| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$31,000.00 |
$20,000.00 |
$12,780.00 |
$77,000.00 |
$38,000.00 |
$16,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 31,305 | CY |
$6.25 |
$8.00 |
$4.79 |
$7.80 |
$8.00 |
$8.80 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 15,037 | CY |
$7.50 |
$13.00 |
$5.33 |
$9.00 |
$8.00 |
$12.30 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$18,000.00 |
$27,690.00 |
$35,000.00 |
$20,000.00 |
$56,000.00 |
| 5 | 221(A) 2800 |
TEMPORARY SLOPE DRAINS | 200 | LF |
$25.00 |
$5.00 |
$22.37 |
$21.00 |
$5.00 |
$21.90 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,376 | LF |
$1.75 |
$1.22 |
$1.30 |
$1.23 |
$6.00 |
$1.25 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 490 | LF |
$8.50 |
$6.14 |
$6.54 |
$6.17 |
$8.00 |
$6.40 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 3,010 | LF |
$1.50 |
$1.24 |
$1.32 |
$1.25 |
$2.00 |
$1.30 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 46,576 | SY |
$1.50 |
$1.18 |
$1.26 |
$1.19 |
$2.00 |
$1.25 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 13 | AC |
$500.00 |
$368.00 |
$391.92 |
$370.00 |
$350.00 |
$384.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,500 | CY |
$55.00 |
$36.00 |
$53.25 |
$51.30 |
$50.00 |
$45.10 |
| 12 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 8,682 | SY |
$3.00 |
$1.30 |
$2.06 |
$1.90 |
$2.50 |
$1.50 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,148 | TON |
$28.00 |
$22.00 |
$31.97 |
$29.00 |
$30.00 |
$33.00 |
| 14 | 407(B) 0250 |
TACK COAT | 1,295 | GAL |
$3.25 |
$4.00 |
$4.26 |
$3.00 |
$4.50 |
$4.20 |
| 15 | 408 5774 |
PRIME COAT | 4,331 | GAL |
$4.50 |
$2.50 |
$2.66 |
$2.75 |
$3.00 |
$2.65 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,616 | TON |
$80.00 |
$71.00 |
$72.95 |
$68.45 |
$75.00 |
$72.20 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,593 | TON |
$90.00 |
$81.00 |
$84.67 |
$83.75 |
$85.00 |
$83.80 |
| 18 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 42 | CY |
$27.00 |
$20.00 |
$21.39 |
$16.00 |
$25.00 |
$67.10 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 29 | CY |
$550.00 |
$800.00 |
$455.51 |
$600.00 |
$850.00 |
$1,160.00 |
| 20 | 509(B) 0321 |
CLASS A CONCRETE | 9 | CY |
$520.00 |
$650.00 |
$427.60 |
$800.00 |
$1,200.00 |
$517.50 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 333 | CY |
$275.00 |
$275.00 |
$325.52 |
$330.00 |
$250.00 |
$346.50 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 4,370 | LB |
$1.20 |
$1.00 |
$0.8400 |
$1.50 |
$1.20 |
$1.40 |
| 23 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 340 | TON |
$45.00 |
$34.00 |
$44.73 |
$43.00 |
$40.00 |
$35.10 |
| 24 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 80 | TON |
$40.00 |
$22.00 |
$34.08 |
$34.00 |
$35.00 |
$61.30 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 56 | LF |
$35.00 |
$17.00 |
$21.25 |
$40.00 |
$25.00 |
$51.80 |
| 26 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 36 | LF |
$45.00 |
$20.00 |
$24.87 |
$47.00 |
$30.00 |
$50.50 |
| 27 | 613(B) 4819 |
96" CORR. GALV. STEEL PIPE | 160 | LF |
$100.00 |
$130.00 |
$106.50 |
$140.00 |
$150.00 |
$164.00 |
| 28 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$1,200.00 |
$1,011.48 |
$2,100.00 |
$875.00 |
$1,120.00 |
| 29 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,200.00 |
$500.00 |
$1,419.18 |
$800.00 |
$1,800.00 |
$2,090.00 |
| 30 | 619(B) 4725 |
REMOVAL OF FENCE | 4,098 | LF |
$2.00 |
$1.00 |
$2.49 |
$1.00 |
$2.00 |
$1.05 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 12,012 | SY |
$3.50 |
$4.50 |
$4.79 |
$4.45 |
$5.50 |
$5.35 |
| 32 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 650 | LF |
$3.50 |
$2.00 |
$2.34 |
$2.20 |
$3.00 |
$2.35 |
| 33 | 619(C) 0924 |
SAWING PAVEMENT | 668 | LF |
$5.00 |
$3.00 |
$4.28 |
$2.00 |
$5.00 |
$7.85 |
| 34 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$800.00 |
$500.00 |
$639.00 |
$1,500.00 |
$300.00 |
$797.00 |
| 35 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 425 | LF |
$20.00 |
$15.95 |
$16.99 |
$16.00 |
$25.00 |
$19.80 |
| 36 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,250.00 |
$2,100.00 |
$2,236.50 |
$2,100.00 |
$2,500.00 |
$2,290.00 |
| 37 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,495.00 |
$1,592.18 |
$1,495.00 |
$2,400.00 |
$1,650.00 |
| 38 | 624(A) 4281 |
FENCE-STYLE WWF | 1,117 | LF |
$8.00 |
$5.90 |
$4.05 |
$5.90 |
$8.00 |
$6.15 |
| 39 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,970 | LF |
$8.00 |
$3.70 |
$3.46 |
$3.70 |
$5.50 |
$3.85 |
| 40 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,197 | LF |
$10.00 |
$4.05 |
$3.73 |
$4.05 |
$6.00 |
$4.20 |
| 41 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$14.00 |
$31.69 |
$16.00 |
$15.00 |
$22.20 |
| 42 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$150.00 |
$140.00 |
$117.97 |
$160.00 |
$132.00 |
$168.00 |
| 43 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 637 | LF |
$230.00 |
$190.00 |
$219.50 |
$240.00 |
$220.00 |
$204.50 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$180.00 |
$145.00 |
$229.73 |
$170.00 |
$185.00 |
$200.50 |
| 45 | 504(B) 1305 |
SAW-CUT GROOVING | 935.7 | SY |
$6.00 |
$3.60 |
$3.83 |
$3.60 |
$4.00 |
$3.80 |
| 46 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 417 | LF |
$90.00 |
$75.00 |
$115.11 |
$85.00 |
$95.00 |
$165.50 |
| 47 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$4.00 |
$2.10 |
$4.14 |
$3.00 |
$2.50 |
$2.75 |
| 48 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$665.00 |
$250.00 |
$272.95 |
$650.00 |
$450.00 |
$563.00 |
| 49 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$1,200.00 |
$1,186.17 |
$2,000.00 |
$1,450.00 |
$1,710.00 |
| 50 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$470.00 |
$225.00 |
$230.30 |
$400.00 |
$204.00 |
$208.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 220.6 | CY |
$550.00 |
$575.00 |
$777.44 |
$700.00 |
$650.00 |
$660.50 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 127.2 | CY |
$520.00 |
$525.00 |
$736.81 |
$700.00 |
$690.00 |
$740.00 |
| 53 | 511(A) 1332 |
REINFORCING STEEL | 330 | LB |
$1.00 |
$1.00 |
$1.15 |
$1.00 |
$1.00 |
$1.20 |
| 54 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 69,750 | LB |
$1.10 |
$1.00 |
$1.14 |
$1.10 |
$1.10 |
$1.30 |
| 55 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 321 | LF |
$30.00 |
$37.00 |
$28.59 |
$45.00 |
$45.00 |
$33.80 |
| 56 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 321 | LF |
$20.00 |
$16.00 |
$33.01 |
$10.00 |
$15.00 |
$45.80 |
| 57 | 514(K) 6260 |
(PL)PILOT HOLES | 97.6 | LF |
$150.00 |
$90.00 |
$69.23 |
$150.00 |
$150.00 |
$76.60 |
| 58 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 804 | SY |
$4.00 |
$3.50 |
$3.41 |
$3.70 |
$3.75 |
$3.70 |
| 60 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 148 | LF |
$700.00 |
$800.00 |
$815.86 |
$1,450.00 |
$810.00 |
$678.00 |
| 61 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,500.00 |
$2,435.00 |
$958.50 |
$5,000.00 |
$2,000.00 |
$6,410.00 |
| 62 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$4.00 |
$4.90 |
$4.30 |
$4.25 |
$4.20 |
| 63 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$100.00 |
$213.00 |
$110.00 |
$150.00 |
$105.50 |
| 64 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,080 | TON |
$50.00 |
$34.84 |
$43.61 |
$44.00 |
$38.00 |
$35.10 |
| 65 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 445 | TON |
$45.00 |
$26.74 |
$35.55 |
$35.00 |
$32.00 |
$38.00 |
| 66 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$25.00 |
$24.70 |
$34.28 |
$30.00 |
$25.00 |
$47.80 |
| 67 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$24.40 |
$33.13 |
$30.00 |
$20.00 |
$37.50 |
| 68 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$24,000.00 |
$78,630.46 |
$20,000.00 |
$20,000.00 |
$33,000.00 |
| 69 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 30.5 | SF |
$20.00 |
$20.00 |
$21.30 |
$21.00 |
$25.00 |
$21.10 |
| 70 | 851(C) 8324 |
2" SQUARE TUBE POST | 82 | LF |
$10.00 |
$10.00 |
$10.65 |
$10.00 |
$12.00 |
$10.50 |
| 71 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 26 | EA |
$10.00 |
$15.00 |
$15.98 |
$10.00 |
$25.00 |
$10.50 |
| 72 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 10,560 | LF |
$0.7500 |
$0.5000 |
$0.5300 |
$0.5000 |
$0.5500 |
$0.5300 |
| 73 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 11,550 | LF |
$0.3000 |
$0.1500 |
$0.1600 |
$0.1600 |
$0.2000 |
$0.1600 |
| 74 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,000 | EA |
$1.00 |
$0.4000 |
$0.4300 |
$0.4000 |
$0.5000 |
$0.4200 |
| 75 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 600 | LF |
$0.9000 |
$1.00 |
$1.07 |
$1.00 |
$1.50 |
$1.05 |
| 76 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,530 | LF |
$22.00 |
$24.00 |
$25.56 |
$0.0100 |
$25.00 |
$23.60 |
| 77 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 4,530 | LF |
$3.00 |
$0.1000 |
$0.0200 |
$0.0100 |
$0.0100 |
$0.1000 |
| 78 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,520 | SD |
$0.2000 |
$1.00 |
$1.07 |
$1.00 |
$1.10 |
$1.15 |
| 79 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,024 | SD |
$3.00 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1100 |
| 80 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,024 | SD |
$3.00 |
$1.50 |
$1.60 |
$1.60 |
$1.65 |
$1.70 |
| 81 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,100 | SD |
$0.7500 |
$0.2500 |
$0.2700 |
$0.2500 |
$0.3000 |
$0.2900 |
| 82 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$0.5000 |
$1.00 |
$1.07 |
$1.00 |
$0.1000 |
$1.15 |
| 83 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,016 | SD |
$0.3000 |
$1.00 |
$1.07 |
$1.00 |
$1.10 |
$1.15 |
| 84 | 880(F) 8878 |
DRUMS | 10,080 | SD |
$0.2000 |
$0.2500 |
$0.2700 |
$0.2500 |
$0.3000 |
$0.2900 |
| 85 | 880(I) 8902 |
FLAGGER | 40 | SD |
$80.00 |
$230.28 |
$352.40 |
$300.00 |
$200.00 |
$224.00 |
| 86 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$15.00 |
$10.00 |
$10.65 |
$10.00 |
$20.00 |
$11.50 |
| 87 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$7,500.00 |
$17,306.25 |
$7,000.00 |
$20,000.00 |
$15,000.00 |
| 88 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,000.00 |
$2,500.00 |
$3,500.00 |
$10,000.00 |
| 89 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$12,000.00 |
$5,500.00 |
$9,620.00 |
$9,000.00 |
$5,000.00 |
$10,000.00 |
| 90 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$135,000.00 |
$140,000.00 |
$168,000.00 |
$160,000.00 |
$150,000.00 |
$150,000.00 |