| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 66C84 | FordDistrict 3 | Bridge Replacement (SN 027-0012) over Big Four Ditch, 3.0 miles south of IL 9. | — | Executed | Tobey's Construction & Cartage, Inc. $1,511,121 · | ||
| Jan 19, 2018 | 66D34 | FordDistrict 3 | Removal of existing double box culvert to be replaced by a double 8'x5' precast box culvert located on IL 47, 1.6 miles north of IL 9 in Gibson City. | — | Executed | Tobey's Construction & Cartage, Inc. $327,585 · | ||
| Mar 9, 2018 | 95819 | CrawfordDistrict 7 | Bridge replacement and approach work on TR 221A over Big Creek, 1.6 miles northeast of Pierceburg. | — | Executed | Allendale Gravel Co., Inc. $488,412 · | ||
| Apr 27, 2018 | 68A79 | McLeanTazewellWoodfordDistrict 4 | 10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange. | — | Executed | Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture $57,888,042 · | ||
| Apr 27, 2018 | 74841 | CrawfordWayneDistrict 7 | Painting 5 bridges at 3 locations in Crawford and Wayne Counties (SN 017-0021, 096-0043, 096-0044, 096-0045 and 096-0046). | — | Executed | Thomas Industrial Coatings, Inc. $458,150 · | ||
| Jun 15, 2018 | 46501 | FordIroquoisLivingstonDistrict 3 | Remove and replace raised reflective pavement markers and reflectors on various routes in District 3 | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $257,475 · | ||
| Jun 15, 2018 | 66H73 | FordDistrict 3 | 4.67 miles of shoulder widening and rumble strips on IL 9 from N 2300E Road to N 2800E Road. | — | Executed | Iroquois Paving Corporation $1,025,141 · | ||
| Jun 15, 2018 | 68E10 | TazewellWoodfordDistrict 4 | Patching on US 24 from the McClugage Bridge to Cummings Lane, and on IL 116 from the Upper Spring Bay to Lourdes (CH 19). | — | Rejected | |||
| Jun 15, 2018 | 68E19 | MarshallWoodfordDistrict 4 | 28.4 miles of Class A pavement patching on I-39, from the McClean County line north to 2.1 miles south of IL 17. | — | Executed | Kinney Contractors, Inc. $429,762 · | ||
| Jun 15, 2018 | 74853 | ClarkCrawfordJasperDistrict 7 | Replacing existing non-crashworthy traffic barrier end-sections and steel plate beam guardrail at various locations. | — | Executed | Midwest Fence Corporation $1,444,046 · | ||
| Jun 15, 2018 | 87646 | FordDistrict 3 | Resurfacing FAS Route 1346 (CH 5) from 1200 E. Road to US 45. | — | Executed | Iroquois Paving Corporation $1,015,301 · | ||
| Jun 15, 2018 | 89663 | WoodfordDistrict 4 | Resurfacing IL 117 from Eureka Avenue to Reagan Drive in the City of Eureka. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $150,054 · | ||
| Jun 15, 2018 | 95839 | CrawfordDistrict 7 | replace the bridge carrying TR 193 over Dogwood Creek, 2.0 miles southeast of Oblong. | — | Rejected | Sangamo Construction Company $728,011 · | ||
| Nov 9, 2018 | 68E17 | WoodfordDistrict 4 | Bridge repairs to SN 102-0007 carrying US Route 24 over Walnut Creek, 0.5 miles west of IL Route 117. | — | Executed | Stark Excavating, Inc. $434,382 · | ||
| Jan 18, 2019 | 66J42 | FordDistrict 3 | removal and replacement of a 3'x 2' concrete box culvert with 30' ERS RCCP culv ert located on IL 115, 0.7 mile south of Main Street in Cabery. | — | Executed | Scanlon Excavating & Concrete, Inc. $36,875 · | ||
| Jan 18, 2019 | 68D79 | WoodfordDistrict 4 | Resurfacing I-39 from the Mclean County line to 0.25 mile north of US 24, includes repair on bridges SN 102-0058 and 102-0059. | — | Executed | Rowe Construction, a div of UCM, Inc. $13,273,213 · | ||
| Mar 8, 2019 | 68E28 | WoodfordDistrict 4 | Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka. | — | Executed | Advanced Asphalt Company $1,373,783 · | ||
| Apr 26, 2019 | 74886 | CrawfordDistrict 7 | Culvert extension on IL 1 at Duncanville Road, 3.6 miles south of IL 33. | — | Executed | Phoenix Corporation of the Quad Cities $181,499 · | ||
| Jun 14, 2019 | 66A03 | FordDistrict 3 | 3.9 MILES OF MILLING AND RESURFACING 2.5 INCHES ON IL 165 MAINLINE FROM THE MCLEAN CO LINE TO IL 47 IN SIBLEY, IL. | — | Executed | Iroquois Paving Corporation $893,506 · | ||
| Jun 14, 2019 | 66K02 | FordDistrict 3 | Class B pavement patching on IL 54 from the Champaign County line to Church Street in Gibson City. | — | Executed | G. M. Sipes Construction, Inc. $285,429 · | ||
| Jun 14, 2019 | 66K03 | FordDistrict 3 | Class B pavement patching on IL 54 from Church Street in Gibson City to East Main Street in Melvin. | — | Executed | G. M. Sipes Construction, Inc. $517,414 · | ||
| Jun 14, 2019 | 66K04 | FordDistrict 3 | Class B pavement patching on IL 54 from East Main Street in Melvin to the Iroquois County line. | — | Executed | G. M. Sipes Construction, Inc. $457,550 · | ||
| Jun 14, 2019 | 68E83 | WoodfordDistrict 4 | REMOVAL OF EXISTING HIGH MAST LIGHTING SYSTEM AND INSTALLATION OF NEW LIGHT POLES, FOUNDATION, LUMINAIRES, ELECTRICAL CABLE, LIGHTING CONTROLLER, AND SERVICE INSTALLATION AT THE INTERCHANGE OF I-39 AND US 24 IN EL PASO. | — | Executed | Bodine Electric of Decatur $281,004 · | ||
| Jun 14, 2019 | 68E95 | MarshallWoodfordDistrict 4 | 22 MILES OF CLASS A PAVEMENT PATCHING ON INTERSTATE 39 FROM 0.25 MILES N OF US RTE 24 TO 2.1 MILES S OF IL RTE 17. | — | Executed | Beniach Construction Co., Inc. $653,392 · | ||
| Jun 14, 2019 | 95848 | CrawfordDistrict 7 | Replace the bridge carrying TR 54 over Dogwood Creek, 0.5 miles southeast of Oblong. | — | Executed | Allendale Gravel Co., Inc. $259,455 · | ||
| Jun 14, 2019 | 95853 | CrawfordDistrict 7 | Resurfacing and lime modified soil and aggregate base on various routes from the Jasper County line to North 700th Street in Annapolis. | — | Executed | Ambraw Asphalt Materials, Inc. $3,003,011 · | ||
| Jul 12, 2019 | 66A81 | FordDistrict 3 | 6 miles of milling and resurfacing of US 24 from Livingston county line to the Iroquois county line. | — | Executed | Iroquois Paving Corporation $2,795,668 · | ||
| Jul 12, 2019 | 68C97 | TazewellWoodfordDistrict 4 | Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,974,381 · | ||
| Aug 2, 2019 | 66J58 | FordDistrict 3 | Removal and replacement of an 18" diameter pipe culvert south of the railroad tracks in Roberts and a and a 2' x 1.5'concrete box culvert on the north side of the 1300N Rd intersection with IL 115. | — | Executed | G. M. Sipes Construction, Inc. $131,005 · | ||
| Aug 2, 2019 | 66K05 | FordDistrict 3 | 3.4 miles of milling, resurfacting and intermittent patching on US 45 from Dawn Avenue in Paxton to the Champaign County line. | — | Executed | Iroquois Paving Corporation $1,379,136 · | ||
| Nov 8, 2019 | 66F60 | FordDistrict 3 | Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. | — | Executed | Tobey's Construction & Cartage, Inc. $432,193 · | ||
| Nov 8, 2019 | 66K27 | FordDistrict 3 | Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. | — | Executed | Iroquois Paving Corporation $841,960 · | ||
| Nov 8, 2019 | 68B62 | WoodfordDistrict 4 | Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 · | ||
| Jan 17, 2020 | 68E34 | WoodfordDistrict 4 | Resurfacing I-39 from 3.1 miles S of IL 116 to 1.0 mile N of IL 116. | — | Executed | Advanced Asphalt Company $9,680,201 · | ||
| Mar 6, 2020 | 66B76 | FordDistrict 3 | 3.903 miles of milling and resurfacing 3" of HMA from the S edge of Gibson City to the Champaign County Line. Also replacing one cross-road culvert. | — | Executed | Iroquois Paving Corporation $1,695,669 · | ||
| Mar 6, 2020 | 68805 | WoodfordDistrict 4 | Rehabilitation of the superstructure that carries IL Rte 116 over the west branch of Panther Creek in Roanoke. | — | Executed | Stark Excavating, Inc. $976,351 · | ||
| Mar 6, 2020 | 68E24 | WoodfordDistrict 4 | Resurfacing I-39 from N of El Paso to 3.1 miles S of Il 116. | — | Executed | Rowe Construction, a div of UCM, Inc. $11,997,953 · | ||
| Apr 24, 2020 | 66E15 | FordIroquoisDistrict 3 | 7.18 miles of milling and resurfacing 2.5" of HMA on IL 54 from IL 115 in Roberts to Spring Creek and updating guardrail at 2 structures. | — | Executed | Iroquois Paving Corporation $2,417,273 · | ||
| Apr 24, 2020 | 66K72 | FordDistrict 3 | 4.15 miles of 3.75" HMA milling and resurfacing with spot guardrail updating and culvert cleaning on IL 9 from the McLean County Line to just W of IL 47 in Gibson City. | — | Executed | Cross Construction, Inc. $2,121,820 · | ||
| Apr 24, 2020 | 68F48 | WoodfordDistrict 4 | Bridge painting along the I-39 corridor in Woodford County on SNs 102-0058, 102-0059, 102-0060, 1020061, and 1020062. | — | Executed | ERA-Valdivia Contractors, Inc. $1,367,875 · | ||
| Apr 24, 2020 | 95868 | CrawfordDistrict 7 | Construction of 7" PCC pavment on Highland Avenue from Lincoln Street to Rector Avenue and on Rector Avenue from Highland Avenue to Mefford Drive in Robinson. | — | Executed | Kieffer Bros. Construction Co., Inc. $571,534 · | ||
| Jun 12, 2020 | 66B04 | FordDistrict 3 | 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. , 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. | — | Executed | Iroquois Paving Corporation $7,095,506 · | ||
| Jun 12, 2020 | 66B78 | FordKankakeeDistrict 3 | 9.26 miles of milling and resurfacing existing pavement 3.75- on IL 115 from CH 18 to 0.3 mile S of Main St in Cabery and Cabery to west corporate limits of Herscher. Work includes guardrail updates, various types of drainage work, and ADA ramp construction in Cabery. | — | Executed | Kankakee Valley Construction Company, Inc. $4,595,011 · | ||
| Jun 12, 2020 | 66D81 | FordDistrict 3 | 8.999 miles of milling and resurfacing from US 24 to IL 54 (N) in Roberts. | — | Executed | Iroquois Paving Corporation $3,941,216 · | ||
| Jun 12, 2020 | 66K91 | FordDistrict 3 | Class A pavement patching and pavement marking on I-57 from the Champaign/Ford county line to the Ford/Iroquois county line. | — | Executed | Lion Construction 1, LLC $88,128 · | ||
| Jun 12, 2020 | 68F24 | WoodfordDistrict 4 | 9 miles of surface maintenance on IL 26 from the Marshall County line to the north city limits of Spring Bay (Zimmerman Rd). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,995,170 · | ||
| Jun 12, 2020 | 68F52 | MarshallWoodfordDistrict 4 | 10 miles of pavement patching on I-39 from N of IL 116 to S of IL 17.. | — | Executed | Kinney Contractors, Inc. $434,438 · | ||
| Jun 12, 2020 | 87724 | FordDistrict 3 | Replace the bridge carrying CH 2 over Wall Town Drainage Ditch, 5 miles west of Loda. | — | Executed | Iroquois Paving Corporation $495,240 · | ||
| Jun 12, 2020 | 95875 | CrawfordDistrict 7 | Replace the bridge carrying TR 68 over Little Creek, 2.0 miles east of Pierceburg. | — | Executed | Allendale Gravel Co., Inc. $420,596 · | ||
| Jul 31, 2020 | 66K99 | FordDistrict 3 | Crack and joint serling on FAI 57 (IL 57) from Champaign County line to Irroquois County line in Ford County for a total length of 6.35 mi. | — | Executed | Complete Asphalt Service Co. $101,312 · | ||
| Nov 6, 2020 | 66K20 | FordDistrict 3 | The project is located on IL 9/IL 47/IL 54 from IL 47 (N) in Gibson City to Baltimore Drive in Paxton for length of 14.01 miles. Project includes 3 3/4" mill and resurface from beginning of project to IL 115 and 2" mill and RS to end of projects. Work includes guardrail updates, drainage work and ADA updates and patching in Gibson City. | — | Executed | Cross Construction, Inc. $8,756,556 · | ||
| Nov 6, 2020 | 68F98 | TazewellWoodfordDistrict 4 | Culvert lining at various locations along US 24 in Tazewell and Woodford Counties. | — | Executed | Phoenix Corporation of the Quad Cities $217,465 · | ||
| Nov 6, 2020 | 89754 | WoodfordDistrict 4 | Remove and replace guardrail and terminals at various locations in Woodford County. | — | Executed | Midwest Fence Corporation $625,958 · | ||
| Mar 5, 2021 | 66K61 | FordDistrict 3 | Milling and resurfacing 3 Project is located in Piper City, Ford County. The job length is 1.09 miles and consists of milling and resurfacing 3.75" of HMA on the mainline pavement. The work also includes several ADA improvements. | — | Executed | Iroquois Paving Corporation $747,230 · | ||
| Apr 23, 2021 | 68G20 | MarshallMcLeanWoodfordDistrict 4 | Installation of communications duct, communications vaults, and fiber optic cable along Interstate 39 from the Interstate 55 interchange to Illinois Route 17 in District Four. | — | Executed | Gerstner Electric, Inc. $1,837,876 · | ||
| Apr 23, 2021 | 68G22 | WoodfordDistrict 4 | Removal of existing high mast towers and installation of new lighting system at Interstate 39 at the Minonk interchange and replacement of light towers at Interstate 74 Mackinaw Dells rest areas. | — | Executed | Laser Electric, Inc. $279,781 · | ||
| Apr 23, 2021 | 87660 | FordDistrict 3 | Replace the bridge carrying CH 23 over Crane Creek, 0.75 mile east of Cabery. | — | Rejected | Tobey's Construction & Cartage, Inc. $426,709 · | ||
| Apr 23, 2021 | 87740 | FordDistrict 3 | Replace the bridge carrying CH 18 over the West Branch of Horse Creek, 2 miles southeast of Cabery. | — | Rejected | Tobey's Construction & Cartage, Inc. $419,682 · | ||
| Jun 11, 2021 | 68G17 | MarshallWoodfordDistrict 4 | Class A and B patching on 1-39 from 1 mile North of IL Route 116 to 2 miles South of IL Route 17 and ramps at the Minonk Interchange. | — | Executed | Kinney Contractors, Inc. $377,733 · | ||
| Jun 11, 2021 | 68G25 | TazewellWoodfordDistrict 4 | Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills. | — | Executed | Kinney Contractors, Inc. $615,751 · | ||
| Jun 11, 2021 | 95899 | CrawfordDistrict 7 | Replace the bridge carrying TR 245 over Freeport Creek, 0.6 mile east of Freeport. | — | Executed | Howell Paving, Inc. $539,620 · | ||
| Jul 30, 2021 | 66L91 | FordIroquoisDistrict 3 | The project consists of 7.15 miles of crack routing and crack sealing on FAP 71 (IL 54) from IL 115 in Roberts to Structure 038-0213 in Ford and Iroquois Counties. | — | Executed | Freehill Asphalt, Inc. $62,711 · | ||
| Jul 30, 2021 | 74915 | CrawfordDistrict 7 | Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363. | — | Executed | Sangamo Construction Company $3,028,564 · | ||
| Jul 30, 2021 | 87780 | FordDistrict 3 | Resurfacing and aggregate shoulders on Elliot Road from IL 54 to IL 9. | — | Executed | Iroquois Paving Corporation $1,626,354 · | ||
| Sep 17, 2021 | 68D17 | WoodfordDistrict 4 | Box culvert replacements on US 150 (S.N. 102-1005; S.N. 102-2503 (new)), 0.9 mile East of Mackinaw River and (S.N. 102-1004; S.N. 102-2030 (new)), 0.16 mile East of CR 1825E. | — | Executed | Phoenix Corporation of the Quad Cities $2,337,434 · | ||
| Sep 17, 2021 | 68G63 | WoodfordDistrict 4 | New shoulders along US 150 from County Road 1250E, West of Goodfield to the McLean County Line. | — | Executed | Rowe Construction, a div of UCM, Inc. $3,018,142 · | ||
| Nov 5, 2021 | 68G57 | MarshallWoodfordDistrict 4 | Bridge painting at various locations in Marshall and Woodford Counties on Structure Nos.: 062-0085, 062-0049, 062-0053, 062-0054, 062-0055, 102-048, 102-0050 and 102-0051. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,487,500 · | ||
| Nov 5, 2021 | 74181 | CrawfordDistrict 7 | Replacement of SN 017-0003 and SN 017-0004 on IL 1, 2.5 and 0.3 miles north of IL 33. | — | Executed | Sangamo Construction Company $3,233,083 · | ||
| Jan 21, 2022 | 66M12 | FordDistrict 3 | Cleaning and painting all structural steel and other steel components of the structure This work is located at one structure on IL 54: Structure No. 027-0076 over the E. Branch of the Vermilion River, two structures on IL 9/47: Structure No. 027-0084 over Drummer Creek (in Gibson) and Structure No. 027-0085_over Drummer Creek (In Gibson). This project consists of cleaning and painting all structural steel and other steel components of the structure. | — | Executed | ERA-Valdivia Contractors, Inc. $311,138 · | ||
| Apr 29, 2022 | 66L03 | FordDistrict 3 | A SMART overlay with 1 This work is located on FAP 326 (IL 47) from the Livingston County line to 8th Street in Gibson City in Ford County (+/-10.58 miles). This work consists of a SMART overlay with 1.5" milling, as well as drainage improvements. | — | Executed | Kankakee Valley Construction Company, Inc. $3,153,189 · | ||
| Apr 29, 2022 | 66M34 | FordDistrict 3 | Class B pavement patching and other related construction work This work is located on FAP Route 71 (IL 54) beginning at the Ford/Iroquois County line (L.M. 0.00) and ending at the South Intersection of IL Route 54 and and IL Route 115 (L.M. 4.90) in Roberts. This work consists of Class B pavement patching and other related construction work. | — | Executed | Terrazas, LLC $183,566 · | ||
| Apr 29, 2022 | 66M45 | FordDistrict 3 | Class B pavement patching and related construction work This work is located on FAS Route 340 (IL 115) beginning at the intersection of IL 115 and IL 54 in Roberts (Log Mile 0.00) and ending at the intersection of IL 115 and IL 9 (Log Mile 10.57). This work consists of Class B pavement patching and related construction work. | — | Rejected | Iroquois Paving Corporation $391,494 · | ||
| Apr 29, 2022 | 68F87 | MarshallWoodfordDistrict 4 | Resurface I-39 from 1 mile N of IL 116 to 2 miles S of IL 17. | — | Executed | Advanced Asphalt Company $25,968,870 · | ||
| Apr 29, 2022 | 68G30 | WoodfordDistrict 4 | Cape Seal on Il 116/117 from IL 117(N) to 1-39. | — | Executed | Beniach Construction Co., Inc. $692,608 · | ||
| Apr 29, 2022 | 68G77 | KnoxWoodfordDistrict 4 | Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas. | — | Executed | Laser Electric, Inc. $179,815 · | ||
| Apr 29, 2022 | 68G78 | WoodfordDistrict 4 | Bridge Painting on structures carrying Roanoke Road (SN 102-0054) and TR 605 (SN 102-0057) over 1-39. | — | Executed | Three Star Painting, Inc. $500,000 · | ||
| Apr 29, 2022 | 87771 | FordDistrict 3 | Resurfacing Buckley Road from IL 54 to the Iroquois County line. | — | Executed | Iroquois Paving Corporation $1,239,137 · | ||
| Jun 17, 2022 | 66B77 | FordDistrict 3 | 3P milling and resurfacing (design overlay) This work is located on FAP 796 (IL 115) from South Corporate Limits of Cabery to IL 116 (+/-7.83 miles) in Ford County. This work consists of 3P milling and resurfacing (design overlay). | — | Executed | Kankakee Valley Construction Company, Inc. $4,357,980 · | ||
| Jun 17, 2022 | 66L89 | FordDistrict 3 | 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch This work is located at FAP 697 (IL 9) from Stockholm Road in Paxton to Vermillion County Line in Ford County (+/- 7.68 miles). This work consists of 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch grading, channel excavation and riprap placement. | — | Executed | Iroquois Paving Corporation $4,972,663 · | ||
| Jun 17, 2022 | 66M60 | FordDistrict 3 | Class A Pavement Patching and related construction work This work is located on FAI Route 57 (I-57) beginning at the Champaign County Line (M.M. 257.08) and ending at the Iroquois County Line (M.M. 263.51). This work consists of Class A Pavement Patching and related construction work. | — | Executed | G. M. Sipes Construction, Inc. $231,790 · | ||
| Jun 17, 2022 | 68G65 | WoodfordDistrict 4 | Bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along w This project consists of bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along with other related collateral work necessary to complete the project as shown in the plans and as described herein. Structure carrying TR 134 over 1-74. | — | Executed | Stark Excavating, Inc. $157,836 · | ||
| Jun 17, 2022 | 68H04 | TazewellWoodfordDistrict 4 | 2.9 miles of median removal and manhole/inlet repairs. | — | Executed | Phoenix Corporation of the Quad Cities $155,327 · | ||
| Jun 17, 2022 | 87798 | FordDistrict 3 | Resurfacing and aggregate shoulders on Elliot Road from 12 North Road to IL 54. | — | Rejected | Iroquois Paving Corporation $397,927 · | ||
| Jun 17, 2022 | 89812 | WoodfordDistrict 4 | HMA Pavement widening, resurfacing and PCC pavement on CH 13 from US 24 north for 0.13 mile. | — | Executed | Rowe Construction, a div of UCM, Inc. $614,969 · | ||
| Nov 18, 2022 | 74755 | CrawfordDistrict 7 | Replacement of SN 017-0022 carrying IL 1 over an unnamed creek, 1.8 miles South of IL 33. | — | Executed | White Construction LLC $1,238,552 · | ||
| Jan 20, 2023 | 89817 | WoodfordDistrict 4 | Resurface Santa Fe Trail from IL 26/Spring Bay Road to Ch 19/Lourdes Road. | — | Executed | Advanced Asphalt Company $952,797 · | ||
| Apr 28, 2023 | 66N14 | FordDistrict 3 | Milling, resurfacing at the Gibson City Maintenance Facility located at 401 S. Illinois Dr. just east of Gibson City. | — | Executed | Iroquois Paving Corporation $294,354 · | ||
| Jun 16, 2023 | 74A06 | ClarkCrawfordDistrict 7 | 11.7 miles of patching, milling, resurfacing and aggregate shoulders on IL 1 from 0.3 miles north of the Clark County line to IL 33. | — | Executed | Ambraw Asphalt Materials, Inc. $7,826,400 · | ||
| Jun 16, 2023 | 87790 | FordDistrict 3 | Replace the bridge carrying Buckingham Road over Kelly Creek located 3.3 mile north of IL 116. | — | Executed | Tobey's Construction & Cartage, Inc. $613,170 · | ||
| Jun 16, 2023 | 89779 | WoodfordDistrict 4 | Removal and replacement of a three-span and four-span PPC deck beam superstructure with concrete bent substructures, HMA approaches, on CH 7 over Panther Creek, 2.5 miles south of US 24. | — | Executed | Otto Baum Company, Inc. $1,998,400 · | ||
| Sep 22, 2023 | 66N33 | FordDistrict 3 | This project consists of 3.2 miles of shoulder widening and rumble strip installation on IL 9 from 160 ft east of Fall St in Paxton to just west of N 2300 E Rd in Ford County. | — | Executed | Iroquois Paving Corporation $1,340,112 · | ||
| Jan 19, 2024 | 66M09 | FordDistrict 3 | This job is located on FAP 798 (IL-115), approximately 5.6 miles south of US-24 in Ford County, (SN 027-2507); box culvert replacement. | — | Executed | Iroquois Paving Corporation $568,073 · | ||
| Jan 19, 2024 | 66N94 | FordDistrict 3 | Class B pavement Patching and other related work This work is located on US Route 45 beginning at the Champaign County Line (L.M. 0.00) and ending at Green Street in Paxton (L.M. 3.28). This project consists of Class B pavement Patching and other related work. | — | Executed | A&A Concrete LLC $126,426 · | ||
| Jan 19, 2024 | 95933 | CrawfordDistrict 7 | Replace the bridge carrying TR 93 over Business Creek, 4 miles north of Oblong. | — | Rejected | |||
| Mar 8, 2024 | 68H23 | WoodfordDistrict 4 | Bridge preservation project on SN 102-0046, carrying US Route 24 over TPandW Railroad. The project is 486 feet in length and is located 2.2 miles West of Eureka. | — | Executed | Stark Excavating, Inc. $1,164,727 · | ||
| Mar 8, 2024 | 74980 | CrawfordDistrict 7 | 0.8 miles of inlay resurfacing on IL 33 from 0.2 miles east of North Glendale Road to Park Forest Drive in Robinson. | — | Executed | Ambraw Asphalt Materials, Inc. $1,227,150 · | ||
| Mar 8, 2024 | 95948 | CrawfordDistrict 7 | Resurface Trimble Road/Robinson Road from IL 1 to E 1150 Avenue. | — | Executed | Ambraw Asphalt Materials, Inc. $1,387,981 · | ||
| Apr 26, 2024 | 68I01 | WoodfordDistrict 4 | Rehabilitation to existing lagoon at the eastbound I-74 Mackinaw Dells Rest Area. | — | Executed | Gensini Excavating, Inc. $3,190,549 · | ||
| Apr 26, 2024 | 74A85 | CrawfordDistrict 7 | Culvert removal and precast concrete culvert placement at 5 entrance locations on TR 183A (East 1000th Avenue) in Palestine. | — | Executed | Samron Midwest Contracting, Inc. $790,790 · | ||
| Apr 26, 2024 | 74C71 | CrawfordDistrict 7 | Partial width resurfacing on IL 33 from 0.7 miles west of 1300th Street to 0.1 miles west of 1300th Street in Robinson. | — | Executed | Ambraw Asphalt Materials, Inc. $338,337 · |
1–100 of 129Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.