ODOT Bid Results

Aug 2010 · 3 let jobs Sign up free
3Let jobs
$28,116,140Total low bids
$1,395,350Total estimates
+1,915.0%Low bids vs estimates

Aug 2010 results

Bid tabs (Excel) ExcelCSV
Let dateContractCounty / DistrictProject EstimateLow bidLow bidder% vs est.Bidders
Aug 19, 2010 100253IMY-0040-5(415)206 Hsipig-0040-5(405)203tr
SEMINOLE PAVEMENT REHABILITATION AND CABLE BARRIER I-40: FROM MILE MARKER 203, EXTEND EAST TO MILE MARKER 213. PROJECT LENGTH = 6.016 MILES · — $24,933,232 DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV 4
Aug 19, 2010 100154SSP-102C(109)SS Alfalfa
Division 6
GRADE, DRAIN, SURFACE , AND BRIDGE US-64: OVER TWIN SPRINGS CREEK , 1.6 MILES EAST OF THE SH-58 JUNCTION. PROJECT LENGTH = 0.383 MILES · — $1,920,007 L & M Contractors, Inc. 3
Aug 19, 2010 100087BRFY-NBIP(420)SS Nowata
Division 8
BRIDGE PAINT AND REPAIR US -60: OVER THE VERDIGRIS RIVER , 3.8 MILES EAST OF THE US -169 JUNCTION. PROJECT LENGTH = 0.137 MILES · $1,395,350 $1,262,900 Seminole Equipment, Inc. -9.5% 2
1–3 of 3

Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.