IDOT Jobs

All dates · 129 jobs · — Sign up free
★ My Jobs

Filtered by: County: Ford Clear all

129 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 66C84 FordDistrict 3 Bridge Replacement (SN 027-0012) over Big Four Ditch, 3.0 miles south of IL 9. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $1,511,121 ·
Jan 19, 2018 66D34 FordDistrict 3 Removal of existing double box culvert to be replaced by a double 8'x5' precast box culvert located on IL 47, 1.6 miles north of IL 9 in Gibson City. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $327,585 ·
Mar 9, 2018 95819 CrawfordDistrict 7 Bridge replacement and approach work on TR 221A over Big Creek, 1.6 miles northeast of Pierceburg. — Executed Nov 26 New Allendale Gravel Co., Inc. $488,412 ·
Apr 27, 2018 68A79 McLeanTazewellWoodfordDistrict 4 10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange. — Executed Nov 26 New Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture $57,888,042 ·
Apr 27, 2018 74841 CrawfordWayneDistrict 7 Painting 5 bridges at 3 locations in Crawford and Wayne Counties (SN 017-0021, 096-0043, 096-0044, 096-0045 and 096-0046). — Executed Nov 26 New Thomas Industrial Coatings, Inc. $458,150 ·
Jun 15, 2018 46501 FordIroquoisLivingstonDistrict 3 Remove and replace raised reflective pavement markers and reflectors on various routes in District 3 — Rejected Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $257,475 ·
Jun 15, 2018 66H73 FordDistrict 3 4.67 miles of shoulder widening and rumble strips on IL 9 from N 2300E Road to N 2800E Road. — Executed Nov 26 New Iroquois Paving Corporation $1,025,141 ·
Jun 15, 2018 68E10 TazewellWoodfordDistrict 4 Patching on US 24 from the McClugage Bridge to Cummings Lane, and on IL 116 from the Upper Spring Bay to Lourdes (CH 19). — Rejected Nov 26 New
Jun 15, 2018 68E19 MarshallWoodfordDistrict 4 28.4 miles of Class A pavement patching on I-39, from the McClean County line north to 2.1 miles south of IL 17. — Executed Nov 26 New Kinney Contractors, Inc. $429,762 ·
Jun 15, 2018 74853 ClarkCrawfordJasperDistrict 7 Replacing existing non-crashworthy traffic barrier end-sections and steel plate beam guardrail at various locations. — Executed Nov 26 New Midwest Fence Corporation $1,444,046 ·
Jun 15, 2018 87646 FordDistrict 3 Resurfacing FAS Route 1346 (CH 5) from 1200 E. Road to US 45. — Executed Nov 26 New Iroquois Paving Corporation $1,015,301 ·
Jun 15, 2018 89663 WoodfordDistrict 4 Resurfacing IL 117 from Eureka Avenue to Reagan Drive in the City of Eureka. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $150,054 ·
Jun 15, 2018 95839 CrawfordDistrict 7 replace the bridge carrying TR 193 over Dogwood Creek, 2.0 miles southeast of Oblong. — Rejected Nov 26 New Sangamo Construction Company $728,011 ·
Nov 9, 2018 68E17 WoodfordDistrict 4 Bridge repairs to SN 102-0007 carrying US Route 24 over Walnut Creek, 0.5 miles west of IL Route 117. — Executed Nov 26 New Stark Excavating, Inc. $434,382 ·
Jan 18, 2019 66J42 FordDistrict 3 removal and replacement of a 3'x 2' concrete box culvert with 30' ERS RCCP culv ert located on IL 115, 0.7 mile south of Main Street in Cabery. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $36,875 ·
Jan 18, 2019 68D79 WoodfordDistrict 4 Resurfacing I-39 from the Mclean County line to 0.25 mile north of US 24, includes repair on bridges SN 102-0058 and 102-0059. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $13,273,213 ·
Mar 8, 2019 68E28 WoodfordDistrict 4 Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka. — Executed Nov 26 New Advanced Asphalt Company $1,373,783 ·
Apr 26, 2019 74886 CrawfordDistrict 7 Culvert extension on IL 1 at Duncanville Road, 3.6 miles south of IL 33. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $181,499 ·
Jun 14, 2019 66A03 FordDistrict 3 3.9 MILES OF MILLING AND RESURFACING 2.5 INCHES ON IL 165 MAINLINE FROM THE MCLEAN CO LINE TO IL 47 IN SIBLEY, IL. — Executed Nov 26 New Iroquois Paving Corporation $893,506 ·
Jun 14, 2019 66K02 FordDistrict 3 Class B pavement patching on IL 54 from the Champaign County line to Church Street in Gibson City. — Executed Nov 26 New G. M. Sipes Construction, Inc. $285,429 ·
Jun 14, 2019 66K03 FordDistrict 3 Class B pavement patching on IL 54 from Church Street in Gibson City to East Main Street in Melvin. — Executed Nov 26 New G. M. Sipes Construction, Inc. $517,414 ·
Jun 14, 2019 66K04 FordDistrict 3 Class B pavement patching on IL 54 from East Main Street in Melvin to the Iroquois County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $457,550 ·
Jun 14, 2019 68E83 WoodfordDistrict 4 REMOVAL OF EXISTING HIGH MAST LIGHTING SYSTEM AND INSTALLATION OF NEW LIGHT POLES, FOUNDATION, LUMINAIRES, ELECTRICAL CABLE, LIGHTING CONTROLLER, AND SERVICE INSTALLATION AT THE INTERCHANGE OF I-39 AND US 24 IN EL PASO. — Executed Nov 26 New Bodine Electric of Decatur $281,004 ·
Jun 14, 2019 68E95 MarshallWoodfordDistrict 4 22 MILES OF CLASS A PAVEMENT PATCHING ON INTERSTATE 39 FROM 0.25 MILES N OF US RTE 24 TO 2.1 MILES S OF IL RTE 17. — Executed Nov 26 New Beniach Construction Co., Inc. $653,392 ·
Jun 14, 2019 95848 CrawfordDistrict 7 Replace the bridge carrying TR 54 over Dogwood Creek, 0.5 miles southeast of Oblong. — Executed Nov 26 New Allendale Gravel Co., Inc. $259,455 ·
Jun 14, 2019 95853 CrawfordDistrict 7 Resurfacing and lime modified soil and aggregate base on various routes from the Jasper County line to North 700th Street in Annapolis. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $3,003,011 ·
Jul 12, 2019 66A81 FordDistrict 3 6 miles of milling and resurfacing of US 24 from Livingston county line to the Iroquois county line. — Executed Nov 26 New Iroquois Paving Corporation $2,795,668 ·
Jul 12, 2019 68C97 TazewellWoodfordDistrict 4 Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $3,974,381 ·
Aug 2, 2019 66J58 FordDistrict 3 Removal and replacement of an 18" diameter pipe culvert south of the railroad tracks in Roberts and a and a 2' x 1.5'concrete box culvert on the north side of the 1300N Rd intersection with IL 115. — Executed Nov 26 New G. M. Sipes Construction, Inc. $131,005 ·
Aug 2, 2019 66K05 FordDistrict 3 3.4 miles of milling, resurfacting and intermittent patching on US 45 from Dawn Avenue in Paxton to the Champaign County line. — Executed Nov 26 New Iroquois Paving Corporation $1,379,136 ·
Nov 8, 2019 66F60 FordDistrict 3 Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $432,193 ·
Nov 8, 2019 66K27 FordDistrict 3 Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. — Executed Nov 26 New Iroquois Paving Corporation $841,960 ·
Nov 8, 2019 68B62 WoodfordDistrict 4 Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 ·
Jan 17, 2020 68E34 WoodfordDistrict 4 Resurfacing I-39 from 3.1 miles S of IL 116 to 1.0 mile N of IL 116. — Executed Nov 26 New Advanced Asphalt Company $9,680,201 ·
Mar 6, 2020 66B76 FordDistrict 3 3.903 miles of milling and resurfacing 3" of HMA from the S edge of Gibson City to the Champaign County Line. Also replacing one cross-road culvert. — Executed Nov 26 New Iroquois Paving Corporation $1,695,669 ·
Mar 6, 2020 68805 WoodfordDistrict 4 Rehabilitation of the superstructure that carries IL Rte 116 over the west branch of Panther Creek in Roanoke. — Executed Nov 26 New Stark Excavating, Inc. $976,351 ·
Mar 6, 2020 68E24 WoodfordDistrict 4 Resurfacing I-39 from N of El Paso to 3.1 miles S of Il 116. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $11,997,953 ·
Apr 24, 2020 66E15 FordIroquoisDistrict 3 7.18 miles of milling and resurfacing 2.5" of HMA on IL 54 from IL 115 in Roberts to Spring Creek and updating guardrail at 2 structures. — Executed Nov 26 New Iroquois Paving Corporation $2,417,273 ·
Apr 24, 2020 66K72 FordDistrict 3 4.15 miles of 3.75" HMA milling and resurfacing with spot guardrail updating and culvert cleaning on IL 9 from the McLean County Line to just W of IL 47 in Gibson City. — Executed Nov 26 New Cross Construction, Inc. $2,121,820 ·
Apr 24, 2020 68F48 WoodfordDistrict 4 Bridge painting along the I-39 corridor in Woodford County on SNs 102-0058, 102-0059, 102-0060, 1020061, and 1020062. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $1,367,875 ·
Apr 24, 2020 95868 CrawfordDistrict 7 Construction of 7" PCC pavment on Highland Avenue from Lincoln Street to Rector Avenue and on Rector Avenue from Highland Avenue to Mefford Drive in Robinson. — Executed Nov 26 New Kieffer Bros. Construction Co., Inc. $571,534 ·
Jun 12, 2020 66B04 FordDistrict 3 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. , 15.17 miles of milling and resurfacing the existing pavement 3.75" on IL 54 from IL 115 in Roberts to IL 9 in Gibson City. The project also includes guardrail updates and various drainage work. — Executed Nov 26 New Iroquois Paving Corporation $7,095,506 ·
Jun 12, 2020 66B78 FordKankakeeDistrict 3 9.26 miles of milling and resurfacing existing pavement 3.75- on IL 115 from CH 18 to 0.3 mile S of Main St in Cabery and Cabery to west corporate limits of Herscher. Work includes guardrail updates, various types of drainage work, and ADA ramp construction in Cabery. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $4,595,011 ·
Jun 12, 2020 66D81 FordDistrict 3 8.999 miles of milling and resurfacing from US 24 to IL 54 (N) in Roberts. — Executed Nov 26 New Iroquois Paving Corporation $3,941,216 ·
Jun 12, 2020 66K91 FordDistrict 3 Class A pavement patching and pavement marking on I-57 from the Champaign/Ford county line to the Ford/Iroquois county line. — Executed Nov 26 New Lion Construction 1, LLC $88,128 ·
Jun 12, 2020 68F24 WoodfordDistrict 4 9 miles of surface maintenance on IL 26 from the Marshall County line to the north city limits of Spring Bay (Zimmerman Rd). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,995,170 ·
Jun 12, 2020 68F52 MarshallWoodfordDistrict 4 10 miles of pavement patching on I-39 from N of IL 116 to S of IL 17.. — Executed Nov 26 New Kinney Contractors, Inc. $434,438 ·
Jun 12, 2020 87724 FordDistrict 3 Replace the bridge carrying CH 2 over Wall Town Drainage Ditch, 5 miles west of Loda. — Executed Nov 26 New Iroquois Paving Corporation $495,240 ·
Jun 12, 2020 95875 CrawfordDistrict 7 Replace the bridge carrying TR 68 over Little Creek, 2.0 miles east of Pierceburg. — Executed Nov 26 New Allendale Gravel Co., Inc. $420,596 ·
Jul 31, 2020 66K99 FordDistrict 3 Crack and joint serling on FAI 57 (IL 57) from Champaign County line to Irroquois County line in Ford County for a total length of 6.35 mi. — Executed Nov 26 New Complete Asphalt Service Co. $101,312 ·
Nov 6, 2020 66K20 FordDistrict 3 The project is located on IL 9/IL 47/IL 54 from IL 47 (N) in Gibson City to Baltimore Drive in Paxton for length of 14.01 miles. Project includes 3 3/4" mill and resurface from beginning of project to IL 115 and 2" mill and RS to end of projects. Work includes guardrail updates, drainage work and ADA updates and patching in Gibson City. — Executed Nov 26 New Cross Construction, Inc. $8,756,556 ·
Nov 6, 2020 68F98 TazewellWoodfordDistrict 4 Culvert lining at various locations along US 24 in Tazewell and Woodford Counties. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $217,465 ·
Nov 6, 2020 89754 WoodfordDistrict 4 Remove and replace guardrail and terminals at various locations in Woodford County. — Executed Nov 26 New Midwest Fence Corporation $625,958 ·
Mar 5, 2021 66K61 FordDistrict 3 Milling and resurfacing 3 Project is located in Piper City, Ford County. The job length is 1.09 miles and consists of milling and resurfacing 3.75" of HMA on the mainline pavement. The work also includes several ADA improvements. — Executed Nov 26 New Iroquois Paving Corporation $747,230 ·
Apr 23, 2021 68G20 MarshallMcLeanWoodfordDistrict 4 Installation of communications duct, communications vaults, and fiber optic cable along Interstate 39 from the Interstate 55 interchange to Illinois Route 17 in District Four. — Executed Nov 26 New Gerstner Electric, Inc. $1,837,876 ·
Apr 23, 2021 68G22 WoodfordDistrict 4 Removal of existing high mast towers and installation of new lighting system at Interstate 39 at the Minonk interchange and replacement of light towers at Interstate 74 Mackinaw Dells rest areas. — Executed Nov 26 New Laser Electric, Inc. $279,781 ·
Apr 23, 2021 87660 FordDistrict 3 Replace the bridge carrying CH 23 over Crane Creek, 0.75 mile east of Cabery. — Rejected Nov 26 New Tobey's Construction & Cartage, Inc. $426,709 ·
Apr 23, 2021 87740 FordDistrict 3 Replace the bridge carrying CH 18 over the West Branch of Horse Creek, 2 miles southeast of Cabery. — Rejected Nov 26 New Tobey's Construction & Cartage, Inc. $419,682 ·
Jun 11, 2021 68G17 MarshallWoodfordDistrict 4 Class A and B patching on 1-39 from 1 mile North of IL Route 116 to 2 miles South of IL Route 17 and ramps at the Minonk Interchange. — Executed Nov 26 New Kinney Contractors, Inc. $377,733 ·
Jun 11, 2021 68G25 TazewellWoodfordDistrict 4 Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills. — Executed Nov 26 New Kinney Contractors, Inc. $615,751 ·
Jun 11, 2021 95899 CrawfordDistrict 7 Replace the bridge carrying TR 245 over Freeport Creek, 0.6 mile east of Freeport. — Executed Nov 26 New Howell Paving, Inc. $539,620 ·
Jul 30, 2021 66L91 FordIroquoisDistrict 3 The project consists of 7.15 miles of crack routing and crack sealing on FAP 71 (IL 54) from IL 115 in Roberts to Structure 038-0213 in Ford and Iroquois Counties. — Executed Nov 26 New Freehill Asphalt, Inc. $62,711 ·
Jul 30, 2021 74915 CrawfordDistrict 7 Bridge replacement (SN 017-8612) on IL 1 over Sugar Creek approximately 1 mile north of the Lawrence County line and realignment of TR 363. — Executed Nov 26 New Sangamo Construction Company $3,028,564 ·
Jul 30, 2021 87780 FordDistrict 3 Resurfacing and aggregate shoulders on Elliot Road from IL 54 to IL 9. — Executed Nov 26 New Iroquois Paving Corporation $1,626,354 ·
Sep 17, 2021 68D17 WoodfordDistrict 4 Box culvert replacements on US 150 (S.N. 102-1005; S.N. 102-2503 (new)), 0.9 mile East of Mackinaw River and (S.N. 102-1004; S.N. 102-2030 (new)), 0.16 mile East of CR 1825E. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $2,337,434 ·
Sep 17, 2021 68G63 WoodfordDistrict 4 New shoulders along US 150 from County Road 1250E, West of Goodfield to the McLean County Line. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $3,018,142 ·
Nov 5, 2021 68G57 MarshallWoodfordDistrict 4 Bridge painting at various locations in Marshall and Woodford Counties on Structure Nos.: 062-0085, 062-0049, 062-0053, 062-0054, 062-0055, 102-048, 102-0050 and 102-0051. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $1,487,500 ·
Nov 5, 2021 74181 CrawfordDistrict 7 Replacement of SN 017-0003 and SN 017-0004 on IL 1, 2.5 and 0.3 miles north of IL 33. — Executed Nov 26 New Sangamo Construction Company $3,233,083 ·
Jan 21, 2022 66M12 FordDistrict 3 Cleaning and painting all structural steel and other steel components of the structure This work is located at one structure on IL 54: Structure No. 027-0076 over the E. Branch of the Vermilion River, two structures on IL 9/47: Structure No. 027-0084 over Drummer Creek (in Gibson) and Structure No. 027-0085_over Drummer Creek (In Gibson). This project consists of cleaning and painting all structural steel and other steel components of the structure. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $311,138 ·
Apr 29, 2022 66L03 FordDistrict 3 A SMART overlay with 1 This work is located on FAP 326 (IL 47) from the Livingston County line to 8th Street in Gibson City in Ford County (+/-10.58 miles). This work consists of a SMART overlay with 1.5" milling, as well as drainage improvements. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,153,189 ·
Apr 29, 2022 66M34 FordDistrict 3 Class B pavement patching and other related construction work This work is located on FAP Route 71 (IL 54) beginning at the Ford/Iroquois County line (L.M. 0.00) and ending at the South Intersection of IL Route 54 and and IL Route 115 (L.M. 4.90) in Roberts. This work consists of Class B pavement patching and other related construction work. — Executed Nov 26 New Terrazas, LLC $183,566 ·
Apr 29, 2022 66M45 FordDistrict 3 Class B pavement patching and related construction work This work is located on FAS Route 340 (IL 115) beginning at the intersection of IL 115 and IL 54 in Roberts (Log Mile 0.00) and ending at the intersection of IL 115 and IL 9 (Log Mile 10.57). This work consists of Class B pavement patching and related construction work. — Rejected Nov 26 New Iroquois Paving Corporation $391,494 ·
Apr 29, 2022 68F87 MarshallWoodfordDistrict 4 Resurface I-39 from 1 mile N of IL 116 to 2 miles S of IL 17. — Executed Nov 26 New Advanced Asphalt Company $25,968,870 ·
Apr 29, 2022 68G30 WoodfordDistrict 4 Cape Seal on Il 116/117 from IL 117(N) to 1-39. — Executed Nov 26 New Beniach Construction Co., Inc. $692,608 ·
Apr 29, 2022 68G77 KnoxWoodfordDistrict 4 Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas. — Executed Nov 26 New Laser Electric, Inc. $179,815 ·
Apr 29, 2022 68G78 WoodfordDistrict 4 Bridge Painting on structures carrying Roanoke Road (SN 102-0054) and TR 605 (SN 102-0057) over 1-39. — Executed Nov 26 New Three Star Painting, Inc. $500,000 ·
Apr 29, 2022 87771 FordDistrict 3 Resurfacing Buckley Road from IL 54 to the Iroquois County line. — Executed Nov 26 New Iroquois Paving Corporation $1,239,137 ·
Jun 17, 2022 66B77 FordDistrict 3 3P milling and resurfacing (design overlay) This work is located on FAP 796 (IL 115) from South Corporate Limits of Cabery to IL 116 (+/-7.83 miles) in Ford County. This work consists of 3P milling and resurfacing (design overlay). — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $4,357,980 ·
Jun 17, 2022 66L89 FordDistrict 3 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch This work is located at FAP 697 (IL 9) from Stockholm Road in Paxton to Vermillion County Line in Ford County (+/- 7.68 miles). This work consists of 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch grading, channel excavation and riprap placement. — Executed Nov 26 New Iroquois Paving Corporation $4,972,663 ·
Jun 17, 2022 66M60 FordDistrict 3 Class A Pavement Patching and related construction work This work is located on FAI Route 57 (I-57) beginning at the Champaign County Line (M.M. 257.08) and ending at the Iroquois County Line (M.M. 263.51). This work consists of Class A Pavement Patching and related construction work. — Executed Nov 26 New G. M. Sipes Construction, Inc. $231,790 ·
Jun 17, 2022 68G65 WoodfordDistrict 4 Bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along w This project consists of bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along with other related collateral work necessary to complete the project as shown in the plans and as described herein. Structure carrying TR 134 over 1-74. — Executed Nov 26 New Stark Excavating, Inc. $157,836 ·
Jun 17, 2022 68H04 TazewellWoodfordDistrict 4 2.9 miles of median removal and manhole/inlet repairs. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $155,327 ·
Jun 17, 2022 87798 FordDistrict 3 Resurfacing and aggregate shoulders on Elliot Road from 12 North Road to IL 54. — Rejected Nov 26 New Iroquois Paving Corporation $397,927 ·
Jun 17, 2022 89812 WoodfordDistrict 4 HMA Pavement widening, resurfacing and PCC pavement on CH 13 from US 24 north for 0.13 mile. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $614,969 ·
Nov 18, 2022 74755 CrawfordDistrict 7 Replacement of SN 017-0022 carrying IL 1 over an unnamed creek, 1.8 miles South of IL 33. — Executed Nov 26 New White Construction LLC $1,238,552 ·
Jan 20, 2023 89817 WoodfordDistrict 4 Resurface Santa Fe Trail from IL 26/Spring Bay Road to Ch 19/Lourdes Road. — Executed Nov 26 New Advanced Asphalt Company $952,797 ·
Apr 28, 2023 66N14 FordDistrict 3 Milling, resurfacing at the Gibson City Maintenance Facility located at 401 S. Illinois Dr. just east of Gibson City. — Executed Nov 26 New Iroquois Paving Corporation $294,354 ·
Jun 16, 2023 74A06 ClarkCrawfordDistrict 7 11.7 miles of patching, milling, resurfacing and aggregate shoulders on IL 1 from 0.3 miles north of the Clark County line to IL 33. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $7,826,400 ·
Jun 16, 2023 87790 FordDistrict 3 Replace the bridge carrying Buckingham Road over Kelly Creek located 3.3 mile north of IL 116. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $613,170 ·
Jun 16, 2023 89779 WoodfordDistrict 4 Removal and replacement of a three-span and four-span PPC deck beam superstructure with concrete bent substructures, HMA approaches, on CH 7 over Panther Creek, 2.5 miles south of US 24. — Executed Nov 26 New Otto Baum Company, Inc. $1,998,400 ·
Sep 22, 2023 66N33 FordDistrict 3 This project consists of 3.2 miles of shoulder widening and rumble strip installation on IL 9 from 160 ft east of Fall St in Paxton to just west of N 2300 E Rd in Ford County. — Executed Nov 26 New Iroquois Paving Corporation $1,340,112 ·
Jan 19, 2024 66M09 FordDistrict 3 This job is located on FAP 798 (IL-115), approximately 5.6 miles south of US-24 in Ford County, (SN 027-2507); box culvert replacement. — Executed Nov 26 New Iroquois Paving Corporation $568,073 ·
Jan 19, 2024 66N94 FordDistrict 3 Class B pavement Patching and other related work This work is located on US Route 45 beginning at the Champaign County Line (L.M. 0.00) and ending at Green Street in Paxton (L.M. 3.28). This project consists of Class B pavement Patching and other related work. — Executed Nov 26 New A&A Concrete LLC $126,426 ·
Jan 19, 2024 95933 CrawfordDistrict 7 Replace the bridge carrying TR 93 over Business Creek, 4 miles north of Oblong. — Rejected Nov 26 New
Mar 8, 2024 68H23 WoodfordDistrict 4 Bridge preservation project on SN 102-0046, carrying US Route 24 over TPandW Railroad. The project is 486 feet in length and is located 2.2 miles West of Eureka. — Executed Nov 26 New Stark Excavating, Inc. $1,164,727 ·
Mar 8, 2024 74980 CrawfordDistrict 7 0.8 miles of inlay resurfacing on IL 33 from 0.2 miles east of North Glendale Road to Park Forest Drive in Robinson. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $1,227,150 ·
Mar 8, 2024 95948 CrawfordDistrict 7 Resurface Trimble Road/Robinson Road from IL 1 to E 1150 Avenue. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $1,387,981 ·
Apr 26, 2024 68I01 WoodfordDistrict 4 Rehabilitation to existing lagoon at the eastbound I-74 Mackinaw Dells Rest Area. — Executed Nov 26 New Gensini Excavating, Inc. $3,190,549 ·
Apr 26, 2024 74A85 CrawfordDistrict 7 Culvert removal and precast concrete culvert placement at 5 entrance locations on TR 183A (East 1000th Avenue) in Palestine. — Executed Nov 26 New Samron Midwest Contracting, Inc. $790,790 ·
Apr 26, 2024 74C71 CrawfordDistrict 7 Partial width resurfacing on IL 33 from 0.7 miles west of 1300th Street to 0.1 miles west of 1300th Street in Robinson. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $338,337 ·
1–100 of 129Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.