| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$43,157.00 |
$37,000.00 |
$195,262.20 |
$45,245.00 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 33,932 | CY |
$6.00 |
$7.30 |
$6.00 |
$6.30 |
$7.65 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 47,747 | CY |
$8.00 |
$8.24 |
$10.00 |
$8.40 |
$9.40 |
$17.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$63,600.00 |
$38,625.00 |
$10,000.00 |
$52,500.00 |
$40,495.00 |
$60,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,128 | LF |
$2.50 |
$1.39 |
$2.00 |
$1.42 |
$1.25 |
$1.99 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$500.00 |
$103.00 |
$185.00 |
$105.00 |
$162.00 |
$237.47 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 215 | LF |
$10.00 |
$8.24 |
$6.75 |
$8.40 |
$9.60 |
$7.76 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 57,265 | SY |
$2.00 |
$1.03 |
$1.20 |
$1.05 |
$1.40 |
$1.15 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 11.78 | AC |
$380.00 |
$103.00 |
$310.00 |
$105.00 |
$318.50 |
$120.00 |
| 10 | 241 2832 |
MOWING | 23.56 | AC |
$75.00 |
$103.00 |
$57.00 |
$105.00 |
$84.20 |
$58.56 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,438 | CY |
$50.00 |
$41.20 |
$36.00 |
$42.00 |
$55.00 |
$70.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 22,867 | SY |
$6.00 |
$4.89 |
$7.10 |
$4.99 |
$8.55 |
$7.00 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 24,566 | SY |
$1.50 |
$1.73 |
$1.05 |
$0.8800 |
$1.80 |
$1.23 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,499 | TON |
$30.00 |
$25.43 |
$21.50 |
$22.77 |
$26.70 |
$34.75 |
| 15 | 407(B) 0250 |
TACK COAT | 3,166 | GAL |
$2.50 |
$2.06 |
$3.10 |
$3.15 |
$4.85 |
$3.40 |
| 16 | 408 5774 |
PRIME COAT | 14,633 | GAL |
$3.50 |
$2.58 |
$3.52 |
$3.68 |
$7.10 |
$4.00 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,761 | TON |
$85.00 |
$77.61 |
$76.50 |
$78.23 |
$80.80 |
$85.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,785 | TON |
$78.00 |
$68.50 |
$73.50 |
$74.66 |
$68.70 |
$81.00 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,154 | TON |
$85.00 |
$84.05 |
$82.50 |
$83.48 |
$84.40 |
$90.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,614 | TON |
$82.00 |
$69.52 |
$79.00 |
$80.33 |
$87.40 |
$87.00 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 142 | CY |
$20.00 |
$25.75 |
$50.00 |
$10.50 |
$25.40 |
$20.00 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 468.59 | CY |
$600.00 |
$319.30 |
$400.00 |
$337.64 |
$507.00 |
$450.00 |
| 23 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 1.7 | CY |
$500.00 |
$1,009.40 |
$1,000.00 |
$972.62 |
$2,782.00 |
$1,630.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 34 | CY |
$300.00 |
$303.85 |
$300.00 |
$316.09 |
$456.00 |
$410.00 |
| 25 | 511(A) 0332 |
REINFORCING STEEL | 60,388 | LB |
$1.00 |
$0.9800 |
$1.00 |
$1.00 |
$0.9000 |
$1.00 |
| 26 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,050 | TON |
$30.00 |
$36.26 |
$37.00 |
$38.52 |
$46.40 |
$41.00 |
| 27 | 611(G) 5709 |
INLET CDI RCP DES. 6 | 1 | EA |
$2,500.00 |
$1,905.50 |
$4,000.00 |
$3,260.25 |
$8,855.00 |
$3,200.00 |
| 28 | 611(G) 5710 |
INLET CDI RCP DES. 7 | 1 | EA |
$2,000.00 |
$5,356.00 |
$6,000.00 |
$5,559.02 |
$11,340.00 |
$4,900.00 |
| 29 | 611(L) 0487 |
JUNCTION BOXES | 79 | CF |
$60.00 |
$82.40 |
$120.00 |
$107.76 |
$105.50 |
$49.00 |
| 30 | 613(A) 0497 |
54" R.C.PIPE CLASS III | 378 | LF |
$150.00 |
$224.54 |
$170.00 |
$230.71 |
$240.00 |
$180.00 |
| 31 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 110 | LF |
$145.00 |
$232.78 |
$235.00 |
$236.24 |
$217.00 |
$180.00 |
| 32 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 72 | LF |
$30.00 |
$49.44 |
$30.00 |
$48.91 |
$33.00 |
$29.00 |
| 33 | 613(L) 5740 |
54" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,500.00 |
$2,575.00 |
$2,800.00 |
$2,558.46 |
$2,808.00 |
$2,500.00 |
| 34 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$850.00 |
$1,184.50 |
$750.00 |
$790.23 |
$1,962.00 |
$1,135.50 |
| 35 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,313.00 |
$8,000.00 |
$5,250.00 |
$7,667.00 |
$10,316.34 |
| 36 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$800.00 |
$1,545.00 |
$3,000.00 |
$1,575.00 |
$1,814.00 |
$1,239.88 |
| 37 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 15,122 | SY |
$3.00 |
$3.09 |
$3.45 |
$3.57 |
$4.75 |
$4.00 |
| 38 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 536 | LF |
$4.00 |
$3.09 |
$3.00 |
$5.25 |
$3.20 |
$3.63 |
| 39 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 537.5 | LF |
$17.00 |
$15.96 |
$16.25 |
$16.28 |
$17.10 |
$16.49 |
| 40 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,472.00 |
$2,475.00 |
$2,520.00 |
$2,397.00 |
$2,093.37 |
| 41 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,800.00 |
$1,545.00 |
$1,550.00 |
$1,575.00 |
$2,181.00 |
$1,793.08 |
| 42 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,346 | LF |
$3.00 |
$3.76 |
$3.75 |
$3.83 |
$3.95 |
$4.50 |
| 43 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 784 | LF |
$3.50 |
$4.17 |
$4.20 |
$4.25 |
$4.35 |
$4.50 |
| 44 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$100.00 |
$103.00 |
$125.00 |
$315.00 |
$216.00 |
$278.92 |
| 45 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$19.00 |
$12.36 |
$75.00 |
$19.80 |
$19.00 |
$28.00 |
| 46 | 501(G) 6309 |
CLSM BACKFILL | 245 | CY |
$125.00 |
$185.40 |
$125.00 |
$142.41 |
$160.00 |
$147.38 |
| 47 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 359 | LF |
$250.00 |
$200.85 |
$220.00 |
$214.13 |
$214.50 |
$230.00 |
| 48 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 998 | LF |
$275.00 |
$247.20 |
$265.00 |
$278.33 |
$261.00 |
$265.00 |
| 49 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$185.00 |
$195.70 |
$145.00 |
$214.51 |
$241.50 |
$189.02 |
| 50 | 504(B) 1305 |
SAW-CUT GROOVING | 2,675 | SY |
$4.50 |
$4.94 |
$3.75 |
$3.96 |
$3.90 |
$4.19 |
| 51 | 504(C) 6250 |
SEALED EXPANSION JOINT | 86.4 | LF |
$275.00 |
$265.84 |
$214.00 |
$231.85 |
$264.00 |
$333.34 |
| 52 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,203.2 | LF |
$82.00 |
$80.86 |
$58.00 |
$79.52 |
$91.30 |
$107.78 |
| 53 | 506(A) 1322 |
STRUCTURAL STEEL | 407,450 | LB |
$2.00 |
$1.30 |
$1.47 |
$1.49 |
$1.40 |
$1.26 |
| 54 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$2,200.00 |
$1,874.60 |
$1,750.00 |
$2,023.11 |
$1,891.00 |
$1,748.41 |
| 55 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,200.00 |
$1,771.60 |
$1,750.00 |
$2,023.11 |
$1,891.00 |
$1,748.50 |
| 56 | 509(A) 1326 |
CLASS AA CONCRETE | 646.5 | CY |
$500.00 |
$497.49 |
$550.00 |
$419.72 |
$465.50 |
$740.00 |
| 57 | 509(B) 1328 |
CLASS A CONCRETE | 314.7 | CY |
$550.00 |
$494.40 |
$700.00 |
$639.72 |
$639.00 |
$550.00 |
| 58 | 509(D) 1331 |
CLASS C CONCRETE | 12.5 | CY |
$320.00 |
$530.45 |
$600.00 |
$525.24 |
$738.50 |
$550.00 |
| 59 | 511(A) 1332 |
REINFORCING STEEL | 1,040 | LB |
$1.00 |
$1.65 |
$1.00 |
$0.8000 |
$3.20 |
$1.00 |
| 60 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 182,100 | LB |
$1.00 |
$0.9500 |
$1.00 |
$0.9600 |
$1.05 |
$1.00 |
| 61 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 312 | LF |
$35.00 |
$22.66 |
$29.00 |
$28.52 |
$34.30 |
$34.33 |
| 62 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,207 | LF |
$36.00 |
$28.05 |
$36.00 |
$34.66 |
$37.80 |
$40.09 |
| 63 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 312 | LF |
$18.00 |
$10.30 |
$8.00 |
$13.20 |
$19.80 |
$20.98 |
| 64 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,207 | LF |
$15.00 |
$10.30 |
$8.00 |
$13.20 |
$22.50 |
$21.06 |
| 65 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 66 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,188 | SY |
$4.00 |
$4.94 |
$3.10 |
$3.30 |
$3.25 |
$4.16 |
| 67 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 150 | LF |
$850.00 |
$696.28 |
$700.00 |
$725.47 |
$837.00 |
$750.00 |
| 68 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 130 | LF |
$1,200.00 |
$836.36 |
$950.00 |
$921.85 |
$1,252.00 |
$1,400.00 |
| 69 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 136 | LF |
$1,700.00 |
$971.29 |
$1,150.00 |
$1,230.61 |
$1,555.00 |
$1,500.00 |
| 70 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$1,800.00 |
$5,150.00 |
$2,000.00 |
$7,260.00 |
$2,160.00 |
$3,964.31 |
| 71 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$3.50 |
$9.27 |
$8.30 |
$8.80 |
$8.65 |
$4.36 |
| 72 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$200.00 |
$164.80 |
$155.00 |
$165.00 |
$162.00 |
$112.62 |
| 73 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,935 | TON |
$40.00 |
$36.26 |
$29.00 |
$37.05 |
$42.00 |
$38.83 |
| 74 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 424 | TON |
$35.00 |
$26.68 |
$21.00 |
$28.20 |
$34.00 |
$32.92 |
| 75 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$36.05 |
$20.00 |
$29.24 |
$56.20 |
$27.92 |
| 76 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 110 | LF |
$25.00 |
$36.05 |
$20.00 |
$29.24 |
$14.80 |
$26.42 |
| 77 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$130,000.00 |
$92,700.00 |
$55,000.00 |
$159,500.00 |
$333,890.00 |
$439,301.56 |
| 78 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,740 | LF |
$0.2500 |
$0.1000 |
$0.1100 |
$0.1100 |
$0.1800 |
$0.1500 |
| 79 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 10,740 | LF |
$0.2500 |
$0.1000 |
$0.1100 |
$0.1100 |
$0.4200 |
$0.1500 |
| 80 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,250 | SD |
$0.3000 |
$0.2100 |
$0.2100 |
$0.2100 |
$0.3800 |
$0.2500 |
| 81 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,500 | SD |
$0.5000 |
$0.1600 |
$0.1600 |
$0.1600 |
$0.3800 |
$0.2000 |
| 82 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,500 | SD |
$1.50 |
$0.2600 |
$0.2600 |
$0.2700 |
$2.70 |
$0.3000 |
| 83 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,500 | SD |
$1.50 |
$0.2600 |
$0.2600 |
$0.2700 |
$0.2200 |
$0.7000 |
| 84 | 880(C) 8848 |
WING BARRICADES | 1,000 | SD |
$1.25 |
$0.2600 |
$0.2600 |
$0.2700 |
$0.2200 |
$0.3000 |
| 85 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,500 | SD |
$0.4000 |
$6.18 |
$6.20 |
$6.36 |
$0.7000 |
$6.80 |
| 86 | 880(F) 8878 |
DRUMS | 12,500 | SD |
$0.2500 |
$1.03 |
$0.1100 |
$0.1100 |
$0.3200 |
$0.1500 |
| 87 | 880(G) 8890 |
CHANNELIZER CONES | 12,500 | SD |
$0.2500 |
$0.1000 |
$0.1100 |
$0.1100 |
$0.0200 |
$0.1500 |
| 88 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 500 | SD |
$8.00 |
$8.24 |
$8.50 |
$8.48 |
$16.20 |
$10.00 |
| 89 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$70.00 |
$103.00 |
$104.00 |
$106.00 |
$91.80 |
$113.00 |
| 90 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$275.00 |
$154.50 |
$155.00 |
$159.00 |
$135.00 |
$170.00 |
| 91 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 37.96 | SF |
$20.00 |
$25.75 |
$26.00 |
$26.50 |
$19.40 |
$28.00 |
| 92 | 851(C) 8324 |
2" SQUARE TUBE POST | 64 | LF |
$15.00 |
$12.36 |
$12.50 |
$12.72 |
$8.65 |
$8.23 |
| 93 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 22 | EA |
$15.00 |
$22.66 |
$22.75 |
$23.32 |
$13.00 |
$25.00 |
| 94 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 18,280 | LF |
$0.6000 |
$0.3600 |
$0.3600 |
$0.3700 |
$0.5500 |
$0.4000 |
| 95 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 12 | LF |
$1.80 |
$12.36 |
$12.50 |
$12.72 |
$21.60 |
$5.11 |
| 96 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$65,000.00 |
$24,205.00 |
$24,405.00 |
$23,112.00 |
$64,735.00 |
$37,000.00 |
| 97 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,150.00 |
$2,015.00 |
$3,630.00 |
$5,939.00 |
$2,000.00 |
| 98 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$7,500.00 |
$9,000.00 |
$16,500.00 |
$10,260.00 |
$14,682.75 |
| 99 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$285,000.00 |
$258,871.75 |
$282,000.00 |
$291,303.76 |
$467,062.64 |
$345,000.00 |