| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$18,500.00 |
$38,000.00 |
$17,500.00 |
$18,793.60 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 29,498 | CY |
$5.00 |
$5.20 |
$5.25 |
$4.75 |
$5.11 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 15,657 | CY |
$7.00 |
$6.50 |
$6.25 |
$6.00 |
$6.47 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$69,000.00 |
$21,630.00 |
$26,500.00 |
$17,000.00 |
$18,126.08 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,905 | LF |
$3.00 |
$5.50 |
$2.75 |
$1.30 |
$2.24 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$210.00 |
$2,800.00 |
$225.00 |
$420.00 |
$448.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 308 | LF |
$10.00 |
$15.05 |
$10.00 |
$10.00 |
$10.08 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 54 | CY |
$81.00 |
$38.50 |
$95.00 |
$100.00 |
$112.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 78,531 | SY |
$1.50 |
$1.35 |
$1.30 |
$1.28 |
$1.85 |
| 10 | 230(F) 2812 |
WATERING | 3,142 | KGAL |
$8.00 |
$5.80 |
$6.00 |
$5.30 |
$8.96 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 16.22 | AC |
$330.00 |
$464.00 |
$445.00 |
$440.00 |
$672.00 |
| 12 | 234(A) 2824 |
FERTILIZING (10-20-10) | 7.85 | TON |
$756.00 |
$873.00 |
$820.00 |
$820.00 |
$896.00 |
| 13 | 241 2832 |
MOWING | 16.22 | AC |
$70.00 |
$124.00 |
$115.00 |
$105.00 |
$112.00 |
| 14 | 307(A) 4200 |
FLY ASH | 979 | TON |
$70.00 |
$76.90 |
$74.00 |
$64.00 |
$78.40 |
| 15 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 18,136 | SY |
$2.20 |
$2.25 |
$1.50 |
$2.35 |
$2.30 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,574 | TON |
$22.00 |
$20.60 |
$24.00 |
$20.00 |
$27.39 |
| 17 | 407(B) 0250 |
TACK COAT | 3,899 | GAL |
$3.20 |
$4.70 |
$4.75 |
$2.50 |
$5.21 |
| 18 | 408 5774 |
PRIME COAT | 5,956 | GAL |
$3.60 |
$4.80 |
$4.75 |
$4.50 |
$5.21 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,097 | TON |
$70.00 |
$65.90 |
$71.00 |
$80.10 |
$75.54 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,039 | TON |
$75.00 |
$77.45 |
$79.00 |
$88.20 |
$87.98 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 402 | CY |
$250.00 |
$198.00 |
$200.00 |
$340.00 |
$285.91 |
| 22 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$1,500.00 |
$2,200.00 |
$2,500.00 |
$3,000.00 |
$3,485.25 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 140 | LF |
$35.00 |
$32.50 |
$58.00 |
$42.00 |
$33.08 |
| 24 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 134 | LF |
$25.00 |
$24.75 |
$37.01 |
$30.00 |
$25.13 |
| 25 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 452 | LF |
$41.00 |
$30.65 |
$42.00 |
$34.00 |
$31.16 |
| 26 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 266 | LF |
$12.00 |
$6.95 |
$11.00 |
$10.00 |
$8.07 |
| 27 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 89 | LF |
$18.00 |
$6.95 |
$11.00 |
$10.00 |
$8.07 |
| 28 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 7 | EA |
$1,500.00 |
$825.00 |
$885.00 |
$1,300.00 |
$1,190.88 |
| 29 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 6 | EA |
$2,000.00 |
$715.00 |
$920.00 |
$1,500.00 |
$1,362.61 |
| 30 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,500.00 |
$550.00 |
$300.00 |
$750.00 |
$957.85 |
| 31 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 39 | CY |
$25.00 |
$43.95 |
$30.00 |
$32.00 |
$64.01 |
| 32 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 80 | CY |
$30.00 |
$45.05 |
$38.00 |
$35.00 |
$55.38 |
| 33 | 613(V) 1180 |
TRENCH EXCAVATION | 156 | CY |
$10.00 |
$11.00 |
$10.00 |
$10.50 |
$11.20 |
| 34 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$16,000.00 |
$10,500.00 |
$15,100.00 |
$16,052.96 |
| 35 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 19,247 | SY |
$3.30 |
$2.60 |
$2.00 |
$2.50 |
$1.96 |
| 36 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 730 | LF |
$2.50 |
$4.40 |
$3.25 |
$2.88 |
$11.20 |
| 37 | 619(C) 0924 |
SAWING PAVEMENT | 11,098 | LF |
$3.25 |
$2.20 |
$1.00 |
$2.50 |
$3.36 |
| 38 | 624(A) 4281 |
FENCE-STYLE WWF | 1,423 | LF |
$7.00 |
$4.50 |
$4.50 |
$7.25 |
$4.59 |
| 39 | 624(B) 4462 |
GATES-STYLE WWF (4.5'HIGH X 12'LONG) | 3 | EA |
$700.00 |
$731.00 |
$700.00 |
$700.00 |
$744.80 |
| 40 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,668 | LF |
$4.25 |
$4.20 |
$4.50 |
$4.40 |
$4.26 |
| 41 | 624(E) 4292 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 383 | LF |
$15.00 |
$40.20 |
$38.00 |
$15.00 |
$40.94 |
| 42 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$77.00 |
$110.00 |
$105.00 |
$105.00 |
$78.40 |
| 43 | 629(C) 4960 |
MAILBOX | 1 | EA |
$165.00 |
$33.00 |
$32.00 |
$31.00 |
$28.00 |
| 44 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$17.00 |
$33.00 |
$32.00 |
$31.00 |
$16.80 |
| 45 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,755 | CY |
$6.00 |
$4.30 |
$5.25 |
$4.10 |
$4.66 |
| 46 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 354 | CY |
$25.00 |
$14.30 |
$25.00 |
$7.50 |
$37.04 |
| 47 | 509(A) 1326 |
CLASS AA CONCRETE | 649.6 | CY |
$400.00 |
$297.00 |
$415.00 |
$360.00 |
$363.49 |
| 48 | 511(A) 1332 |
REINFORCING STEEL | 101,180 | LB |
$1.00 |
$0.7700 |
$0.8500 |
$0.9500 |
$0.8900 |
| 49 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$11,000.00 |
$5,000.00 |
$23,000.00 |
$24,000.00 |
| 50 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 4,100 | CY |
$6.00 |
$4.30 |
$5.25 |
$4.10 |
$4.66 |
| 51 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 316.4 | CY |
$25.00 |
$16.50 |
$25.00 |
$7.50 |
$37.04 |
| 52 | 509(A) 1326 |
CLASS AA CONCRETE | 700.1 | CY |
$400.00 |
$297.00 |
$415.00 |
$350.00 |
$363.49 |
| 53 | 511(A) 1332 |
REINFORCING STEEL | 116,550 | LB |
$1.00 |
$0.7700 |
$0.8500 |
$0.9500 |
$0.8900 |
| 54 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$11,000.00 |
$5,000.00 |
$23,000.00 |
$24,000.00 |
| 55 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 20,000 | LF |
$0.1600 |
$0.1100 |
$0.1500 |
$0.1000 |
$0.1600 |
| 56 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,500 | EA |
$0.5700 |
$0.5500 |
$0.6300 |
$0.5500 |
$0.6700 |
| 57 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 20,000 | LF |
$0.2100 |
$0.2700 |
$0.1700 |
$0.2500 |
$0.1800 |
| 58 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,100 | SD |
$0.2300 |
$0.1100 |
$0.0600 |
$0.1000 |
$0.0600 |
| 59 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,500 | SD |
$0.5600 |
$1.10 |
$0.0600 |
$1.05 |
$0.0600 |
| 60 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,300 | SD |
$1.01 |
$1.10 |
$0.0600 |
$1.05 |
$0.0600 |
| 61 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,200 | SD |
$0.4200 |
$0.3800 |
$0.1100 |
$0.3700 |
$0.1100 |
| 62 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.01 |
$1.10 |
$6.34 |
$1.05 |
$6.72 |
| 63 | 880(D) 8854 |
VERTICAL PANELS | 4,500 | SD |
$0.0700 |
$0.2700 |
$0.0200 |
$0.2600 |
$0.0200 |
| 64 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 52,560 | SD |
$0.1100 |
$0.0300 |
$0.0300 |
$0.0200 |
$0.0200 |
| 65 | 880(F) 8878 |
DRUMS | 13,500 | SD |
$0.1100 |
$0.1700 |
$0.0200 |
$0.1500 |
$0.0200 |
| 66 | 880(G) 8890 |
CHANNELIZER CONES | 14,400 | SD |
$0.1300 |
$0.1700 |
$0.0200 |
$0.1500 |
$0.0200 |
| 67 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 720 | SD |
$10.48 |
$15.50 |
$5.30 |
$14.00 |
$5.60 |
| 68 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 22 | EA |
$20.00 |
$55.00 |
$53.00 |
$50.00 |
$57.50 |
| 69 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 97.27 | SF |
$14.66 |
$13.20 |
$18.00 |
$12.25 |
$19.55 |
| 70 | 851(C) 8324 |
2" SQUARE TUBE POST | 110.5 | LF |
$6.86 |
$6.60 |
$16.00 |
$6.25 |
$17.25 |
| 71 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 16,000 | LF |
$0.4100 |
$0.6000 |
$0.5000 |
$0.5700 |
$0.5200 |
| 72 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 500 | LF |
$1.17 |
$2.20 |
$1.30 |
$2.10 |
$1.38 |
| 73 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 60 | LF |
$11.00 |
$12.45 |
$6.35 |
$10.25 |
$6.90 |
| 74 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 4 | EA |
$157.78 |
$137.35 |
$265.00 |
$130.00 |
$287.50 |
| 75 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$37,825.00 |
$18,700.00 |
$18,000.00 |
$17,000.00 |
$19,550.00 |
| 76 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$25,275.00 |
$1,821.00 |
$3,500.00 |
$3,651.25 |
| 77 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$6,000.00 |
$6,595.00 |
$2,000.00 |
$8,000.00 |
$6,842.50 |
| 78 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$166,150.00 |
$153,665.00 |
$165,000.00 |
$98,000.00 |
$195,786.76 |