IDOT Jobs

2021 · 129 jobs · — Sign up free
★ My Jobs

Filtered by: County: Cook Clear all

129 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 15, 2021 61G68 CookDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement and pavement markings on Oak Park Avenue from Roosevelt Road to North Avenue in Oak Park. — Executed Nov 26 New Arrow Road Construction Co. $2,086,257 ·
Jan 15, 2021 61G76 CookDistrict 1 Roadway reconstruction, box culvert replacement, and constructon of a soldier pile retaining wall under the I-294 bridge, on Franklin Avenue from east of the Canadian Pacific Bensenville Yard entrance to est of the I-294 bridge in Franklin Park. — Executed Nov 26 New Dunnet Bay Construction Company $1,671,760 ·
Jan 15, 2021 61G78 CookDistrict 1 Traffic signal replacement and sidewalk construction on US 20 from Walnut Avenue to Center Avenue in Streamwood. — Executed Nov 26 New Triggi Construction, Inc. $296,311 ·
Jan 15, 2021 61G86 CookDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement, pavement widening to accommodate bike lanes, and pavement markings on McCarthy Road from Illinois Street to Walker Road in Lemont. — Executed Nov 26 New P. T. Ferro Construction Co. $1,669,136 ·
Jan 15, 2021 61G87 CookDistrict 1 Resurfacing Kenilworth Avenue from Green Bay Road to Sheridan Road in the Village of Kenilworth. — Executed Nov 26 New Peter Baker & Son Co. $678,334 ·
Jan 15, 2021 61G88 CookDistrict 1 Replace the superstructure that carries Roy Avenue over Addison Creek, located south of Country Club Drive in Northlake. — Executed Nov 26 New Alliance Contractors, Inc. $576,447 ·
Jan 15, 2021 62D60 CookDistrict 1 (3.40-mile) Standard overlay, ADA improvements and channelization on Kedzie Ave. from n/o 871h St. to 103rd St. and 115th St. to n/o 131 St. and at 87th St. Located within the City of Blue Island, Villages of Alsip, Evergreen Park, and Merrionette Park. — Executed Nov 26 New D. Construction, Inc. $3,133,576 ·
Jan 15, 2021 62H50 CookDistrict 1 Bridge Deck Overlay, Joint Repairs and Substructure Repairs (672.28 FT) The improvement on IL Rte. 50 over BRC Railroad consist of Bridge Deck Overlay, Joint Repairs and Substructure Repairs. Located in the City of Chicago and Village of Bedford Park. — Executed Nov 26 New D. Construction, Inc. $3,336,549 ·
Jan 15, 2021 62J73 CookDistrict 1 (1.46-Mile) Standard overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA sidewalk repair and thermoplastic pavement marking on US 34 from 1-294 to Edgewood Avenue within the Villages of Western Springs and LaGrange. — Executed Nov 26 New K-Five Construction Corporation $1,608,307 ·
Jan 15, 2021 62L26 CookDistrict 1 (2.27 4-Mile) Standard overlay project on 47th Street from east of Plainfield Road to west of IL Rte. 43 (Harlem Avenue) that includes ADA sidewalk improvements. Located in Villages of Brookfield, McCook, and Lyons. — Executed Nov 26 New R. W. Dunteman Company $1,944,316 ·
Jan 15, 2021 62L45 CookDistrict 1 Smart Overlay, Class D patching and ADA improvement. Project begins 50 ft south of 31st St. and proceeds approximately 4637.9 ft in a northerly direction to 23rd St. in the Villages of Brookfield and Berwyn Township. — Executed Nov 26 New Humir Construction, Inc. $1,088,461 ·
Jan 15, 2021 62L46 CookDistrict 1 Sealing cracks and joints in the existing HMA pavement, restriping with modified urethane pavement marking in (6.69-Mile) Improvement on 1-290 from 1-88 to East of Austin Blvd consist of sealing cracks and joints in the existing HMA pavement, restriping with modified urethane pavement marking in the village of Hillside, Bellwood, Maywood, Forest Park, Broadview, and Oak Park, Provisio and Oak Park Townships. — Executed Nov 26 New Freehill Asphalt, Inc. $628,759 ·
Jan 15, 2021 62L47 CookDuPageDistrict 1 Cleaning and sealing cracks and joints in the existing concrete pavement, new pavement marking in the village (2.80-Mile) Improvement on 1-290 from Grand Ave to Cook County Line Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, new pavement marking in the village of Elmhurst, York and Addison Townships. — Executed Nov 26 New Freehill Asphalt, Inc. $206,128 ·
Jan 15, 2021 62L50 CookDistrict 1 (1,945-Mile) Pavement Patching and Crack and Joint Sealing project from South Indiana Ave to East of 1-94 (Bishop Ford Expy.) in Hyde Park Township, in Cook County. — Executed Nov 26 New K-Five Construction Corporation $902,975 ·
Jan 15, 2021 62L74 CookDistrict 1 (1,444-Ft.) SMART Overlay and ADA Ramp Improvement. Location: IL 64 (North Ave.) Sheffield Ave to Halsted St. in The City of Chicago in Cook County. — Executed Nov 26 New MAT Construction Leasing, Inc. $242,011 ·
Jan 15, 2021 62L75 CookDistrict 1 (2.9-Mile) Crack and Joint Sealing on existing HMA pavement. Location: IL 64 (North Ave.) Damen Ave to US 41 within the City of Chicago in Cook County. — Executed Nov 26 New SKC Construction, Inc. $133,565 ·
Jan 15, 2021 62L78 CookDistrict 1 (1.71-Mile) Crack and joint sealing improvements on IL 171 from Forest Preserve Dr. to south of Des Plaines River Rd. Located within the Village of River Grove in Cook County. — Executed Nov 26 New SKC Construction, Inc. $117,128 ·
Jan 15, 2021 62L79 CookDistrict 1 (5.98-Mile) SMART Overlay and ADA Pedestrian Ramps project on IL-43 (FAP 348) from north of US 6 (159th St) to north of 111th St. Located within the Villages of Orland Park, Worth and Palos Heights in Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $4,409,859 ·
Jan 15, 2021 62M01 CookDistrict 1 (1.373-Mile) HMA SMART Overlay of IL-1 (Halsted St), approx. 600' north of the intersection of 159th St, and extends to the north through Harvey and Phoenix in Cook County to a point approx. 200' north of East 149th St. — Executed Nov 26 New K-Five Construction Corporation $787,084 ·
Jan 15, 2021 62M22 CookDistrict 1 Bridge deck overlay and joint repair (426.26-FT) Improvement of 31st street over Des Plaines River consists of bridge deck overlay and joint repair. Located in the Village of Riverside, in Cook County, IL. SN=016-0870 — Executed Nov 26 New D. Construction, Inc. $614,303 ·
Jan 15, 2021 62M38 CookDistrict 1 Bridge deck overlay and joint repairs (522-FT) Improvement of Illinois 171 over Des Plaines River consists of bridge deck overlay and joint repairs. Located in the Village of River Grove, in Cook County, IL. SN=016-0697 — Executed Nov 26 New Copenhaver Construction, Inc. $777,979 ·
Jan 15, 2021 62M49 CookDistrict 1 Bridge Deck Overlay, Approach Slab Reconstruction, Joint Repairs and Substructure Repairs (793-FT) Improvement on 3151 Street over Salt Creek consist of Bridge Deck Overlay, Approach Slab Reconstruction, Joint Repairs and Substructure Repairs. Located in the Village of Westchester and Village of La Grange Park SN=016-0868 — Executed Nov 26 New Martam Construction Incorporated $1,166,915 ·
Jan 15, 2021 62M61 CookDistrict 1 Interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. , Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. — Executed Nov 26 New H & H Electric Co. $877,057 ·
Jan 15, 2021 62M80 CookDistrict 1 Bridge Deck Overlay, Joint Repairs and Substructure Repairs (1,449-FT.) Improvement on 25th Avenue over IHB Railroad consist of Bridge Deck Overlay, Joint Repairs and Substructure Repairs. Located in the Village of Franklin Park and Melrose Park in Cook County. — Executed Nov 26 New Martam Construction Incorporated $2,587,526 ·
Jan 15, 2021 62M90 CookDistrict 1 Cleaning and painting existing steel structures at 2 locations. 1st located on I-80 at Ridgeland Avenue (SN 016-0718) in the Village of Tinley Park. 2nd located on Torrence Avenue over CSXT and IHB Railroads (SN 016-0935) in the Village of Burnham, Cook. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $494,274 ·
Mar 5, 2021 61E91 CookDistrict 1 Widening US 14 to add southbound, right-turn lane for proposed Metra access road. Project begins at Klingenberg Lane to Metra Station Access Road in Barrington. — Executed Nov 26 New Campanella and Sons, Inc. $1,484,365 ·
Mar 5, 2021 61G22 CookDistrict 1 Replace the bridge carrying Brookfield Avenue over Salt Creek in Brookfield. — Executed Nov 26 New Lorig Construction Company $3,471,604 ·
Mar 5, 2021 61G57 CookDistrict 1 Construction of a multi-use path on the west side of US 12, from Central Road to Elk Boulevard in Des Plaines. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $2,386,230 ·
Mar 5, 2021 61G81 CookDistrict 1 Pavement reconstruction, storm sewer, sidewalks and pavment markings on 123rd Street from 76th Avenue to Harlem Avenue in Palos Heights. — Executed Nov 26 New Lindahl Brothers, Inc. $1,470,766 ·
Mar 5, 2021 61G92 CookDistrict 1 Full Depth reconstruction on Acacia Drive, beginning at the south intersection with Wolf Road and ending at the north intersection with Wolf Road, in the Village of Indian Head Park — Executed Nov 26 New Lindahl Brothers, Inc. $1,464,512 ·
Mar 5, 2021 62C52 CookDistrict 1 (3.57-Mile) Resurfacing project consisting of HMA surface removal, pavement patching, HMA resurfacing, ADA improvements and pavement marking on Dixie HWy. — Executed Nov 26 New Iroquois Paving Corporation $3,189,418 ·
Mar 5, 2021 62D14 CookDistrict 1 (4.8-Mile) of SMART overlay, milled rumble strips and ADA improvements on Palatine Road from IL 62 (Algonquin Road) to east of Roselle Road in the Villages of Barrington Hills, Hoffman Estates, Inverness, Palatine and South Barrington. — Executed Nov 26 New Builders Paving, LLC $1,698,000 ·
Mar 5, 2021 62H51 CookDistrict 1 Bridge rehab, ADA improvements and shared-use path on Cermak Road in the Villages of Broadview and Westchester (SN 016-0631, 016-0632, 016-0633). — Executed Nov 26 New Herlihy Mid-Continent Company $9,477,993 ·
Mar 5, 2021 62J27 CookDistrict 1 (2,589.74-Ft) Culvert removal and replacement, drainage improvements, roadway removal and replacement, earth excavation. landscaping, and erosion control at Farmers Creek over and at unnamed ditch. Located in the City of Des Plaines and Village of Niles in Cook County. — Executed Nov 26 New Lorig Construction Company $1,925,500 ·
Mar 5, 2021 62K88 CookDistrict 1 This is an ADA Improvement project located along various State maintained routes within the Village of Oak Park and City of Park Ridge in Cook County. — Executed Nov 26 New Capitol Cement Co., Inc. $1,234,644 ·
Mar 5, 2021 62L04 CookDistrict 1 Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston Niles and Evanston Townshi (2.53-Mile) Improvement on Church St from Gross Point to Dodge Ave consists of Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston Niles and Evanston Townships. , (2.53-Mile) This improvement on Church St from Gross Point to Dodge Ave consist of Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston, Niles and Evanston Townships. — Executed Nov 26 New Builders Paving, LLC $1,720,000 ·
Mar 5, 2021 62L18 CookDistrict 1 2.5 miles of resurfacing, patching and ADA improvements on IL 53 / Hicks Road from US 14 (Northwest Highway) to Lake-Cook Road, in the Village of Palatine. — Executed Nov 26 New Builders Paving, LLC $2,518,000 ·
Mar 5, 2021 62L54 CookDistrict 1 (0.7-Mile) Standard overlay with ADA improvements on Ashland Avenue from just south of Marketplace Access Road to Cermak Road, in the City of Chicago. — Executed Nov 26 New Bigane Paving Company $762,654 ·
Mar 5, 2021 62L57 CookDistrict 1 (3.1-Mile) Smart Overlay improvements, ADA improvements along IL 43 (Harlem Avenue) from .IL 64 (North Avenue) to IL 19 (Irving Park Road) in the City of Chicago and Villages of Elmwood Park, Oak Park and River Forest Cook County. — Executed Nov 26 New Bigane Paving Company $2,581,721 ·
Mar 5, 2021 62L59 CookDistrict 1 (1.52-Mile) SMART Overlay, ADA improvements. Location: Busse Road, from 534-ft south of IL-72 (Higgins Road) to 86 feet south of IL-58 (Golf Road) in the Villages of Elk Grove and Mount Prospect, in Elk Grove Township in Cook County. — Executed Nov 26 New Builders Paving, LLC $1,398,000 ·
Mar 5, 2021 62L60 CookDistrict 1 Smart Overlay Improvement in the City of Chicago in West Chicago Townships This improvement on Washington Blvd. from IL-50 (Cicero Ave.) to Hamlin Ave. consists of Smart Overlay Improvement in the City of Chicago in West Chicago Townships. — Executed Nov 26 New Bigane Paving Company $766,871 ·
Mar 5, 2021 62L73 CookDistrict 1 (3.05-Mile) Standard overlay and pedestrian ramp ADA improvements on IL 64 from IL 43 (Harlem Ave.) to IL 50 (Cicero Ave) within the Village of Oak Park and City of Chicago. — Executed Nov 26 New Arrow Road Construction Co. $4,285,543 ·
Mar 5, 2021 62L86 CookDistrict 1 (5.36-Mile) Smart overlay and ADA improvements project on Pulaski Rd from IL 64 (North Ave.) to Devon Ave. within the City of Chicago in Cook County. — Executed Nov 26 New Bigane Paving Company $4,394,460 ·
Mar 5, 2021 62L93 CookDistrict 1 (5.1-Mile) SMART overlay and ADA improvements on Arlington Heights Road from Palatine Road to IL 72 (Higgins Road) within the City of Arlington Heights. — Executed Nov 26 New Builders Paving, LLC $4,780,000 ·
Mar 5, 2021 62L94 CookDistrict 1 (1.80-Mile) SMART Overlay and ADA Improvements on Montrose Ave. between Central Ave. and Pulaski Road and is located within the City of Chicago. — Executed Nov 26 New Bigane Paving Company $1,172,657 ·
Mar 5, 2021 62L95 CookDistrict 1 (2.5-Mile) SMART overlay and ADA improvements on Cermak Road from Kedzie Avenue to Halsted Street in the City of Chicago. — Executed Nov 26 New Bigane Paving Company $1,397,407 ·
Mar 5, 2021 62M08 CookDistrict 1 (2.8-Mile) SMART overlay, detector loop replacement and ADA improvements on US 30 (Lincoln Highway) from IL 43 (Harlem Avenue) to IL 50 (Cicero Avenue) within the Village of Matteson. — Executed Nov 26 New D. Construction, Inc. $2,036,371 ·
Mar 5, 2021 62M12 CookDistrict 1 (2.7-Mile) SMART overlay and ADA improvements on 87th Street from Keeler Avenue to Damen Street in the Village of Evergreen Park, and the Cities of Chicago and Hometown. — Executed Nov 26 New MAT Construction Leasing, Inc. $1,983,305 ·
Mar 5, 2021 62M14 CookDistrict 1 (1.08-Mile) SMART Overlay, ADA Improvements; Location: FAP 358: Torrence Ave from Grand Calumet River to Harding Ave in the Villages of Burnham and Calumet City. — Executed Nov 26 New K-Five Construction Corporation $970,850 ·
Mar 5, 2021 62M18 CookDistrict 1 (1.5-Mile) SMART resurfacing and ADA improvements on Ballard Road from Rand Road to Greenwood in the City of Des Plaines, City of Park Ridge, Village of Niles and unincorporated Maine Township. — Executed Nov 26 New Arrow Road Construction Co. $871,373 ·
Mar 5, 2021 62M29 CookDistrict 1 Bridge deck overlay, joint repairs, bearing replacement and concrete repairs on SN 016-0456 and 016-1041 carrying IL 394 over CN and NS Railroads, south of US 30. — Executed Nov 26 New D. Construction, Inc. $1,577,079 ·
Mar 5, 2021 62M87 CookDistrict 1 Trombone Mast Arm Replacement at various locations in District One. — Executed Nov 26 New Thorne Electric, Inc. $914,786 ·
Mar 5, 2021 62M94 CookDistrict 1 Building demolition located along Rand Road near the bridge over the Des Plaines River This work consists of building demolition located along Rand Road near the bridge over the Des Plaines River. This project has a gross length of 349 LF. — Executed Nov 26 New Martam Construction Incorporated $173,405 ·
Mar 5, 2021 62N03 CookDistrict 1 Bridge deck repairs and expansion joint repairs (575-Ft.) The improvement on Des Plaines Ave. bridge and Ridgeland Ave. bridge over 1-290 consists of bridge deck repairs and expansion joint repairs. Located in the Villages of Oak Park and Forest Park in Cook County, IL. — Executed Nov 26 New Herlihy Mid-Continent Company $381,292 ·
Mar 5, 2021 62N09 CookDistrict 1 Cleaning and painting the steel surfaces of bridge structures carrying Sauk Trail over 1-57 in the Village of Richton Park, Rich Township. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $489,433 ·
Mar 5, 2021 62N12 CookDistrict 1 Cleaning and painting the steel surfaces at CTA bridge structure over 1-90/94 S This improvement consists of cleaning and painting the steel surfaces at CTA bridge structure over 1-90/94 S. of 55th Street, in the City of Chicago, Lake Township. — Executed Nov 26 New Capital Industrial Services $2,533,300 ·
Apr 23, 2021 60T06 CookDistrict 1 Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 , Replace bridge structure carrying northbound IL Route 43 over the Metropolitan Water Reclamation District of Greater Chicago Railroad in the Village of Lyons. SN 016-0314 — Executed Nov 26 New ICC Group Inc. $5,307,000 ·
Apr 23, 2021 60T17 CookDistrict 1 Intersection Reconstruction (traffic signal installation), ADA Improvements at the intersection of FAU 2710: Des Plaines River Road and Robinson. Location: Village of Franklin Park in Cook County. — Executed Nov 26 New Plote Construction, Inc. $1,311,636 ·
Apr 23, 2021 60X72 CookDistrict 1 The construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted f The improvement consists of the construction of a parking lot, storm sewer removal and replacement of existing frame and lid with bolted frame and ltd. The work is located on IL 64 (North Ave.) at pump station #12 in Melrose Park. — Executed Nov 26 New Martam Construction Incorporated $361,804 ·
Apr 23, 2021 61G09 CookDistrict 1 Resurfacing Park Boulevard from Irving Park Road to Schaumburg Road in Streamwood. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,304,037 ·
Apr 23, 2021 61G99 CookDistrict 1 Concrete Sidewalk, curb and gutter replacement, tree removal, and landscaping on US 30 from Orchard Drive to the east village limits on Rockwell Street in Park Forest. — Executed Nov 26 New Copenhaver Construction, Inc. $243,209 ·
Apr 23, 2021 61H01 CookDistrict 1 Resurfacing, HMA pavement patching, curb and gutter repairs on Old Willow Road from South Wolf Road to US 45 in Prospect Heights. — Executed Nov 26 New Arrow Road Construction Co. $510,388 ·
Apr 23, 2021 61H06 CookDistrict 1 Streetscape improvements on St. Charles Road from Mannheim Road to 25th Avenue in Bellwood. — Executed Nov 26 New Landmark Contractors, Inc. $964,551 ·
Apr 23, 2021 61H08 CookDistrict 1 Resurfcing, curb and gutter, sidewalk replacement, detector loops and pavement markings on Kensington Road from Dryden Place to Regency Drive West in Arlington Heights. — Executed Nov 26 New Arrow Road Construction Co. $1,282,651 ·
Apr 23, 2021 61H09 CookDistrict 1 Resurfacing Salem Drive from the village limits to Bode Road, Jones Road from Highland Boulevard to Hassel Road, and Hassell Road from Rosedale to Jones Road in Hoffman Estates. — Executed Nov 26 New Schroeder Asphalt Services, Inc. $651,585 ·
Apr 23, 2021 62633 CookDistrict 1 (4,391-Ft) Intersection improvement including channelization, traffic signal modernization and resurfacing of IL 58 at Niles Center Rd. and at US 41 (Skokie Blvd.) in the Village of Skokie. — Executed Nov 26 New Alliance Contractors, Inc. $4,496,491 ·
Apr 23, 2021 62K80 CookWillDistrict 1 Demolition and reconstruction of the existing bridge deck and concrete approaches, resurfacing to meet the bridge approaches, reconstruction and expansion of outside shoulders, removal and replacement of existing guar guardrail, and various drainage and grading improvements. — Executed Nov 26 New D. Construction, Inc. $2,056,069 ·
Apr 23, 2021 62L52 CookDistrict 1 (1.762-Mile) Cleaning and sealing longitudinal joints in the existing HMA pavement between traffic lanes and curb and gutter, restriping pavement marking in the City of Chicago, Lake and North Chicago Townships. — Executed Nov 26 New SKC Construction, Inc. $183,344 ·
Apr 23, 2021 62L89 CookDistrict 1 (1.73-Mile) SMART overlay (resurfacing) and ADA improvement project on Dempster St. from east of Skokie Blvd. to McCormick Ave. within the Village of Skokie in Cook County. — Executed Nov 26 New Builders Paving, LLC $2,092,030 ·
Apr 23, 2021 62M04 CookDistrict 1 (3.553-Mile) Crack and Joint Sealing pavement preservation project. Includes renewal of pavement markings. Location: FAP 344: IL 83 from S. of Weiland Rd to Palatine Rd in the City of Prospect Heights and the Village — Executed Nov 26 New SKC Construction, Inc. $179,385 ·
Apr 23, 2021 62M13 CookDistrict 1 SMART Overlay, ADA Improvements: HMA removal and replacement (single pass), pavement patching, pavement markings. Location: FAU 3520: Gross Point Road from N of Oakton St to Howard St in the Village of Morton Grove and Skokie. — Executed Nov 26 New Peter Baker & Son Co. $545,253 ·
Apr 23, 2021 62M26 CookDistrict 1 Bridge deck overlay and joint repair The improvement of McHenry Road over Wheeling Drainage Ditch consists of bridge deck overlay and joint repair. The improvement is located in the Village of Wheeling in Cook County, IL. — Executed Nov 26 New Lorig Construction Company $446,325 ·
Apr 23, 2021 62M31 CookDistrict 1 This is a bridge repair project that includes bridge deck overlay, partial depth approach reconstruction, joint reconstruction, concrete bridge deck repair, full depth bridge deck repair. Located: IL Route 7 at 86th Ave. within within the Village of Palos Park. — Executed Nov 26 New Lorig Construction Company $298,774 ·
Apr 23, 2021 62M40 CookDistrict 1 Bridge Preservation Project, including bridge deck overlay (scarification and latex concrete overlay), deck repairs, reconstructing transverse joints. Location: Bridge carrying Roosevelt Rd over Des Plaines River, East of IL 171 in the Village of Forest Park in Cook County. — Executed Nov 26 New MYS, Incorporated $512,616 ·
Apr 23, 2021 62N30 CookDistrict 1 A Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships o (0.102-Mile) Improvement on I-94 at IL 50 (Cicero Ave.), II 58 (Dempster Ave.) and Lake Ave. consist of a Bridge Substructure Repair in the City of Chicago, and the Village of Skokie and Wilmette in the Townships of New Trier, Jefferson and Niles. — Executed Nov 26 New Rausch Infrastructure, LLC $830,616 ·
Apr 23, 2021 62N92 CookDuPageDistrict 1 Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 4 (150-Mile) Improvement consists of Litter/Debris removal from edge of pavement to the Pedestrian Barrier on I-55 - Stevenson expressway from IL 43 (Harlem Ave.) to I-355. — Executed Nov 26 New Western Remac, Inc. $207,720 ·
Jun 11, 2021 61G98 CookDistrict 1 Installation of a wireless interconnect system and traffic signal modificatons on 143rd St. from Wolf Rd. to LaGrange Rd. in Orland Park. — Executed Nov 26 New Hecker and Company, Inc. $192,511 ·
Jun 11, 2021 61H11 CookDistrict 1 Resurface East Fullerton Ave. from North Worlf Rd. to Geneva Ave. in Northlake. — Executed Nov 26 New J. A. Johnson Paving Company $652,256 ·
Jun 11, 2021 61H13 CookDistrict 1 Construction of a multi-use path and traffic signal modifications along Wolf Road from the Bemis Woods Trial to Ogden Avenue in Western Springs. — Executed Nov 26 New Martam Construction Incorporated $377,363 ·
Jun 11, 2021 62F39 CookDistrict 1 Drainage Improvement (reinstating roadside berms, storm sewer, PS 17 improvements), Retaining Wall, Standard Overlay Location: IL 58, from West of US 45 (West Hospital Entrance) to East River Road, in the City of Des Plaines. — Executed Nov 26 New Martam Construction Incorporated $2,777,624 ·
Jun 11, 2021 62F84 CookDistrict 1 (1.811-Mile) Pavement widening project on Glenwood Dyer Road from Stony Island Avenue to Torrence Avenue that includes standard overlay, traffic signal modification, and ADA improvement work It is located in the Village of Lynwood and unincorporated Cook County. — Executed Nov 26 New K-Five Construction Corporation $4,242,424 ·
Jun 11, 2021 62K79 CookDistrict 1 Bridge deck overlay, expansion joint replacement, cleaning and resealing, bridge substructure repair and traff The improvement consists of bridge deck overlay, expansion joint replacement, cleaning and resealing, bridge substructure repair and traffic signal replacement at the bridge located on IL 394 over Glenwood Dyre Road in the Villages of Glenwood and Lynwood, in Cook County. IL. Gross and net length is 1,160 FT (0.22 Miles). — Executed Nov 26 New D. Construction, Inc. $1,404,369 ·
Jun 11, 2021 62L07 CookDistrict 1 Design overlay resurfacing on Oak Park Avenue approximately 85 feet south of 31S1 St This improvement consists of design overlay resurfacing on Oak Park Avenue approximately 85 feet south of 31S1 St. and extends in a northerly direction approximately 10,920 feet (2.07 miles) to Approximately 190 feet north of Roosevelt Rd. — Executed Nov 26 New K-Five Construction Corporation $1,519,500 ·
Jun 11, 2021 62L20 CookDistrict 1 This is a Standard Overlay and ADA Pedestrian Ramps project on Avenue L (FAP 29 from 116 feet southeast of Indianapolis Ave and extends northwest toward Avenue L and then north toward 95th Street for a total distance of 0.85 miles. The project is located within Hyde Park Township. — Executed Nov 26 New MAT Construction Leasing, Inc. $613,640 ·
Jun 11, 2021 62L21 CookDistrict 1 The Project includes standard overlay and ADA improvements on Dempster St. from Ridge Ave. to Chicago Ave. The gross and the net length is equal to 2061.4 ft 0.39 mile. The project is located within the City of Evanston. — Executed Nov 26 New Chicagoland Paving Contractors, Inc. $440,000 ·
Jun 11, 2021 62L63 CookDistrict 1 Smart overlay resurfacing on US 41/ Foster Avenue approximately 260 feet west of Ashland Avenue and extends in This improvement consists of smart overlay resurfacing on US 41/ Foster Avenue approximately 260 feet west of Ashland Avenue and extends in an easterly direction approximately 5640 feet (1.068 miles) to Approximately 160 feet east of US 41 (Lake Shore Dr.). Location in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $724,432 ·
Jun 11, 2021 62L80 CookDistrict 1 (1.73-Mile) SMART overlay and ADA improvements on US 14 (Peterson Avenue) from US 41 to Ridge Avenue. The project is located in the City of Chicago. — Executed Nov 26 New MAT Construction Leasing, Inc. $2,139,433 ·
Jun 11, 2021 62L87 CookDistrict 1 (5,213-Feet) SMART overlay and ADA improvements on Wolf Road from IL 38 (Roosevelt Road) to Cermak Road located in the Village of Hillside and Westchester. — Executed Nov 26 New Plote Construction, Inc. $719,199 ·
Jun 11, 2021 62L91 CookDistrict 1 (4.40-Mile) Smart overlay and ADA improvements project on IL 43 (Waukegan Rd.) from Ammer Rd. to Lake-Cook Rd. within the Villages of Glenview, Northfield, Northbrook and Deerfield. There is an omission within the project limits. — Executed Nov 26 New Plote Construction, Inc. $3,981,000 ·
Jun 11, 2021 62L92 CookDistrict 1 (5.89-Mile) SMART Overlay project and it begins on IL 43 (Harlem Ave.) at 111th Street and continues in a northerly direction for 33,426 (6.33 mile) feet to 62nd Street. The project is within the City of Chicago, Villages of Bedford Park, Bridgeview, Burbank, Chicago Ridge, Palos Hills, Summit and Worth. — Executed Nov 26 New Gallagher Asphalt Corporation $5,033,078 ·
Jun 11, 2021 62M09 CookDistrict 1 Crack and joint sealing pavement preservation project. Includes renewal of pavement markings. Location: FAU 1581: 111th Street, from Central Ave to Pulaski Rd in the Village of Oak Lawn and the City of Chicago, in Cook County. — Executed Nov 26 New SKC Construction, Inc. $151,360 ·
Jun 11, 2021 62M17 CookDistrict 1 Smart Overlay/Pedestrian ramp (ADA) improvements along IL 83 (Elmhurst Road) from Oakton Street to IL 58 (Golf This project consists of Smart Overlay/Pedestrian ramp (ADA) improvements along IL 83 (Elmhurst Road) from Oakton Street to IL 58 (Golf Road) spanning a total length of 8,778 ft (1.66 Miles) in the Village of Mt. Prospect and the City of Des Plaines. — Executed Nov 26 New Plote Construction, Inc. $1,551,000 ·
Jun 11, 2021 62M41 CookDistrict 1 Bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 1 The improvement consists of bridge deck overlay, expansion joint replacement and bridge substructure repair located on a bridge carrying 130th Street over 1-94 and at CSSS and IHB RR in Cook County, IL. Gross and net length is 785 FT (0.15 Miles). — Executed Nov 26 New Areatha Construction Co., Inc. $3,345,536 ·
Jun 11, 2021 62N17 CookDistrict 1 Cleaning and painting existing steel structures at 3 locations Improvements consists of cleaning and painting existing steel structures at 3 locations. 1st location is located on Grand Avenue over Des Plaines River {SN 016-0 855), in the Village of River Grove; 2nd and 3rd location is located on US 64 (North Avenue) at RR-CN (SN 016-0500 and SN 016-1126), in the Village of River Grove. — Executed Nov 26 New Capital Industrial Services $493,930 ·
Jun 11, 2021 62N24 CookDistrict 1 Bridge deck patching on a bridge carrying IL 53 over US 14 (Northwest Highway) in Cook County The improvement consists of bridge deck patching on a bridge carrying IL 53 over US 14 (Northwest Highway) in Cook County. IL. Gross length is 4044 FT (0. 77 Miles). Net length is 516 FT (0.10 Miles). — Executed Nov 26 New Herlihy Mid-Continent Company $276,951 ·
Jun 11, 2021 62N29 CookDistrict 1 (1.17-Mile) Noise wall repairs. Location: IL-53, from IL-68 (Dundee Road) to Lake-Cook Road in the Villages of Palatine and Arlington Heights, in Palatine Township in Cook County. — Executed Nov 26 New Lorig Construction Company $421,460 ·
Jun 11, 2021 62N38 CookDistrict 1 Bridge repair for the structures on 1-94/90 at various locations in the City of Chicago, Cook County, IL The improvement consists of bridge repair for the structures on 1-94/90 at various locations in the City of Chicago, Cook County, IL. Gross length is 5808 FT (1. 10 Miles). — Executed Nov 26 New Rausch Infrastructure, LLC $699,680 ·
Jun 11, 2021 62N90 CookMcHenryDistrict 1 Cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR This improvement consists of cleaning and painting designated steel surfaces of bridge structures carrying 1 )IL 72 (Higgins Rd) over RR; 2) US 14 (Northwest Hwy) over Fox River; 3) IL62 (Algonquin Rd) over Fox River in the Villages of Hoffman Estates, Fox River Grove and Algonquin in Barrington and Algonquin Townships. — Executed Nov 26 New Capital Industrial Services $683,300 ·
Jul 30, 2021 60M12 CookDistrict 1 (2,558-Ft) Designed Overlay, ADA Improvements, includes HMA removal and replacement, Class D patching and PMK installation. Location: FAU 2839 California Ave. from 59th St. to 63rd St. within the City of Chicago in Cook County. — Executed Nov 26 New MAT Construction Leasing, Inc. $347,601 ·
Jul 30, 2021 60X74 CookDistrict 1 Removal and replacement of the structure that carries IL 83 over Tinley Creek (1229.52-Ft) This project consists of removal and replacement of the structure that carries IL 83 over Tinley Creek. Also included are intersection improvements, pavement reconstruction, widening, resurfacing, drainage adjustments, and ADA improvements. Located in the Villages of Alsip and Crestwood in Cook County. — Executed Nov 26 New Copenhaver Construction, Inc. $7,156,871 ·
1–100 of 129Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.