| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$25,000.00 |
$17,000.00 |
$31,515.00 |
$10,000.00 |
$33,500.00 |
$47,300.00 |
$65,757.60 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 15,682 | CY |
$10.00 |
$8.00 |
$6.50 |
$7.50 |
$9.50 |
$7.50 |
$7.15 |
$5.70 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,671 | CY |
$12.00 |
$8.00 |
$8.50 |
$8.95 |
$12.50 |
$10.00 |
$9.35 |
$20.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$3,500.00 |
$15,000.00 |
$19,488.00 |
$21,000.00 |
$4,000.00 |
$12,250.00 |
$21,436.80 |
$45,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 1,427 | LF |
$10.00 |
$6.00 |
$11.00 |
$12.00 |
$9.00 |
$7.80 |
$12.10 |
$7.20 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,506 | LF |
$1.50 |
$2.00 |
$1.99 |
$3.00 |
$1.75 |
$2.20 |
$2.19 |
$2.50 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 490 | LF |
$10.00 |
$9.00 |
$12.95 |
$18.00 |
$8.00 |
$14.50 |
$14.25 |
$16.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 1,970 | SY |
$1.20 |
$3.30 |
$6.95 |
$13.10 |
$7.50 |
$10.00 |
$7.65 |
$9.00 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 16.8 | AC |
$195.00 |
$550.00 |
$6,450.00 |
$1,710.00 |
$6,772.50 |
$5,680.00 |
$7,095.00 |
$8,000.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 16.8 | AC |
$300.00 |
$550.00 |
$6,450.00 |
$11,114.00 |
$6,772.50 |
$5,680.00 |
$7,095.00 |
$8,000.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,493 | CY |
$50.00 |
$42.00 |
$45.10 |
$49.65 |
$46.00 |
$62.00 |
$49.61 |
$67.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 510 | TON |
$40.00 |
$20.00 |
$22.70 |
$25.00 |
$40.00 |
$31.50 |
$24.97 |
$37.00 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,084 | TON |
$75.00 |
$52.00 |
$69.40 |
$76.35 |
$72.00 |
$79.00 |
$76.34 |
$86.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,010 | TON |
$95.00 |
$64.00 |
$69.40 |
$76.35 |
$72.00 |
$81.00 |
$76.34 |
$86.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$330.00 |
$250.00 |
$275.00 |
$900.00 |
$287.50 |
$440.00 |
$1,200.00 |
| 16 | 510(A) 6333 |
RETAINING WALL | 143 | SY |
$850.00 |
$400.00 |
$650.00 |
$556.99 |
$800.00 |
$1,150.00 |
$824.30 |
$500.00 |
| 17 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 96 | TON |
$96.00 |
$30.00 |
$38.00 |
$42.00 |
$45.00 |
$48.50 |
$41.80 |
$55.00 |
| 18 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 48 | TON |
$66.30 |
$27.00 |
$31.00 |
$37.00 |
$43.00 |
$40.50 |
$34.10 |
$90.00 |
| 19 | 611(G) 5338 |
INLET GPI TYPE 2 (DES. 12) | 1 | EA |
$7,000.00 |
$4,000.00 |
$4,500.00 |
$6,050.00 |
$6,500.00 |
$6,750.00 |
$4,950.00 |
$4,500.00 |
| 20 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 93 | LF |
$68.00 |
$65.00 |
$34.90 |
$38.50 |
$68.00 |
$62.00 |
$38.39 |
$18.00 |
| 21 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 60 | LF |
$80.00 |
$70.00 |
$53.60 |
$59.00 |
$78.00 |
$76.00 |
$58.96 |
$24.00 |
| 22 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 71 | LF |
$121.07 |
$75.00 |
$74.20 |
$81.65 |
$120.00 |
$100.00 |
$81.62 |
$40.00 |
| 23 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 152 | LF |
$50.00 |
$30.00 |
$27.60 |
$31.00 |
$42.00 |
$26.00 |
$30.36 |
$18.00 |
| 24 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$600.00 |
$600.00 |
$1,075.00 |
$1,260.00 |
$750.00 |
$950.00 |
$1,182.50 |
$2,300.00 |
| 25 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,400.00 |
$700.00 |
$1,292.00 |
$1,452.00 |
$1,500.00 |
$1,350.00 |
$1,421.20 |
$2,500.00 |
| 26 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 1 | EA |
$1,379.25 |
$1,300.00 |
$1,500.00 |
$2,800.00 |
$1,500.00 |
$1,200.00 |
$1,540.00 |
$3,700.00 |
| 27 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,282.35 |
$1,600.00 |
$1,700.00 |
$1,800.00 |
$1,200.00 |
$1,400.00 |
$1,430.00 |
$4,300.00 |
| 28 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 62 | CY |
$48.25 |
$50.00 |
$47.00 |
$51.70 |
$45.00 |
$60.00 |
$51.70 |
$60.00 |
| 29 | 613(V) 1180 |
TRENCH EXCAVATION | 140 | CY |
$20.00 |
$10.00 |
$14.00 |
$15.00 |
$18.00 |
$13.00 |
$15.40 |
$95.00 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$10,000.00 |
$7,700.00 |
$8,200.00 |
$5,000.00 |
$8,000.00 |
$8,470.00 |
$25,000.00 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,402 | SY |
$4.00 |
$3.00 |
$3.00 |
$5.00 |
$4.25 |
$6.00 |
$3.30 |
$2.30 |
| 32 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,139 | LF |
$6.00 |
$7.00 |
$5.20 |
$7.25 |
$5.75 |
$7.00 |
$5.94 |
$6.50 |
| 33 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$25.00 |
$25.00 |
$12.00 |
$12.40 |
$10.50 |
$33.00 |
$35.00 |
| 34 | 501(G) 6309 |
CLSM BACKFILL | 56 | CY |
$160.00 |
$85.00 |
$150.00 |
$160.00 |
$185.50 |
$165.00 |
$211.45 |
$150.00 |
| 35 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 448 | LF |
$220.00 |
$200.00 |
$265.00 |
$199.00 |
$209.00 |
$215.00 |
$232.57 |
$280.00 |
| 36 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$225.00 |
$155.00 |
$185.00 |
$202.00 |
$210.00 |
$190.00 |
$193.36 |
$295.00 |
| 37 | 504(B) 1305 |
SAW-CUT GROOVING | 452 | SY |
$7.00 |
$6.00 |
$6.60 |
$6.00 |
$6.80 |
$7.70 |
$8.36 |
$11.00 |
| 38 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 357 | LF |
$80.00 |
$52.00 |
$75.00 |
$78.00 |
$81.40 |
$76.25 |
$87.94 |
$135.00 |
| 39 | 506(A) 1322 |
STRUCTURAL STEEL | 380 | LB |
$3.25 |
$5.00 |
$2.50 |
$2.50 |
$3.05 |
$3.00 |
$2.29 |
$6.50 |
| 40 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$900.00 |
$1,000.00 |
$450.00 |
$390.00 |
$427.50 |
$585.00 |
$571.29 |
$550.00 |
| 41 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$390.00 |
$412.00 |
$585.00 |
$768.21 |
$800.00 |
| 42 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 6 | EA |
$600.00 |
$250.00 |
$400.00 |
$250.00 |
$278.00 |
$650.00 |
$440.00 |
$540.00 |
| 43 | 509(A) 1326 |
CLASS AA CONCRETE | 135 | CY |
$700.00 |
$675.00 |
$550.00 |
$550.00 |
$645.00 |
$757.50 |
$797.25 |
$1,150.00 |
| 44 | 509(B) 1328 |
CLASS A CONCRETE | 60 | CY |
$700.00 |
$550.00 |
$550.00 |
$550.00 |
$575.00 |
$775.00 |
$797.25 |
$690.00 |
| 45 | 511(A) 1332 |
REINFORCING STEEL | 38,580 | LB |
$1.00 |
$1.00 |
$0.8500 |
$1.00 |
$1.22 |
$0.8500 |
$1.04 |
$1.20 |
| 46 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 324 | LF |
$32.00 |
$33.00 |
$40.00 |
$30.00 |
$32.00 |
$37.10 |
$29.37 |
$130.00 |
| 47 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 324 | LF |
$12.00 |
$15.00 |
$10.00 |
$15.00 |
$15.50 |
$15.90 |
$16.50 |
$56.00 |
| 48 | 514(K) 6260 |
(PL)PILOT HOLES | 96 | LF |
$200.00 |
$175.00 |
$150.00 |
$170.00 |
$184.00 |
$170.00 |
$243.87 |
$165.00 |
| 49 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 50 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 108 | LF |
$773.10 |
$600.00 |
$700.00 |
$640.00 |
$665.00 |
$688.00 |
$899.80 |
$900.00 |
| 51 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,163 | TON |
$50.00 |
$30.00 |
$50.00 |
$39.00 |
$46.00 |
$41.50 |
$47.71 |
$55.00 |
| 52 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 124 | TON |
$42.00 |
$25.00 |
$40.00 |
$37.00 |
$43.00 |
$35.00 |
$36.84 |
$90.00 |
| 53 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$29.90 |
$18.00 |
$30.00 |
$40.00 |
$30.00 |
$32.00 |
$33.00 |
$53.00 |
| 54 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$22.00 |
$18.00 |
$30.00 |
$20.00 |
$25.00 |
$41.00 |
$33.00 |
$53.00 |
| 55 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$15,076.80 |
$13,000.00 |
$12,500.00 |
$12,500.00 |
$10,250.00 |
$17,600.00 |
$25,000.00 |
| 56 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$1,500.00 |
$1,250.00 |
$1,500.00 |
$1,350.00 |
$1,100.00 |
$1,061.50 |
$1,700.00 |
| 57 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 75 | LF |
$17.50 |
$20.00 |
$15.00 |
$19.00 |
$18.00 |
$20.00 |
$19.91 |
$23.00 |
| 58 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,250.00 |
$2,500.00 |
$1,900.00 |
$2,500.00 |
$2,000.00 |
$2,525.00 |
$2,618.00 |
$3,000.00 |
| 59 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 16 | SF |
$25.30 |
$22.00 |
$9.50 |
$25.00 |
$12.00 |
$25.00 |
$27.50 |
$25.00 |
| 60 | 851(C) 8324 |
2" SQUARE TUBE POST | 30 | LF |
$11.18 |
$11.00 |
$21.00 |
$15.00 |
$23.00 |
$11.00 |
$11.00 |
$13.00 |
| 61 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 12,482 | LF |
$0.5500 |
$0.6000 |
$0.6300 |
$0.6400 |
$0.7000 |
$0.7500 |
$0.7200 |
$0.7500 |
| 62 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8.00 |
$10,000.00 |
$4,240.00 |
$6,600.00 |
$4,500.00 |
$6,000.00 |
$440.00 |
$10,000.00 |
| 63 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$15,870.00 |
$14,100.00 |
$15,250.00 |
$14,200.00 |
$14,080.00 |
$23,000.00 |
| 64 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$5,500.00 |
$1,250.00 |
$3,500.00 |
$2,500.00 |
$5,000.00 |
$3,300.00 |
$18,000.00 |
| 65 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$95,000.00 |
$85,000.00 |
$105,000.00 |
$55,000.00 |
$103,094.00 |
$67,000.00 |
$107,328.31 |
$131,429.00 |