| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 138,572 | CY |
$4.00 |
$5.40 |
$6.75 |
$1.80 |
$11.00 |
| 2 | 202(C) 0184 |
UNCLASSIFIED BORROW | 8,868 | CY |
$6.00 |
$5.40 |
$9.50 |
$12.25 |
$11.00 |
| 3 | 223 2801 |
TEMPORARY SILT FENCE | 3,200 | LF |
$3.00 |
$1.70 |
$2.06 |
$1.40 |
$1.50 |
| 4 | 224 2803 |
TEMPORARY SEDIMENT FILTER | 12 | EA |
$400.00 |
$90.00 |
$412.52 |
$175.00 |
$185.00 |
| 5 | 227 0100 |
TEMPORARY SILT DIKE | 322 | LF |
$8.00 |
$5.85 |
$10.31 |
$6.00 |
$6.50 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 153,315 | SY |
$1.50 |
$1.26 |
$1.39 |
$1.14 |
$1.20 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 31.68 | AC |
$650.00 |
$426.00 |
$464.08 |
$450.00 |
$475.00 |
| 8 | 241 2832 |
MOWING | 31.68 | AC |
$60.00 |
$69.00 |
$77.35 |
$70.00 |
$75.00 |
| 9 | 303 0192 |
AGGREGATE BASE | 116,145 | CY |
$28.00 |
$17.68 |
$16.75 |
$8.75 |
$25.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 370,640 | SY |
$1.75 |
$0.9800 |
$0.9900 |
$1.25 |
$1.05 |
| 11 | 327(A) 4200 |
(SP)FLY ASH | 21,852 | TON |
$26.00 |
$31.00 |
$36.08 |
$32.00 |
$65.00 |
| 12 | 327(D) 4230 |
(SP)LIME | 1,337 | TON |
$110.00 |
$153.27 |
$182.24 |
$149.00 |
$145.00 |
| 13 | 327(E) 4240 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE | 404,651 | SY |
$2.00 |
$0.9500 |
$1.16 |
$2.45 |
$2.35 |
| 14 | 327(G) 4260 |
(SP)LIME PRETREATMENT | 75,981 | SY |
$2.00 |
$1.04 |
$0.4600 |
$1.20 |
$1.30 |
| 15 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 72,253 | TON |
$21.00 |
$24.00 |
$26.21 |
$23.50 |
$16.00 |
| 16 | 408 5774 |
PRIME COAT | 137,987 | GAL |
$3.50 |
$1.50 |
$4.26 |
$2.75 |
$5.20 |
| 17 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 59,442 | TON |
$65.00 |
$56.25 |
$51.56 |
$58.00 |
$62.75 |
| 18 | 413(D) 4868 |
(SP)RUMBLE STRIP-METHOD PCC-CON | 127,075 | LF |
$0.5000 |
$0.3100 |
$0.2600 |
$0.1700 |
$0.2700 |
| 19 | 414(A) 0210 |
(SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 147,898 | SY |
$10.00 |
$4.70 |
$3.87 |
$15.55 |
$4.50 |
| 20 | 414(A1) 5725 |
(SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 183,552 | SY |
$13.00 |
$8.10 |
$8.22 |
$17.20 |
$7.75 |
| 21 | 414(B) 5913 |
H.E.S. CONCRETE (FULL DEPTH PATCHING) | 300 | SY |
$46.00 |
$150.00 |
$112.31 |
$80.00 |
$60.00 |
| 22 | 414(P) 6000 |
(SP)P.C. CONCRETE FOR PAVEMENT | 102,728 | CY |
$84.00 |
$84.30 |
$73.88 |
$75.00 |
$66.00 |
| 23 | 417 5267 |
COLD MILLING PAVEMENT | 29,528 | SY |
$4.00 |
$2.76 |
$3.24 |
$3.38 |
$3.25 |
| 24 | 611(E) 6000 |
INLET (SMD-TYPE 1) | 5 | EA |
$3,000.00 |
$1,597.50 |
$2,800.00 |
$2,500.00 |
$3,200.00 |
| 25 | 613(B) 0492 |
24" R.C.PIPE CLASS III | 300 | LF |
$50.00 |
$55.38 |
$65.00 |
$35.00 |
$85.00 |
| 26 | 613(CC) 7197 |
TYPE B6 CULVERT END TREATMENT | 5 | EA |
$1,000.00 |
$1,011.75 |
$2,500.00 |
$2,500.00 |
$1,100.00 |
| 27 | 613(P) 1091 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 4,638 | LF |
$15.00 |
$7.64 |
$7.40 |
$10.00 |
$21.00 |
| 28 | 613(Q) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 1,548 | LF |
$18.00 |
$7.63 |
$7.40 |
$10.00 |
$26.00 |
| 29 | 613(R) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 557 | CY |
$47.00 |
$5.00 |
$30.00 |
$25.00 |
$30.00 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$22,055.00 |
$55,000.00 |
$25,000.00 |
$40,126.70 |
| 31 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 221,835 | SY |
$3.50 |
$1.27 |
$2.29 |
$4.90 |
$4.25 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 109,401 | SY |
$2.00 |
$2.81 |
$4.74 |
$2.36 |
$2.00 |
| 33 | 619(C) 0924 |
SAWING PAVEMENT | 88,745 | LF |
$3.50 |
$0.1000 |
$4.50 |
$0.0100 |
$2.00 |
| 34 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 14,590 | LF |
$17.00 |
$13.85 |
$13.41 |
$10.55 |
$11.45 |
| 35 | 623(E) 7114 |
THRIE BEAM BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,500.00 |
$1,384.50 |
$1,340.68 |
$1,500.00 |
$1,625.00 |
| 36 | 623(F) 4452 |
GUARD RAIL ANCHOR UNIT (TYPE G) | 8 | EA |
$1,500.00 |
$1,235.40 |
$1,196.30 |
$1,470.00 |
$1,600.00 |
| 37 | 623(F) 6030 |
GUARD RAIL ANCHOR UNIT (TYPE B) | 19 | EA |
$750.00 |
$521.85 |
$505.33 |
$460.00 |
$500.00 |
| 38 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 2 | EA |
$2,500.00 |
$2,236.50 |
$2,165.71 |
$1,800.00 |
$1,950.00 |
| 39 | 625(G) 1270 |
(PL)REMOVE AND RESET GUARD RAIL | 2,000 | LF |
$16.00 |
$6.92 |
$6.70 |
$5.00 |
$5.40 |
| 40 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 50 | EA |
$3.00 |
$5.86 |
$5.67 |
$8.00 |
$10.00 |
| 41 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 50 | EA |
$3.00 |
$5.86 |
$5.67 |
$8.00 |
$10.00 |
| 42 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 50 | EA |
$4.50 |
$5.86 |
$5.67 |
$14.00 |
$15.00 |
| 43 | 890A/B 8762 |
(PL)REMOVE & RESET G.E.T. GUARD RAIL END SECTION | 10 | EA |
$750.00 |
$585.75 |
$567.21 |
$525.00 |
$575.00 |
| 44 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1.94 | CY |
$450.00 |
$303.53 |
$293.92 |
$285.00 |
$500.00 |
| 45 | 804(B) 2916 |
REINFORCING STEEL | 308 | LB |
$1.10 |
$2.13 |
$2.06 |
$2.00 |
$2.50 |
| 46 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 110 | EA |
$12.65 |
$26.63 |
$25.78 |
$25.00 |
$10.00 |
| 47 | 854(C) 8530 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 138,836 | LF |
$0.4000 |
$0.4400 |
$0.4200 |
$0.4100 |
$0.4500 |
| 48 | 854(C) 8535 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | 39,936 | LF |
$0.5500 |
$0.6200 |
$0.6000 |
$0.5800 |
$0.6500 |
| 49 | 854(C) 8540 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | 5,872 | LF |
$1.00 |
$1.07 |
$1.03 |
$1.00 |
$1.10 |
| 50 | 854(C) 8555 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(24" WIDE) | 48 | LF |
$5.00 |
$5.33 |
$5.16 |
$5.00 |
$6.00 |
| 51 | 890A/B 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 16 | EA |
$154.00 |
$106.50 |
$103.13 |
$100.00 |
$110.00 |
| 52 | 890A/B 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 2 | EA |
$195.00 |
$106.50 |
$103.13 |
$100.00 |
$110.00 |
| 53 | 627(O) 4410 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 35,100 | LF |
$3.00 |
$1.35 |
$3.06 |
$1.50 |
$4.10 |
| 54 | 627(P) 4425 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 35,100 | LF |
$21.00 |
$25.00 |
$16.86 |
$24.15 |
$38.00 |
| 55 | 856(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 90,000 | LF |
$0.2500 |
$0.1900 |
$0.1900 |
$0.1800 |
$0.2000 |
| 56 | 856(G) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 17,000 | EA |
$0.6000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1500 |
| 57 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 80,000 | LF |
$0.2000 |
$0.1300 |
$0.1200 |
$0.1200 |
$0.1500 |
| 58 | 871 8705 |
(PL)CONST.ZONE IMPACT ATTEN. | 2,700 | SD |
$1.00 |
$1.07 |
$1.03 |
$1.00 |
$1.05 |
| 59 | 878(C) 8487 |
MODULAR GLARE SCREEN | 223,200 | SD |
$0.1000 |
$0.0300 |
$0.0300 |
$0.0300 |
$0.0500 |
| 60 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 900 | SD |
$5.00 |
$31.95 |
$30.94 |
$30.00 |
$32.00 |
| 61 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 25,200 | SD |
$0.0600 |
$0.1300 |
$0.1200 |
$0.1200 |
$0.1500 |
| 62 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 17,100 | SD |
$0.6000 |
$2.66 |
$2.58 |
$2.50 |
$2.60 |
| 63 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 30,600 | SD |
$1.00 |
$0.4300 |
$0.4100 |
$0.4000 |
$0.4500 |
| 64 | 880(C) 8842 |
BARRICADES(TYPE III) | 13,500 | SD |
$0.5000 |
$1.01 |
$0.9800 |
$0.9500 |
$1.00 |
| 65 | 880(C) 8848 |
WING BARRICADES | 1,800 | SD |
$0.6000 |
$4.26 |
$4.13 |
$4.00 |
$4.25 |
| 66 | 880(D) 8854 |
VERTICAL PANELS | 308,250 | SD |
$0.1000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
| 67 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 35,100 | SD |
$0.1500 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.2000 |
| 68 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 450,000 | SD |
$0.0600 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
| 69 | 880(F) 8878 |
DRUMS | 96,750 | SD |
$0.2000 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.2000 |
| 70 | 880(H) 8896 |
CONES(36" LARGE) | 72,000 | SD |
$0.0500 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
| 71 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 1,400 | HOUR |
$65.00 |
$56.00 |
$75.00 |
$65.00 |
$75.00 |
| 72 | 882(B) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,800 | SD |
$15.00 |
$3.20 |
$3.09 |
$3.00 |
$3.25 |
| 73 | 642 0098 |
STAKING | 1 | LSUM |
$125,000.00 |
$125,000.00 |
$180,000.00 |
$106,700.00 |
$150,000.00 |
| 74 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,500.00 |
$5,500.00 |
$25,000.00 |
| 75 | 640 1398 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$11,000.00 |
$7,500.00 |
$16,500.00 |
$125,000.00 |
| 76 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$893,748.00 |
$748,340.00 |
$750,000.00 |
$793,750.00 |
$800,000.00 |
| 77 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$60,000.00 |
$85,000.00 |
$95,000.00 |
$125,000.00 |
$300,000.00 |
| 78 | 876(C) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 45 | SD |
$20.00 |
$47.93 |
$46.41 |
$45.00 |
$100.00 |
| 79 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 45 | SD |
$6.00 |
$31.95 |
$30.94 |
$30.00 |
$32.00 |
| 80 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,395 | SD |
$0.2000 |
$0.1300 |
$0.1200 |
$0.1200 |
$0.1500 |
| 81 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 90 | SD |
$0.7500 |
$2.13 |
$2.06 |
$2.00 |
$2.60 |
| 82 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 990 | SD |
$1.50 |
$0.4300 |
$0.4100 |
$0.4000 |
$0.4500 |
| 83 | 880(C) 8842 |
BARRICADES(TYPE III) | 90 | SD |
$0.5000 |
$1.01 |
$0.9800 |
$0.9500 |
$1.00 |
| 84 | 880(C) 8848 |
WING BARRICADES | 90 | SD |
$0.5000 |
$3.20 |
$3.09 |
$3.00 |
$4.25 |
| 85 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,170 | SD |
$0.1000 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.2000 |
| 86 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 22,250 | SD |
$0.1000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
| 87 | 880(F) 8878 |
DRUMS | 22,250 | SD |
$0.1000 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.2000 |
| 88 | 880(G) 8890 |
CHANNELIZER CONES | 20,340 | SD |
$0.1000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0300 |
| 89 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 270 | HOUR |
$45.00 |
$56.00 |
$76.57 |
$65.00 |
$75.00 |
| 90 | 882(B) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 270 | SD |
$25.00 |
$3.20 |
$3.09 |
$3.00 |
$3.25 |
| 91 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 865 | CY |
$10.00 |
$6.00 |
$12.50 |
$9.80 |
$11.00 |
| 92 | 202(C) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$12.00 |
$10.00 |
$15.00 |
$12.25 |
$11.00 |
| 93 | 223 2801 |
TEMPORARY SILT FENCE | 1,150 | LF |
$3.00 |
$1.70 |
$2.06 |
$1.40 |
$1.50 |
| 94 | 224 2803 |
TEMPORARY SEDIMENT FILTER | 5 | EA |
$200.00 |
$175.73 |
$412.51 |
$175.00 |
$185.00 |
| 95 | 227 0100 |
TEMPORARY SILT DIKE | 1,540 | LF |
$2.50 |
$6.12 |
$6.13 |
$6.00 |
$6.50 |
| 96 | 230(A) 2806 |
SOLID SLAB SODDING | 5,000 | SY |
$2.00 |
$1.18 |
$1.39 |
$1.14 |
$1.20 |
| 97 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,290 | TON |
$25.00 |
$19.15 |
$26.00 |
$23.50 |
$16.00 |
| 98 | 509(A) 0319 |
CLASS AA CONCRETE | 430 | CY |
$450.00 |
$372.75 |
$116.36 |
$200.00 |
$215.00 |
| 99 | 509(D) 0325 |
CLASS C CONCRETE | 5 | CY |
$350.00 |
$300.00 |
$445.00 |
$350.00 |
$550.00 |
| 100 | 612(E) 0645 |
INLETS ADJUST TO GRADE | 3 | EA |
$1,500.00 |
$1,200.00 |
$2,100.00 |
$2,000.00 |
$2,200.00 |
| 101 | 628 5110 |
(PL)CABLE END ANCHOR UNIT | 30 | EA |
$1,500.00 |
$1,011.75 |
$1,500.19 |
$1,490.00 |
$1,615.00 |
| 102 | 628 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 36,501 | LF |
$11.00 |
$8.52 |
$10.83 |
$9.25 |
$10.00 |
| 103 | 628 5175 |
CABLE BARRIER TENSION METER | 1 | EA |
$1,500.00 |
$2,130.00 |
$6,160.03 |
$4,950.00 |
$7,500.00 |