IDOT Jobs

All dates · 1,087 jobs · — Sign up free
★ My Jobs

Filtered by: County: Cook Clear all

1,087 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Nov 9, 2018 61F14 CookDistrict 1 Resurfacing and ADA sidewalk improvements on Smith Street from Palatine Road to Dundee Road in the Village of Palatine. — Executed Nov 26 New Arrow Road Construction Co. $1,357,145 ·
Nov 9, 2018 61F16 CookDistrict 1 Roadway reconstruction on FAU Route 1076 (Locust Road) from Lake Avenue to Wilmette Avenue in the Village of Wilmette. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $4,089,411 ·
Nov 9, 2018 62A36 CookDistrict 1 Intersection improvement, drainage, traffic modernization, shared-use path and watermain relocation on IL 68 in the Villages of Barrington and Inverness. — Executed Nov 26 New Martam Construction Incorporated $2,526,633 ·
Nov 9, 2018 62C71 CookDistrict 1 Resurfacing on IL 7/US 6 (Wolf Road from just north of Southwest Highway to approximately 75 ft north of 151 Street in the Village of Orland Park. — Executed Nov 26 New D. Construction, Inc. $1,200,451 ·
Nov 9, 2018 62G32 CookDistrict 1 Bridge repair that includes structural steel repair to the structure carrying 79th Street over the CSX Railroad in the Village of Bridgeview. — Executed Nov 26 New Sumit Construction Co., Inc. $103,465 ·
Nov 9, 2018 62G84 CookDistrict 1 Cleaning and painting designated steel surfaces of SN 016-0669 carrying Addison Street over I-90/94 in the City of Chicago. — Executed Nov 26 New Capital Industrial Services $899,933 ·
Nov 9, 2018 62G89 CookDistrict 1 Cleaning and painting 2 structures on I-90/94 in Chicago: 1) SN 016-0204 - eastbound ramp to Ohio; 2) SN 016-2551 - reversible to Ohio. — Executed Nov 26 New Capital Industrial Services $733,300 ·
Jan 18, 2019 46483 CookDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. — Executed Nov 26 New Superior Road Striping, Inc. $579,619 ·
Jan 18, 2019 60484 CookDistrict 1 Removal of existing bridge structure carrying 135th Street over Ashland Avenue, also, storm sewer installation, integral retaining wall, sidewalk and concrete barrier wall construction. — Executed Nov 26 New D. Construction, Inc. $1,519,602 ·
Jan 18, 2019 60Y68 CookDistrict 1 Landscaping within the following boundaries of I-90/94: Roosevelt Road to Washington Blvd. and Peoria St. to Clinton St., and I-290: Roosevelt Rd. to Van Buren St. and Ashland Ave. to Clinton St. — Executed Nov 26 New Copenhaver Construction, Inc. $131,623 ·
Jan 18, 2019 61E44 CookDistrict 1 Replace the superstructure and repair the abutments on the structure carrying Barker Avenue over Salt Creek in the City of Rolling Meadows. — Executed Nov 26 New Martam Construction Incorporated $613,257 ·
Jan 18, 2019 61F00 CookDistrict 1 Roadway reconstruction with drainage and lighting work on State and National Parkway from PLum Grove Road to IL Route 58 in Schaumburg. — Executed Nov 26 New Plote Construction, Inc. $5,761,331 ·
Jan 18, 2019 61F21 CookDistrict 1 Pavement reconstruction, widening and resurfacing, traffic signal replacement at the intersection of US 6 and Van Dam Road in the Village of South Holland. — Executed Nov 26 New Gallagher Asphalt Corporation $1,793,572 ·
Jan 18, 2019 61F22 CookDistrict 1 Roadway reconstructioon with sidewalk, curb and gutter, and drainage work on Walnut Lane from Schaumburg Lane to Weathersfield Way in Schaumburg. — Executed Nov 26 New Alliance Contractors, Inc. $2,692,563 ·
Jan 18, 2019 61F24 CookDistrict 1 Resurfacing on Lively Boulevard from Devon Avenue to Landmeier Road in the Village of Elk Grove Village. — Executed Nov 26 New K-Five Construction Corporation $1,295,822 ·
Jan 18, 2019 61F35 CookDistrict 1 Sidewalk Construction and traffic signal improvement on Archer Road from 68th Street to 66th Place, and on State Road from Lavergne Avenue to Cicero Avenue in Bedford Park. — Executed Nov 26 New Triggi Construction, Inc. $191,631 ·
Jan 18, 2019 61F43 CookDistrict 1 Rehabilitate the bridges carrying Oak Street and Cherry Street over the UP Railroad in the Village of Winnetka. — Executed Nov 26 New Dunnet Bay Construction Company $3,345,570 ·
Jan 18, 2019 62C07 CookDistrict 1 Traffic signal modernization at Central Park Avenue. Channelization and traffic signal modernization at Crawford/Pulaski Road, and Kedzie Avenue. — Executed Nov 26 New Iroquois Paving Corporation $8,882,487 ·
Jan 18, 2019 62C51 CookDistrict 1 Resurfacing and pedestrian ramp improvement project on IL 83 (Torrence Ave.) from Glenwood Dyer Rd. to south of I-80. — Executed Nov 26 New D. Construction, Inc. $1,892,784 ·
Jan 18, 2019 62F03 CookDistrict 1 Bridge rehabilitation in Northfield. — Executed Nov 26 New Dunnet Bay Construction Company $1,994,113 ·
Jan 18, 2019 62F23 CookDistrict 1 Resurfacing Palatine Road from US 12 to IL 21, and patching on Dundee Road from east of Kennicott Ave to First Street. — Executed Nov 26 New J. A. Johnson Paving Company $5,278,586 ·
Jan 18, 2019 62F30 CookDistrict 1 Superstructure replacement, retaining wall modifications, approach slab replacement, HMA resurfcing and ADA ramp installation on IL 171 over CSX RR/Ingredion RR spur. — Executed Nov 26 New D. Construction, Inc. $1,337,721 ·
Jan 18, 2019 62G07 CookDistrict 1 Removal and replacement of headwalls and wingwalls on either side of the existing double cell box culvert crossing Burnham Ave., 40 ft north of 202nd St. in Lynwood. — Executed Nov 26 New MYS, Incorporated $188,874 ·
Jan 18, 2019 62G87 CookLakeMcHenryDistrict 1 Cleaning and painting existing steel on structures. IL 137 over US 45, IL 31 over UPRR, and Green Bay Road over North Shore Channel. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $302,850 ·
Jan 18, 2019 62H31 CookLakeDistrict 1 Crack and joint sealing on US 12 (Rand Rd.) from Ela Road to IL 58 (Golf Rd.) — Executed Nov 26 New Freehill Asphalt, Inc. $451,265 ·
Jan 18, 2019 62H47 CookDistrict 1 Resurfacing on Palatine Rd. approximately 100 feet west of the centerline of US 14 (Northwest Hwy.) to 70 feet east of centerline of US 12 (Rand Rd.). 2.93 miles. — Executed Nov 26 New Builders Paving, LLC $3,557,204 ·
Mar 8, 2019 60M72 CookDistrict 1 Bridge deck overlay, joint repairs, structural repair of concrete and steel to I-94 at IL 68 (Dundee Road). — Executed Nov 26 New Rausch Infrastructure, LLC $1,199,708 ·
Mar 8, 2019 60N83 CookDistrict 1 Rehabilitation and widening on SN 016-0533 carrying Willow Road over Lehigh and SOO line in Glenview. — Executed Nov 26 New Lorig Construction Company $8,661,763 ·
Mar 8, 2019 60R65 CookDistrict 1 Overlay 016-2525 bridge deck with thin polymer in the City of Harvey. — Executed Nov 26 New MYS, Incorporated $116,107 ·
Mar 8, 2019 60R69 CookDistrict 1 Deck patching, deck scarification, latex concrete overlay abutment repairs, joint repairs, slab repairs and debris removal on Golf Road over the East and West Fork N. Branch Chicago River (SN 016-0355, 016-0356, 016-1256 and 016-1257) — Executed Nov 26 New Martam Construction Incorporated $973,368 ·
Mar 8, 2019 60R75 CookDistrict 1 Bridge deck scarification and latex concrete overlay, reconstruction of transverse bridge joints, and substructure repairs on US 30 over Thorn Creek. — Executed Nov 26 New MYS, Incorporated $380,278 ·
Mar 8, 2019 60T49 CookDistrict 1 Resurfacing and pedestrian ramp improvements on US 14 (Northwest Highway) through the Village of Arlington Heights, Village of Mount Prospect and the city of Des Plaines — Executed Nov 26 New Arrow Road Construction Co. $4,073,824 ·
Mar 8, 2019 60W87 CookDistrict 1 Surface preparation and painting of structrual steel, containment and disposal of lead waste and maintenance of traffic at 5 bridge structures located on IL 171 and on I-55 in Villages of McCook and Summit. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $2,284,150 ·
Mar 8, 2019 61F41 CookDistrict 1 Roadway reconstruction on Irving Park Road from east of IL 59 to Bartlett Road in Streamwood. — Executed Nov 26 New Plote Construction, Inc. $6,796,581 ·
Mar 8, 2019 61F48 CookDistrict 1 Sidewalk construction adjacent to 79th Street from Garden Lane to Oak Grove Avenue in the Village of Justice. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $113,944 ·
Mar 8, 2019 61F49 CookDistrict 1 Reconstruction of Northfield Road from Winnetka Road to Willow Road in the Village of Northfield. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,588,343 ·
Mar 8, 2019 61F54 CookDistrict 1 Resurfacing Schick Road from Petersdorf Road to Fairfax Lane, and resurfacing Petersdorf Road from Schick Road to Army Trial Road in the Village of Bartlett. — Executed Nov 26 New Plote Construction, Inc. $1,214,960 ·
Mar 8, 2019 61F60 CookDistrict 1 Construction of a multi-use path along Brainard Avenue from Joliet Road to 55th Street in the City of Countryside. — Executed Nov 26 New K-Five Construction Corporation $964,375 ·
Mar 8, 2019 62F37 CookDistrict 1 Repairs on Bridge SN 016-0225 carrying US 34 (Ogden Avenue) over IHB Railroad in the Village of LaGrange. — Executed Nov 26 New D. Construction, Inc. $513,202 ·
Mar 8, 2019 62F49 CookWillDistrict 1 6.45 miles of 3P resurfacing and ADA ramps on IL 43 from north of US 30 to just north of US 6. — Executed Nov 26 New D. Construction, Inc. $5,880,439 ·
Mar 8, 2019 62F66 CookDistrict 1 1.91 miles of HMA resurfcing, pavement patching, removal and replacement of curb and gutter, sidewalk removal and replacement and placement of thermoplastic markings along Avondale Avenue from Ogallah Avenue to Bryn Mawr Avenue in Chicago. — Executed Nov 26 New Arrow Road Construction Co. $1,771,483 ·
Mar 8, 2019 62G21 CookDistrict 1 Resurfacing and pedestrian ramp improvements on US 12/20/41 (Indianapolis Ave) from S. Ewing Ave. to 106th Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $1,035,977 ·
Mar 8, 2019 62G47 CookDistrict 1 7.33 miles of resurfacing and pedestrian ramp projects on IL 171 (First Ave.) from 43rd Street to Des Plaines River Road. — Executed Nov 26 New R. W. Dunteman Company $7,076,939 ·
Mar 8, 2019 62G50 CookDistrict 1 Deck overlay, joint repair and structural steel repair on SN 016-0344 carrying US 45 over the Cal Sag Channel in Palos Township. — Executed Nov 26 New MYS, Incorporated $474,229 ·
Mar 8, 2019 62G67 CookDistrict 1 Resurfacing and ADA pedestrian ramp improvements on vincennes Avenue from 119th Street to 127th Street in Blue Island. — Executed Nov 26 New K-Five Construction Corporation $827,549 ·
Mar 8, 2019 62G80 CookDistrict 1 3P resurfacing and median rehabilitation with pedestrian ramps along 127th Street/Burr Oak Ave from east of I-294 to Atesian Avenue in Blue Island. — Executed Nov 26 New Gallagher Asphalt Corporation $3,053,618 ·
Mar 8, 2019 62H07 CookDistrict 1 0.5 miles of HMA resurfacing, pavement patching, milled shoulder rumble strips and pavement marking on IL 19 from Taft Avenue to Seymour Avenue in Chicago. — Executed Nov 26 New Plote Construction, Inc. $673,920 ·
Mar 8, 2019 62H17 CookDistrict 1 Structural repairs of concrete on the structure carrying Joliet Road over the BandOCT RR in the Village of McCook — Executed Nov 26 New D. Construction, Inc. $262,345 ·
Mar 8, 2019 62H19 CookDistrict 1 Bridge joint replacement and bridge deck sealing on SN 016-0273 carrying Torrence Avenue over I-80/I-94 in the Village of Lansing — Executed Nov 26 New D. Construction, Inc. $272,594 ·
Mar 8, 2019 62H27 CookDistrict 1 Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement, and longitudinal joints between existing pavement and Curb and gutter and restriping with hot spray thermoplastic pavement marking. — Executed Nov 26 New Denler, Inc. $252,444 ·
Mar 8, 2019 62H41 CookDistrict 1 2.4 miles of resurfacing and pedestrian ramp upgrades on IL 171 (Archer Ave.) from west of Ashland Avenue to State Street in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $1,424,366 ·
Mar 8, 2019 62H43 CookDistrict 1 2.3 miles of resurfacing and pedestrian ramp improvements on US 14 from Western Avenue to Vernon Avenue through the cities of Des Plaines and Park Ridge. — Executed Nov 26 New Arrow Road Construction Co. $2,276,865 ·
Apr 26, 2019 60N21 CookDistrict 1 Replacement of bridge superstructure and substructure repairs on SN 016-2417 carrying Glenwood Road over Thorn Creek in Chicago Heights. — Executed Nov 26 New D. Construction, Inc. $2,337,418 ·
Apr 26, 2019 60R42 CookDistrict 1 3P resurfacing on US 45 from IL 83 to West Creek Road in Palos Park. — Executed Nov 26 New D. Construction, Inc. $1,719,110 ·
Apr 26, 2019 60V94 CookDistrict 1 0.26 mile resurfacing on California Avenue from Cermak Road to 19th Street in the City of Chicago. — Executed Nov 26 New Gallagher Asphalt Corporation $230,632 ·
Apr 26, 2019 61D85 CookDistrict 1 Pavement widening, resurfacing, curb and gutter, sidewalk, traffic signal modernization and street lighting at the intersection of Pulaski Road and 183rd Street in Country Club Hills. — Executed Nov 26 New D. Construction, Inc. $4,586,119 ·
Apr 26, 2019 61E94 CookDistrict 1 Sidewalk improvements at various locations within the the Village of Barrington — Executed Nov 26 New Copenhaver Construction, Inc. $303,835 ·
Apr 26, 2019 61F01 CookDistrict 1 Resurfacing with sidewalk, curb and gutter work on Riverside Drive from Harlem Avenue to Cermak Road in the City of Berwyn. — Executed Nov 26 New K-Five Construction Corporation $1,813,626 ·
Apr 26, 2019 61F09 CookDistrict 1 Pavement removal, storm sewers, HMA pavement, curb and gutter, sidewalks, traffic signals, street lighting and pavement markings on Woodfiled Road, from Martingale Road to the East Frontage Road in Schaumburg. — Executed Nov 26 New R. W. Dunteman Company $8,043,997 ·
Apr 26, 2019 61F10 CookDistrict 1 Pavement removal, storm sewers, HMA pavement, curb and gutter, sidewalks, traffic signals, street lighting and pavement markings on Woodfiled Road, from Meacham Road to Martingale Road in Schaumburg. — Executed Nov 26 New R. W. Dunteman Company $6,586,314 ·
Apr 26, 2019 61F39 CookDistrict 1 Roadway Reconstruction on Braga Drive from 25th Avenue to West 16th Street and on West 16th Street from Braga Drive to 21st Avenue in the Village of Broadview. — Executed Nov 26 New J. Nardulli Concrete, Inc. $1,657,606 ·
Apr 26, 2019 61F46 CookDistrict 1 Resurfacing Roy Avenue from North Avenue to Winters Drive in the City of Northlake. — Executed Nov 26 New Plote Construction, Inc. $1,225,697 ·
Apr 26, 2019 61F53 CookDistrict 1 Resurfacing Illinois Street from Orchard Drive to Western Avenue in the Village of Park Forest. — Executed Nov 26 New Iroquois Paving Corporation $1,016,064 ·
Apr 26, 2019 61F77 CookDistrict 1 Resurfacing Burr Ridge Parkway from County Line Road to Bridewall Drive in the Village of Burr Ridge. — Executed Nov 26 New Lindahl Brothers, Inc. $597,901 ·
Apr 26, 2019 62G42 CookDistrict 1 0.46 mile 3P resurfacing, pedestrian ramps, storm sewer repair, and drainage on Lawrence Ave from 471 ft east of Manheim Centerline to Rose St through Schiller Park, and east of Canfield Ave in Norridge. — Rejected Nov 26 New R. W. Dunteman Company $1,919,386 ·
Apr 26, 2019 62H12 CookDistrict 1 Resurfacing and pedestrian ramps on IL 58 from the intersection of IL 58 and Meijer Dr Easterly for 4.58 miles to the west leg of the intersection with Broadway St. — Executed Nov 26 New Arrow Road Construction Co. $5,713,416 ·
Apr 26, 2019 62H22 CookDistrict 1 6.00 miles of resurfacing, milled rumble strips, and pedestrian ramp improvements on US 6 from 94th Ave to west of Pulaski Rd/Crawford Ave in Oak Forest. — Executed Nov 26 New D. Construction, Inc. $5,035,013 ·
Apr 26, 2019 62H23 CookDistrict 1 Bridge repairs, structural steel repair, and deck slab repairs for the bridge carrying IL 43 over Cal Sag Channel in Palos Township. — Executed Nov 26 New Rausch Infrastructure, LLC $996,583 ·
Apr 26, 2019 62H29 CookLakeDistrict 1 A total of 10.2 miles of routing, cleaning, and sealing of longitudinal cracks at 3 locations on IL 21/US 45 in Niles, Glenview, Vernon Hills, Libertyville and Gurnee. — Executed Nov 26 New Denler, Inc. $525,544 ·
Apr 26, 2019 62H44 CookDistrict 1 3.1 miles of resurfacing and pedestrian ramps on IL 62 (Algonquin Road) from IL 58 to IL 83 through Rolling Meadows, Des Plaines, Mount Prospect and Arlington Heights. — Executed Nov 26 New Arrow Road Construction Co. $3,932,574 ·
Apr 26, 2019 62H45 CookDistrict 1 2.5 miles of resurfacing and pedestrian ramps on IL 58 (Dempster Avenue) from IL 43 (Waukegan Avenue) to US 41 (Skokie Boulevard) in the Villages of Skokie and Martin Grove. — Executed Nov 26 New Plote Construction, Inc. $3,896,916 ·
Apr 26, 2019 62H72 CookDistrict 1 Concrete bridge deck sealing upon the entire bridge deck surface, sidewalks, inside and top of parapets of various structures within Cook County. — Executed Nov 26 New M & M Concrete, Inc. $246,000 ·
Apr 26, 2019 62H73 CookDistrict 1 Removing a portion of existing retaining wall, construction of new stem, temporary soil retention system, structural repair of concrete, pavement patching, coring weep holes and cleaning drainage structures on 1-90 in the City of Chicago. — Executed Nov 26 New Areatha Construction Co., Inc. $493,651 ·
Jun 14, 2019 46506 CookDistrict 1 Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Cook County. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $820,000 ·
Jun 14, 2019 46509 CookDistrict 1 Remove and replace reflectors and pavement marker castings within limits shown. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $246,018 ·
Jun 14, 2019 60R80 CookDistrict 1 Bridge deck and approach overlay, repairs and reconstruction of deck joints on structures carrying Sheridan Road over ravines in the Village of Glencoe and City of Highland Park. (SN 016-0616, 0617, 0618, 0619) — Executed Nov 26 New Copenhaver Construction, Inc. $1,624,894 ·
Jun 14, 2019 61F06 CookDistrict 1 PCC multi-use path construction with ADA ramp improvements on Shermer Road from West Lake Avenue to willow Road in the Village of Glenview. — Executed Nov 26 New M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $999,270 ·
Jun 14, 2019 61F37 CookDistrict 1 Roadway reconstruction, traffic signals, interconnection with railroad signals, curb and gutter, sidewalk and street lighting at the intersection of 95th Street and Museum Avenue in Oak Lawn. — Executed Nov 26 New Alliance Contractors, Inc. $1,728,958 ·
Jun 14, 2019 61F84 CookDistrict 1 Construction of a pedestrian path adjacent to Roselle Road from Algonquin Road to Shire Circle in the Village of Palatine. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $379,874 ·
Jun 14, 2019 62C08 CookDistrict 1 Intersection widening, traffic signal modernization and resurfacing at Kedzie Avenue and 119th Street in Merrionette. — Executed Nov 26 New D. Construction, Inc. $920,917 ·
Jun 14, 2019 62H09 CookDuPageKaneDistrict 1 Guardrail end section replacement at various locations in Cook, DuPage and Kane Counties. — Executed Nov 26 New Midwest Fence Corporation $433,668 ·
Jun 14, 2019 62H11 CookWillDistrict 1 Guardrail end section replacement at various locations in Cook and Will Counties. — Executed Nov 26 New Midwest Fence Corporation $559,277 ·
Jun 14, 2019 62H89 CookDistrict 1 259 FT OF BRIDGE DECK SEALING, NEOPRENE EXPANSION JOINT REMOVAL, INSTALLING PREFORMED JOINT SEALS, CLEANING BRIDGE DRAINAGE SYSTEM, AND DECK SLAB REPAIRS ON STEVENSON EXPRESSWAY AT PULASKI RD. — Executed Nov 26 New Vixen Construction, Inc. $628,701 ·
Jun 14, 2019 62H94 CookDuPageDistrict 1 Expressway sweeping on I-55 (Stevenson Expressway) from I-355 to I-90/94 and on I-94, US 41 from US 14 (Dempster Street) to IL 68 (Dundee Road). — Executed Nov 26 New Elgin Sweeping Services, Inc. $2,196,168 ·
Jun 14, 2019 62J07 CookDistrict 1 Intermittent resurfacing project on various state maintained arterial routes in various cities. — Executed Nov 26 New J. A. Johnson Paving Company $4,887,777 ·
Jun 14, 2019 62J09 CookDuPageDistrict 1 Intermittent resurfacing project on various expressway routes. — Executed Nov 26 New R. W. Dunteman Company $1,653,207 ·
Jun 14, 2019 62J10 CookDistrict 1 Intermittent resurfacing on various state maintained arterial routes in Cook County — Executed Nov 26 New R. W. Dunteman Company $1,600,201 ·
Jun 14, 2019 62J11 CookKaneMcHenryDistrict 1 Intermittent resurfacing on various routes in McHenry, Kane and Cook counties. — Executed Nov 26 New J. A. Johnson Paving Company $1,797,700 ·
Jun 14, 2019 62J12 CookWillDistrict 1 Intermittent resurfacing on various state maintained expressway routes in Cook and Will counties. — Executed Nov 26 New D. Construction, Inc. $826,171 ·
Jun 14, 2019 62J15 CookDuPageDistrict 1 INTRMITTENT RESURFACING PROJECT ON VARIOUS ROUTES IN VARIOUS CITIES. — Executed Nov 26 New R. W. Dunteman Company $2,872,070 ·
Jul 12, 2019 62B78 CookDistrict 1 Pump station 4 reconstruction. I-290 just west of the Des Plaines River in Forest Park. — Executed Nov 26 New IHC Construction Companies, L.L.C. $45,950,314 ·
Jul 12, 2019 62F29 CookDistrict 1 Extensive repairs to SN 016-0575 carrying Sauk Trail over I-57 in Richton. — Executed Nov 26 New Lorig Construction Company $4,914,414 ·
Jul 12, 2019 62G69 CookDistrict 1 Standard overlay, ADA improvements, and pedestrian traffic signal on IL-58 from Lincoln St. to IL-43 in Morton Grove and Glenview. — Executed Nov 26 New Arrow Road Construction Co. $1,267,939 ·
Jul 12, 2019 62G70 CookDistrict 1 Resurfacing and pedestrian ramps on Central Avenue from just south of 53rd Street to just north of 47th Street in Chicago — Executed Nov 26 New Bigane Paving Company $829,349 ·
Jul 12, 2019 62G76 CookDistrict 1 1.7745 miles of resurfacing (smart) and ADA improvements on Niles Center Road in Skokie. — Executed Nov 26 New Arrow Road Construction Co. $2,125,538 ·
Jul 12, 2019 62G77 CookDistrict 1 1.9 miles of resurfacing and pedestrian ramps on Elston Avenue in Chicago. — Executed Nov 26 New Bigane Paving Company $1,760,423 ·
Jul 12, 2019 62H54 CookDistrict 1 Light tower removal and replacement, installing new light towers, light poles, foundations, conduits, cables, and site restoration at I-57 at US 30 in Matteson and I-290/IL-53 at I-90 in Rolling Meadows. — Executed Nov 26 New Meade Inc. $1,225,424 ·
Jul 12, 2019 62H56 CookDistrict 1 0.95 miles of standard overlay and pedestrian ramp improvements on Touhy Avenue from US 41 to Lawndale Avenue in Lincolnwood and Skokie. — Executed Nov 26 New Arrow Road Construction Co. $1,389,978 ·
Jul 12, 2019 62J02 CookDistrict 1 2.63 miles of standard overlay and pedestrian ramp improvements on IL-1 from US 6 to Ridge Rd. in Harvey and Homewood. — Executed Nov 26 New D. Construction, Inc. $3,229,163 ·
Jul 12, 2019 62J21 CookDistrict 1 Lining of existing drainage structures on Vermont Street from Western Avenue to Ashland Avenue in the Village of Blue Island. — Executed Nov 26 New Benchmark Construction Co., Inc. $251,849 ·
101–200 of 1,087‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.