| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$47,463.00 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,596 | CY |
$6.00 |
$14.31 |
$6.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$10.00 |
$16.13 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$13,179.00 |
$8,120.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,317 | LF |
$2.00 |
$1.82 |
$1.75 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$200.00 |
$138.00 |
$175.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 322 | LF |
$9.00 |
$7.13 |
$9.95 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 5,847 | SY |
$2.00 |
$3.19 |
$1.44 |
| 9 | 232(A) 2813 |
SEEDING METHOD A | 1.21 | AC |
$550.00 |
$993.84 |
$295.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.21 | AC |
$400.00 |
$515.66 |
$199.00 |
| 11 | 241 2832 |
MOWING | 4.84 | AC |
$70.00 |
$97.37 |
$149.00 |
| 12 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$1,250.00 |
$5,531.00 |
$1,500.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,515 | CY |
$45.00 |
$40.20 |
$30.00 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 4,932 | SY |
$6.50 |
$11.07 |
$10.00 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 5,604 | SY |
$2.00 |
$1.53 |
$1.50 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 632 | TON |
$25.00 |
$47.80 |
$16.00 |
| 17 | 407(B) 0250 |
TACK COAT | 1,879 | GAL |
$3.00 |
$3.74 |
$2.77 |
| 18 | 408 5774 |
PRIME COAT | 2,909 | GAL |
$5.00 |
$4.19 |
$7.12 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 393 | TON |
$95.00 |
$81.85 |
$80.32 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,492 | TON |
$75.00 |
$79.33 |
$64.03 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 263 | TON |
$100.00 |
$92.46 |
$91.79 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 346 | TON |
$95.00 |
$110.62 |
$70.75 |
| 23 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 1,878 | TON |
$35.00 |
$32.81 |
$30.00 |
| 24 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 503 | TON |
$25.00 |
$26.67 |
$25.00 |
| 25 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,545 | SY |
$2.50 |
$1.53 |
$2.00 |
| 26 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 201 | LF |
$60.00 |
$72.38 |
$52.55 |
| 27 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$600.00 |
$498.00 |
$858.40 |
| 28 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$5,531.00 |
$2,500.00 |
| 29 | 619(B) 4725 |
REMOVAL OF FENCE | 1,288 | LF |
$2.00 |
$3.51 |
$1.00 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,539 | SY |
$5.00 |
$1.96 |
$4.00 |
| 31 | 619(C) 0924 |
SAWING PAVEMENT | 46 | LF |
$3.00 |
$3.75 |
$10.00 |
| 32 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 800 | LF |
$18.00 |
$18.25 |
$16.50 |
| 33 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,250.00 |
$2,207.00 |
$1,995.00 |
| 34 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,500.00 |
$1,654.00 |
$1,495.00 |
| 35 | 624(A) 4281 |
FENCE-STYLE WWF | 323 | LF |
$6.00 |
$5.14 |
$5.00 |
| 36 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 683 | LF |
$9.00 |
$5.67 |
$4.00 |
| 37 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$110.00 |
$221.00 |
$200.00 |
| 38 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$11.00 |
$17.00 |
$15.00 |
| 39 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$26.00 |
$62.69 |
$25.00 |
| 40 | 501(G) 6309 |
CLSM BACKFILL | 178.8 | CY |
$95.00 |
$134.27 |
$145.00 |
| 41 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 446.67 | LF |
$200.00 |
$259.54 |
$275.00 |
| 42 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 398.34 | LF |
$225.00 |
$238.80 |
$325.00 |
| 43 | 504(A) 1304 |
APPROACH SLAB | 246.4 | SY |
$175.00 |
$140.37 |
$175.00 |
| 44 | 504(B) 1305 |
SAW-CUT GROOVING | 1,068.4 | SY |
$2.00 |
$5.18 |
$3.90 |
| 45 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 437 | LF |
$70.00 |
$125.10 |
$85.00 |
| 46 | 506(A) 1322 |
STRUCTURAL STEEL | 1,190 | LB |
$3.90 |
$1.93 |
$2.00 |
| 47 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,120.00 |
$278.00 |
$1,000.00 |
| 48 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$1,265.00 |
$1,380.00 |
$3,000.00 |
| 49 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$535.00 |
$244.00 |
$500.00 |
| 50 | 509(A) 1326 |
CLASS AA CONCRETE | 256.3 | CY |
$525.00 |
$569.77 |
$1,000.00 |
| 51 | 509(B) 1328 |
CLASS A CONCRETE | 152 | CY |
$420.00 |
$917.06 |
$800.00 |
| 52 | 511(A) 1332 |
REINFORCING STEEL | 1,180 | LB |
$1.30 |
$0.9200 |
$1.00 |
| 53 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 122,870 | LB |
$1.30 |
$0.8900 |
$1.00 |
| 54 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 273 | LF |
$46.00 |
$23.86 |
$50.00 |
| 55 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 273 | LF |
$20.00 |
$121.57 |
$25.00 |
| 56 | 514(G) 6310 |
METAL PILE SHOES | 14 | EA |
$200.00 |
$105.00 |
$100.00 |
| 57 | 514(K) 6260 |
(PL)PILOT HOLES | 364 | LF |
$120.00 |
$157.20 |
$160.00 |
| 58 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 829 | SY |
$3.40 |
$5.34 |
$3.65 |
| 60 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 69 | LF |
$2,700.00 |
$1,484.55 |
$1,500.00 |
| 61 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,000.00 |
$1,095.00 |
$2,500.00 |
| 62 | 523(A) 6550 |
SEALER CRACK PREPARATION | 190 | LF |
$4.25 |
$11.65 |
$4.00 |
| 63 | 523(B) 6560 |
SEALER RESIN | 1.2 | GAL |
$200.00 |
$460.96 |
$120.00 |
| 64 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 340 | TON |
$35.00 |
$34.00 |
$45.00 |
| 65 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 100 | TON |
$28.00 |
$27.52 |
$40.00 |
| 66 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 416 | SY |
$3.00 |
$1.55 |
$2.00 |
| 67 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 98 | LF |
$16.00 |
$12.42 |
$30.00 |
| 68 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$16.00 |
$31.81 |
$30.00 |
| 69 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$35,000.00 |
$73,016.00 |
$100,000.00 |
| 70 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$200.00 |
$127.00 |
$150.00 |
| 71 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,374 | LF |
$0.7500 |
$2.28 |
$1.40 |
| 72 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 27,840 | SD |
$0.2000 |
$0.0600 |
$0.1500 |
| 73 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,880 | SD |
$0.5000 |
$0.0600 |
$1.00 |
| 74 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 960 | SD |
$1.75 |
$0.0600 |
$1.00 |
| 75 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 720 | SD |
$2.00 |
$13.89 |
$2.00 |
| 76 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,840 | SD |
$0.5000 |
$0.1100 |
$0.5000 |
| 77 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 8,640 | SD |
$0.1500 |
$0.0600 |
$0.1000 |
| 78 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$14.00 |
$10.14 |
$15.00 |
| 79 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$52,454.00 |
$9,300.00 |
| 80 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,500.00 |
$18,000.00 |
$6,000.00 |
| 81 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$9,000.00 |
$12,000.00 |
$5,000.00 |
| 82 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$115,000.00 |
$124,000.00 |
$200,000.00 |