Bid tab 140177

Let May 15, 2014 · Division 4 · Logan Sign up free

‹ May 2014 results

BRIDGE AND APPROACHES SH -74: OVER SKELETON CREEK , 13.5 MILES NORTH OF SH -33. PROJECT LENGTH = 0.942 MILES

Let date
Thursday, May 15, 2014
Contract
140177
J/P numbers
24216(04)
District
Division 4
County
Logan
Highway
Limits
BRIDGE AND APPROACHES SH -74: OVER SKELETON CREEK , 13.5 MILES NORTH OF SH -33. PROJECT LENGTH = 0.942 MILES
Project number
SSP-142C(139)SS

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,990,327
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $4,508,601 -9.7%
2 MANHATTAN ROAD & BRIDGE COMPANY, LLC $4,707,106 -5.7% +4.4%
3 OBC, INC. $4,754,912 -4.7% +5.5%
4 SEWELL BROS., INC. $4,938,099 -1.0% +9.5%
5 Cimarron Construction Company, LLC $6,192,438 +24.1% +37.3%

Bid tab: unit prices 102 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 MANHATTAN ROAD …#3 OBC, INC.#4 SEWELL BROS., I…#5 Cimarron Constr…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,000.00 $75,677.49 $135,000.00 $41,414.25 $50,000.00 $136,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION57,963CY $7.00 $4.62 $5.00 $6.72 $7.00 $6.00
3202(D) 0184 UNCLASSIFIED BORROW80,766CY $9.00 $4.62 $5.25 $7.44 $8.00 $9.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $35,000.00 $41,716.13 $20,000.00 $48,820.95 $30,000.00 $36,000.00
5221(C) 2801 TEMPORARY SILT FENCE8,370LF $2.00 $2.69 $1.25 $1.28 $1.30 $2.50
6221(D) 2803 TEMPORARY SEDIMENT FILTER2EA $140.00 $228.73 $260.00 $106.00 $250.00 $450.00
7221(F) 0100 TEMPORARY SILT DIKE400LF $10.00 $7.26 $8.25 $8.46 $8.75 $10.00
8221(G) 0151 TEMPORARY ROCK FILTER DAM TYPE 230CY $75.00 $147.96 $172.00 $212.00 $100.00 $260.00
9221(G) 0152 TEMPORARY ROCK FILTER DAM TYPE 322CY $85.00 $180.01 $235.00 $318.00 $125.00 $390.00
10230(A) 2806 SOLID SLAB SODDING63,504SY $2.50 $1.43 $1.25 $1.26 $1.30 $2.25
11233(A) 2817 VEGETATIVE MULCHING15.24AC $400.00 $234.13 $395.00 $411.28 $425.00 $600.00
12241 2832 MOWING43.4AC $80.00 $64.84 $90.00 $93.28 $97.00 $100.00
13307(A) 4200 FLY ASH1,242.4TON $70.00 $62.35 $70.00 $74.20 $73.00 $84.00
14307(K) 4300 STABILIZED SUBGRADE23,007.1SY $4.65 $2.57 $2.10 $2.65 $2.25 $3.00
15310(B) 0149 SUBGRADE, METHOD B3,619SY $2.50 $1.77 $3.00 $2.12 $4.00 $5.00
16407(B) 0250 TACK COAT7,287GAL $3.00 $3.05 $2.60 $2.65 $2.75 $3.00
17408 5774 PRIME COAT9,202GAL $4.50 $8.55 $7.25 $7.42 $7.70 $7.00
18411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)9,363.8TON $84.00 $87.06 $72.00 $76.59 $80.00 $91.25
19411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)3,027.4TON $90.00 $107.53 $89.00 $94.34 $100.00 $108.00
20412 5267 COLD MILLING PAVEMENT2,082SY $3.50 $2.40 $6.75 $2.12 $7.00 $8.00
21509(A) 0319 CLASS AA CONCRETE128.3CY $550.00 $681.14 $650.00 $616.62 $450.00 $700.00
22509(D) 0325 CLASS C CONCRETE35.06CY $295.00 $357.57 $350.00 $486.74 $400.00 $250.00
23511(A) 0332 REINFORCING STEEL19,270LB $1.05 $0.7500 $0.9000 $0.8900 $0.9000 $1.10
24601(B) 0536 TYPE I-A PLAIN RIPRAP2,038TON $40.00 $46.72 $48.00 $62.38 $45.00 $55.00
25601(C) 0538 TYPE I-A FILTER BLANKET680TON $30.00 $38.13 $42.00 $56.07 $40.00 $52.00
26611(A) 2657 MANHOLE (4' DIAMETER)1EA $2,000.00 $860.86 $1,600.00 $1,643.00 $3,000.00 $3,500.00
27611(B) 2680 ADD'L.DEPTH IN MANHOLE (4' DIAMETER)4.05VF $125.00 $126.67 $100.00 $127.20 $160.00 $420.00
28611(G) 5336 INLET GPI TYPE 2 (DES. 10)1EA $3,500.00 $3,118.53 $3,500.00 $3,446.20 $4,000.00 $4,500.00
29613(A) 0492 24" R.C.PIPE CLASS III147LF $60.00 $104.98 $65.00 $53.00 $50.00 $95.00
30613(A) 0493 30" R.C.PIPE CLASS III92LF $75.00 $142.07 $75.00 $68.90 $70.00 $115.00
31613(A) 0494 36" R.C.PIPE CLASS III190LF $85.00 $164.21 $95.00 $79.50 $90.00 $155.00
32613(B) 0689 18" CORR. GALV. STEEL PIPE128LF $30.00 $63.05 $30.00 $32.86 $25.00 $40.00
33613(B) 0690 24" CORR. GALV. STEEL PIPE3LF $35.00 $285.66 $750.00 $116.60 $1,200.00 $45.00
34613(B) 4536 83" X 57" CORR. GALV. STEEL PIPE ARCH112LF $100.00 $188.35 $100.00 $116.60 $136.00 $130.00
35613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND2EA $500.00 $629.86 $890.00 $694.30 $1,200.00 $650.00
36613(L) 5732 30" PREFAB. CULVERT END SECTION, ROUND2EA $1,000.00 $799.64 $1,050.00 $821.50 $1,400.00 $1,300.00
37613(M) 7196 TYPE A6 CULVERT END TREATMENT2EA $1,000.00 $2,392.33 $725.00 $1,229.17 $1,200.00 $1,300.00
38613(P) 0760 18" GALV. STEEL CULVERT END SECTION ROUND2EA $227.50 $114.01 $180.00 $249.10 $185.00 $300.00
39613(P) 4579 83" X 57" GALV. STEEL CULVERT END SECTION ARCH4EA $2,000.00 $2,310.18 $2,300.00 $2,438.00 $4,000.00 $2,600.00
40613(W) 4500 24" JACKED CONDUIT86LF $350.00 $474.27 $750.00 $424.00 $450.00 $400.00
41619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $3,001.70 $13,000.00 $9,752.00 $20,000.00 $100,000.00
42619(B) 4728 REMOVAL OF ASPHALT PAVEMENT17,344SY $3.50 $2.40 $6.25 $2.12 $6.50 $7.75
43619(B) 4780 REMOVAL OF GUARDRAIL556LF $3.00 $4.80 $3.00 $2.44 $5.75 $3.75
44619(C) 0924 SAWING PAVEMENT1,267LF $3.00 $4.84 $3.50 $2.12 $5.00 $6.00
45623 0100 (PL)GUARDRAIL CURBING2EA $782.09 $610.08 $1,750.00 $901.00 $2,000.00 $1,500.00
46623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE687.5LF $16.00 $18.61 $16.50 $16.43 $17.50 $20.00
47623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,106.75 $2,341.32 $2,250.00 $2,067.00 $2,400.00 $2,850.00
48623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,549.28 $1,722.98 $2,125.00 $1,521.10 $2,250.00 $2,675.00
49624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)5,089LF $5.00 $4.18 $3.65 $3.69 $3.85 $9.25
50501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON180CY $25.00 $12.50 $50.00 $16.50 $15.00 $20.00
51501(G) 6309 CLSM BACKFILL206CY $150.00 $121.71 $150.00 $144.69 $150.00 $185.00
52503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,596LF $230.00 $206.15 $245.00 $199.69 $200.00 $255.00
53504(A) 1304 APPROACH SLAB281.2SY $180.00 $161.94 $150.00 $147.78 $185.00 $210.00
54504(B) 1305 SAW-CUT GROOVING2,051.6SY $4.50 $4.56 $3.95 $4.18 $4.50 $9.00
55504(C) 6250 SEALED EXPANSION JOINT43.2LF $250.00 $213.80 $195.00 $289.88 $245.00 $275.00
56504(D) 6245 CONCRETE RAIL (TR4)923.4LF $90.00 $83.31 $64.00 $82.47 $75.00 $125.00
57506(A) 1322 STRUCTURAL STEEL1,800LB $4.00 $1.88 $2.25 $1.98 $3.00 $2.25
58507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY8EA $2,500.00 $1,663.55 $2,900.00 $1,416.94 $1,700.00 $3,000.00
59507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY24EA $2,500.00 $1,663.55 $2,900.00 $1,416.94 $1,700.00 $3,000.00
60509(A) 1326 CLASS AA CONCRETE465.2CY $500.00 $641.41 $375.00 $489.22 $600.00 $850.00
61509(B) 1328 CLASS A CONCRETE250.3CY $520.00 $658.81 $630.00 $483.41 $600.00 $800.00
62511(A) 1332 REINFORCING STEEL1,670LB $1.00 $0.7300 $1.10 $0.9700 $2.00 $1.15
63511(B) 6010 EPOXY COATED REINFORCING STEEL138,110LB $1.10 $0.8400 $1.10 $1.03 $1.00 $1.50
64514(A) 6010 PILES, FURNISHED (HP 10X42)221LF $30.00 $30.97 $37.00 $38.80 $30.00 $48.00
65514(A) 6011 PILES, FURNISHED (HP 12X53)723.5LF $35.00 $44.94 $47.00 $45.77 $35.00 $58.00
66514(B) 6292 PILES, DRIVEN (HP 10X42)221LF $20.00 $19.40 $10.00 $11.00 $15.00 $26.00
67514(B) 6294 PILES, DRIVEN (HP 12X53)723.5LF $20.00 $18.40 $11.00 $11.00 $15.00 $27.00
68514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)2EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
69515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,988SY $4.00 $4.32 $3.75 $3.30 $3.50 $5.00
70516(A) 6096 DRILLED SHAFTS 60" DIAMETER274LF $700.00 $598.35 $1,505.00 $825.58 $1,000.00 $1,200.00
71516(C) 6200 CROSSHOLE SONIC LOGGING2EA $2,500.00 $3,181.80 $2,300.00 $1,963.50 $10,000.00 $5,000.00
72523(A) 6550 SEALER CRACK PREPARATION81.6LF $5.00 $4.80 $4.20 $4.40 $5.00 $6.00
73523(B) 6560 SEALER RESIN1GAL $150.00 $120.07 $105.00 $110.00 $250.00 $250.00
74613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $25.00 $18.36 $16.00 $18.58 $25.00 $25.00
75613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $25.00 $20.36 $16.00 $19.40 $25.00 $25.00
76619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $55,000.00 $70,236.71 $37,000.00 $165,000.00 $70,000.00 $270,000.00
77413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC8,090LF $0.4000 $0.6200 $0.2000 $0.3400 $0.5000 $2.00
78805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS16EA $200.00 $113.54 $93.00 $95.40 $100.00 $120.00
79850(A) 8110 SHEET ALUMINUM SIGNS27SF $18.10 $27.76 $23.00 $23.32 $23.00 $28.00
80851(C) 8327 2 1/4" SQUARE TUBE POST39LF $8.50 $11.35 $9.30 $9.54 $10.00 $12.00
81855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)20,202LF $0.7000 $0.5400 $0.4400 $0.4600 $0.4500 $0.5500
82855(A) 8814 TRAFFIC STRIPE(PLASTIC)(8" WIDE)2,422LF $1.34 $0.5700 $0.4600 $0.4800 $0.5000 $0.6000
83855(A) 8818 TRAFFIC STRIPE(PLASTIC)(12" WIDE)2,662LF $2.12 $1.26 $1.05 $1.06 $1.10 $1.30
84855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)42LF $9.14 $15.13 $12.25 $12.72 $13.00 $15.70
85855(B) 8818 TRAFFIC STRIPE(PLASTIC)(ARROWS)3EA $300.00 $119.84 $98.00 $100.70 $100.00 $125.00
86857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)39,400LF $0.3000 $0.1100 $0.1000 $0.1000 $0.1000 $0.1200
87857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1344EA $1.00 $0.7600 $0.6200 $0.6400 $0.6500 $0.8000
88857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)33,400LF $0.5000 $0.0900 $0.0800 $0.0700 $0.0900 $0.1000
89880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF6,120SD $0.6000 $0.0400 $0.0400 $0.0300 $0.0500 $0.0500
90880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF3,960SD $1.00 $0.0600 $0.0600 $0.0500 $0.0700 $0.1000
91880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,680SD $1.50 $1.20 $1.00 $1.01 $0.9800 $1.25
92880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,320SD $0.5000 $1.51 $1.22 $1.27 $1.25 $1.60
93880(C) 8848 WING BARRICADES1,440SD $1.25 $0.1300 $0.1100 $0.1100 $0.1500 $0.1500
94880(D) 8854 VERTICAL PANELS3,960SD $0.7500 $0.3800 $0.3100 $0.3200 $0.3300 $0.4000
95880(E) 8860 WARNING LIGHTS(TYPE A)4,560SD $0.2500 $0.5000 $0.4100 $0.4200 $0.4200 $0.5500
96880(F) 8878 DRUMS19,980SD $0.5000 $0.7600 $0.6100 $0.6400 $0.6200 $0.8000
97880(G) 8884 TUBE CHANNELIZERS3,180SD $0.3500 $0.3200 $0.2600 $0.2700 $0.3000 $0.3500
98880(G) 8890 CHANNELIZER CONES23,400SD $0.3500 $0.1300 $0.1100 $0.1100 $0.1200 $0.1500
99882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN45SD $30.00 $63.08 $85.00 $53.00 $55.00 $75.00
100642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,000.00 $42,084.17 $22,350.00 $23,187.50 $18,000.00 $25,000.00
101220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $2,500.00 $3,001.70 $1,998.00 $4,240.00 $4,000.00 $22,000.00
102641 1552 MOBILIZATION1LSUM $243,066.00 $180,357.24 $253,250.00 $249,156.40 $225,000.00 $150,000.00