(102-2)L
- Let date
- Friday, June 14, 2019
- Contract
- 68E83 · job page
- District
- District 4
- County
- Woodford
- Highway
- Limits
- REMOVAL OF EXISTING HIGH MAST LIGHTING SYSTEM AND INSTALLATION OF NEW LIGHT POLES, FOUNDATION, LUMINAIRES, ELECTRICAL CABLE, LIGHTING CONTROLLER, AND SERVICE INSTALLATION AT THE INTERCHANGE OF I-39 AND US 24 IN EL PASO.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Bodine Electric of Decatur Low bidder | $281,004 | ||
| 2 | Laser Electric, Inc. | $299,015 | +6.4% | |
| 3 | Oberlander Electric Co. | $323,840 | +15.2% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Bodine Electric… | #2 Laser Electric,… | #3 Oberlander Elec… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0325541 | REM EX LIGHTING SYSTM | 1 | L SUM | $54,064.70 | $50,609.59 | $70,000.00 | |
| 2 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $11,948.00 | $10,576.42 | $29,300.00 | |
| 3 | 67100100 | MOBILIZATION | 1 | L SUM | $3,942.84 | $14,738.72 | $12,875.00 | |
| 4 | 80400100 | ELECT SERV INSTALL | 1 | EACH | $2,628.56 | $3,312.29 | $3,375.00 | |
| 5 | 81028350 | UNDRGRD C PVC 2 | 520 | FOOT | $18.61 | $26.68 | $33.95 | |
| 6 | 81603000 | UD 2#8 #8G XLPUSE 3/4 | 8,328 | FOOT | $10.41 | $9.63 | $9.00 | |
| 7 | 82110008 | LUM LED RDWY H | 21 | EACH | $746.75 | $763.05 | $475.00 | |
| 8 | 82500335 | LT CONT PEDM 240V100 | 1 | EACH | $7,029.01 | $6,031.13 | $6,050.00 | |
| 9 | 83060840 | LT P GS 50MH TEN MT | 17 | EACH | $3,301.23 | $3,897.74 | $3,370.00 | |
| 10 | 83060845 | LT P GS 50MH TN MT-TW | 2 | EACH | $3,339.47 | $3,932.63 | $3,334.00 | |
| 11 | 83600358 | LP F M 15BC 8 5/8X8 | 19 | EACH | $859.06 | $1,034.49 | $1,075.00 | |
| 12 | 83800650 | BKWY DEV COU SS SCRN | 76 | EACH | $134.42 | $129.85 | $201.00 |