| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$91,800.00 |
$98,571.00 |
$6,574.00 |
$12,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 140 | CY |
$10.00 |
$12.00 |
$22.68 |
$12.36 |
$35.20 |
$28.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,830 | CY |
$13.00 |
$11.13 |
$18.36 |
$13.85 |
$24.70 |
$24.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,750.00 |
$3,456.00 |
$10,300.00 |
$11,875.00 |
$8,900.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 194 | LF |
$2.00 |
$1.60 |
$1.36 |
$1.32 |
$1.35 |
$1.20 |
| 6 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 103 | CY |
$112.00 |
$98.00 |
$129.60 |
$82.40 |
$107.00 |
$78.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 2,045 | SY |
$1.60 |
$1.45 |
$1.40 |
$1.23 |
$1.30 |
$1.40 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.04 | AC |
$885.00 |
$100.00 |
$432.00 |
$103.00 |
$107.00 |
$425.00 |
| 9 | 241 2832 |
MOWING | 2 | AC |
$100.00 |
$65.00 |
$63.72 |
$66.95 |
$69.60 |
$63.00 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,500 | SY |
$4.75 |
$6.40 |
$2.92 |
$3.09 |
$5.45 |
$6.20 |
| 11 | 407(B) 0250 |
TACK COAT | 720 | GAL |
$4.00 |
$3.85 |
$3.78 |
$3.42 |
$4.80 |
$3.70 |
| 12 | 408 5774 |
PRIME COAT | 546 | GAL |
$8.00 |
$6.00 |
$5.94 |
$12.32 |
$9.80 |
$5.80 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 691 | TON |
$100.00 |
$89.00 |
$86.40 |
$96.38 |
$84.20 |
$84.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 229 | TON |
$115.00 |
$90.00 |
$89.10 |
$97.02 |
$131.00 |
$87.00 |
| 15 | 412 5267 |
COLD MILLING PAVEMENT | 701 | SY |
$10.00 |
$14.00 |
$14.04 |
$5.05 |
$20.50 |
$12.50 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$5,750.00 |
$3,132.00 |
$7,725.00 |
$5,755.00 |
$5,000.00 |
| 17 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,578 | SY |
$6.00 |
$7.00 |
$5.40 |
$5.06 |
$7.50 |
$6.85 |
| 18 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 651 | LF |
$4.00 |
$4.50 |
$2.16 |
$3.09 |
$4.90 |
$5.25 |
| 19 | 619(C) 0924 |
SAWING PAVEMENT | 360 | LF |
$5.25 |
$5.50 |
$7.02 |
$7.21 |
$5.40 |
$11.00 |
| 20 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,810 | CY |
$10.00 |
$9.40 |
$11.50 |
$3.09 |
$13.10 |
$24.00 |
| 21 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 230 | CY |
$25.00 |
$16.00 |
$28.75 |
$12.36 |
$17.40 |
$41.00 |
| 22 | 504(F) 6006 |
HANDRAILING | 185.5 | LF |
$120.00 |
$125.00 |
$94.14 |
$76.22 |
$73.10 |
$110.00 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 518.1 | CY |
$500.00 |
$465.00 |
$483.50 |
$386.77 |
$552.50 |
$800.00 |
| 24 | 510(A) 6334 |
RETAINING WALL | 207 | SY |
$900.00 |
$1,151.00 |
$872.26 |
$914.54 |
$675.50 |
$1,170.00 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 87,870 | LB |
$1.00 |
$0.7900 |
$0.9600 |
$0.8700 |
$0.9300 |
$0.8500 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,650 | LF |
$42.00 |
$29.40 |
$29.36 |
$51.48 |
$31.20 |
$23.00 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,650 | LF |
$20.00 |
$12.60 |
$19.50 |
$22.06 |
$13.40 |
$44.00 |
| 28 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$17,750.00 |
$17,250.00 |
$20,600.00 |
$20,315.00 |
$50,000.00 |
| 30 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 9,240 | SD |
$0.3500 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
| 31 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,860 | SD |
$0.7000 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
| 32 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 960 | SD |
$1.60 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
| 33 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,800 | SD |
$1.05 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.2700 |
$0.0600 |
| 34 | 880(C) 8848 |
WING BARRICADES | 240 | SD |
$1.00 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.2100 |
$0.0600 |
| 35 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,560 | SD |
$0.2500 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.1600 |
$0.0600 |
| 36 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 148 | SD |
$15.00 |
$11.00 |
$10.80 |
$10.30 |
$10.70 |
$11.00 |
| 37 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,000 | LF |
$0.5500 |
$1.65 |
$1.62 |
$1.55 |
$1.95 |
$1.60 |
| 38 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$3,564.00 |
$3,090.00 |
$5,350.00 |
$8,000.00 |
| 39 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$13,500.00 |
$22,680.00 |
$21,630.00 |
$23,400.00 |
$33,000.00 |
| 40 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 11,116 | CY |
$8.00 |
$6.95 |
$7.34 |
$7.00 |
$8.90 |
$14.25 |
| 41 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$18.50 |
$6.50 |
$16.20 |
$15.45 |
$29.70 |
$23.50 |
| 42 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$17,604.00 |
$16,789.00 |
$29,850.00 |
$85,000.00 |
| 43 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,036 | LF |
$1.75 |
$1.50 |
$1.36 |
$1.32 |
$1.35 |
$1.20 |
| 44 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$250.00 |
$150.00 |
$210.60 |
$154.50 |
$160.50 |
$180.00 |
| 45 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$8.50 |
$12.00 |
$7.29 |
$11.33 |
$11.80 |
$7.80 |
| 46 | 229 4318 |
DITCH LINER PROTECTION | 658 | LF |
$2.50 |
$2.20 |
$1.09 |
$2.06 |
$2.15 |
$2.40 |
| 47 | 230(A) 2806 |
SOLID SLAB SODDING | 16,762 | SY |
$1.85 |
$1.40 |
$1.40 |
$1.26 |
$1.30 |
$1.40 |
| 48 | 233(A) 2817 |
VEGETATIVE MULCHING | 4 | AC |
$395.00 |
$100.00 |
$432.00 |
$103.00 |
$107.00 |
$440.00 |
| 49 | 241 2832 |
MOWING | 12 | AC |
$100.00 |
$65.00 |
$63.72 |
$66.95 |
$69.60 |
$64.00 |
| 50 | 307(K) 4300 |
STABILIZED SUBGRADE | 5,343 | SY |
$8.50 |
$7.37 |
$7.24 |
$6.90 |
$18.80 |
$7.00 |
| 51 | 407(B) 0250 |
TACK COAT | 2,139 | GAL |
$3.75 |
$3.85 |
$3.78 |
$3.42 |
$4.80 |
$3.70 |
| 52 | 408 5774 |
PRIME COAT | 2,192 | GAL |
$8.00 |
$5.30 |
$5.18 |
$9.58 |
$8.05 |
$5.10 |
| 53 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,538 | TON |
$92.50 |
$89.00 |
$86.40 |
$74.14 |
$75.50 |
$84.00 |
| 54 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 624 | TON |
$110.00 |
$90.00 |
$89.10 |
$87.77 |
$84.50 |
$87.00 |
| 55 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 240 | CY |
$20.00 |
$12.62 |
$10.80 |
$12.36 |
$16.70 |
$31.50 |
| 56 | 509(A) 0319 |
CLASS AA CONCRETE | 172 | CY |
$500.00 |
$502.50 |
$455.15 |
$569.59 |
$471.00 |
$1,185.00 |
| 57 | 509(D) 0325 |
CLASS C CONCRETE | 114 | CY |
$315.00 |
$357.50 |
$345.97 |
$355.35 |
$313.00 |
$650.00 |
| 58 | 511(A) 0332 |
REINFORCING STEEL | 28,372 | LB |
$1.00 |
$0.8200 |
$0.8500 |
$0.9900 |
$1.05 |
$0.8500 |
| 59 | 611(G) 5711 |
INLET CDI RCP DES. 8 | 1 | EA |
$8,500.00 |
$4,400.00 |
$2,672.00 |
$3,502.00 |
$14,855.00 |
$6,800.00 |
| 60 | 611(H) 5796 |
ADD'L DEPTH IN INLET CDI RCP DES. 8 | 6 | VF |
$450.00 |
$435.00 |
$637.20 |
$607.70 |
$561.00 |
$700.00 |
| 61 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 112 | LF |
$115.00 |
$84.00 |
$46.44 |
$110.31 |
$83.20 |
$84.00 |
| 62 | 613(V) 1180 |
TRENCH EXCAVATION | 276 | CY |
$18.50 |
$7.00 |
$10.80 |
$10.30 |
$16.10 |
$34.00 |
| 63 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,500.00 |
$9,250.00 |
$3,996.00 |
$3,811.00 |
$9,371.00 |
$4,800.00 |
| 64 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,021 | SY |
$5.50 |
$5.50 |
$5.40 |
$6.03 |
$8.55 |
$6.80 |
| 65 | 619(C) 0924 |
SAWING PAVEMENT | 58 | LF |
$6.50 |
$8.40 |
$9.72 |
$9.27 |
$13.50 |
$11.00 |
| 66 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 325 | LF |
$20.00 |
$17.60 |
$17.28 |
$16.48 |
$18.20 |
$16.75 |
| 67 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,600.00 |
$2,592.00 |
$2,472.00 |
$2,349.00 |
$2,500.00 |
| 68 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,715.00 |
$1,674.00 |
$1,596.50 |
$2,204.00 |
$1,600.00 |
| 69 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$15.00 |
$22.00 |
$10.80 |
$10.30 |
$12.80 |
$10.50 |
| 70 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$20.00 |
$11.50 |
$19.80 |
$15.45 |
$25.60 |
$31.50 |
| 71 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$150.00 |
$164.50 |
$163.49 |
$228.17 |
$166.50 |
$133.00 |
| 72 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,596 | LF |
$230.00 |
$212.00 |
$216.57 |
$216.41 |
$201.50 |
$210.00 |
| 73 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$190.00 |
$192.00 |
$265.46 |
$197.72 |
$243.00 |
$240.00 |
| 74 | 504(B) 1305 |
SAW-CUT GROOVING | 2,002.2 | SY |
$5.00 |
$4.40 |
$4.18 |
$5.15 |
$4.05 |
$4.40 |
| 75 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 897 | LF |
$95.00 |
$88.25 |
$78.74 |
$76.64 |
$97.80 |
$105.00 |
| 76 | 506(A) 1322 |
STRUCTURAL STEEL | 1,500 | LB |
$3.00 |
$2.50 |
$2.82 |
$2.15 |
$3.50 |
$4.50 |
| 77 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$350.00 |
$574.72 |
$1,158.52 |
$441.00 |
$525.00 |
| 78 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$1,325.00 |
$1,453.35 |
$1,996.68 |
$1,295.00 |
$1,375.00 |
| 79 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 24 | EA |
$600.00 |
$417.00 |
$422.79 |
$813.39 |
$453.00 |
$265.00 |
| 80 | 509(A) 1326 |
CLASS AA CONCRETE | 501 | CY |
$575.00 |
$597.50 |
$491.08 |
$663.63 |
$440.00 |
$830.00 |
| 81 | 509(B) 1328 |
CLASS A CONCRETE | 181.7 | CY |
$570.00 |
$635.00 |
$660.48 |
$658.05 |
$581.00 |
$580.00 |
| 82 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 135,490 | LB |
$1.05 |
$1.02 |
$1.02 |
$1.06 |
$0.9600 |
$0.8000 |
| 83 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 880 | LF |
$45.00 |
$29.40 |
$29.78 |
$24.88 |
$34.70 |
$23.50 |
| 84 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 880 | LF |
$20.00 |
$12.60 |
$13.20 |
$12.36 |
$15.60 |
$47.00 |
| 85 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 86 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,748 | SY |
$5.00 |
$4.18 |
$3.30 |
$4.94 |
$3.20 |
$4.00 |
| 87 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 286 | LF |
$1,000.00 |
$686.50 |
$777.57 |
$766.26 |
$738.50 |
$805.00 |
| 88 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$2,750.00 |
$5,280.00 |
$3,785.25 |
$856.00 |
$2,000.00 |
| 89 | 523(A) 6550 |
SEALER CRACK PREPARATION | 244.5 | LF |
$5.00 |
$4.40 |
$4.40 |
$5.15 |
$4.30 |
$4.20 |
| 90 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$150.00 |
$100.00 |
$110.00 |
$114.33 |
$107.00 |
$105.00 |
| 91 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,454 | TON |
$40.00 |
$40.30 |
$40.45 |
$41.30 |
$43.00 |
$48.00 |
| 92 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 288 | TON |
$35.00 |
$30.00 |
$27.30 |
$31.72 |
$34.10 |
$48.00 |
| 93 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$28.00 |
$29.26 |
$30.90 |
$39.70 |
$52.00 |
| 94 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 48 | LF |
$30.00 |
$30.00 |
$24.86 |
$30.90 |
$28.80 |
$45.00 |
| 95 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$26,000.00 |
$49,500.00 |
$42,142.45 |
$29,940.00 |
$70,000.00 |
| 96 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$33,000.00 |
$21,000.00 |
$20,984.19 |
$18,390.00 |
$48,000.00 |
| 97 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,600 | SD |
$0.3500 |
$1.10 |
$1.08 |
$1.03 |
$0.7500 |
$1.04 |
| 98 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 7,980 | SD |
$0.7000 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.7500 |
$0.0600 |
| 99 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,360 | SD |
$1.60 |
$0.5500 |
$0.5400 |
$0.5200 |
$0.7500 |
$0.5200 |
| 100 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,560 | SD |
$1.05 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.3200 |
$0.0600 |
| 101 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$1.00 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.1600 |
$0.0600 |
| 102 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 17,220 | SD |
$0.2500 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.1100 |
$0.0600 |
| 103 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$15.00 |
$8.80 |
$8.64 |
$8.24 |
$6.40 |
$8.30 |
| 104 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 14 | EA |
$65.00 |
$82.50 |
$81.00 |
$77.25 |
$53.50 |
$78.00 |
| 105 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$135.00 |
$275.00 |
$270.00 |
$257.50 |
$267.50 |
$260.00 |
| 106 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 48 | SF |
$16.00 |
$27.50 |
$27.00 |
$25.75 |
$32.10 |
$26.00 |
| 107 | 851(C) 8324 |
2" SQUARE TUBE POST | 26 | LF |
$7.00 |
$13.20 |
$12.96 |
$12.36 |
$8.55 |
$12.50 |
| 108 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 59 | LF |
$8.00 |
$13.20 |
$12.96 |
$12.36 |
$9.65 |
$12.50 |
| 109 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,600 | LF |
$0.5500 |
$0.7700 |
$0.7600 |
$0.7200 |
$0.9400 |
$0.7200 |
| 110 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$15,000.00 |
$11,340.00 |
$12,514.50 |
$17,975.00 |
$25,000.00 |
| 111 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$6,750.00 |
$3,465.00 |
$3,090.00 |
$3,611.00 |
$28,000.00 |
| 112 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$168,000.00 |
$180,000.00 |
$190,223.04 |
$160,195.52 |
$362,391.62 |
$225,000.00 |