IDOT Jobs

All dates · 402 jobs · — Sign up free
★ My Jobs

Filtered by: County: Will Clear all

402 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 6, 2020 78766 WilliamsonDistrict 9 Patching at 2 locations: 1) IL 13 east of Greenbriar Road; 2) IL 13 west of IL 148. — Executed Nov 26 New Samron Midwest Contracting, Inc. $39,862 ·
Apr 24, 2020 60V40 WillDistrict 1 Intersection channelization and new traffic signal on US-6. (Maple Rd.) at Gougar Rd. Proposed intersection lighting. — Executed Nov 26 New Austin Tyler Construction, Inc. $2,663,060 ·
Apr 24, 2020 62G85 WillDistrict 1 Removal and replacement of the culvert, constructing a new culvert under a driveway, filling existing culvert under roadway, guardrail removal and replacement. (SN 099-0450,SN 099-0441) — Executed Nov 26 New Iroquois Paving Corporation $1,087,469 ·
Apr 24, 2020 62H79 WillDistrict 1 Traffic Signal modernization and Traffic Signal Retroreflective Backplate Installation at various locations in the City of Joliet. — Rejected Nov 26 New John Burns Construction Company $2,648,889 ·
Apr 24, 2020 62J43 WillDistrict 1 Designed overlay and ADA improvements on US 52 from Eden Ln to E of Joyce Rd. — Executed Nov 26 New Austin Tyler Construction, Inc. $1,748,994 ·
Apr 24, 2020 62K22 DuPageWillDistrict 1 ADA improvements along various state routes in Dupage and Will Counties. — Executed Nov 26 New Davis Concrete Construction Co. $558,989 ·
Apr 24, 2020 62K34 WillDistrict 1 Bridge deck repairs including full and partial depth bridge deck patching, and the removal of existing asphalt over the patches on I-80 from Center St to Rowel Ave in Joliet. — Executed Nov 26 New D. Construction, Inc. $607,895 ·
Apr 24, 2020 62K50 WillDistrict 1 Bridge deck repairs and shoulder reconstruction on I-55 over IL 53, Joliet Rd, and S Madison St in Bolingbrook and Burr Ridge. — Executed Nov 26 New K-Five Construction Corporation $3,075,389 ·
Apr 24, 2020 62K54 WillDistrict 1 Pavement patching including asphalt surface removal, HMA surface course, pavement patching, and placement of pavement markings on I-55 from S of I-80 to S of Weber Rd. — Executed Nov 26 New Gallagher Asphalt Corporation $4,277,656 ·
Apr 24, 2020 99642 WilliamsonDistrict 9 Resurfacing Crenshaw Road from Skyline Road to Pease Road. — Executed Nov 26 New Samron Midwest Contracting, Inc. $834,637 ·
Jun 12, 2020 62F22 WillDistrict 1 Installation of new shoulders, milled rumble strips, and guardrail on Monee- , Installation of new shoulders, milled rumble strips, and guardrail on Monee- Manhattan Road from Brynn Drive to Center Road. The gross length of the project is 35 ,622 feet (6.75 miles) in the Village of Manhattan and unincorporated Green Garden and Manhattan Townships in Will County. — Executed Nov 26 New Iroquois Paving Corporation $1,692,651 ·
Jun 12, 2020 62J62 WillDistrict 1 (3.69 Mile) Standard overlay, new shoulder and milled rumble strip in Wesley Wesley Township in Will County. — Executed Nov 26 New Iroquois Paving Corporation $2,130,977 ·
Jun 12, 2020 62J91 WillDistrict 1 (1.32 Mile) Standard overlay from Bluff Road to Frontage Road West. in Village of Channahon in Will County. , (1.32 Mile) Standard overlay from Bluff Road to Frontage Road West in — Executed Nov 26 New P. T. Ferro Construction Co. $361,155 ·
Jun 12, 2020 62K55 WillDistrict 1 Light tower and foundation removal. Install new light poles, metal foundations, LED luminaires, conduits, cables, excavation and site restorations at 1-55 at I 113 (Coal City Rd) Interchange. — Executed Nov 26 New H & H Electric Co. $1,034,047 ·
Jun 12, 2020 62K95 WillDistrict 1 (290 FT.) Bridge steel repair project on US 30 WB (Cass St.) at the Des Plaines River in the City of Joliet, in Joliet Township, Will County. — Executed Nov 26 New D. Construction, Inc. $149,592 ·
Jun 12, 2020 78758 PulaskiWilliamsonDistrict 9 Bearing removal and replacement, joint reconstruction, plating beam ends, diaphragm removal and replacement, concrete overlay and deck patching on SN SN 100-0057 over I-57 in Williamson County and bearing removal and replacement on SN 077-0028(31) over I-57 in Pulaski County. — Executed Nov 26 New Samron Midwest Contracting, Inc. $498,769 ·
Jul 31, 2020 61G64 WillDistrict 1 Construction of a multi-use path along the natural gas pipeline right of way, from Taylor Road to Normantown Road in Romeoville — Executed Nov 26 New R. W. Dunteman Company $773,338 ·
Jul 31, 2020 78787 WilliamsonDistrict 9 5.8 miles of resurfacing on I-57 from Herrin Road to Old IL 13 in Marion. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $4,925,290 ·
Sep 18, 2020 62K28 WillDistrict 1 (0.53 Mile) Traffic signal installation, median reconstruction, new sidewalk installation, and ADA and drainage improvement at the intersection of IL 59 and Champion Road. — Executed Nov 26 New Alliance Contractors, Inc. $839,622 ·
Sep 18, 2020 62M72 WillDistrict 1 Traffic Signal Modernization and Traffic Signal Retroreflective Backplate Installation at various locations in the City of Joliet. — Executed Nov 26 New John Burns Construction Company $2,353,333 ·
Sep 18, 2020 78822 WilliamsonDistrict 9 High friction surface treatment on the northbound I-57 entrance Ramp A and Ramp A-R; Ramp A begins at IL 13 and continues to The Hill Avenue overpass; Ramp A-R begins at IL 13 and ends where it merges into Ramp A. — Executed Nov 26 New E. T. Simonds Construction Company $379,353 ·
Nov 6, 2020 60W34 WillDistrict 1 (1.27-miles) Pavement reconstruction along 1-80 EB from Gardner St to Rowell Ave. replacement and widening of the bridges carrying EB Hickory Creek, Rowell Ave and 1-80 EB and WB over Richards St., and lighting in the City of Joliet. — Executed Nov 26 New D. Construction, Inc. and P. T. Ferro Construction Company JV $41,618,429 ·
Nov 6, 2020 61G28 WillDistrict 1 Construction of a multi-use path along the ComEd right-of-way in Romeoville. — Executed Nov 26 New Pan-Oceanic Engineering Co., Inc. $974,364 ·
Nov 6, 2020 61G36 WillDistrict 1 Traffic Signal modernization and construction of a fiber optic communication system on Black Road from US 30 to IL 59 in Joliet. — Executed Nov 26 New H & H Electric Co. $1,061,567 ·
Nov 6, 2020 62L70 WillDistrict 1 (2.87-Mile) Crack and joint sealing improvements on US 30 from Larkin Ave. to US 30 (Center St. SB), located within the Cities of Joliet and Crest Hill. — Rejected Nov 26 New Denler, Inc. $141,906 ·
Nov 6, 2020 62M00 WillDistrict 1 (6.395-Mile) Crack and Joint Sealing of PCC Pavement; Location: FAP 338: IL 59 from DuPage County Line to North of Pheasant Chase Drive in the City of Naperville and Village of Plainfield in Will County. — Rejected Nov 26 New SKC Construction, Inc. $452,962 ·
Nov 6, 2020 62M63 WillDistrict 1 New bridge structure carrying the future north bound traffic IL 59 over 1-55 at the interchange of IL 59 and 1-55 located in the City of Joliet, Village of Shorewood, and Troy Township. SN 21029B — Executed Nov 26 New D. Construction, Inc. $8,700,000 ·
Nov 6, 2020 62M99 WillDistrict 1 Cleaning(sweeping) various arterial highways in District One throughout (South) Will county. — Rejected Nov 26 New Illinois Central Sweeping LLC $388,960 ·
Nov 6, 2020 78768 WilliamsonDistrict 9 Substructure repairs, joint reconstruction, parapet repairs and bridge deck microsilica concrete overlay on SN 100-0039 carrying IL 148 over I-57, 0.6 miles west of IL 37. — Executed Nov 26 New Samron Midwest Contracting, Inc. $748,970 ·
Jan 15, 2021 62L25 WillDistrict 1 (1.988-Mile) SMART overlay on Governor's Hwy. From IL-50 to Cook County Line. Located in the Village of University Park in Will County. — Executed Nov 26 New P. T. Ferro Construction Co. $970,197 ·
Jan 15, 2021 62L37 WillDistrict 1 County-wide ADA improvements of curb ramps for sidewalks on IL 7 from Hamilton Street to Madison Street and on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will County. — Executed Nov 26 New Davis Concrete Construction Co. $378,925 ·
Jan 15, 2021 62L55 WillDistrict 1 (9.65-Mile) SMART Overlay, pedestrian ramps. rumble -strips. Location: IL-102, from 26-ft northwest of Ryan 73 feet east of Kankakee County Line Road in the City of Wilmington, Wilmington and Wesley Townships. — Executed Nov 26 New Iroquois Paving Corporation $2,338,876 ·
Jan 15, 2021 62M06 WillDistrict 1 8.5 miles SMART overlay project consisting of milling and resurfacing, and the installation of shoulder rumble strips on I-55 from north of River Road to north of IandM Canal. — Executed Nov 26 New D. Construction, Inc. $8,161,702 ·
Jan 15, 2021 78817 WilliamsonDistrict 9 Replacing a gabion wing wall on SN 100-5002 at the intersection of Herrin Road and Collins Road near Johnston City. — Executed Nov 26 New K. D. Crain and Sons, Inc. $13,690 ·
Mar 5, 2021 62L05 WillDistrict 1 Smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township (3.32 mile) Improvement on IL-53 from Hoff Rd to Manhattan Rd consists of smart overlay with HMA shoulder rumble strips in the village of Elwood, Jackson Township. — Executed Nov 26 New Austin Tyler Construction, Inc. $1,859,998 ·
Mar 5, 2021 62L36 WillDistrict 1 Retrofitting curb ramps for sidewalks to make compliant with PROWAG ADA improvements project consist of retrofitting curb ramps for sidewalks to make compliant with PROWAG. Location: Along various State routes (see remarks) in Lockport, Plainfield, and New Lenox in Will County. — Executed Nov 26 New M & J Underground Inc. $318,495 ·
Mar 5, 2021 62M02 WillDistrict 1 Pavement patching, HMA surface removal, HMA resurfacing, pedestrian ramp improvements and culvert replacement at 2 locations: 1) IL 1 from west of IL 394 to just south of Burville Road; 2) IL 394 from north of County Line Road to north of IL 1. — Executed Nov 26 New Iroquois Paving Corporation $4,489,310 ·
Mar 5, 2021 62M32 WillDistrict 1 (4.6-Mile) Pavement patching and crack and joint sealing on US 45 from north of Colorado Avenue to Stuenkel Road within the Village of Frankfort. — Executed Nov 26 New P. T. Ferro Construction Co. $427,820 ·
Mar 5, 2021 62N16 WillDistrict 1 Cleaning and painting existing steel on the structures No. 1: carrying 1-55 E. Frontage Road (Thomas Dillon Dr.) over I and M Canal, No. 2: US Route 6 (Jackson St.} over Spring Creek, No. 3: IL-113 over 1-55, in Village of Channahon and Diamond, and in City of Joliet, Wilmington, and Braidwood. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $318,001 ·
Mar 5, 2021 62N21 WillDistrict 1 (9.40-Mile) Pavement patching (intermittent resurfacing) project. Surface patching of longitudinal joints, lanes and shoulders and full depth (Class D) patching. Reinstate pavement markings affected by patching on Interstate 80 (I-80) from Kendall County Line to Des Plaines River in Will County. — Executed Nov 26 New D. Construction, Inc. $597,886 ·
Mar 5, 2021 62N22 WillDistrict 1 Bridge deck overlay and bridge joint repairs on 8 structures on I-55 from south of I-80 to south of Weber Road. Includes intermittent 2- surface for joints and full depth patching. — Executed Nov 26 New D. Construction, Inc. $5,963,776 ·
Mar 5, 2021 99654 WilliamsonDistrict 9 Construct a multi-use path, a three-sided concrete structure and traffic signal improvements. Project begins at the southwest corner of IL 13 and Greenbriar Road to an existing path at John A Logan Community College. — Executed Nov 26 New Samron Midwest Contracting, Inc. $827,594 ·
Mar 5, 2021 99659 WilliamsonDistrict 9 Intersection improvements including replacement of sidewalks, enhancement of crosswalks and warning signs on Monroe Street from North 20th Street to North 16th Street in the City of Herrin. — Executed Nov 26 New Samron Midwest Contracting, Inc. $73,890 ·
Apr 23, 2021 46562 WillDistrict 1 (11.40-Mile) Pavement marking installation project on Interstate 80 (I-80) between IL 43 (Harlem Ave.) and US 30 (Lincoln Hwy located within the Village of New Lenox and Makena in Will County. — Executed Nov 26 New Maintenance Coatings Co. $896,240 ·
Apr 23, 2021 60T30 WillDistrict 1 Intersection Reconstruction (Channelization, Widening, Traffic Signal Modernization, Drainage Improvements); Location: FAU 381: IL Route 129 at Coal City Road, in the City of Braidwood, City of Wilmington, and Unincorporated areas in Will County. — Executed Nov 26 New D. Construction, Inc. $2,643,645 ·
Apr 23, 2021 61G95 WillDistrict 1 Resurfacing, curb and gutter, sidewalk replacement, ornamental lighting, brick paver sidewalk, landscaping and pavement markings on IL 171 from 11th Street to 10th Street and on IL 7 from IL 171 to Hamilton Street in Lockport. — Executed Nov 26 New R. W. Dunteman Company $1,793,189 ·
Apr 23, 2021 61G96 WillDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on West Street from Corning Avenue to Joliet Road in Peotone. — Executed Nov 26 New P. T. Ferro Construction Co. $321,841 ·
Apr 23, 2021 61H00 WillDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement, and pavement markings on Court Street from Elder Lane to Eastgate Avenue in Monee. — Executed Nov 26 New Iroquois Paving Corporation $256,749 ·
Apr 23, 2021 62K80 CookWillDistrict 1 Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements. — Executed Nov 26 New D. Construction, Inc. $2,056,069 ·
Apr 23, 2021 62M15 WillDistrict 1 (1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 112: IL 53 from South of I-55 to Joliet Road, in the Village of Bolingbrook and Romeoville. — Executed Nov 26 New K-Five Construction Corporation $1,563,017 ·
Apr 23, 2021 62M16 WillDistrict 1 (2.78-Mile) Smart Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAP 607: US 52/ 6/ 30 Jefferson St. from Joyce Rd.to Bluff St., within the City of Joliet. — Executed Nov 26 New D. Construction, Inc. $2,573,421 ·
Apr 23, 2021 62M27 WillDistrict 1 Bridge Deck and Approach repairs This improvement consists of Bridge Deck and Approach repairs. Structural repair of Concrete, deck scarification, deck latex concrete overlay, approach HMA overlay, bridge deck grooving in Green Garden Township. — Executed Nov 26 New P. T. Ferro Construction Co. $128,281 ·
Jun 11, 2021 46572 LakeWillDistrict 1 Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $635,000 ·
Jun 11, 2021 61B89 WillDistrict 1 Reconstruct the intersection of Cedar Road at Laraway Road in New Lenox. — Executed Nov 26 New P. T. Ferro Construction Co. $7,905,136 ·
Jun 11, 2021 61G53 WillDistrict 1 Replace the bridge carrying Garnsey Avenue over Spring Creek, south of Columbia St. in the City of Joliet. — Executed Nov 26 New P. T. Ferro Construction Co. $2,324,588 ·
Jun 11, 2021 62H03 WillDistrict 1 Deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconst (1.02-Mile) Improvement consists of deck replacement for 1-55 over IL 53, superstructure replacement for 1-55 over Joliet Road, remove and reconstruct a retaining wall at 1-55 and IL 53 and substructure repair for both the bridges located in the Village of Bolingbrook. — Executed Nov 26 New D. Construction, Inc. $17,762,802 ·
Jun 11, 2021 62L66 WillDistrict 1 This is a 2.93 mile SMART overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA improvements and thermoplastic pavement marking on IL 53 (Bolingbrook Dr.) from DuPage County Line to I-55 within the Village of Bolingbrook. — Executed Nov 26 New K-Five Construction Corporation $2,220,000 ·
Jun 11, 2021 62N08 WillDistrict 1 Bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the b The improvement consists of bridge deck sealing, expansion joint replacement, cleaning existing bearings and deck drains repairs for the bridge located on l-55 over Kankakee River in the City of Wilmington in Will County Gross and net length is 1,067 FT (0.2 Miles). — Executed Nov 26 New D. Construction, Inc. $1,390,024 ·
Jun 11, 2021 78812 FranklinWilliamsonDistrict 9 Retrofitting ADA ramps, relocating and installing pedestrian push buttons and signal heads at the intersection of IL 149 and Jefferson Street in West Frankfort and the intersections of IL 37 and 4th Street, Broadway Boulevard, and 8th Street in Johnston City. — Executed Nov 26 New Samron Midwest Contracting, Inc. $192,459 ·
Jun 11, 2021 78870 JeffersonWilliamsonDistrict 9 PPC I-beam repair and substructure repairs on SN 041-0096 carrying IL 148 over over the Big Muddy River east of Waltonville in Jefferson County and PPC I-beam repair, deck patching and substructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek south of Marion in Williamson County. — Executed Nov 26 New Samron Midwest Contracting, Inc. $396,056 ·
Jun 11, 2021 99667 WilliamsonDistrict 9 Resurface Lake Egypt Road from South Market Road to IL 166. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $890,783 ·
Jul 30, 2021 61G74 WillDistrict 1 Construction of a 10' wide HMA trail that includes pedestrian tunnels, retaining walls, box culverts, storm sewers, sidewalks, curb and gutter, fencing and pavement markings. Project begins at Spring Creek Greenway Trail in Lockport and concludes at the intersection of Cougar Road and 159th Street. — Executed Nov 26 New D. Construction, Inc. $6,860,486 ·
Jul 30, 2021 62G10 KendallWillDistrict 1 (1700-Ft) Traffic Signal Installation, Channelization. Roadway Reconstruction. Location: IL 126 at County Line Road in the Na-Au-Say and Plainfield Townships in Will and Kendall Counties. — Executed Nov 26 New P. T. Ferro Construction Co. $1,259,611 ·
Sep 17, 2021 62K30 WillDistrict 1 (13.6-Mile) Pavement Rehabilitation (designed overlay). Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Southbound, from South of I-80 to just South of Weber Rd in Will County. — Executed Nov 26 New K-Five Construction Corporation and D Construction, Inc. and Gallagher Asphalt Corp JV $23,952,848 ·
Sep 17, 2021 62K51 WillDistrict 1 (13.6-miles) Pavement rehabilitation (designed overlay) project for Northbound direction. Includes milling and resurfacing, Class D patching, pavement markings, drainage, ITS and landscaping improvements. Location: I-55 Northbound, from South of I-80 to just South of Weber Rd in Will County. — Executed Nov 26 New K-Five Construction Corporation and D Construction, Inc. and Gallagher Asphalt Corp JV $23,734,628 ·
Sep 17, 2021 78848 FranklinUnionWilliamsonDistrict 9 Bridge deck repairs on SN 100-0069 carrying IL 148 over Crab Orchard Lake, 2.8 miles south of IL 13; SN 091-0064 carrying IL 127 over Lingle Creek, 0.3 miles north of Mill Creek; SN 091-0067 carrying IL 127 over Mill Creek, 0.5 miles 0.5 miles north of Mill Creek; SN 028-0037 carrying IL 149 over Big Muddy River, 1.6 miles east of Ziegler. — Executed Nov 26 New E. T. Simonds Construction Company $1,177,173 ·
Nov 5, 2021 62F87 CookWillDistrict 1 (1,215 Ft.) Channelization project on Illinois Route 50 (Cicero Avenue) and Steger Road that includes standard overlay, traffic signal installation, and lighting installation. Located in the Villages of University Park and Richton Park. — Executed Nov 26 New P. T. Ferro Construction Co. $1,073,908 ·
Jan 21, 2022 61G73 WillDistrict 1 Pavement reconstruction, HMA and PCC pavement, storm sewer, culverts, curb and gutter, sidewalks, guardrail, traffic signals, lighting and pavement markings on 80th Avenue from Greenway Boulevard to Timber Drive and replacing the bridge carrying 80th Avenue over I-80, in Tinley Park. — Executed Nov 26 New D. Construction, Inc. $45,187,001 ·
Jan 21, 2022 62D49 WillDistrict 1 Bridge replacement of the structure that carries IL lover Deer Creek with a two-cell cast-in-place culvert Scope of work consists of bridge replacement of the structure that carries IL lover Deer Creek with a two-cell cast-in-place culvert. Also included are sheet-pile wingwall installation, concrete curb and gutter. — Executed Nov 26 New D. Construction, Inc. $1,310,528 ·
Jan 21, 2022 62N28 WillDistrict 1 (1,000-Ft) Culvert replacement located on US 52 (Cedar Road) over Ditch N of Forked Creek (2 .9 Ml S of Hoff Roda) in the unincorporated Wilton Township. — Executed Nov 26 New P. T. Ferro Construction Co. $455,194 ·
Jan 21, 2022 62P56 CookWillDistrict 1 Cleaning and painting of steel bridge structures at 5 locations This project consists of cleaning and painting of steel bridge structures at 5 locations. SN-0016-0048 and 0049 structures carrying 1-57 NB and SB over RR, Rich Township, Cook County. SN-099-0005; 0286 and 0304 structures carrying 1-55 NB and SB over RR and creek, in Wilmington Township, Will County. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $444,000 ·
Jan 21, 2022 62P86 WillDistrict 1 Cleaning(sweeping} various arterial highways in District One throughout Will County The improvement consists of cleaning(sweeping} various arterial highways in District One throughout Will County. — Executed Nov 26 New Elgin Sweeping Services, Inc. $860,098 ·
Jan 21, 2022 99634 WilliamsonDistrict 9 Reconstruct existing lane confirguration with traffic signal modifications and pavment markings on Williamson County Parkway at 17th Street in Marion. — Executed Nov 26 New E. T. Simonds Construction Company $353,562 ·
Mar 11, 2022 61B94 WillDistrict 1 Replace the bridge carrying Cedar Road over Spring Creek, 1.1 miles north of US 6. — Executed Nov 26 New
Mar 11, 2022 62M50 WillDistrict 1 (315-Ft) Bridge Preservation Project including bridge deck patching and overlay expansion joint replacement, bearings, piers, and beams repair. Location: Bridge carrying Black Road over I-55 in the Village of Shorewood and City of Joliet. — Executed Nov 26 New Herlihy Mid-Continent Company $1,043,452 ·
Mar 11, 2022 62M53 WillDistrict 1 (13.06-Mile) Interstate 57 (I-57) between Kankakee County Line and Steger Rd. (Including rest areas and weigh stations). Scope includes standard overlay, Class A patching, rest area improvements, weigh station repairs, bridge deck sealing located within Villages of Peotone, Monee and University Park. — Executed Nov 26 New Iroquois Paving Corporation and Gallagher Asphalt Corporation and D. Construction, Inc. Tri Venture $42,266,497 ·
Mar 11, 2022 62M55 WillDistrict 1 (1029-Ft) Bridge Preservation Project including partial bridge deck patching, median removal, expansion joints replacement and deck scarification and overlay located on the bridge carrying IL 7 over EJ and E Railroad in the City of Lockport. — Executed Nov 26 New D. Construction, Inc. $711,756 ·
Mar 11, 2022 62N61 WillDistrict 1 (2.36-Mile) SMART overlay, ADA improvements, and illuminated street name signs on IL 53 (Independence Dr) from 135th St/Romeo Rd to 135th St/Romeo Road, located in the Village of Romeoville in Will County. — Executed Nov 26 New K-Five Construction Corporation $1,745,000 ·
Mar 11, 2022 62P81 WillDistrict 1 Cleaning and painting designated steel surfaces of bridge structures carrying 1-55 over US-30 (SN 099-0016 and 0017); 1-55 over RR (SN 099-0018, 0019): 1-55 over Abandoned RR (SN 099-0022 and 0023); in the villages of Romeoville, Plainfield and in the city of Joliet. — Executed Nov 26 New Capital Industrial Services $563,830 ·
Mar 11, 2022 62R34 CookWillDistrict 1 Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-80 expressway from I-294 to I-355 (133.2-Mile) The improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-80 expressway from I-294 to I-355. — Executed Nov 26 New MYS, Incorporated $138,395 ·
Mar 11, 2022 78895 JeffersonWilliamsonDistrict 9 Bridge deck HMA overlay and joint replacement on SN 100-0054 carrying Cedar Grove Road over I-57, north of Marion; and pier repair and approach slab patching on SN041-0032 carrying IL 37 over Casey Fork, 2 miles south of IL 148. — Executed Nov 26 New E. T. Simonds Construction Company $269,455 ·
Mar 11, 2022 99665 WilliamsonDistrict 9 Sidewalk construction along IL 13 from State Street to Fair Street in Marion. — Executed Nov 26 New Lake Contracting, Inc. $209,037 ·
Apr 29, 2022 62H62 WillDistrict 1 Improvements located at the IDOT Birds Bridge Maintenance yard at 22608 S. Frontage Rd, Channahon includes pavement removal, sanitary manhole adjustments, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement markings. — Executed Nov 26 New Gallagher Asphalt Corporation $439,851 ·
Apr 29, 2022 62N20 WillDistrict 1 (2612-Ft) Bridge superstructure replacement and bridge widening of the two-lane structure over 1-80 at Wolf Road located in the Village of Mokena, Will County. — Executed Nov 26 New P. T. Ferro Construction Co. $4,699,500 ·
Apr 29, 2022 62N87 WillDistrict 1 This is a curb ramps for sidewalks ADA improvement project, consisting of sidewalk removal and replacement, comb. conc. curb and gutter removal and replacement and collateral and incidental work at various locations along US Route 6, 30, 52 and IL Routes 7 and 171 in the City of Joliet in Will County. — Executed Nov 26 New Triggi Construction, Inc. $971,423 ·
Apr 29, 2022 62P35 WillDistrict 1 This project is located at various locations along US Rte. 6, US Rte. 30, US Rte. 52 and IL Rte. 7 in the City of Joliet in Will County. The ADA improvement includes sidewalk removal, combination concrete curb and gutter removal and replacement and installation of concrete sidewalk. — Executed Nov 26 New Triggi Construction, Inc. $998,023 ·
Apr 29, 2022 62R44 WillDistrict 1 Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to Reed R (216-Mile) Improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to Reed Road. — Executed Nov 26 New Winston's Image LLC $222,264 ·
Apr 29, 2022 78896 WilliamsonDistrict 9 3.2 miles of pavement patching on IL 166 from Tune Road to Kinnel Orchard Road. — Executed Nov 26 New G. M. Sipes Construction, Inc. $176,928 ·
Apr 29, 2022 78914 JacksonWilliamsonDistrict 9 2.4 miles of HMA surface removal, resurfacing and patching on Old IL 13 from Giant City Road to Spillway Road. — Executed Nov 26 New E. T. Simonds Construction Company $753,253 ·
Apr 29, 2022 78923 WilliamsonDistrict 9 3.7 miles of surface removal and HMA surfacing on IL 13 from 0.9 miles east of Crab Orchard Road to the Saline County line. — Executed Nov 26 New E. T. Simonds Construction Company $1,093,312 ·
Apr 29, 2022 99672 WilliamsonDistrict 9 Replace deck beams, modify existing abutments and pier cap to the structure carrying Spillway Road over Little Grassy Creek, 4 miles south of Carterville. — Executed Nov 26 New Samron Midwest Contracting, Inc. $444,444 ·
Jun 17, 2022 60W35 WillDistrict 1 (1.19-Mile) Pavement reconstruction along I-80 WB from Gardner St to Rowell Ave, replacement and widening of bridges carrying WB I-80 over Hickory Creek and Rowell Ave/WCL RR, bridge deck patching at EB and WB I-80 over Raynor Ave., SB Center St to EB I-80 Ramps, Des Plaines River, IL 53, and Gardner St/BNSF RR/UP RR and lighting in the city of Joliet in Will County. — Executed Nov 26 New D. Construction, Inc. and P. T. Ferro Construction Company JV $38,303,613 ·
Jun 17, 2022 61H26 WillDistrict 1 Reconstruction of Penfield Street from Gould Street to IL 1, and the reconstruction of Gould Street from Indiana Avenue to Penfield Street in Beecher. — Executed Nov 26 New Iroquois Paving Corporation $5,343,400 ·
Jun 17, 2022 61H75 WillDistrict 1 Resurfacng Court Street from Eastgate Avenue to Will Center Road in Monee. — Executed Nov 26 New Iroquois Paving Corporation $295,197 ·
Jun 17, 2022 61H76 WillDistrict 1 Resurfacing Budler Road from Taylor Road to Airport Road in Romeoville. — Executed Nov 26 New Austin Tyler Construction, Inc. $683,544 ·
Jun 17, 2022 62H15 WillDistrict 1 (2.5-Mile) Interchange reconstruction of I-55 from I-80 to US 52 ; adding auxiliary lanes on I-55 ; intersection improvement; new traffic signals; retaining and noise abatement walls; drainage improvement; shared- use path; roadway lighting; ITS; and aesthetic landscaping located in Joliet and Shorewood. — Executed Nov 26 New D. Construction, Inc. $59,259,179 ·
Jun 17, 2022 62H16 WillDistrict 1 Bridge rehabilitation, channelization and traffic signal modernization at US 52 (Jefferson St) and 1-55 interc (1,778-Ft.) Improvement consists of bridge rehabilitation, channelization and traffic signal modernization at US 52 (Jefferson St) and 1-55 interchange, located in Village of Shorewood, Will County. — Executed Nov 26 New D. Construction, Inc. $6,157,939 ·
Jun 17, 2022 62N47 WillDistrict 1 (1.198-Mile) SMART Overlay and ADA ramp improvements from E o f I-80 to E of Church St. Work also includes sidewalk removal, removal and replacement of combination concrete curb and gutter, installation of PCC sidewalk, detectable warnings, adjustment of drainage structures, and pavement markings located in the Village of New Lenox. — Executed Nov 26 New P. T. Ferro Construction Co. $1,638,840 ·
Jun 17, 2022 62N50 WillDistrict 1 (1.71-Mile) SMART Overlay and ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK FAP 876: IL 1 (Main St), from Burville Road to Union Avenue, located in the Village of Crete. — Executed Nov 26 New Iroquois Paving Corporation $1,316,006 ·
Jun 17, 2022 78619 WilliamsonDistrict 9 Replacing SN 100-0055 carrying Westminster Drive over I-57 near the City of Marion. — Executed Nov 26 New Samron Midwest Contracting, Inc. $7,311,127 ·
101–200 of 402‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.