9Let jobs
$20,898,447Total low bids
$20,424,990Total estimates
+2.3%Low bids vs estimates
Feb 2010 results
Bid tabs (Excel) ExcelCSV| Let date | Contract | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 25, 2010 | 100027STP-STIM(483)AG | Cleveland Division 3 |
RESURFACE (ASPHALT ) CITY STREETS (BRYANT AVE ): BEGIN AT SE 27TH STREET IN THE CITY OF MOORE, EXTEND NORTH . PROJECT LENGTH = 1.58 MILES · | — | $860,410 | Silver Star Construction Company, Inc. | 6 | |
| Feb 25, 2010 | 100030STP-STIM(465)EH | Ellis Division 6 |
PEDESTRIAN IMPROVEMENTS US-283: FROM GRAND AVE EXTEND NORTH IN THE TOWN OF SHATTUCK . PROJECT LENGTH = 0.673 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED . · | $834,655 | $604,894 | Redlands Contracting, LLC | -27.5% | 7 |
| Feb 25, 2010 | 100035STP-STIM(452)EH | Kay Division 4 |
PEDESTRIAN IMPROVEMENTS US-60BUS/US-77: ON US-60 BUS RD, FROM MAIN ST EXT EAST . ON US-77, FROM GRAND AVE EXT SOUTH IN THE TOWN OF TONKAWA . PROJECT LENGTH = 0.748 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED . · | $386,381 | $323,564 | HEMBREE & HODGSON CONSTRUCTION, LLC | -16.3% | 5 |
| Feb 25, 2010 | 100038STP-STIM(447)EH | Lincoln Division 3 |
PEDESTRIAN IMPROVEMENTS SH-105: FROM OKLAHOMA STREET , EXTEND EAST IN THE TOWN OF TRYON . PROJECT LENGTH = 0.172 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED . · | $309,790 | $249,700 | MORTON CONSTRUCTION, INC. | -19.4% | 11 |
| Feb 25, 2010 | 100045STP-STIM(448)EH | Seminole Division 3 |
PEDESTRIAN IMPROVEMENT SH -56: FROM CHESTNUT STREET , EXTEND EAST IN THE TOWN OF SASAKWA . PROJECT LENGTH = 0.22 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED . · | $175,233 | $156,594 | WADE CONSTRUCTION, INC. | -10.6% | 11 |
| Feb 18, 2010 | 100042TCSP-0H68(007)TC | Stp-stim(504)hp |
CLEVELAND GRADE, DRAIN, SURFACE AND BRIDGE CITY STREET (ROBINSON STREET): DRAINAGE AND PUMP STATION AT THE BNSF RAILROAD CROSSING IN THE CITY OF NORMAN. PROJECT LENGTH = 0.333 MILES · | $11,219,849 | $12,207,432 | MANHATTAN ROAD & BRIDGE COMPANY, LLC | +8.8% | 5 |
| Feb 18, 2010 | 100064SSP-107B(148)SS | Bryan Division 2 |
GRADE, DRAIN, SURFACE , AND BRIDGE US-69B: AT THE US-69 JUNCTION IN DURANT. PROJECT LENGTH = 1.254 MILES · | $6,855,255 | $5,390,237 | OBC, INC. | -21.4% | 7 |
| Feb 18, 2010 | 100015HSIPY-166A(236)TR | Rogers Division 8 |
SAFETY IMPROVEMENT (TRAFFIC SIGNAL) SH-167: AT THE INTERSECTION OF SH-167 AND ROLLINS STREET IN THE CITY OF CATOOSA . PROJECT LENGTH = 0.296 MILES · | $643,826 | $740,473 | BECCO CONTRACTORS, INC. | +15.0% | 2 |
| Feb 18, 2010 | 100054MC-108C(281)PT. 1 | 2 |
CADDO, CANADIAN RESURFACE (ASPHALT ) SH-37: BEGIN JUST EAST OF US -281 JCT, AND EXTEND EAST. PROJECT LENGTH = 6.76 MILES · | — | $365,145 | Silver Star Construction Company, Inc. | 2 |
1–9 of 9
Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.