| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$20,000.00 |
$36,562.00 |
$65,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 17,800 | CY |
$8.00 |
$8.00 |
$8.86 |
$9.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,321 | CY |
$12.00 |
$10.00 |
$8.90 |
$5.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$18,000.00 |
$24,113.75 |
$18,721.66 |
| 5 | 209 0120 |
MACHINE GRADING | 100 | LF |
$60.00 |
$10.00 |
$60.60 |
$15.33 |
| 6 | 210 0121 |
OBLITERATING ABANDONED ROAD | 932 | LF |
$10.00 |
$3.50 |
$8.08 |
$24.00 |
| 7 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,390 | LF |
$2.00 |
$1.12 |
$1.13 |
$1.83 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 196 | LF |
$8.00 |
$7.69 |
$7.77 |
$7.39 |
| 9 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 20 | CY |
$100.00 |
$68.00 |
$151.50 |
$80.88 |
| 10 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 106 | CY |
$100.00 |
$68.00 |
$126.25 |
$68.47 |
| 11 | 230(A) 2806 |
SOLID SLAB SODDING | 31,983 | SY |
$1.50 |
$1.24 |
$1.25 |
$1.55 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.06 | AC |
$300.00 |
$350.00 |
$353.50 |
$235.31 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,844 | CY |
$50.00 |
$45.00 |
$47.51 |
$40.00 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 11,517 | SY |
$1.50 |
$1.00 |
$1.38 |
$1.15 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,927 | TON |
$32.00 |
$27.00 |
$21.62 |
$19.93 |
| 16 | 407(B) 0250 |
TACK COAT | 2,994 | GAL |
$2.50 |
$3.00 |
$3.03 |
$1.75 |
| 17 | 408 5774 |
PRIME COAT | 6,023 | GAL |
$4.00 |
$5.00 |
$5.05 |
$0.5000 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,186 | TON |
$75.00 |
$66.50 |
$67.17 |
$49.28 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,464 | TON |
$85.00 |
$67.00 |
$67.67 |
$53.28 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$250.00 |
$299.53 |
$475.00 |
| 21 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 895 | TON |
$40.00 |
$35.00 |
$30.68 |
$31.87 |
| 22 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 255 | TON |
$30.00 |
$28.00 |
$23.77 |
$35.41 |
| 23 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 142 | LF |
$25.00 |
$30.00 |
$29.65 |
$35.35 |
| 24 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 54 | LF |
$60.00 |
$50.00 |
$38.93 |
$63.52 |
| 25 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$950.00 |
$1,500.00 |
$1,090.23 |
$2,300.00 |
| 26 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,100.00 |
$1,700.00 |
$1,604.76 |
$2,308.20 |
| 27 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$7,120.50 |
$27,488.11 |
| 28 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,279 | SY |
$4.00 |
$5.50 |
$6.06 |
$5.87 |
| 29 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 3 | EA |
$500.00 |
$800.00 |
$1,010.00 |
$802.44 |
| 30 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,546 | LF |
$6.00 |
$3.50 |
$4.55 |
$3.75 |
| 31 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 16 | EA |
$100.00 |
$75.00 |
$75.75 |
$100.51 |
| 32 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 7 | EA |
$185.00 |
$125.00 |
$126.25 |
$218.75 |
| 33 | 629(C) 4960 |
MAILBOX | 32 | EA |
$30.00 |
$25.00 |
$25.25 |
$59.12 |
| 34 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 32 | EA |
$25.00 |
$10.00 |
$10.10 |
$93.57 |
| 35 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,591 | CY |
$10.00 |
$7.50 |
$5.50 |
$9.94 |
| 36 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 49 | CY |
$50.00 |
$45.00 |
$61.67 |
$60.00 |
| 37 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 832 | CY |
$12.00 |
$15.00 |
$11.00 |
$20.00 |
| 38 | 508 6359 |
PRECAST ARCH CULVERT | 76 | LF |
$5,000.00 |
$5,000.00 |
$5,045.52 |
$5,750.00 |
| 39 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 672 | TON |
$40.00 |
$33.00 |
$35.61 |
$40.00 |
| 40 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 30 | TON |
$30.00 |
$30.00 |
$23.68 |
$40.00 |
| 41 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$12,000.00 |
$16,500.00 |
$18,000.00 |
| 42 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$27.00 |
$16.00 |
$11.00 |
$21.00 |
| 43 | 501(G) 6309 |
CLSM BACKFILL | 70 | CY |
$180.00 |
$145.00 |
$123.68 |
$151.35 |
| 44 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 942 | LF |
$228.00 |
$250.00 |
$239.69 |
$250.00 |
| 45 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$175.00 |
$185.00 |
$219.23 |
$280.00 |
| 46 | 504(B) 1305 |
SAW-CUT GROOVING | 89 | SY |
$8.00 |
$30.00 |
$38.50 |
$23.00 |
| 47 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 695 | LF |
$75.00 |
$75.00 |
$70.65 |
$72.00 |
| 48 | 506(A) 1322 |
STRUCTURAL STEEL | 960 | LB |
$3.50 |
$3.00 |
$2.27 |
$2.36 |
| 49 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$950.00 |
$300.00 |
$574.41 |
$365.00 |
| 50 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$1,250.00 |
$900.00 |
$1,357.47 |
$1,150.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 266 | CY |
$600.00 |
$550.00 |
$467.91 |
$475.00 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 82.2 | CY |
$650.00 |
$550.00 |
$518.24 |
$645.00 |
| 53 | 511(A) 1332 |
REINFORCING STEEL | 80,770 | LB |
$1.00 |
$0.8500 |
$0.8500 |
$1.18 |
| 54 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 266 | LF |
$40.00 |
$40.00 |
$41.68 |
$53.00 |
| 55 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 266 | LF |
$15.00 |
$10.00 |
$8.80 |
$35.00 |
| 56 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 57 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 128 | LF |
$1,000.00 |
$1,100.00 |
$1,526.00 |
$1,650.00 |
| 58 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,100.00 |
$3,500.00 |
$4,290.00 |
$4,700.00 |
| 59 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,217 | TON |
$40.00 |
$35.00 |
$33.41 |
$27.00 |
| 60 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 314 | TON |
$30.00 |
$28.00 |
$23.68 |
$33.00 |
| 61 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$24.00 |
$28.43 |
$37.00 |
| 62 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$24.00 |
$23.75 |
$37.00 |
| 63 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$8,500.00 |
$27,500.00 |
$40,000.00 |
| 64 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$17.00 |
$17.50 |
$17.60 |
$20.69 |
| 65 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,250.00 |
$2,200.00 |
$2,117.50 |
$2,500.00 |
| 66 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$1,450.00 |
$2,222.00 |
$1,600.00 |
| 67 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 16 | EA |
$10.00 |
$20.00 |
$20.20 |
$21.28 |
| 68 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 4 | EA |
$10.00 |
$22.00 |
$22.22 |
$21.29 |
| 69 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 64,161 | LF |
$0.3000 |
$0.0800 |
$0.0800 |
$0.1400 |
| 70 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,250.00 |
$5,302.50 |
$13,598.13 |
| 71 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$16,500.00 |
$27,775.00 |
$29,561.15 |
| 72 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,250.00 |
$4,545.00 |
$1,500.00 |
| 73 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$139,953.00 |
$150,000.00 |
$131,106.94 |
$85,000.00 |