ODOT Bid Results

Feb 2010 · 9 let jobs Sign up free
9Let jobs
$20,898,447Total low bids
$20,424,990Total estimates
+2.3%Low bids vs estimates

Feb 2010 results

Bid tabs (Excel) ExcelCSV
Let dateContractCounty / DistrictProject EstimateLow bidLow bidder% vs est.Bidders
Feb 25, 2010 100027STP-STIM(483)AG Cleveland
Division 3
RESURFACE (ASPHALT ) CITY STREETS (BRYANT AVE ): BEGIN AT SE 27TH STREET IN THE CITY OF MOORE, EXTEND NORTH . PROJECT LENGTH = 1.58 MILES · — $860,410 Silver Star Construction Company, Inc. 6
Feb 25, 2010 100030STP-STIM(465)EH Ellis
Division 6
PEDESTRIAN IMPROVEMENTS US-283: FROM GRAND AVE EXTEND NORTH IN THE TOWN OF SHATTUCK . PROJECT LENGTH = 0.673 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED . · $834,655 $604,894 Redlands Contracting, LLC -27.5% 7
Feb 25, 2010 100035STP-STIM(452)EH Kay
Division 4
PEDESTRIAN IMPROVEMENTS US-60BUS/US-77: ON US-60 BUS RD, FROM MAIN ST EXT EAST . ON US-77, FROM GRAND AVE EXT SOUTH IN THE TOWN OF TONKAWA . PROJECT LENGTH = 0.748 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED . · $386,381 $323,564 HEMBREE & HODGSON CONSTRUCTION, LLC -16.3% 5
Feb 25, 2010 100038STP-STIM(447)EH Lincoln
Division 3
PEDESTRIAN IMPROVEMENTS SH-105: FROM OKLAHOMA STREET , EXTEND EAST IN THE TOWN OF TRYON . PROJECT LENGTH = 0.172 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED . · $309,790 $249,700 MORTON CONSTRUCTION, INC. -19.4% 11
Feb 25, 2010 100045STP-STIM(448)EH Seminole
Division 3
PEDESTRIAN IMPROVEMENT SH -56: FROM CHESTNUT STREET , EXTEND EAST IN THE TOWN OF SASAKWA . PROJECT LENGTH = 0.22 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED . · $175,233 $156,594 WADE CONSTRUCTION, INC. -10.6% 11
Feb 18, 2010 100042TCSP-0H68(007)TC Stp-stim(504)hp
CLEVELAND GRADE, DRAIN, SURFACE AND BRIDGE CITY STREET (ROBINSON STREET): DRAINAGE AND PUMP STATION AT THE BNSF RAILROAD CROSSING IN THE CITY OF NORMAN. PROJECT LENGTH = 0.333 MILES · $11,219,849 $12,207,432 MANHATTAN ROAD & BRIDGE COMPANY, LLC +8.8% 5
Feb 18, 2010 100064SSP-107B(148)SS Bryan
Division 2
GRADE, DRAIN, SURFACE , AND BRIDGE US-69B: AT THE US-69 JUNCTION IN DURANT. PROJECT LENGTH = 1.254 MILES · $6,855,255 $5,390,237 OBC, INC. -21.4% 7
Feb 18, 2010 100015HSIPY-166A(236)TR Rogers
Division 8
SAFETY IMPROVEMENT (TRAFFIC SIGNAL) SH-167: AT THE INTERSECTION OF SH-167 AND ROLLINS STREET IN THE CITY OF CATOOSA . PROJECT LENGTH = 0.296 MILES · $643,826 $740,473 BECCO CONTRACTORS, INC. +15.0% 2
Feb 18, 2010 100054MC-108C(281)PT. 1 2
CADDO, CANADIAN RESURFACE (ASPHALT ) SH-37: BEGIN JUST EAST OF US -281 JCT, AND EXTEND EAST. PROJECT LENGTH = 6.76 MILES · — $365,145 Silver Star Construction Company, Inc. 2
1–9 of 9

Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.