| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,000.00 |
$12,360.00 |
$14,000.00 |
$15,442.50 |
$9,288.00 |
$11,000.00 |
$7,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 10,147 | CY |
$6.50 |
$6.18 |
$6.75 |
$9.59 |
$10.30 |
$10.50 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,305 | CY |
$7.50 |
$9.27 |
$8.00 |
$9.59 |
$12.10 |
$15.50 |
$11.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$16,852.86 |
$9,600.00 |
$8,839.50 |
$31,595.00 |
$22,400.00 |
$15,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 700 | LF |
$1.20 |
$1.32 |
$2.00 |
$1.36 |
$1.35 |
$1.40 |
$1.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 273 | LF |
$8.50 |
$8.13 |
$8.00 |
$8.40 |
$8.20 |
$7.40 |
$8.05 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 532 | LF |
$2.50 |
$2.06 |
$2.00 |
$2.13 |
$2.10 |
$1.10 |
$2.04 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 21,141 | SY |
$2.00 |
$1.29 |
$1.50 |
$1.33 |
$1.30 |
$1.32 |
$1.28 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 4.37 | AC |
$300.00 |
$154.50 |
$525.00 |
$159.75 |
$156.00 |
$450.00 |
$120.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.37 | AC |
$250.00 |
$154.50 |
$500.00 |
$159.75 |
$156.00 |
$424.00 |
$150.00 |
| 11 | 241 2832 |
MOWING | 8.74 | AC |
$100.00 |
$59.74 |
$75.00 |
$61.77 |
$60.30 |
$58.00 |
$55.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,069 | CY |
$50.00 |
$52.02 |
$60.50 |
$47.82 |
$52.50 |
$52.50 |
$50.50 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 7,039 | SY |
$1.95 |
$1.80 |
$1.85 |
$1.28 |
$1.80 |
$1.80 |
$1.75 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 518 | TON |
$52.00 |
$24.72 |
$28.50 |
$27.10 |
$43.40 |
$27.00 |
$26.00 |
| 15 | 407(B) 0250 |
TACK COAT | 1,741 | GAL |
$3.35 |
$3.61 |
$4.50 |
$3.73 |
$3.65 |
$3.60 |
$3.50 |
| 16 | 408 5774 |
PRIME COAT | 4,083 | GAL |
$5.00 |
$5.09 |
$5.50 |
$1.50 |
$5.15 |
$5.10 |
$4.95 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,640 | TON |
$85.00 |
$77.25 |
$80.25 |
$79.88 |
$78.00 |
$78.00 |
$75.00 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 751 | TON |
$135.00 |
$123.60 |
$128.40 |
$127.80 |
$125.00 |
$125.00 |
$120.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 69 | CY |
$304.00 |
$283.25 |
$350.00 |
$372.75 |
$406.50 |
$610.00 |
$350.00 |
| 20 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 612 | TON |
$40.00 |
$37.44 |
$39.00 |
$37.28 |
$90.70 |
$68.50 |
$45.00 |
| 21 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 115 | TON |
$45.50 |
$27.55 |
$38.00 |
$26.63 |
$59.50 |
$72.50 |
$32.00 |
| 22 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 102 | LF |
$17.00 |
$20.60 |
$55.00 |
$17.04 |
$51.70 |
$55.00 |
$15.00 |
| 23 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 35 | LF |
$15.00 |
$20.60 |
$40.00 |
$13.85 |
$51.70 |
$45.00 |
$15.00 |
| 24 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$1,000.00 |
$772.50 |
$1,500.00 |
$1,278.00 |
$1,065.00 |
$1,040.00 |
$500.00 |
| 25 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 4 | CY |
$75.00 |
$103.00 |
$200.00 |
$53.25 |
$340.50 |
$110.00 |
$45.00 |
| 26 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,450.00 |
$4,635.00 |
$7,000.00 |
$5,857.50 |
$6,333.00 |
$7,400.00 |
$5,000.00 |
| 27 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,720 | SY |
$6.50 |
$3.61 |
$5.00 |
$3.73 |
$4.05 |
$2.60 |
$5.00 |
| 28 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 402 | LF |
$6.00 |
$3.09 |
$5.00 |
$2.37 |
$10.50 |
$5.20 |
$4.00 |
| 29 | 619(C) 0924 |
SAWING PAVEMENT | 48 | LF |
$11.50 |
$10.30 |
$5.00 |
$9.59 |
$8.55 |
$8.30 |
$5.00 |
| 30 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$30.00 |
$18.54 |
$20.00 |
$19.17 |
$15.60 |
$15.50 |
$18.00 |
| 31 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,450.00 |
$2,240.25 |
$2,275.00 |
$2,316.38 |
$2,132.00 |
$2,315.00 |
$1,450.00 |
| 32 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,940.00 |
$1,493.50 |
$1,550.00 |
$1,544.25 |
$1,404.00 |
$2,125.00 |
$1,450.00 |
| 33 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 635 | LF |
$4.65 |
$3.14 |
$4.65 |
$3.89 |
$3.80 |
$3.10 |
$3.05 |
| 34 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,511 | LF |
$9.00 |
$3.24 |
$4.95 |
$4.21 |
$4.10 |
$3.20 |
$3.15 |
| 35 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,774 | LF |
$4.35 |
$3.35 |
$5.00 |
$4.58 |
$4.70 |
$3.30 |
$3.25 |
| 36 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$20.00 |
$20.60 |
$15.00 |
$21.72 |
$17.40 |
$26.00 |
$13.00 |
| 37 | 501(G) 6309 |
CLSM BACKFILL | 218.2 | CY |
$200.00 |
$164.80 |
$145.00 |
$150.45 |
$157.50 |
$125.00 |
$165.00 |
| 38 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 523.34 | LF |
$255.00 |
$231.80 |
$239.00 |
$250.00 |
$225.50 |
$212.00 |
$280.00 |
| 39 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$250.00 |
$175.10 |
$165.00 |
$115.61 |
$220.50 |
$257.00 |
$260.00 |
| 40 | 504(B) 1305 |
SAW-CUT GROOVING | 737.4 | SY |
$5.00 |
$5.67 |
$5.50 |
$4.42 |
$4.30 |
$4.70 |
$4.50 |
| 41 | 504(C) 6250 |
SEALED EXPANSION JOINT | 41.75 | LF |
$350.00 |
$259.56 |
$253.10 |
$208.11 |
$271.00 |
$206.00 |
$320.00 |
| 42 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 331.9 | LF |
$90.00 |
$71.07 |
$80.00 |
$100.00 |
$108.00 |
$108.00 |
$85.00 |
| 43 | 506(A) 1322 |
STRUCTURAL STEEL | 690 | LB |
$3.00 |
$2.16 |
$2.60 |
$3.00 |
$5.90 |
$5.10 |
$3.00 |
| 44 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$2,000.00 |
$1,361.66 |
$1,053.30 |
$2,000.00 |
$1,426.00 |
$800.00 |
$600.00 |
| 45 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 5 | EA |
$2,000.00 |
$1,367.84 |
$1,053.30 |
$2,000.00 |
$1,426.00 |
$1,180.00 |
$1,500.00 |
| 46 | 509(A) 1326 |
CLASS AA CONCRETE | 122.6 | CY |
$650.00 |
$500.58 |
$600.00 |
$800.00 |
$582.00 |
$965.00 |
$600.00 |
| 47 | 509(B) 1328 |
CLASS A CONCRETE | 112 | CY |
$650.00 |
$498.52 |
$600.00 |
$750.00 |
$636.50 |
$678.00 |
$600.00 |
| 48 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$592.25 |
$300.00 |
$1,000.00 |
$528.50 |
$1,110.00 |
$350.00 |
| 49 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 42,280 | LB |
$1.20 |
$1.02 |
$0.9800 |
$1.15 |
$1.25 |
$0.8500 |
$1.00 |
| 50 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 537 | SY |
$5.00 |
$5.15 |
$5.00 |
$4.05 |
$3.95 |
$4.20 |
$3.10 |
| 51 | 516(A) 6090 |
DRILLED SHAFTS 24" DIAMETER | 84 | LF |
$400.00 |
$340.93 |
$217.00 |
$348.77 |
$386.00 |
$452.00 |
$500.00 |
| 52 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 152 | LF |
$750.00 |
$621.09 |
$657.00 |
$631.85 |
$578.50 |
$610.00 |
$750.00 |
| 53 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$2,832.50 |
$4,000.00 |
$1,863.75 |
$1,664.00 |
$4,155.00 |
$2,700.00 |
| 54 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,070 | TON |
$50.00 |
$39.50 |
$37.00 |
$36.58 |
$41.50 |
$68.50 |
$45.00 |
| 55 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 210 | TON |
$40.00 |
$29.61 |
$35.00 |
$26.65 |
$34.10 |
$71.50 |
$30.00 |
| 56 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$30.90 |
$50.00 |
$21.99 |
$52.20 |
$55.00 |
$30.00 |
| 57 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$30.00 |
$30.90 |
$20.00 |
$18.52 |
$14.80 |
$45.00 |
$30.00 |
| 58 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,665.00 |
$18,000.00 |
$20,000.00 |
$11,395.00 |
$85,000.00 |
$15,000.00 |
| 59 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 2,800 | LF |
$0.4500 |
$0.5400 |
$0.5700 |
$0.5500 |
$1.15 |
$1.15 |
$0.5200 |
| 60 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.92 | CY |
$530.00 |
$515.00 |
$600.00 |
$532.50 |
$260.00 |
$261.00 |
$500.00 |
| 61 | 804(B) 2916 |
REINFORCING STEEL | 128 | LB |
$1.65 |
$2.06 |
$3.00 |
$2.13 |
$1.55 |
$1.60 |
$2.00 |
| 62 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$450.00 |
$1,545.00 |
$1,900.00 |
$1,597.50 |
$312.00 |
$313.00 |
$1,500.00 |
| 63 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 99.43 | SF |
$25.00 |
$25.75 |
$28.00 |
$26.62 |
$40.60 |
$40.50 |
$25.00 |
| 64 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 50 | LF |
$20.00 |
$25.75 |
$28.00 |
$26.63 |
$15.60 |
$15.50 |
$25.00 |
| 65 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 92 | LF |
$12.00 |
$10.30 |
$12.00 |
$10.65 |
$8.30 |
$8.40 |
$10.00 |
| 66 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,000 | LF |
$0.5500 |
$0.9100 |
$0.9400 |
$0.9400 |
$1.15 |
$1.20 |
$0.8800 |
| 67 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,060.00 |
$5,000.00 |
$677.69 |
$4,030.00 |
$8,400.00 |
$1,500.00 |
| 68 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,000.00 |
$12,360.00 |
$12,000.00 |
$20,022.00 |
$9,710.00 |
$20,700.00 |
$14,000.00 |
| 69 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,447 | CY |
$6.50 |
$6.18 |
$7.00 |
$9.59 |
$10.30 |
$10.50 |
$8.00 |
| 70 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,416 | CY |
$7.50 |
$9.27 |
$8.50 |
$9.59 |
$12.10 |
$15.50 |
$12.00 |
| 71 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,190.00 |
$12,516.56 |
$9,600.00 |
$6,693.53 |
$16,140.00 |
$19,000.00 |
$21,000.00 |
| 72 | 221(C) 2801 |
TEMPORARY SILT FENCE | 312 | LF |
$1.20 |
$1.32 |
$1.70 |
$1.36 |
$1.35 |
$1.40 |
$1.30 |
| 73 | 221(F) 0100 |
TEMPORARY SILT DIKE | 175 | LF |
$8.50 |
$8.12 |
$8.00 |
$8.40 |
$8.20 |
$7.40 |
$8.00 |
| 74 | 229 4318 |
DITCH LINER PROTECTION | 420 | LF |
$2.50 |
$2.06 |
$2.00 |
$2.13 |
$2.10 |
$1.05 |
$2.00 |
| 75 | 230(A) 2806 |
SOLID SLAB SODDING | 10,395 | SY |
$2.00 |
$1.29 |
$1.75 |
$1.33 |
$1.30 |
$1.32 |
$1.28 |
| 76 | 232(B) 2814 |
SEEDING METHOD B | 2.14 | AC |
$300.00 |
$154.50 |
$525.00 |
$159.75 |
$156.00 |
$450.00 |
$150.00 |
| 77 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.14 | AC |
$250.00 |
$154.50 |
$500.00 |
$159.75 |
$156.00 |
$424.00 |
$150.00 |
| 78 | 241 2832 |
MOWING | 4.28 | AC |
$100.00 |
$59.74 |
$65.00 |
$61.77 |
$60.30 |
$58.00 |
$55.00 |
| 79 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 999 | CY |
$50.00 |
$52.01 |
$60.50 |
$47.82 |
$52.50 |
$52.50 |
$50.50 |
| 80 | 325 5271 |
SEPARATOR FABRIC | 7,206 | SY |
$1.95 |
$1.80 |
$1.95 |
$1.28 |
$1.80 |
$1.80 |
$1.75 |
| 81 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 556 | TON |
$52.00 |
$24.72 |
$28.50 |
$27.10 |
$43.40 |
$27.00 |
$26.00 |
| 82 | 407(B) 0250 |
TACK COAT | 892 | GAL |
$3.35 |
$3.61 |
$4.50 |
$3.73 |
$3.65 |
$3.60 |
$3.50 |
| 83 | 408 5774 |
PRIME COAT | 5,262 | GAL |
$5.00 |
$5.09 |
$5.45 |
$1.50 |
$5.15 |
$5.10 |
$4.99 |
| 84 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,606 | TON |
$85.00 |
$77.25 |
$80.25 |
$79.88 |
$78.00 |
$78.00 |
$745.00 |
| 85 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 794 | TON |
$135.00 |
$123.60 |
$128.40 |
$127.80 |
$125.00 |
$125.00 |
$120.00 |
| 86 | 509(D) 0325 |
CLASS C CONCRETE | 75 | CY |
$304.00 |
$283.25 |
$350.00 |
$372.75 |
$418.50 |
$610.00 |
$350.00 |
| 87 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 54 | LF |
$21.00 |
$30.90 |
$28.00 |
$31.95 |
$59.00 |
$38.00 |
$50.00 |
| 88 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,725.00 |
$1,648.00 |
$1,800.00 |
$1,171.50 |
$1,219.00 |
$2,585.00 |
$1,800.00 |
| 89 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,140.00 |
$3,605.00 |
$7,000.00 |
$7,348.50 |
$10,135.00 |
$7,400.00 |
$5,000.00 |
| 90 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,506 | SY |
$6.50 |
$3.61 |
$5.50 |
$3.73 |
$4.10 |
$2.60 |
$5.00 |
| 91 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 398 | LF |
$6.00 |
$3.09 |
$4.00 |
$2.37 |
$9.65 |
$5.20 |
$4.00 |
| 92 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$11.50 |
$10.30 |
$5.00 |
$9.59 |
$9.30 |
$8.30 |
$5.00 |
| 93 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$20.00 |
$15.45 |
$15.00 |
$21.71 |
$26.40 |
$26.00 |
$13.00 |
| 94 | 501(G) 6309 |
CLSM BACKFILL | 122 | CY |
$200.00 |
$164.80 |
$145.00 |
$150.44 |
$166.50 |
$152.00 |
$165.00 |
| 95 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 278 | LF |
$215.00 |
$176.13 |
$184.65 |
$200.00 |
$173.50 |
$195.00 |
$200.00 |
| 96 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 299 | LF |
$235.00 |
$194.67 |
$206.74 |
$220.00 |
$207.00 |
$196.00 |
$220.00 |
| 97 | 504(A) 1304 |
APPROACH SLAB | 187.4 | SY |
$250.00 |
$175.10 |
$170.00 |
$116.66 |
$285.00 |
$264.00 |
$260.00 |
| 98 | 504(B) 1305 |
SAW-CUT GROOVING | 833.3 | SY |
$5.00 |
$5.67 |
$5.50 |
$4.42 |
$4.30 |
$4.70 |
$4.50 |
| 99 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 371 | LF |
$90.00 |
$86.52 |
$80.00 |
$100.00 |
$99.20 |
$108.00 |
$85.00 |
| 100 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$3.00 |
$2.16 |
$2.60 |
$3.00 |
$4.25 |
$5.30 |
$3.00 |
| 101 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,500.00 |
$524.27 |
$335.00 |
$2,000.00 |
$1,498.00 |
$775.00 |
$600.00 |
| 102 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$1,390.50 |
$980.00 |
$2,000.00 |
$1,498.00 |
$1,155.00 |
$1,500.00 |
| 103 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$500.00 |
$563.41 |
$265.00 |
$160.62 |
$387.50 |
$261.00 |
$300.00 |
| 104 | 509(A) 1326 |
CLASS AA CONCRETE | 195.4 | CY |
$650.00 |
$603.58 |
$600.00 |
$800.00 |
$554.00 |
$837.00 |
$600.00 |
| 105 | 509(B) 1328 |
CLASS A CONCRETE | 116.4 | CY |
$650.00 |
$601.52 |
$600.00 |
$750.00 |
$701.50 |
$696.00 |
$600.00 |
| 106 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$489.25 |
$250.00 |
$1,000.03 |
$502.50 |
$1,110.00 |
$350.00 |
| 107 | 511(A) 1332 |
REINFORCING STEEL | 140 | LB |
$1.00 |
$0.9100 |
$2.00 |
$1.15 |
$4.95 |
$0.7500 |
$1.00 |
| 108 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 62,210 | LB |
$1.20 |
$1.02 |
$0.9800 |
$1.15 |
$1.30 |
$0.8500 |
$1.00 |
| 109 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 265 | LF |
$40.00 |
$27.86 |
$32.50 |
$31.80 |
$45.20 |
$30.50 |
$45.00 |
| 110 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 265 | LF |
$20.00 |
$15.45 |
$15.00 |
$29.21 |
$20.20 |
$87.50 |
$12.00 |
| 111 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 112 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 686 | SY |
$5.00 |
$5.15 |
$5.00 |
$4.05 |
$3.95 |
$4.20 |
$3.00 |
| 113 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 156 | LF |
$750.00 |
$805.46 |
$623.00 |
$700.00 |
$687.50 |
$505.00 |
$800.00 |
| 114 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$2,832.50 |
$4,000.00 |
$1,978.72 |
$1,664.00 |
$4,155.00 |
$2,500.00 |
| 115 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$6.18 |
$6.00 |
$5.33 |
$5.20 |
$5.20 |
$5.20 |
| 116 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$113.30 |
$200.00 |
$106.50 |
$104.00 |
$104.00 |
$150.00 |
| 117 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,020 | TON |
$50.00 |
$39.50 |
$36.00 |
$36.58 |
$42.20 |
$68.50 |
$45.00 |
| 118 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 285 | TON |
$40.00 |
$29.61 |
$34.00 |
$26.64 |
$29.80 |
$66.00 |
$32.00 |
| 119 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$30.90 |
$50.00 |
$21.78 |
$55.20 |
$55.00 |
$30.00 |
| 120 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 90 | LF |
$30.00 |
$30.90 |
$20.00 |
$17.74 |
$17.20 |
$45.00 |
$30.00 |
| 121 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,815.00 |
$25,000.00 |
$22,000.00 |
$9,490.00 |
$85,000.00 |
$15,000.00 |
| 122 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 31,800 | SD |
$0.3100 |
$0.4100 |
$0.4500 |
$0.4300 |
$0.2600 |
$0.2500 |
$0.4000 |
| 123 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,400 | SD |
$0.7000 |
$0.2600 |
$0.2700 |
$0.2700 |
$2.10 |
$2.10 |
$0.2500 |
| 124 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,200 | SD |
$1.60 |
$0.2600 |
$0.2700 |
$0.2700 |
$2.10 |
$2.10 |
$0.2500 |
| 125 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 750 | SD |
$4.75 |
$3.09 |
$3.21 |
$3.20 |
$2.60 |
$2.60 |
$3.00 |
| 126 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,700 | SD |
$1.05 |
$1.03 |
$1.07 |
$1.07 |
$1.55 |
$1.60 |
$1.00 |
| 127 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$1.00 |
$0.5100 |
$0.5500 |
$0.5300 |
$0.3100 |
$0.3000 |
$1.00 |
| 128 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,600 | SD |
$0.3000 |
$1.03 |
$1.07 |
$1.07 |
$0.3600 |
$0.3500 |
$1.00 |
| 129 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 328 | SD |
$14.50 |
$20.60 |
$21.40 |
$21.30 |
$14.60 |
$14.50 |
$20.00 |
| 130 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 2,800 | LF |
$0.4500 |
$0.5400 |
$0.5700 |
$0.5500 |
$1.15 |
$1.15 |
$0.5000 |
| 131 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$300.00 |
$1,545.00 |
$1,800.00 |
$1,597.50 |
$312.00 |
$313.00 |
$1,500.00 |
| 132 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 35.5 | SF |
$25.00 |
$25.75 |
$28.00 |
$26.63 |
$40.60 |
$40.50 |
$25.00 |
| 133 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 58 | LF |
$12.00 |
$10.30 |
$12.00 |
$10.65 |
$7.30 |
$7.30 |
$10.00 |
| 134 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,000 | LF |
$0.5500 |
$0.9100 |
$0.9500 |
$0.9400 |
$1.15 |
$1.20 |
$0.8800 |
| 135 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$15,330.00 |
$15,800.00 |
$18,637.50 |
$16,325.00 |
$18,500.00 |
$17,500.00 |
| 136 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,100.00 |
$6,000.00 |
$677.69 |
$4,030.00 |
$8,400.00 |
$1,500.00 |
| 137 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$160,000.00 |
$167,205.10 |
$145,000.00 |
$150,000.00 |
$303,977.32 |
$185,000.00 |
$160,000.00 |