| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 8, 2019 | 60R75 | CookDistrict 1 | Bridge deck scarification and latex concrete overlay, reconstruction of transverse bridge joints, and substructure repairs on US 30 over Thorn Creek. | — | Executed | MYS, Incorporated $380,278 · | ||
| Mar 8, 2019 | 60T49 | CookDistrict 1 | Resurfacing and pedestrian ramp improvements on US 14 (Northwest Highway) through the Village of Arlington Heights, Village of Mount Prospect and the city of Des Plaines | — | Executed | Arrow Road Construction Co. $4,073,824 · | ||
| Mar 8, 2019 | 60W87 | CookDistrict 1 | Surface preparation and painting of structrual steel, containment and disposal of lead waste and maintenance of traffic at 5 bridge structures located on IL 171 and on I-55 in Villages of McCook and Summit. | — | Executed | Eagle Painting & Maintenance Company, Inc. $2,284,150 · | ||
| Mar 8, 2019 | 61F40 | WillDistrict 1 | Construct an extension of Kings Road from Rodeo Drive to Hassert Boulevard in Bollingbrook. | — | Executed | K-Five Construction Corporation & Herlihy Mid-Continent Company $7,485,866 · | ||
| Mar 8, 2019 | 61F41 | CookDistrict 1 | Roadway reconstruction on Irving Park Road from east of IL 59 to Bartlett Road in Streamwood. | — | Executed | Plote Construction, Inc. $6,796,581 · | ||
| Mar 8, 2019 | 61F44 | WillDistrict 1 | Replace the bridge carrying TR 68 over Lily Creek, 0.1 mil north of Caton Farm Road in Plainfield Township. | — | Executed | D. Construction, Inc. $945,717 · | ||
| Mar 8, 2019 | 61F45 | KaneDistrict 1 | Replace the bridge carrying Silver Glen Road over Otter Creek. | — | Executed | D. Construction, Inc. $2,118,804 · | ||
| Mar 8, 2019 | 61F47 | LakeDistrict 1 | Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield. | — | Executed | A Lamp Concrete Contractors, Inc. $1,668,129 · | ||
| Mar 8, 2019 | 61F48 | CookDistrict 1 | Sidewalk construction adjacent to 79th Street from Garden Lane to Oak Grove Avenue in the Village of Justice. | — | Executed | A Lamp Concrete Contractors, Inc. $113,944 · | ||
| Mar 8, 2019 | 61F49 | CookDistrict 1 | Reconstruction of Northfield Road from Winnetka Road to Willow Road in the Village of Northfield. | — | Executed | A Lamp Concrete Contractors, Inc. $1,588,343 · | ||
| Mar 8, 2019 | 61F54 | CookDistrict 1 | Resurfacing Schick Road from Petersdorf Road to Fairfax Lane, and resurfacing Petersdorf Road from Schick Road to Army Trial Road in the Village of Bartlett. | — | Executed | Plote Construction, Inc. $1,214,960 · | ||
| Mar 8, 2019 | 61F57 | KaneDistrict 1 | construction of a dedicated entrance ramp from northbound Randall Road to eastbound US 20, removal of the Weld Road connection to Randall Road, creation of a cul-de-sac on Weld Road and the reconfiguration of Randall Road, in the City of Elgin. | — | Executed | Curran Contracting Company $6,244,244 · | ||
| Mar 8, 2019 | 61F59 | KaneDistrict 1 | Trffic signal interconnect along Indian Trail between Aurora Avenue and Pennsbury Lane in Aurora. | — | Executed | H & H Electric Co. $826,220 · | ||
| Mar 8, 2019 | 61F60 | CookDistrict 1 | Construction of a multi-use path along Brainard Avenue from Joliet Road to 55th Street in the City of Countryside. | — | Executed | K-Five Construction Corporation $964,375 · | ||
| Mar 8, 2019 | 61F61 | WillDistrict 1 | Resurfacing Burville Road from stte Street to IL 394 in the Village of Crete. | — | Executed | Iroquois Paving Corporation $395,403 · | ||
| Mar 8, 2019 | 61F62 | DuPageDistrict 1 | Roadway reconstruction on Washington Street from Town Road to Arbor Avenue in the city of West Chicago. | — | Executed | Schroeder Asphalt Services, Inc. $1,120,972 · | ||
| Mar 8, 2019 | 62C14 | KaneDistrict 1 | Bridge deck replacement with widened roadway, new expansion joints, and approach slab replacement on IL 38 over UPRR. | — | Executed | Herlihy Mid-Continent Company $2,789,910 · | ||
| Mar 8, 2019 | 62D38 | LakeDistrict 1 | Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599) | — | Executed | Martam Construction Incorporated $377,924 · | ||
| Mar 8, 2019 | 62F35 | McHenryDistrict 1 | Bridge joint repairs and deck overlay on SN 056-0007 carrying US 14/IL 173 (Division Street) over UPRR in the City of Harvard. | — | Executed | Sjostrom & Sons, Inc. $1,257,790 · | ||
| Mar 8, 2019 | 62F37 | CookDistrict 1 | Repairs on Bridge SN 016-0225 carrying US 34 (Ogden Avenue) over IHB Railroad in the Village of LaGrange. | — | Executed | D. Construction, Inc. $513,202 · | ||
| Mar 8, 2019 | 62F49 | CookWillDistrict 1 | 6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6. | — | Executed | D. Construction, Inc. $5,880,439 · | ||
| Mar 8, 2019 | 62F54 | DuPageDistrict 1 | 2.5 miles of resurfacing and ADA sidewalk improvements on IL 64 (North Avenue) from Villa Avenue to the Cook County line in the Village of Villa Park and the City of Elmhurst. | — | Executed | R. W. Dunteman Company $2,773,288 · | ||
| Mar 8, 2019 | 62F66 | CookDistrict 1 | 1.91 miles of HMA resurfcing, pavement patching, removal and replacement of curb and gutter, sidewalk removal and replacement and placement of thermoplastic markings along Avondale Avenue from Ogallah Avenue to Bryn Mawr Avenue in Chicago. | — | Executed | Arrow Road Construction Co. $1,771,483 · | ||
| Mar 8, 2019 | 62G21 | CookDistrict 1 | Resurfacing and pedestrian ramp improvements on US 12/20/41 (Indianapolis Ave) from S. Ewing Ave. to 106th Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $1,035,977 · | ||
| Mar 8, 2019 | 62G47 | CookDistrict 1 | 7.33 miles of resurfacing and pedestrian ramp projects on IL 171 (First Ave.) from 43rd Street to Des Plaines River Road. | — | Executed | R. W. Dunteman Company $7,076,939 · | ||
| Mar 8, 2019 | 62G48 | McHenryDistrict 1 | Removal and replacement of culvert SN 056-0227 on IL 31 in the City of McHenry. | — | Executed | Alliance Contractors, Inc. $1,033,397 · | ||
| Mar 8, 2019 | 62G50 | CookDistrict 1 | Deck overlay, joint repair and structural steel repair on SN 016-0344 carrying US 45 over the Cal Sag Channel in Palos Township. | — | Executed | MYS, Incorporated $474,229 · | ||
| Mar 8, 2019 | 62G58 | LakeDistrict 1 | 2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan. | — | Executed | J. A. Johnson Paving Company $2,327,169 · | ||
| Mar 8, 2019 | 62G62 | DuPageDistrict 1 | 6 miles of resurfacing on US 34 (Ogden Avenue) from Ivanhoe Ave to east of IL 83 (Kingery Highway in the Villages of Lisle, Downers Grove, Westmont and Clarendon Hills. | — | Executed | R. W. Dunteman Company $7,098,580 · | ||
| Mar 8, 2019 | 62G64 | DuPageDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp improvements on US 20 (W. Lake Street) from west of Summerfield Drive to west of I-355 (Veterans Memorial Tollway) in the Villages of Addison and Bloomingdale. | — | Executed | K-Five Construction Corporation $3,428,345 · | ||
| Mar 8, 2019 | 62G67 | CookDistrict 1 | Resurfacing and ADA pedestrian ramp improvements on vincennes Avenue from 119th Street to 127th Street in Blue Island. | — | Executed | K-Five Construction Corporation $827,549 · | ||
| Mar 8, 2019 | 62G80 | CookDistrict 1 | 3P resurfacing and median rehabilitation with pedestrian ramps along 127th Street/Burr Oak Ave from east of I-294 to Atesian Avenue in Blue Island. | — | Executed | Gallagher Asphalt Corporation $3,053,618 · | ||
| Mar 8, 2019 | 62G90 | LakeDistrict 1 | Sheet pile retaining wall and parking improvement at Illinois Beach State Park | — | Executed | Alliance Contractors, Inc. $953,418 · | ||
| Mar 8, 2019 | 62G98 | WillDistrict 1 | Removal and replacement of bridge decks of SN 099-0286, 099-0005 and 099-0304 c carrying I-55 over BNSF Railroad and Grant Creek in Wilminton and Channahon Townships. | — | Executed | D. Construction, Inc. $7,870,946 · | ||
| Mar 8, 2019 | 62H01 | DuPageDistrict 1 | Bridge deck overlay, joint repair, structural repair of concrete, drainage structure adjustment and concrete repair of beam ends for the structures carrying IL 83 of US 34 and the BNSF Railroad in the Villages of Hinsdale, Clarendon Hills and Westmont. | — | Executed | Herlihy Mid-Continent Company $2,269,678 · | ||
| Mar 8, 2019 | 62H04 | DuPageDistrict 1 | Bridge deck scarification, latex overlay, joint repairs, structural concrete and steel repairs on IL 38 (Roosevelt Road) over Salt Creek, also Bridge deck scarification, latex overlay, and joint repairs on IL 38 Frontage Road over Salt Creek. | — | Executed | Martam Construction Incorporated $1,330,256 · | ||
| Mar 8, 2019 | 62H07 | CookDistrict 1 | 0.5 miles of HMA resurfacing, pavement patching, milled shoulder rumble strips and pavement marking on IL 19 from Taft Avenue to Seymour Avenue in Chicago. | — | Executed | Plote Construction, Inc. $673,920 · | ||
| Mar 8, 2019 | 62H14 | VariousDistrict 1 | Vegetation management on various expressway and primary routes along Historic US Route 66 | — | Executed | Endrizzi Contracting, Inc $422,930 · | ||
| Mar 8, 2019 | 62H17 | CookDistrict 1 | Structural repairs of concrete on the structure carrying Joliet Road over the BandOCT RR in the Village of McCook | — | Executed | D. Construction, Inc. $262,345 · | ||
| Mar 8, 2019 | 62H19 | CookDistrict 1 | Bridge joint replacement and bridge deck sealing on SN 016-0273 carrying Torrence Avenue over I-80/I-94 in the Village of Lansing | — | Executed | D. Construction, Inc. $272,594 · | ||
| Mar 8, 2019 | 62H24 | DuPageDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp work on IL 56 (Butterfield Road) from the Kane County line to the CNRR overpass in Aurora. | — | Executed | Geneva Construction Company $1,241,694 · | ||
| Mar 8, 2019 | 62H27 | CookDistrict 1 | Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement, and longitudinal joints between existing pavement and Curb and gutter and restriping with hot spray thermoplastic pavement marking. | — | Executed | Denler, Inc. $252,444 · | ||
| Mar 8, 2019 | 62H30 | DuPageDistrict 1 | Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement; longitudinal joints between the existing HMA pavement and curb and gutter; and restriping with hot spray thermoplastic pavement marking. | — | Executed | Freehill Asphalt, Inc. $285,968 · | ||
| Mar 8, 2019 | 62H32 | KaneDistrict 1 | 7.55 miles of Resurfacing (SMART) and pedestrian ramp project on IL 64 from IL 47 to Randall Road. | — | Executed | Curran Contracting Company $2,608,470 · | ||
| Mar 8, 2019 | 62H35 | WillDistrict 1 | Repairs on SN 099-0056 carrying I-80 over the Des Plaines River in Joliet. | — | Executed | Lakes & Rivers Contracting, Inc. $847,500 · | ||
| Mar 8, 2019 | 62H39 | LakeDistrict 1 | Demolition of a single-family home in Mundelein and an auto repair building in Grayslake. | — | Executed | Lima Contractors $158,946 · | ||
| Mar 8, 2019 | 62H41 | CookDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp upgrades on IL 171 (Archer Ave.) from west of Ashland Avenue to State Street in the City of Chicago. | — | Executed | MAT Construction Leasing, Inc. $1,424,366 · | ||
| Mar 8, 2019 | 62H43 | CookDistrict 1 | 2.3 miles of resurfacing and pedestrian ramp improvements on US 14 from Western Avenue to Vernon Avenue through the cities of Des Plaines and Park Ridge. | — | Executed | Arrow Road Construction Co. $2,276,865 · | ||
| Mar 8, 2019 | 62H55 | WillDistrict 1 | 9.62 miles of Shoulder rumble strip installation on I-80 at various locations between the Will County line and US 30. | — | Executed | D. Construction, Inc. $277,857 · | ||
| Mar 8, 2019 | 62H68 | WillDistrict 1 | Bridge structural steel repair and bearing replacement of the bridges carrying I-80 over Des Plaines River in Joliet | — | Executed | ICC Group Inc. $4,978,000 · | ||
| Apr 26, 2019 | 60N21 | CookDistrict 1 | Replacement of bridge superstructure and substructure repairs on SN 016-2417 carrying Glenwood Road over Thorn Creek in Chicago Heights. | — | Executed | D. Construction, Inc. $2,337,418 · | ||
| Apr 26, 2019 | 60R42 | CookDistrict 1 | 3P resurfacing on US 45 from IL 83 to West Creek Road in Palos Park. | — | Executed | D. Construction, Inc. $1,719,110 · | ||
| Apr 26, 2019 | 60R52 | WillDistrict 1 | Approximately 3 miles of roadway reconstruction, resurfacing, replacement of bridge structures carrying US 6 over Marley Creek, drainage improvement, pavement markings, and aesthetic landscaping from Cedar Rd to Will-Cook Rd in Homer Glen. | — | Executed | D. Construction, Inc. $14,392,722 · | ||
| Apr 26, 2019 | 60R74 | WillDistrict 1 | Bridge deck overlay and bridge joint repair of the bridge carrying IL 50 over rock creek in unincorporated Wilton Township. | — | Executed | Iroquois Paving Corporation $658,368 · | ||
| Apr 26, 2019 | 60T21 | KaneDistrict 1 | Reconstruction of IL 47 at Main Street intersection including raising the profile, removal and replacement of 2 structures (IL 47 over Blackberry Creek and Main St over Blackberry Creek), and traffic signal installation. | — | Executed | D. Construction, Inc. $9,758,131 · | ||
| Apr 26, 2019 | 60V17 | DuPageDistrict 1 | 2.42 miles of resurfacing on IL 56 from I-355 to 22nd Street in Lombard, Oak Brook and Downers Grove. | — | Executed | K-Five Construction Corporation $4,278,640 · | ||
| Apr 26, 2019 | 60V94 | CookDistrict 1 | 0.26 mile resurfacing on California Avenue from Cermak Road to 19th Street in the City of Chicago. | — | Executed | Gallagher Asphalt Corporation $230,632 · | ||
| Apr 26, 2019 | 61D48 | WillDistrict 1 | Construction of a multi-use path and sidewalk replacement algon the west parkway of Farrell Road from Division Street to south of 7th Street in the City of Lockport. | — | Executed | P. T. Ferro Construction Co. $334,680 · | ||
| Apr 26, 2019 | 61D85 | CookDistrict 1 | Pavement widening, resurfacing, curb and gutter, sidewalk, traffic signal modernization and street lighting at the intersection of Pulaski Road and 183rd Street in Country Club Hills. | — | Executed | D. Construction, Inc. $4,586,119 · | ||
| Apr 26, 2019 | 61E24 | LakeDistrict 1 | Pavement reconstruction, sidewalks, HMA pedestrian path, box culvert, water main relacation, traffic signal and street lighting on Weiland Road from Deerfield Parkway to Lake Cook Road. | — | Executed | Lake County Grading Company, LLC $12,090,770 · | ||
| Apr 26, 2019 | 61E94 | CookDistrict 1 | Sidewalk improvements at various locations within the the Village of Barrington | — | Executed | Copenhaver Construction, Inc. $303,835 · | ||
| Apr 26, 2019 | 61E96 | DuPageDistrict 1 | Construction of an HMA pedestrian path, sidewalks, storm sewer and the extension of Church Road from Grove Avenue to IL 19 in Bensenville. | — | Rejected | Martam Construction Incorporated $697,572 · | ||
| Apr 26, 2019 | 61F01 | CookDistrict 1 | Resurfacing with sidewalk, curb and gutter work on Riverside Drive from Harlem Avenue to Cermak Road in the City of Berwyn. | — | Executed | K-Five Construction Corporation $1,813,626 · | ||
| Apr 26, 2019 | 61F09 | CookDistrict 1 | Pavement removal, storm sewers, HMA pavement, curb and gutter, sidewalks, traffic signals, street lighting and pavement markings on Woodfiled Road, from Martingale Road to the East Frontage Road in Schaumburg. | — | Executed | R. W. Dunteman Company $8,043,997 · | ||
| Apr 26, 2019 | 61F10 | CookDistrict 1 | Pavement removal, storm sewers, HMA pavement, curb and gutter, sidewalks, traffic signals, street lighting and pavement markings on Woodfiled Road, from Meacham Road to Martingale Road in Schaumburg. | — | Executed | R. W. Dunteman Company $6,586,314 · | ||
| Apr 26, 2019 | 61F26 | DuPageDistrict 1 | Resurfacing Spring Road from Vallette Street to St. Charles Road in the City of Elmhurst. | — | Executed | A Lamp Concrete Contractors, Inc. $569,103 · | ||
| Apr 26, 2019 | 61F29 | DuPageDistrict 1 | Sidewalk construction on County Line Road from 60th Street to Longwood Drive in the Village of Burr Ridge. | — | Executed | Davis Concrete Construction Co. $667,394 · | ||
| Apr 26, 2019 | 61F39 | CookDistrict 1 | Roadway Reconstruction on Braga Drive from 25th Avenue to West 16th Street and on West 16th Street from Braga Drive to 21st Avenue in the Village of Broadview. | — | Executed | J. Nardulli Concrete, Inc. $1,657,606 · | ||
| Apr 26, 2019 | 61F46 | CookDistrict 1 | Resurfacing Roy Avenue from North Avenue to Winters Drive in the City of Northlake. | — | Executed | Plote Construction, Inc. $1,225,697 · | ||
| Apr 26, 2019 | 61F50 | DuPageDistrict 1 | Resurfacing Blanchard Street from south of Tara Court to President Street and President Street from Blanchard Street to IL 38 in the City of Wheaton. | — | Executed | K-Five Construction Corporation $922,751 · | ||
| Apr 26, 2019 | 61F51 | DuPageDistrict 1 | Roadway reconstruction on Arlington Heights Road from Pierce Road to Thorndale Road in the village of Itasca. | — | Executed | A Lamp Concrete Contractors, Inc. $808,321 · | ||
| Apr 26, 2019 | 61F52 | DuPageDistrict 1 | Channelization improvements on Diehl Road from Davis Parkway to Winfield Road in the City of Warrenville. | — | Executed | Alliance Contractors, Inc. $383,892 · | ||
| Apr 26, 2019 | 61F53 | CookDistrict 1 | Resurfacing Illinois Street from Orchard Drive to Western Avenue in the Village of Park Forest. | — | Executed | Iroquois Paving Corporation $1,016,064 · | ||
| Apr 26, 2019 | 61F55 | DuPageDistrict 1 | Resurfacing, curb and gutter, sidewalks, Street lighting and pavement markings on Forest Avenue from Joliet Street to IL 59 in West Chicago. | — | Executed | J. A. Johnson Paving Company $581,927 · | ||
| Apr 26, 2019 | 61F56 | DuPageDistrict 1 | Resurfacing Harrison Avenue from Gary Avenue to College Avenue in the City of Wheaton. | — | Executed | J. A. Johnson Paving Company $984,239 · | ||
| Apr 26, 2019 | 61F64 | WillDistrict 1 | Reconstruct the intersection of Rodeo Drive at Kings Road in Bolingbrook. | — | Executed | K-Five Construction Corporation $2,914,616 · | ||
| Apr 26, 2019 | 61F65 | LakeDistrict 1 | Reconstruction of Orchard Lane from Monaville Road to Rollins Road, and resurfacing of Hook Lane from Orchard Lane to Rollins Road in the Village of Round Lake Beach. | — | Executed | Campanella and Sons, Inc. $5,231,811 · | ||
| Apr 26, 2019 | 61F66 | DuPageDistrict 1 | Intersection and traffic signal improvements at 75th Street and Naper Boulevard in the City of Naperville. | — | Executed | Home Towne Electric, Inc. $859,094 · | ||
| Apr 26, 2019 | 61F67 | WillDistrict 1 | Resurfacing University Parkway from Steger-Monee Road to Western Avenue in the Village of University Park. | — | Executed | D. Construction, Inc. $583,358 · | ||
| Apr 26, 2019 | 61F68 | WillDistrict 1 | Intersection improvement on US 52 at Gougar Road in the Village of Manhattan. | — | Executed | P. T. Ferro Construction Co. $874,335 · | ||
| Apr 26, 2019 | 61F69 | LakeDistrict 1 | Resurfacing Grand Avenue from Nippersink Boulevard to Illinois Route 59 in the Village of Fox Lake. | — | Executed | Peter Baker & Son Co. $1,287,252 · | ||
| Apr 26, 2019 | 61F70 | DuPageDistrict 1 | Resurface Collins Avenue from Swift Road to Rohwling Road, and resurface Fullerton Avenue from Rohwling Road to Addison Road in the village of Addison. | — | Executed | R. W. Dunteman Company $3,325,608 · | ||
| Apr 26, 2019 | 61F71 | DuPageDistrict 1 | Pavement reconstruction, resurfacing, add curb islands, storm sewer, water main adjustments, sidewalks and pavement markings at various locations in Bensenville. | — | Executed | R. W. Dunteman Company $2,799,980 · | ||
| Apr 26, 2019 | 61F72 | DuPageDistrict 1 | Resurfacing Janes Avenue from 75th Street to Center Drive in the Village of Woodridge. | — | Executed | K-Five Construction Corporation $529,749 · | ||
| Apr 26, 2019 | 61F73 | DuPageDistrict 1 | Rehabilitate the bridge carrying St. Charles Road over Salt Creek, 0.2 mile west of IL 83 in Villa Park. | — | Executed | Rausch Infrastructure, LLC $1,988,969 · | ||
| Apr 26, 2019 | 61F75 | LakeDistrict 1 | Roadway reconstruction on Rockland Road from IL 21 to the Des Plaines River in Libertyville. | — | Executed | Copenhaver Construction, Inc. $6,139,354 · | ||
| Apr 26, 2019 | 61F77 | CookDistrict 1 | Resurfacing Burr Ridge Parkway from County Line Road to Bridewall Drive in the Village of Burr Ridge. | — | Executed | Lindahl Brothers, Inc. $597,901 · | ||
| Apr 26, 2019 | 62C01 | LakeDistrict 1 | 1.433 miles of 3P resurfacing and milled rumble strips on US 41 from IL 120 to Dorchester Avenue in Parck City and Gurnee. | — | Executed | Peter Baker & Son Co. $3,628,516 · | ||
| Apr 26, 2019 | 62G23 | DuPageDistrict 1 | 2.29 miles of resurfacing consisting of HMA surface removal, pavement patching, HMA resurfacing, ADA sidewalk repair, and thermoplastic pavement marking on IL 53 from I-88 to 59th St in Lisle. | — | Executed | K-Five Construction Corporation $2,942,254 · | ||
| Apr 26, 2019 | 62G42 | CookDistrict 1 | 0.46 mile 3P resurfacing, pedestrian ramps, storm sewer repair, and drainage on Lawrence Ave from 471 ft east of Manheim Centerline to Rose St through Schiller Park, and east of Canfield Ave in Norridge. | — | Rejected | R. W. Dunteman Company $1,919,386 · | ||
| Apr 26, 2019 | 62G51 | DuPageDistrict 1 | Bridge deck and approach overlay and repairs, reconstrution of deck joint, and repair of substructure for 022-0034 carrying US 34 over St. Josepth Creek in Lisle. | — | Executed | ERA-Valdivia Contractors, Inc. $486,455 · | ||
| Apr 26, 2019 | 62G96 | LakeDistrict 1 | 0.947 mile of 3P resurfacing and overlaying including pedestrian curb improvements on US 41 from Lake-Cook Road to south of Chantilly Boulevard in Highland Park. | — | Executed | Plote Construction, Inc. $2,694,455 · | ||
| Apr 26, 2019 | 62G97 | WillDistrict 1 | Jack column retrofitting, repairing bascule girders, modification of center and tail lock, repairing steel grid deck and railings, and painting of Brandon Rd over the Des Plaines River in Joliet. | — | Executed | D. Construction, Inc. $3,391,575 · | ||
| Apr 26, 2019 | 62H12 | CookDistrict 1 | Resurfacing and pedestrian ramps on IL 58 from the intersection of IL 58 and Meijer Dr Easterly for 4.58 miles to the west leg of the intersection with Broadway St. | — | Executed | Arrow Road Construction Co. $5,713,416 · | ||
| Apr 26, 2019 | 62H13 | KendallWillDistrict 1 | Clean and paint SN 099-0083 carrying US 52 over Hickory Creek in Joliet, and SN 047-0006 carrying IL 31 over BNSF RR in Oswego. | — | Executed | Eagle Painting & Maintenance Company, Inc. $279,700 · | ||
| Apr 26, 2019 | 62H22 | CookDistrict 1 | 6.00 miles of resurfacing, milled rumble strips, and pedestrian ramp improvements on US 6 from 94th Ave to west of Pulaski Rd/Crawford Ave in Oak Forest. | — | Executed | D. Construction, Inc. $5,035,013 · | ||
| Apr 26, 2019 | 62H23 | CookDistrict 1 | Bridge repairs, structural steel repair, and deck slab repairs for the bridge carrying IL 43 over Cal Sag Channel in Palos Township. | — | Executed | Rausch Infrastructure, LLC $996,583 · | ||
| Apr 26, 2019 | 62H28 | LakeDistrict 1 | Routing, cleaning and sealing longitudinal cracks on IL 137 from IL 83 to O'Plaine Road in Libertyville and Green Oaks. | — | Executed | SKC Construction, Inc. $254,148 · | ||
| Apr 26, 2019 | 62H29 | CookLakeDistrict 1 | A total of 10.2 miles of routing, cleaning, and sealing of longitudinal cracks at 3 locations on IL 21/US 45 in Niles, Glenview, Vernon Hills, Libertyville and Gurnee. | — | Executed | Denler, Inc. $525,544 · | ||
| Apr 26, 2019 | 62H36 | LakeDistrict 1 | 1.9 miles of resurfacing, pedestrian ramp improvements and culvert repairs on US 41 from West Park Avenue to Chantilly Boulevard in the City of Highland Park. | — | Executed | Peter Baker & Son Co. and Plote Construction, Inc JV $5,321,788 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.