2020-164-RA-WS-RS
- Let date
- Friday, March 11, 2022
- Contract
- 62M53 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- (13.06-Mile) Interstate 57 (I-57) between Kankakee County Line and Steger Rd. (Including rest areas and weigh stations). Scope includes standard overlay, Class A patching, rest area improvements, weigh station repairs, bridge deck sealing located within Villages of Peotone, Monee and University Park.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Iroquois Paving Corporation and Gallagher Asphalt Corporation and D. Construction, Inc. Tri Venture Low bidder | $42,266,497 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Iroquois Paving… |
|---|---|---|---|---|---|---|
| 1 | K0029614 | WEED CONT AQUATIC | 0.75 | GALLON | $3,500.00 | |
| 2 | K0029624 | WEED CONTROL TEASEL | 1 | GALLON | $495.00 | |
| 3 | X0325201 | SHOULDER RUM STRIP RM | 61,307 | SQ YD | $1.00 | |
| 4 | X0325222 | WEED CONT BASAL TRTMT | 40 | GALLON | $880.00 | |
| 5 | X0327117 | ATMS SYS INTEGRATION | 1 | L SUM | $50,000.00 | |
| 6 | X0327120 | WEED CTRL NTV LSCP EN | 36.6 | ACRE | $1,110.00 | |
| 7 | X0327206 | DATA SERVER | 1 | L SUM | $100,000.00 | |
| 8 | X1400222 | BLUETOOTH DETECTOR | 5 | EACH | $15,000.00 | |
| 9 | X2010100 | TREE LIMB REM 4-10 | 10 | EACH | $100.00 | |
| 10 | X2010200 | TREE LIMB REM OVER 10 | 10 | EACH | $200.00 | |
| 11 | X2010350 | TREE REMOV ACRES SPL | 50.3 | ACRE | $3,800.00 | |
| 12 | X2020110 | GRADING & SHAP SHLDRS | 3,370 | UNIT | $6.00 | |
| 13 | X2503110 | MOWING SPL | 36.6 | ACRE | $1,500.00 | |
| 14 | X2700001 | TEMP RUMBLE STRIPS SP | 216 | EACH | $400.00 | |
| 15 | X3100001 | HMA SURF REM COMPLETE | 1,334 | SQ YD | $24.00 | |
| 16 | X4062457 | TEMP PAVEMENT INTERSTATE | 2,070 | SQ YD | $65.00 | |
| 17 | X4400110 | TEMP PAVT REMOVAL | 1,100 | SQ YD | $25.00 | |
| 18 | X4400220 | CURB REM & REPLACEMT | 80 | FOOT | $113.00 | |
| 19 | X4400501 | COMB C&G REMOV REPL < = 10FT | 102 | FOOT | $100.00 | |
| 20 | X5870015 | BR DK CONCRETE SEALER | 15,428 | SQ FT | $2.00 | |
| 21 | X6030310 | FR & LIDS ADJUST SPL | 4 | EACH | $1,100.00 | |
| 22 | X6700410 | ENGR FLD OFF A SPL | 24 | CAL MO | $6,000.00 | |
| 23 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $5,050,000.00 | |
| 24 | X7013820 | TR CONT SURVEIL EXPWY | 200 | CAL DA | $0.0100 | |
| 25 | X8300001 | LIGHT POLE SPECIAL | 1 | EACH | $15,000.00 | |
| 26 | X8570000 | SMART TRAF MONIT SYS | 1 | L SUM | $420,000.00 | |
| 27 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $50,000.00 | |
| 28 | Z0026290 | F&I WEIGH-IN-MOT COMP | 1 | L SUM | $410,000.00 | |
| 29 | Z0030850 | TEMP INFO SIGNING | 154 | SQ FT | $30.00 | |
| 30 | Z0034105 | MATL TRANSFER DEVICE | 103,134 | TON | $20.00 | |
| 31 | Z0064600 | SELECTIVE CLEARING | 14.06 | ACRE | $6,500.00 | |
| 32 | Z0076600 | TRAINEES | 1,500 | HOUR | $0.8000 | |
| 33 | Z0076604 | TRAINEES TPG | 1,500 | HOUR | $15.00 | |
| 34 | 20100110 | TREE REMOV 6-15 | 600 | UNIT | $19.00 | |
| 35 | 20100210 | TREE REMOV OVER 15 | 400 | UNIT | $22.00 | |
| 36 | 20101000 | TEMPORARY FENCE | 5,720 | FOOT | $3.00 | |
| 37 | 20101350 | TREE PRUN OVER 10 | 25 | EACH | $150.00 | |
| 38 | 20200100 | EARTH EXCAVATION | 405 | CU YD | $200.00 | |
| 39 | 20201200 | REM & DISP UNS MATL | 253 | CU YD | $200.00 | |
| 40 | 20400800 | FURNISHED EXCAVATION | 133 | CU YD | $200.00 | |
| 41 | 21101615 | TOPSOIL F & P 4 | 12,720 | SQ YD | $4.33 | |
| 42 | 21400100 | GRADING & SHAP DITCH | 2,440 | FOOT | $20.00 | |
| 43 | 25000210 | SEEDING CL 2A | 2.6 | ACRE | $3,083.00 | |
| 44 | 25000400 | NITROGEN FERT NUTR | 3,801 | POUND | $3.00 | |
| 45 | 25000500 | PHOSPHORUS FERT NUTR | 3,801 | POUND | $3.00 | |
| 46 | 25000600 | POTASSIUM FERT NUTR | 3,801 | POUND | $3.00 | |
| 47 | 25000750 | MOWING | 48 | ACRE | $350.00 | |
| 48 | 25003115 | INTERSEED CL 1B | 36.6 | ACRE | $1,783.00 | |
| 49 | 25003210 | INTERSEED CL 2A | 3 | ACRE | $1,729.00 | |
| 50 | 25100125 | MULCH METHOD 3 | 36.6 | ACRE | $1,700.00 | |
| 51 | 25100630 | EROSION CONTR BLANKET | 12,720 | SQ YD | $0.9000 | |
| 52 | 25200110 | SODDING SALT TOLERANT | 25 | SQ YD | $10.00 | |
| 53 | 25200200 | SUPPLE WATERING | 64 | UNIT | $0.0100 | |
| 54 | 28000305 | TEMP DITCH CHECKS | 80 | FOOT | $3.80 | |
| 55 | 28000400 | PERIMETER EROS BAR | 50 | FOOT | $1.90 | |
| 56 | 28000510 | INLET FILTERS | 2 | EACH | $136.00 | |
| 57 | 28100203 | STONE RIPRAP CL A2 | 12 | TON | $295.00 | |
| 58 | 31101200 | SUB GRAN MAT B 4 | 2,070 | SQ YD | $8.00 | |
| 59 | 40600290 | BIT MATLS TACK CT | 404,704 | POUND | $0.0100 | |
| 60 | 40600370 | LONG JOINT SEALANT | 275,878 | FOOT | $2.60 | |
| 61 | 40600400 | MIX CR JTS FLANGEWYS | 990 | TON | $0.0100 | |
| 62 | 40600982 | HMA SURF REM BUTT JT | 445 | SQ YD | $0.0100 | |
| 63 | 40601005 | HMA REPL OVER PATCH | 497 | TON | $100.00 | |
| 64 | 40602985 | HMA BC IL-9.5 N70 | 4,108 | TON | $115.00 | |
| 65 | 40604062 | HMA SC IL-9.5 D N70 | 22,425 | TON | $105.00 | |
| 66 | 40604172 | P HMA SC IL-9.5 E N70 | 4,108 | TON | $145.00 | |
| 67 | 40605015 | P HMA BC SMA 12.5 N80 | 51,497 | TON | $107.50 | |
| 68 | 40605036 | P SC SMA 12.5 F N80 | 51,637 | TON | $120.00 | |
| 69 | 42101300 | PROTECTIVE COAT | 1,350 | SQ YD | $1.00 | |
| 70 | 42400200 | PC CONC SIDEWALK 5 | 12,000 | SQ FT | $8.55 | |
| 71 | 42400800 | DETECTABLE WARNINGS | 40 | SQ FT | $35.00 | |
| 72 | 44000157 | HMA SURF REM 2 | 184,890 | SQ YD | $4.00 | |
| 73 | 44000165 | HMA SURF REM 4 | 496,472 | SQ YD | $7.00 | |
| 74 | 44000600 | SIDEWALK REM | 12,000 | SQ FT | $3.00 | |
| 75 | 44002224 | HMA RM OV PATCH 6 | 4,929 | SQ YD | $24.00 | |
| 76 | 44004250 | PAVED SHLD REMOVAL | 970 | SQ YD | $20.00 | |
| 77 | 44200050 | WELDED WIRE REINF | 1,975 | SQ YD | $13.00 | |
| 78 | 44200561 | CL A PATCH T1 11 | 26 | SQ YD | $1,000.00 | |
| 79 | 44200565 | CL A PATCH T2 11 | 190 | SQ YD | $350.00 | |
| 80 | 44200569 | CL A PATCH T3 11 | 99 | SQ YD | $350.00 | |
| 81 | 44200571 | CL A PATCH T4 11 | 559 | SQ YD | $350.00 | |
| 82 | 44200620 | CL A PATCH T2 14 | 1,571 | SQ YD | $600.00 | |
| 83 | 44200624 | CL A PATCH T3 14 | 1,573 | SQ YD | $600.00 | |
| 84 | 44200628 | CL A PATCH T4 14 | 4,318 | SQ YD | $600.00 | |
| 85 | 44200982 | CL B PATCH T2 11 | 682 | SQ YD | $350.00 | |
| 86 | 44200986 | CL B PATCH T3 11 | 338 | SQ YD | $350.00 | |
| 87 | 44200988 | CL B PATCH T4 11 | 1,637 | SQ YD | $300.00 | |
| 88 | 44201298 | DOWEL BARS 1 1/4 | 2,644 | EACH | $22.50 | |
| 89 | 44201737 | CL D PATCH T1 8 | 760 | SQ YD | $66.00 | |
| 90 | 44201741 | CL D PATCH T2 8 | 760 | SQ YD | $68.00 | |
| 91 | 44201745 | CL D PATCH T3 8 | 760 | SQ YD | $70.00 | |
| 92 | 44201747 | CL D PATCH T4 8 | 760 | SQ YD | $74.00 | |
| 93 | 44201815 | CL D PATCH T2 14 | 437 | SQ YD | $180.00 | |
| 94 | 44201819 | CL D PATCH T3 14 | 280 | SQ YD | $172.00 | |
| 95 | 44201821 | CL D PATCH T4 14 | 7,235 | SQ YD | $144.00 | |
| 96 | 44213000 | PATCH REINFORCEMENT | 8,348 | SQ YD | $60.00 | |
| 97 | 44213200 | SAW CUTS | 35,247 | FOOT | $6.50 | |
| 98 | 44213202 | TIE BARS 1 | 3,225 | EACH | $24.00 | |
| 99 | 48102100 | AGG WEDGE SHLD TYPE B | 8,701 | TON | $45.00 | |
| 100 | 60260100 | INLETS ADJUST | 3 | EACH | $925.00 | |
| 101 | 60402510 | GRATES T11 | 1 | EACH | $480.00 | |
| 102 | 63500105 | DELINEATORS | 1,130 | EACH | $53.00 | |
| 103 | 64200116 | SHOULDER RUM STRIP 16 | 275,878 | FOOT | $0.2000 | |
| 104 | 66900200 | NON SPL WASTE DISPOSL | 253 | CU YD | $200.00 | |
| 105 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $3,300.00 | |
| 106 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,475.00 | |
| 107 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,475.00 | |
| 108 | 66901006 | REG SUB MON | 5 | CAL DA | $935.00 | |
| 109 | 67100100 | MOBILIZATION | 1 | L SUM | $2,486,853.11 | |
| 110 | 70106800 | CHANGEABLE MESSAGE SN | 14 | CAL MO | $1,000.00 | |
| 111 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $75,000.00 | |
| 112 | 70300150 | SHRT TRM PAVT MK REM | 219,000 | SQ FT | $0.0500 | |
| 113 | 70301120 | TEMP PVT MK L4 EPOXY | 276,000 | FOOT | $0.1500 | |
| 114 | 70301125 | TEMP PVT MK L5 EPOXY | 34,000 | FOOT | $0.9000 | |
| 115 | 70307120 | TEMP PVT MK L4 T4 TAPE | 572,000 | FOOT | $0.0100 | |
| 116 | 70307125 | TEMP PVT MK L5 T4 TAPE | 70,000 | FOOT | $0.0100 | |
| 117 | 70400100 | TEMP CONC BARRIER | 1,800 | FOOT | $35.00 | |
| 118 | 70400200 | REL TEMP CONC BARRIER | 1,800 | FOOT | $15.00 | |
| 119 | 70600280 | IMP ATTN TEMP SUN TL3 | 2 | EACH | $7,500.00 | |
| 120 | 70600370 | IMP ATTN REL SUN TL3 | 2 | EACH | $2,500.00 | |
| 121 | 78000100 | THPL PVT MK LTR & SYM | 42 | SQ FT | $7.00 | |
| 122 | 78000200 | THPL PVT MK LINE 4 | 285,361 | FOOT | $0.7500 | |
| 123 | 78000400 | THPL PVT MK LINE 6 | 92 | FOOT | $1.25 | |
| 124 | 78000500 | THPL PVT MK LINE 8 | 16,227 | FOOT | $1.50 | |
| 125 | 78000600 | THPL PVT MK LINE 12 | 15,758 | FOOT | $3.25 | |
| 126 | 78000650 | THPL PVT MK LINE 24 | 520 | FOOT | $6.25 | |
| 127 | 78004620 | PREF PL PM TD LN 4 | 2,576 | FOOT | $4.85 | |
| 128 | 78004625 | PREF PL PM TD L 5 | 34,485 | FOOT | $7.00 | |
| 129 | 78004635 | PREF PL PM TD L 7 | 770 | FOOT | $9.50 | |
| 130 | 78004640 | PREF PL PM TD L 8 | 263 | FOOT | $13.00 | |
| 131 | 78009004 | MOD URETH PM LINE 4 | 46,111 | FOOT | $0.8000 | |
| 132 | 78009008 | MOD URETH PM LINE 8 | 6,375 | FOOT | $1.70 | |
| 133 | 78009012 | MOD URETH PM LINE 12 | 3,140 | FOOT | $3.75 | |
| 134 | 78011025 | GRV RCSD PVT MRKG 5 | 2,576 | FOOT | $0.7000 | |
| 135 | 78011030 | GRV RCSD PVT MRKG 6 | 34,485 | FOOT | $1.50 | |
| 136 | 78011040 | GRV RCSD PVT MRKG 8 | 770 | FOOT | $4.00 | |
| 137 | 78011045 | GRV RCSD PVT MRKG 9 | 263 | FOOT | $5.00 | |
| 138 | 78100100 | RAISED REFL PAVT MKR | 3,666 | EACH | $31.00 | |
| 139 | 78200011 | BARR WALL REF TYPE C | 288 | EACH | $10.00 | |
| 140 | 78300200 | RAISED REF PVT MK REM | 3,689 | EACH | $0.0100 | |
| 141 | 78300202 | PAVMT MRKG REM WTR BL | 55,626 | SQ FT | $0.2500 |