.00) and ending at McLean_County line in Ford County. 4.2 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $690,200 · | ||
| Jul 31, 2026 | 66T22 | FordDistrict 3 | Class D pavement patching of_mainline pavement on F.A.P. Route 693 (IL 9), beginning at IL 9/47 intersection (L.M. 0.00) and ending at Ford/McLean County Line (L.M. 4.30) in Ford County._Approximately 4.3 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $610,480 · | ||
| Jul 31, 2026 | 66T30 | LaSalleDistrict 3 | Installation of flashing beacons at the intersection of IL18 and E 15th Rd. | — | Executed | CSD Environmental Services, Inc. $404,001 · | ||
| Jul 31, 2026 | 66T35 | KankakeeDistrict 3 | Removing and replacing high-mast tower, underpass and roadway lighting luminares at the I-57 and IL 50 Interchange and at the south IL 1/17 intersection. | — | Executed | Laser Electric, Inc. $447,135 · | ||
| Jul 31, 2026 | 66T37 | LaSalleDistrict 3 | Furnishing and installing video detection systems at_the intersections of IL 351/5th St. Intersection, IL 351/ 11th Street Intersection, and IL 351 and Civic Rd. Intersections. | — | Executed | Ficek Electric & Communication Systems, Inc. $241,801 · | ||
| Jul 31, 2026 | 66T53 | DeKalbDistrict 3 | Milling and resurfacing 2 1/4" (standard overlay) and additional work including shoulder and centerline rumble strips, pavement marking, and raised reflective pavement markers on FAP 17 (IL 64) beginning from Ogle County Line to Clare Rd. in DeKalb County. Approximately 6.108 miles gross length. | — | Executed | Curran Contracting Company $2,389,089 · | ||
| Sep 18, 2026 | 66863 | KankakeeDistrict 3 | Reconstructing the interchange to provide a single point urban diamond interchange This project is located on FAI 57 (I-57) at IL-17 interchange in Kankakee. Work consists of reconstructing the interchange to provide a single point urban diamond interchange. The proposed interchange will accommodate a future six lane section on I-57. Bridges SN 046-0006 (NB) and SN 046-0007 (SB) will be replaced with SN 046-0154, and SN 046-0005 carrying the KBandS RR over I-57 with SN 046-9904. The work consists of reconstruction of 1.6 miles of I-57, and 0.73 miles of IL 17. Work includes pa | — | Executed | |||
| Sep 18, 2026 | 66926 | LaSalleDistrict 3 | IL 23 deck replacement (SN 050-0047) at Covel Creek 3.4 miles south of IL 71 and bridge replacement (SN 050-0048) at Covel Creek 5.0 miles south of IL 71. | — | Executed | D. Construction, Inc. $4,253,399 · | ||
| Sep 18, 2026 | 66B81 | IroquoisDistrict 3 | Culvert replacement (SN 038-2517) at stream under IL 1, located 0.3 miles south of US 24. | — | Active | |||
| Sep 18, 2026 | 66M67 | LaSalleDistrict 3 | Removing and replacing SN 050-0124 carrying IL 71 over Cedar Creek, located approximately 3 miles west of I-39 in LaSalle County. | — | Executed | D. Construction, Inc. $868,946 · | ||
| Sep 18, 2026 | 87918 | KankakeeDistrict 3 | HMA surface removal, HMA overlay and shoulders on CH 17 from Will County line to E 9000 N Road. | — | Executed | |||
| — | 3-00606-0040 3006060040 | District 3 | US-6 FR | Rehabilitation - Pavement Designed Overlay 0.1 Mi W of 1600 E Rd to 1800 E St | $300,000 | Planned | ||
| — | 3-00606-0070 3006060070 | District 3 | US-34US-6 | Rehabilitation - Pavement Designed Overlay, ADA Improvements 0.2 Mi NE of 1200N Rd to ILL 40 | $4,700,000 | Planned | ||
| — | 3-00632-0150 3006320150 | District 3 | US-6 | Safety Intersection Reconstn At ILL 47 in Morris | $15,000,000 | Planned | ||
| — | 3-00632-0155 3006320155 | District 3 | US-6 | Safety Utility Adjustment At ILL 47 in Morris | $1,000,000 | Planned | ||
| — | 3-00650-0150 3006500150 | District 3 | Old Us 6 | Rehabilitation - Pavement Designed Overlay N 29th Rd to 0.8 Mi E at US 6 | $250,000 | Planned | ||
| — | 3-00650-0170 3006500170 | District 3 | US-6 | Rehabilitation - Pavement Designed Overlay ILL 71 in Ottawa to Jefferson St in Marseilles | $5,100,000 | Planned | ||
| — | 3-01746-0050 3017460050 | District 3 | IL-17 | Reconstruction - Pavement Pavement Replacement ILL 1 (N) in Grant Park to Indiana State Line | $14,000,000 | Planned | ||
| — | 3-01746-0055 3017460055 | District 3 | IL-17 | Reconstruction - Pavement Utility Adjustment ILL 1 (N) in Grant Park to Indiana State Line | $500,000 | Planned | ||
| — | 3-01746-0060 3017460060 | District 3 | IL-17US-45US-52 | Rehabilitation - Pavement Designed Overlay N 5th Ave in Kankakee to 0.1 Mi E of ILL 1 in Sun River Terrace | $6,200,000 | Planned | ||
| — | 3-01746-0140 3017460140 | District 3 | IL-17 | Reconstruction - Pavement Reconstruction N Fairmont Ave to Eastgate Pkwy in Kankakee | $15,000,000 | Planned | ||
| — | 3-01753-0020 3017530020 | District 3 | IL-17 | Rehabilitation - Pavement Designed Overlay 0.2 Mi E of ILL 47 in Dwight to 0.5 Mi W of Reddick Rd in Reddick | $5,600,000 | Planned | ||
| — | 3-01753-0110 3017530110 | District 3 | E-w FrShelly AveW Main St | Rehabilitation - Pavement Designed Overlay W Main St: ILL 17 to Shelly Ave; Shelly Ave: Dead End to W Main St in Reddick; E-W FR: ILL 17 to Shelly Ave | $500,000 | Planned | ||
| — | 3-01850-0000 3018500000 | District 3 | IL-18IL-18 A | Rehabilitation - Pavement Standard Overlay, ADA Improvements, Patching W of E 16th Rd to Otter Creek Rd in Streator | $2,300,000 | Planned | ||
| — | 3-01850-0060 3018500060 | District 3 | IL-18 | Rehabilitation - Pavement Designed Overlay ILL 89 to 0.1 Mi E of ILL 251 | $5,000,000 | Planned | ||
| — | 3-01964-2004 3019642004 | District 3 | IL-64 | Reconstruction - Bridges Culvert Replacement Drainage Ditch 0.6 Mi W of Five Points Rd | $1,250,000 | Planned | ||
| — | 3-02350-0210 3023500210 | District 3 | IL-23 | Safety Intersection Reconstn At ILL 71 in Ottawa | $2,000,000 | Planned | ||
| — | 3-02353-0000 3023530000 | District 3 | IL-23 | Reconstruction - Pavement Pavement Replacement 0.4 Mi N to 0.4 Mi S of I-55 in Pontiac | $5,000,000 | Planned | ||
| — | 3-02606-0100 3026060100 | District 3 | IL-26 | Rehabilitation - Pavement Designed Overlay ILL 29 2.3 mi SE to end of route | $1,200,000 | Planned | ||
| — | 3-03406-0000 3034060000 | District 3 | US-34 | Rehabilitation - Pavement Designed Overlay, ADA Improvements ILL 26 to 0.2 Mi E of Dover Rd in Princeton | $800,000 | Planned | ||
| — | 3-03406-0110 3034060110 | District 3 | US-34 | Rehabilitation - Pavement Designed Overlay, ADA Improvements 0.2 Mi E of Dover Rd in Princeton to E of Illinois St in Dover | $3,300,000 | Planned | ||
| — | 3-03450-0120 3034500120 | District 3 | US-34 | Rehabilitation - Pavement Designed Overlay 1st Ave to W of I-39 in Mendota | $1,949,000 | Planned | ||
| — | 3-03819-0050 3038190050 | District 3 | IL-38 | Preservation - Pavements Crack & Joint Sealing Ogle Co Line to John Huber Pkwy (S) | $80,000 | Planned | ||
| — | 3-03950-0000 3039500000 | District 3 | I-39US-51 | Reconstruction - Pavement Pavement Replacement 0.5 Mi N of UP RR to Little Vermilion River (NB) & 0.5 Mi N of UP RR to 1.5 Mi N of Little Vermilion River (SB) | $10,000,000 | Planned | ||
| — | 3-03950-0120 3039500120 | District 3 | I-39US-51 | Reconstruction - Pavement Pavement Replacement Marshall Co Line to 0.3 Mi N of NS RR | $23,000,000 | Planned | ||
| — | 3-03950-0130 3039500130 | District 3 | I-39US-51 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-1st) 0.3 Mi N of NS RR to 0.5 Mi S of ILL 351 | $32,000,000 | Planned | ||
| — | 3-03950-0160 3039500160 | District 3 | (northbound)I-39US-51 | Reconstruction - Pavement Pavement Replacement 0.8 Mi N of CH 5 to 0.5 Mi N of CH 54 in Tonica | $11,000,000 | Planned | ||
| — | 3-03950-0170 3039500170 | District 3 | I-39US-51 | Reconstruction - Pavement Pavement Replacement 0.4 Mi N of W Walnut St to Lincoln Memorial Bridge S of ILL 351 | $4,500,000 | Planned | ||
| — | 3-03950-0180 3039500180 | District 3 | I-39US-51 | Reconstruction - Pavement Pavement Replacement Lincoln Memorial Bridge 0.7 Mi S of US 6 to 1 Mi N of US 6 | $14,000,000 | Planned | ||
| — | 3-03950-0200 3039500200 | District 3 | I-39US-51 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-1st) US 52 to 0.3 Mi S of Lee Co Line | $37,000,000 | Planned | ||
| — | 3-03950-0210 3039500210 | District 3 | I-39US-51 | Maintenance - Pavements Patching Intchg Ramp Entry Points | $500,000 | Planned | ||
| — | 3-03950-0240 3039500240 | District 3 | I-39US-51 | Miscellaneous Improvement Shoulder Reconstruction Various Locations in LaSalle Co | $3,500,000 | Planned | ||
| — | 3-04538-0030 3045380030 | District 3 | US-45 | Rehabilitation - Pavement Designed Overlay US 24 to ILL 54 | $8,500,000 | Planned | ||
| — | 3-04538-0035 3045380035 | District 3 | US-45 | Rehabilitation - Pavement Utility Adjustment US 24 to ILL 54 | $100,000 | Planned | ||
| — | 3-04538-0130 3045380130 | District 3 | Old Route 45 | Rehabilitation - Pavement Designed Overlay, ADA Improvements CH 4 in Clifton to ILL 116 in Ashkum | $1,700,000 | Planned | ||
| — | 3-04747-0010 3047470010 | District 3 | IL-47 | Initial Construction - Pa Additional Lanes ILL 71 to Caton Farm Rd | $20,000,000 | Planned | ||
| — | 3-04747-0030 3047470030 | District 3 | IL-47 | Reconstruction - Pavement Culvert Replacement ILL 71 to Caton Farm Rd | $18,000,000 | Planned | ||
| — | 3-04747-0040 3047470040 | District 3 | IL-47 | Maintenance - Pavements Patching At US 34 in Yorkville | $500,000 | Planned | ||
| — | 3-04938-0010 3049380010 | District 3 | IL-49 | Rehabilitation - Pavement Standard Overlay US 24 in Crescent City to Vermilion Co Line | $4,180,000 | Planned | ||
| — | 3-05046-0070 3050460070 | District 3 | IL-50IL-50 A | Reconstruction - Pavement Pavement Replacement S of Brookmont Blvd to N of US 45/52 & Indiana Ave to Fair St in Kankakee | $17,000,000 | Planned | ||
| — | 3-05046-0075 3050460075 | District 3 | IL-50IL-50 A | Reconstruction - Pavement Utility Adjustment S of Brookmont Blvd to N of US 45/52 & Indiana Ave to Fair St in Kankakee | $500,000 | Planned | ||
| — | 3-05247-0010 3052470010 | District 3 | US-52 | Rehabilitation - Pavement Designed Overlay ILL 47 to Will Co Line | $6,000,000 | Planned | ||
| — | 3-05332-0000 3053320000 | District 3 | IL-53 | Rehabilitation - Pavement Designed Overlay 0.3 Mi W of I-55 in Gardner to Will Co Line | $4,500,000 | Planned | ||
| — | 3-05427-0000 3054270000 | District 3 | IL-54 | Rehabilitation - Pavement Designed Overlay ILL 9/47 IN GIBSON CITY TO CHAMPAIGN CO LINE | $3,600,000 | Planned | ||
| — | 3-05553-0170 3055530170 | District 3 | I-55 | Preservation - Pavements Smart Overlay McLean Co Line to 1.7 Mi S of ILL 116 | $11,317,000 | Planned | ||
| — | 3-05553-0210 3055530210 | District 3 | I-55 | Preservation - Pavements Smart Overlay 1.7 Mi S of ILL 116 to 0.8 Mi N of Wolf Creek | $17,000,000 | Planned | ||
| — | 3-05727-0050 3057270050 | District 3 | I-57 | Preservation - Pavements Smart Overlay Champaign Co Line to Iroquois Co Line | $10,926,000 | Planned | ||
| — | 3-05738-0110 3057380110 | District 3 | I-57 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-2nd) 0.5 Mi N of Clifton to 0.5 Mi N of Iroquois Co Line | $18,000,000 | Planned | ||
| — | 3-05738-0210 3057380210 | District 3 | I-57 | Preservation - Pavements Smart Overlay 2.4 Mi N of US 24 to 0.5 Mi N of ILL 116 | $15,140,000 | Planned | ||
| — | 3-05746-0020 3057460020 | District 3 | I-57 | Reconstruction - Bridges Bridge Replacement At ILL 17 Intchg in Kankakee | $20,000,000 | Planned | ||
| — | 3-05746-0030 3057460030 | District 3 | I-57 | Reconstruction - Pavement Interchange Reconstruction, Reconstruction, Retaining Wall 0.2 Mi S of Waldron Rd to 0.5 Mi N of ILL 17 in Kankakee | $40,000,000 | Planned | ||
| — | 3-05746-0036 3057460036 | District 3 | I-57 | Reconstruction - Pavement Utility Adjustment 0.2 Mi S of Waldron Rd to 0.5 Mi N of ILL 17 in Kankakee | $2,000,000 | Planned | ||
| — | 3-05746-0120 3057460120 | District 3 | I-57 | Reconstruction - Bridges RR Separation Replacement KB&S RR (Overhead) 0.5 Mi S of ILL 17 in Kankakee | $14,000,000 | Planned | ||
| — | 3-05746-0150 3057460150 | District 3 | I-57 | Reconstruction - Pavement Reconstruction 0.3 Mi N of Grinnell Rd to 0.1 Mi S of Armour Rd | $20,000,000 | Planned | ||
| — | 3-05746-0160 3057460160 | District 3 | I-57 | Reconstruction - Pavement Reconstruction Minnie Creek to Kankakee River Bridge in Kankakee | $50,000,000 | Planned | ||
| — | 3-06043-0000 3060430000 | District 3 | (northbound)I-180 | Reconstruction - Bridges Bridge Replacement Brush Creek 1.1 Mi N of ILL 26 | $4,500,000 | Planned | ||
| — | 3-06044-0000 3060440000 | District 3 | (southbound)I-180 | Reconstruction - Bridges Bridge Replacement Brush Creek 1.1 Mi N of ILL 26 | $4,600,000 | Planned | ||
| — | 3-06045-0000 3060450000 | District 3 | (southbound)I-180 | Reconstruction - Bridges Bridge Replacement Over ILL 26 2 Mi NW of Bureau Junction | $5,000,000 | Planned | ||
| — | 3-06046-0000 3060460000 | District 3 | (northbound)I-180 | Reconstruction - Bridges Bridge Replacement Over ILL 26 2 Mi NW of Bureau Junction | $5,000,000 | Planned | ||
| — | 3-06049-0000 3060490000 | District 3 | (southbound)I-180 | Reconstruction - Bridges Bridge Replacement IAIS RR & I&M Canal 0.7 Mi S of ILL 26 | $15,000,000 | Planned | ||
| — | 3-06050-0000 3060500000 | District 3 | (northbound)I-180 | Reconstruction - Bridges Bridge Replacement IAIS RR & I&M Canal 0.7 Mi S of ILL 26 | $15,000,000 | Planned | ||
| — | 3-06059-0000 3060590000 | District 3 | I-180 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay ILL 26 & Bureau Creek 0.9 Mi E of ILL 29 | $2,000,000 | Planned | ||
| — | 3-06060-0000 3060600000 | District 3 | I-180IL-26 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay ILL 26 & Bureau Creek 0.9 Mi E of ILL 29 | $2,000,000 | Planned | ||
| — | 3-06132-0000 3061320000 | District 3 | I-80 | Reconstruction - Bridges Bridge Replacement At CH 19 (Overhead) 3 Mi E of I-180 | $4,100,000 | Planned | ||
| — | 3-06134-0010 3061340010 | District 3 | Old Dad Joe TrailRed Covered Bridge | Maintenance - Bridges Bridge Repair Bureau Creek 0.5 Mi W of ILL 26 | $1,000,000 | Planned | ||
| — | 3-06151-0000 3061510000 | District 3 | (eastbound)I-80 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Bureau Creek 2 Mi W of ILL 26 | $1,700,000 | Planned | ||
| — | 3-06152-0000 3061520000 | District 3 | (westbound)I-80 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Bureau Creek 2 Mi W of ILL 26 | $1,700,000 | Planned | ||
| — | 3-06653-0000 3066530000 | District 3 | Old Route 66 | Rehabilitation - Pavement Designed Overlay Prairie St in Odell to Grundy Co Line | $6,700,000 | Planned |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.