| 1 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 10 | DAY |
$300.00 |
$300.00 |
$300.00 |
$300.00 |
| 2 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$23,114.00 |
$50,000.00 |
$65,000.00 |
| 3 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 22,386 | CY |
$6.50 |
$7.01 |
$8.00 |
$5.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$9,533.18 |
$100,000.00 |
$60,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 15,320 | LF |
$1.75 |
$1.18 |
$1.30 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,360 | LF |
$7.00 |
$6.06 |
$6.66 |
$8.50 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 150,723 | SY |
$1.50 |
$1.23 |
$1.35 |
$1.40 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 31.14 | AC |
$600.00 |
$200.00 |
$650.00 |
$900.00 |
| 9 | 234(A) 2824 |
FERTILIZING (10-20-10) | 16 | TON |
$700.00 |
$710.00 |
$800.00 |
$700.00 |
| 10 | 234(A) 4409 |
FERTILIZING (18-46-0) | 3 | TON |
$700.00 |
$995.54 |
$1,000.00 |
$700.00 |
| 11 | 307(D) 4230 |
LIME | 736 | TON |
$150.00 |
$244.09 |
$185.00 |
$210.00 |
| 12 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 54,552 | SY |
$3.00 |
$2.38 |
$2.75 |
$3.50 |
| 13 | 311(C) 0153 |
PROCESSING EXISTING BASE & SURFACE, METHOD C | 21,347 | LF |
$10.00 |
$17.80 |
$10.00 |
$10.00 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,813 | TON |
$30.00 |
$28.77 |
$25.00 |
$33.00 |
| 15 | 407(B) 0250 |
TACK COAT | 7,959 | GAL |
$3.25 |
$2.26 |
$5.50 |
$6.00 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,022 | TON |
$87.50 |
$82.00 |
$94.00 |
$95.00 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,474 | TON |
$87.50 |
$89.00 |
$94.00 |
$95.00 |
| 18 | 509(B) 0321 |
CLASS A CONCRETE | 122.24 | CY |
$600.00 |
$762.63 |
$585.00 |
$740.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$252.00 |
$400.00 |
$300.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 9,550 | LB |
$0.9000 |
$1.00 |
$0.8500 |
$1.10 |
| 21 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 773 | TON |
$38.00 |
$50.38 |
$37.00 |
$40.00 |
| 22 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 234 | TON |
$30.00 |
$34.35 |
$27.00 |
$32.00 |
| 23 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 3 | EA |
$2,000.00 |
$2,970.71 |
$3,000.00 |
$7,000.00 |
| 24 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 144 | LF |
$70.00 |
$147.55 |
$102.00 |
$110.00 |
| 25 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 136 | LF |
$80.00 |
$172.62 |
$135.00 |
$120.00 |
| 26 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 2,160 | LF |
$35.00 |
$34.19 |
$25.00 |
$38.00 |
| 27 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 100 | LF |
$38.00 |
$54.28 |
$33.00 |
$42.50 |
| 28 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 830 | LF |
$45.00 |
$58.58 |
$44.00 |
$52.00 |
| 29 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$500.00 |
$1,070.06 |
$350.00 |
$1,200.00 |
| 30 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$600.00 |
$1,283.68 |
$600.00 |
$1,300.00 |
| 31 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 72 | EA |
$1,200.00 |
$950.00 |
$1,075.00 |
$850.00 |
| 32 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,678.00 |
$1,240.00 |
$900.00 |
| 33 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$1,593.00 |
$1,250.00 |
$925.00 |
| 34 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 14 | EA |
$2,200.00 |
$2,300.00 |
$1,480.00 |
$975.00 |
| 35 | 619(B) 0291 |
REMOVAL OF HEADWALL | 3 | EA |
$675.00 |
$750.00 |
$500.00 |
$700.00 |
| 36 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 67 | SY |
$12.00 |
$10.90 |
$7.50 |
$20.00 |
| 37 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 1 | EA |
$2,500.00 |
$5,900.49 |
$3,500.00 |
$42,000.00 |
| 38 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 195 | LF |
$10.00 |
$18.73 |
$10.00 |
$35.00 |
| 39 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 4 | EA |
$110.00 |
$192.62 |
$100.00 |
$200.00 |
| 40 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 134 | SF |
$18.00 |
$15.00 |
$16.00 |
$22.00 |
| 41 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 204 | LF |
$9.98 |
$8.00 |
$9.00 |
$8.50 |
| 42 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 15,144 | LF |
$0.5000 |
$0.5800 |
$0.6000 |
$0.9000 |
| 43 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 66 | LF |
$1.75 |
$10.00 |
$11.00 |
$6.50 |
| 44 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 2 | EA |
$400.00 |
$500.00 |
$550.00 |
$600.00 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$12,942.01 |
$10,500.00 |
$16,000.00 |
| 46 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 188.4 | CY |
$12.50 |
$18.00 |
$20.00 |
$10.50 |
| 47 | 501(G) 6309 |
CLSM BACKFILL | 81.2 | CY |
$150.00 |
$190.00 |
$150.00 |
$125.00 |
| 48 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 298.66 | LF |
$225.00 |
$213.00 |
$220.00 |
$250.00 |
| 49 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 211.2 | LF |
$65.00 |
$87.00 |
$75.00 |
$73.00 |
| 50 | 506(A) 1322 |
STRUCTURAL STEEL | 680 | LB |
$3.00 |
$3.50 |
$3.50 |
$2.70 |
| 51 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$850.00 |
$1,135.00 |
$1,000.00 |
$500.00 |
| 52 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$850.00 |
$1,135.00 |
$1,000.00 |
$500.00 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 65.5 | CY |
$575.00 |
$700.00 |
$700.00 |
$875.00 |
| 54 | 509(B) 1328 |
CLASS A CONCRETE | 70 | CY |
$600.00 |
$742.50 |
$700.00 |
$625.00 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 25,130 | LB |
$0.9000 |
$1.14 |
$0.9000 |
$1.10 |
| 56 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 240 | LF |
$35.00 |
$31.50 |
$30.00 |
$60.00 |
| 57 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 625 | LF |
$38.00 |
$37.80 |
$35.00 |
$65.00 |
| 58 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 240 | LF |
$14.00 |
$13.50 |
$15.00 |
$25.00 |
| 59 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 625 | LF |
$14.00 |
$16.20 |
$15.00 |
$25.00 |
| 60 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 61 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,175 | TON |
$38.00 |
$41.80 |
$35.00 |
$37.00 |
| 62 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 340 | TON |
$32.00 |
$31.87 |
$27.00 |
$32.00 |
| 63 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$10,000.00 |
$75,000.00 |
| 64 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 25 | LF |
$35.00 |
$25.00 |
$28.00 |
$326.00 |
| 65 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 1 | EA |
$1,500.00 |
$2,375.00 |
$2,650.00 |
$9,000.00 |
| 66 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,200.00 |
$2,575.00 |
$2,835.00 |
$1,800.00 |
| 67 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 542 | CY |
$15.00 |
$16.95 |
$8.00 |
$40.75 |
| 68 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 84 | CY |
$10.00 |
$20.00 |
$20.00 |
$12.00 |
| 69 | 509(A) 1326 |
CLASS AA CONCRETE | 171.3 | CY |
$575.00 |
$471.26 |
$575.00 |
$440.00 |
| 70 | 511(A) 1332 |
REINFORCING STEEL | 27,065 | LB |
$0.9000 |
$0.9800 |
$0.8500 |
$1.10 |
| 71 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 21 | TON |
$38.00 |
$78.00 |
$35.00 |
$41.50 |
| 72 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 7 | TON |
$32.00 |
$73.00 |
$27.00 |
$55.00 |
| 73 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$21,137.13 |
$81,000.00 |
$92,000.00 |
| 74 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$1,122.17 |
$3,500.00 |
$1,340.00 |
| 75 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$213,991.95 |
$175,000.00 |
$250,000.00 |