| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$39,749.16 |
$25,000.00 |
$240,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 36,951 | CY |
$6.00 |
$6.61 |
$5.25 |
$11.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 66,717 | CY |
$8.00 |
$6.61 |
$6.75 |
$12.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$45,000.00 |
$35,388.19 |
$41,500.00 |
$70,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,733 | LF |
$2.00 |
$2.67 |
$1.35 |
$1.62 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 322 | LF |
$8.00 |
$7.19 |
$6.30 |
$9.48 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 6 | CY |
$100.00 |
$63.11 |
$130.00 |
$601.64 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 74,779 | SY |
$1.50 |
$1.40 |
$1.25 |
$1.52 |
| 9 | 230(F) 2812 |
WATERING | 5,982 | KGAL |
$6.00 |
$2.91 |
$2.50 |
$2.53 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 15.45 | AC |
$550.00 |
$381.01 |
$735.00 |
$948.18 |
| 11 | 241 2832 |
MOWING | 31 | AC |
$110.00 |
$74.05 |
$65.00 |
$82.18 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 22,414 | SY |
$6.00 |
$6.51 |
$6.25 |
$8.00 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 13,817 | SY |
$3.00 |
$1.35 |
$1.55 |
$1.12 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 71 | TON |
$30.00 |
$29.86 |
$32.00 |
$41.03 |
| 15 | 407(B) 0250 |
TACK COAT | 9,063 | GAL |
$4.00 |
$2.98 |
$2.60 |
$2.53 |
| 16 | 408 5774 |
PRIME COAT | 13,031 | GAL |
$7.00 |
$8.72 |
$7.55 |
$3.79 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,969 | TON |
$85.00 |
$101.52 |
$88.00 |
$95.13 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 13,948 | TON |
$75.00 |
$89.58 |
$78.00 |
$83.44 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,312 | TON |
$95.00 |
$119.26 |
$104.00 |
$107.46 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,519 | TON |
$79.00 |
$97.94 |
$85.00 |
$86.35 |
| 21 | 509(A) 0319 |
CLASS AA CONCRETE | 283.8 | CY |
$450.00 |
$716.91 |
$575.00 |
$590.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$445.37 |
$325.00 |
$375.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 38,724 | LB |
$1.00 |
$1.07 |
$1.10 |
$1.25 |
| 24 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 58 | LF |
$85.00 |
$178.18 |
$90.00 |
$165.00 |
| 25 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 128 | LF |
$45.00 |
$116.73 |
$55.00 |
$72.00 |
| 26 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 90 | LF |
$70.00 |
$191.12 |
$75.00 |
$92.00 |
| 27 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 102 | LF |
$200.00 |
$260.55 |
$87.00 |
$170.00 |
| 28 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 54 | LF |
$75.00 |
$155.42 |
$65.00 |
$66.00 |
| 29 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$908.46 |
$1,180.00 |
$1,300.00 |
| 30 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,220.00 |
$2,449.34 |
$1,170.00 |
$2,200.00 |
| 31 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,720.00 |
$2,567.22 |
$1,115.00 |
$2,000.00 |
| 32 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$3,615.68 |
$1,180.00 |
$2,300.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,500.00 |
$10,035.57 |
$21,000.00 |
$18,000.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 21,863 | SY |
$3.00 |
$2.64 |
$3.10 |
$2.53 |
| 35 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,720 | LF |
$5.00 |
$3.58 |
$3.50 |
$3.45 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$20.00 |
$20.24 |
$16.50 |
$20.04 |
| 37 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,600.00 |
$2,426.55 |
$1,970.00 |
$2,402.05 |
| 38 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,500.00 |
$2,171.12 |
$1,765.00 |
$2,149.20 |
| 39 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 1 | EA |
$1,100.00 |
$1,194.39 |
$1,250.00 |
$1,281.94 |
| 40 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,745 | LF |
$5.00 |
$7.16 |
$10.55 |
$10.52 |
| 41 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$16.00 |
$7.66 |
$6.25 |
$7.59 |
| 42 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 255 | CY |
$15.00 |
$27.07 |
$45.00 |
$23.00 |
| 43 | 501(G) 6309 |
CLSM BACKFILL | 320 | CY |
$150.00 |
$139.73 |
$140.00 |
$150.00 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 384.2 | SY |
$200.00 |
$190.88 |
$155.00 |
$220.00 |
| 45 | 504(B) 1305 |
SAW-CUT GROOVING | 2,786 | SY |
$5.00 |
$4.54 |
$4.00 |
$4.80 |
| 46 | 504(C) 6250 |
SEALED EXPANSION JOINT | 98.2 | LF |
$300.00 |
$244.63 |
$235.00 |
$365.00 |
| 47 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,254 | LF |
$85.00 |
$87.69 |
$70.00 |
$105.00 |
| 48 | 506(A) 1322 |
STRUCTURAL STEEL | 914,615 | LB |
$2.10 |
$1.43 |
$2.65 |
$1.68 |
| 49 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$3,000.00 |
$3,501.78 |
$3,700.00 |
$7,300.00 |
| 50 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$3,000.00 |
$3,501.78 |
$3,700.00 |
$3,600.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 618.4 | CY |
$550.00 |
$737.06 |
$650.00 |
$850.00 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 296.4 | CY |
$550.00 |
$643.42 |
$825.00 |
$900.00 |
| 53 | 509(D) 1331 |
CLASS C CONCRETE | 15.3 | CY |
$450.00 |
$445.00 |
$650.00 |
$820.00 |
| 54 | 511 6306 |
MECHANICAL SPLICES | 74 | EA |
$25.00 |
$122.65 |
$45.00 |
$135.00 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 2,110 | LB |
$0.9000 |
$0.8000 |
$1.30 |
$1.22 |
| 56 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 262,250 | LB |
$1.10 |
$0.9900 |
$1.30 |
$1.31 |
| 57 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$450.00 |
$358.32 |
$700.00 |
$540.00 |
| 58 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 50 | SY |
$600.00 |
$298.60 |
$750.00 |
$460.00 |
| 59 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 280 | LF |
$30.00 |
$27.83 |
$28.00 |
$30.00 |
| 60 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,310 | LF |
$40.00 |
$38.85 |
$34.00 |
$37.00 |
| 61 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 280 | LF |
$20.00 |
$58.01 |
$9.00 |
$20.00 |
| 62 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,310 | LF |
$20.00 |
$26.30 |
$10.00 |
$20.00 |
| 63 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 64 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,312 | SY |
$5.00 |
$4.36 |
$3.80 |
$4.61 |
| 65 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 468 | LF |
$900.00 |
$606.33 |
$1,550.00 |
$800.00 |
| 66 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$5,000.00 |
$3,583.17 |
$3,000.00 |
$2,300.00 |
| 67 | 523(A) 6550 |
SEALER CRACK PREPARATION | 835 | LF |
$5.00 |
$4.78 |
$4.15 |
$5.00 |
| 68 | 523(B) 6560 |
SEALER RESIN | 12 | GAL |
$150.00 |
$119.44 |
$105.00 |
$125.00 |
| 69 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,550 | TON |
$50.00 |
$42.38 |
$32.00 |
$53.00 |
| 70 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 707 | TON |
$40.00 |
$32.57 |
$30.00 |
$29.00 |
| 71 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 95 | LF |
$30.00 |
$24.51 |
$20.00 |
$15.00 |
| 72 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 42 | LF |
$30.00 |
$25.86 |
$20.00 |
$15.00 |
| 73 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$83,132.86 |
$155,000.00 |
$170,000.00 |
| 74 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$70,000.00 |
$58,349.53 |
$180,000.00 |
$85,000.00 |
| 75 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 370 | SD |
$135.00 |
$89.40 |
$72.00 |
$88.50 |
| 76 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 27,589 | LF |
$0.1500 |
$0.1400 |
$0.1200 |
$0.1400 |
| 77 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,000 | EA |
$1.00 |
$0.5900 |
$0.4800 |
$0.5800 |
| 78 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 22,707 | LF |
$0.2000 |
$0.2300 |
$0.1900 |
$0.2300 |
| 79 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 370 | SD |
$10.00 |
$5.11 |
$4.15 |
$5.06 |
| 80 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 662.5 | LF |
$20.00 |
$45.46 |
$24.00 |
$9.78 |
| 81 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,935 | SD |
$0.2500 |
$0.2600 |
$0.2100 |
$0.2500 |
| 82 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,650 | SD |
$1.00 |
$0.2600 |
$0.2100 |
$0.2500 |
| 83 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 9,765 | SD |
$1.25 |
$0.2600 |
$0.2100 |
$0.2500 |
| 84 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 740 | SD |
$2.00 |
$7.66 |
$6.20 |
$7.59 |
| 85 | 880(C) 8848 |
WING BARRICADES | 1,840 | SD |
$0.7000 |
$2.55 |
$2.05 |
$2.53 |
| 86 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,480 | SD |
$0.1000 |
$0.6400 |
$0.5200 |
$0.6300 |
| 87 | 880(F) 8878 |
DRUMS | 33,045 | SD |
$0.2000 |
$0.1300 |
$0.1100 |
$0.1300 |
| 88 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 920 | SD |
$12.00 |
$12.78 |
$10.30 |
$12.64 |
| 89 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 2 | EA |
$75.00 |
$57.47 |
$46.50 |
$56.90 |
| 90 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$250.00 |
$121.33 |
$100.00 |
$120.10 |
| 91 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$18.00 |
$35.76 |
$29.00 |
$35.40 |
| 92 | 851(C) 8324 |
2" SQUARE TUBE POST | 26 | LF |
$10.00 |
$11.49 |
$9.50 |
$11.38 |
| 93 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 19,467 | LF |
$0.5000 |
$0.5700 |
$0.4700 |
$0.5700 |
| 94 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$55,000.00 |
$60,381.65 |
$49,975.00 |
$61,852.70 |
| 95 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,985.98 |
$2,899.00 |
$30,271.53 |
| 96 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$8,957.93 |
$19,059.00 |
$38,126.30 |
| 97 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$360,000.00 |
$294,783.47 |
$415,000.00 |
$400,000.00 |