| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$34,408.72 |
$46,944.44 |
$87,550.00 |
$46,944.44 |
$543,282.12 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 229,162.11 | CY |
$5.39 |
$4.84 |
$4.85 |
$4.84 |
$5.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 173,666.42 | CY |
$5.31 |
$6.85 |
$6.75 |
$9.50 |
$8.75 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,095.37 |
$273,044.27 |
$415,575.00 |
$273,044.27 |
$385,222.45 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 17,130 | LF |
$1.04 |
$1.40 |
$1.45 |
$1.40 |
$1.40 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 63 | EA |
$160.00 |
$150.00 |
$154.50 |
$150.00 |
$150.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 7,084 | LF |
$5.41 |
$7.35 |
$7.55 |
$7.35 |
$7.35 |
| 8 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 30 | CY |
$106.39 |
$95.32 |
$98.00 |
$95.32 |
$50.00 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 4,602.23 | LF |
$1.57 |
$1.55 |
$1.60 |
$1.55 |
$1.55 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 580,311.24 | SY |
$1.25 |
$1.55 |
$1.60 |
$1.55 |
$1.55 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 119.9 | AC |
$242.11 |
$450.00 |
$463.50 |
$450.00 |
$450.00 |
| 12 | 241 2832 |
MOWING | 239.8 | AC |
$40.15 |
$70.00 |
$72.10 |
$70.00 |
$70.00 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 294,639.45 | SY |
$7.25 |
$4.25 |
$4.45 |
$6.50 |
$5.32 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 988.2 | TON |
$32.75 |
$30.44 |
$28.50 |
$30.44 |
$31.07 |
| 15 | 407(B) 0250 |
TACK COAT | 119,333.98 | GAL |
$3.00 |
$2.40 |
$3.45 |
$2.50 |
$2.11 |
| 16 | 408 5774 |
PRIME COAT | 102,867.21 | GAL |
$3.01 |
$3.11 |
$3.45 |
$2.00 |
$3.25 |
| 17 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 33,620.19 | TON |
$64.92 |
$61.14 |
$72.30 |
$83.50 |
$91.51 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 99,158.89 | TON |
$70.00 |
$57.00 |
$64.50 |
$74.90 |
$80.42 |
| 19 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 21,866.42 | TON |
$79.53 |
$69.81 |
$78.55 |
$89.00 |
$95.65 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,143.21 | TON |
$78.42 |
$63.03 |
$72.10 |
$80.00 |
$80.58 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 775.29 | CY |
$13.95 |
$30.00 |
$30.90 |
$5.00 |
$30.00 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 2,166.24 | CY |
$419.77 |
$486.70 |
$437.75 |
$605.00 |
$433.70 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 1,038.24 | CY |
$271.42 |
$283.77 |
$242.05 |
$378.00 |
$283.77 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 325,419.3 | LB |
$0.8600 |
$1.07 |
$1.10 |
$0.8500 |
$0.9700 |
| 25 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 429 | TON |
$45.29 |
$45.75 |
$51.00 |
$49.52 |
$54.24 |
| 26 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 17 | EA |
$1,817.33 |
$1,440.00 |
$2,800.00 |
$2,546.12 |
$1,440.00 |
| 27 | 611(G) 6004 |
INLET (SMD-TYPE 2A) | 2 | EA |
$3,000.00 |
$1,787.00 |
$3,075.00 |
$2,820.82 |
$1,787.00 |
| 28 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 3 | EA |
$3,381.49 |
$2,460.00 |
$3,690.00 |
$3,454.38 |
$2,460.00 |
| 29 | 611(L) 0487 |
JUNCTION BOXES | 59 | CF |
$92.54 |
$50.00 |
$79.10 |
$1,337.27 |
$50.00 |
| 30 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,596 | LF |
$49.42 |
$52.75 |
$91.75 |
$52.75 |
$57.10 |
| 31 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 274 | LF |
$64.28 |
$61.03 |
$100.50 |
$61.03 |
$71.50 |
| 32 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 293 | LF |
$105.49 |
$94.14 |
$203.40 |
$94.14 |
$105.80 |
| 33 | 613(A) 4410 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III | 155 | LF |
$100.00 |
$100.50 |
$145.00 |
$100.50 |
$100.70 |
| 34 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,100 | LF |
$29.62 |
$26.90 |
$34.75 |
$39.72 |
$26.90 |
| 35 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 302 | LF |
$34.14 |
$31.25 |
$39.85 |
$44.49 |
$31.25 |
| 36 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 468 | LF |
$48.06 |
$39.20 |
$51.25 |
$49.33 |
$39.20 |
| 37 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 239 | LF |
$53.58 |
$46.40 |
$61.25 |
$53.53 |
$46.40 |
| 38 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 350 | LF |
$33.39 |
$33.80 |
$42.75 |
$45.12 |
$33.80 |
| 39 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 560 | LF |
$40.55 |
$39.80 |
$51.70 |
$49.54 |
$39.80 |
| 40 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 80 | LF |
$61.47 |
$53.10 |
$89.40 |
$62.09 |
$53.10 |
| 41 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 14 | EA |
$999.01 |
$1,225.00 |
$1,600.00 |
$1,750.00 |
$1,225.00 |
| 42 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 32 | EA |
$1,143.87 |
$1,450.00 |
$1,855.00 |
$1,500.00 |
$1,450.00 |
| 43 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 6 | EA |
$1,593.50 |
$1,850.00 |
$2,060.00 |
$1,635.00 |
$1,850.00 |
| 44 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 9 | EA |
$1,207.73 |
$1,250.00 |
$1,905.00 |
$1,550.00 |
$1,250.00 |
| 45 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,420.87 |
$1,475.00 |
$2,000.00 |
$1,950.00 |
$1,475.00 |
| 46 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$2,500.00 |
$2,265.00 |
$2,000.00 |
$2,500.00 |
| 47 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,405.52 |
$59,530.46 |
$78,280.00 |
$59,530.46 |
$390,479.81 |
| 48 | 619(B) 0291 |
REMOVAL OF HEADWALL | 18 | EA |
$794.26 |
$750.00 |
$454.00 |
$1,190.77 |
$1,000.00 |
| 49 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 84,783 | SY |
$3.18 |
$3.28 |
$2.30 |
$6.25 |
$6.46 |
| 50 | 624(B) 4460 |
GATES-STYLE WWF (4.5'HIGH X 10'LONG) | 6 | EA |
$1,000.00 |
$1,350.00 |
$824.00 |
$1,350.00 |
$1,350.00 |
| 51 | 624(B) 4462 |
GATES-STYLE WWF (4.5'HIGH X 12'LONG) | 6 | EA |
$1,200.00 |
$1,500.00 |
$901.00 |
$1,500.00 |
$1,500.00 |
| 52 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 12,908.89 | LF |
$4.17 |
$5.85 |
$7.35 |
$5.85 |
$5.85 |
| 53 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 2 | EA |
$200.93 |
$250.00 |
$258.00 |
$150.00 |
$120.83 |
| 54 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 660 | CY |
$9.90 |
$4.00 |
$10.30 |
$19.96 |
$4.00 |
| 55 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 380 | CY |
$13.95 |
$30.00 |
$30.90 |
$5.00 |
$30.00 |
| 56 | 509(A) 1326 |
CLASS AA CONCRETE | 3,265 | CY |
$307.15 |
$305.00 |
$408.00 |
$434.00 |
$430.06 |
| 57 | 511(A) 1332 |
REINFORCING STEEL | 220,820 | LB |
$0.8300 |
$1.11 |
$1.05 |
$0.9000 |
$1.01 |
| 58 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 122 | TON |
$48.43 |
$47.75 |
$41.25 |
$59.28 |
$54.24 |
| 59 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 41 | TON |
$36.71 |
$34.76 |
$41.25 |
$59.28 |
$41.21 |
| 60 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | EA |
$2,635.11 |
$4,000.00 |
$10,300.00 |
$5,000.00 |
$4,000.00 |
| 61 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 176,700 | LF |
$0.2000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1000 |
| 62 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 10,000 | LF |
$1.16 |
$1.16 |
$1.20 |
$0.5000 |
$0.5000 |
| 63 | 857(E) 8884 |
(PL)C/L CONSTRUCTION ZONE PAVEMENT MARKERS(YELLOW) | 800 | EA |
$1.00 |
$1.00 |
$1.05 |
$2.00 |
$2.00 |
| 64 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 3,090 | SD |
$3.35 |
$1.00 |
$1.05 |
$0.2500 |
$0.2500 |
| 65 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 29,040 | SD |
$0.1500 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0300 |
| 66 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 45,264 | SD |
$0.1600 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0300 |
| 67 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 18,768 | SD |
$1.10 |
$2.65 |
$2.75 |
$2.50 |
$3.50 |
| 68 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 32,020 | SD |
$0.3300 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.0500 |
| 69 | 880(C) 8848 |
WING BARRICADES | 2,208 | SD |
$0.6400 |
$0.0200 |
$0.0200 |
$2.00 |
$3.00 |
| 70 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 61,380 | SD |
$0.1000 |
$0.1000 |
$0.1000 |
$0.0500 |
$0.0500 |
| 71 | 880(F) 8878 |
DRUMS | 17,775 | SD |
$0.1800 |
$0.4000 |
$0.4000 |
$1.00 |
$1.50 |
| 72 | 880(G) 8890 |
CHANNELIZER CONES | 14,350 | SD |
$0.1800 |
$0.0200 |
$0.0200 |
$1.00 |
$1.50 |
| 73 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 1,000 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 74 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,176 | SD |
$11.33 |
$6.00 |
$6.20 |
$4.00 |
$4.00 |
| 75 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 57,036.78 | LF |
$0.1700 |
$0.1300 |
$0.1500 |
$0.0900 |
$0.1600 |
| 76 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 731.32 | SF |
$22.51 |
$27.00 |
$27.80 |
$15.00 |
$15.00 |
| 77 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 1,216 | LF |
$6.85 |
$6.00 |
$6.20 |
$7.00 |
$7.00 |
| 78 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 134,726 | LF |
$0.3400 |
$0.3900 |
$0.5000 |
$0.4000 |
$0.4000 |
| 79 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 66 | EA |
$200.00 |
$125.00 |
$129.00 |
$175.00 |
$175.00 |
| 80 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$27,153.19 |
$44,800.00 |
$78,600.00 |
$76,000.00 |
$100,000.00 |
| 81 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,093.08 |
$5,000.00 |
$15,900.00 |
$7,500.00 |
$20,000.00 |
| 82 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,945.27 |
$7,500.00 |
$16,000.00 |
$32,000.00 |
$17,000.00 |
| 83 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$141,135.78 |
$722,451.55 |
$750,000.00 |
|
|