| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$110,000.00 |
$28,263.07 |
$66,250.00 |
$28,263.07 |
$65,000.00 |
$35,216.62 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 341,914 | CY |
$4.00 |
$2.41 |
$2.48 |
$2.50 |
$2.41 |
$6.06 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$10.00 |
$12.78 |
$13.20 |
$12.78 |
$12.78 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$51,000.00 |
$100,562.81 |
$104,000.00 |
$100,562.81 |
$100,562.81 |
$149,382.55 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,120 | LF |
$2.50 |
$2.00 |
$2.05 |
$2.00 |
$2.00 |
$2.02 |
| 6 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 5 | EA |
$5,000.00 |
$1,000.00 |
$1,035.00 |
$1,000.00 |
$1,000.00 |
$1,000.15 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,473 | LF |
$6.50 |
$8.00 |
$8.25 |
$8.00 |
$8.00 |
$8.02 |
| 8 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 3 | EA |
$250.00 |
$300.00 |
$310.00 |
$300.00 |
$300.00 |
$305.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 182,308 | SY |
$1.50 |
$1.60 |
$1.65 |
$1.60 |
$1.60 |
$1.61 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 160.2 | AC |
$550.00 |
$700.00 |
$725.00 |
$700.00 |
$700.00 |
$350.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 160.2 | AC |
$450.00 |
$600.00 |
$620.00 |
$600.00 |
$600.00 |
$300.00 |
| 12 | 241 2832 |
MOWING | 75.9 | AC |
$70.00 |
$100.00 |
$103.00 |
$100.00 |
$100.00 |
$21.87 |
| 13 | 307(A) 4200 |
FLY ASH | 1,289 | TON |
$70.00 |
$76.89 |
$75.00 |
$75.00 |
$76.00 |
$83.36 |
| 14 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 23,423 | SY |
$3.50 |
$3.06 |
$2.60 |
$3.00 |
$2.50 |
$2.10 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 853 | TON |
$36.00 |
$36.81 |
$38.00 |
$36.81 |
$50.00 |
$39.34 |
| 16 | 407(B) 0250 |
TACK COAT | 55,819 | GAL |
$1.50 |
$2.25 |
$2.75 |
$3.00 |
$2.50 |
$2.95 |
| 17 | 408 5774 |
PRIME COAT | 43,380 | GAL |
$2.50 |
$4.00 |
$5.55 |
$1.00 |
$3.50 |
$3.46 |
| 18 | 409(A) 4242 |
FABRIC REINFORCEMENT | 24,971 | SY |
$2.20 |
$2.20 |
$1.45 |
$1.75 |
$1.60 |
$1.54 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 33,213 | TON |
$70.00 |
$77.00 |
$78.00 |
$89.00 |
$88.00 |
$90.54 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 49,910 | TON |
$60.00 |
$68.50 |
$70.45 |
$84.00 |
$80.00 |
$84.48 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 20,422 | TON |
$76.00 |
$87.00 |
$90.45 |
$97.00 |
$96.00 |
$97.10 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 603 | TON |
$75.00 |
$85.00 |
$86.70 |
$100.00 |
$105.00 |
$103.24 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 50,240 | SY |
$2.50 |
$1.50 |
$1.40 |
$0.7100 |
$1.15 |
$0.5900 |
| 24 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 88,400 | LF |
$0.1500 |
$0.0700 |
$0.1000 |
$0.0700 |
$0.2100 |
$0.1400 |
| 25 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 497 | CY |
$15.00 |
$15.00 |
$15.45 |
$25.00 |
$15.35 |
$15.60 |
| 26 | 509(A) 1326 |
CLASS AA CONCRETE | 1,150 | CY |
$400.00 |
$400.00 |
$326.50 |
$432.00 |
$435.55 |
$435.60 |
| 27 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 12 | CY |
$600.00 |
$600.00 |
$525.00 |
$350.00 |
$650.00 |
$651.00 |
| 28 | 509(D) 0325 |
CLASS C CONCRETE | 144 | CY |
$270.00 |
$250.00 |
$258.00 |
$285.00 |
$295.00 |
$295.50 |
| 29 | 510(C) 6136 |
SLOPE WALL (6") | 173 | SY |
$150.00 |
$145.00 |
$105.00 |
$155.00 |
$91.66 |
$91.75 |
| 30 | 511(A) 0332 |
REINFORCING STEEL | 162,657 | LB |
$0.8500 |
$0.8500 |
$0.9900 |
$0.7500 |
$0.6500 |
$0.6600 |
| 31 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 373 | TON |
$50.00 |
$53.36 |
$55.00 |
$53.36 |
$55.00 |
$55.90 |
| 32 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 3 | EA |
$2,400.00 |
$2,475.52 |
$2,550.00 |
$2,100.00 |
$2,600.00 |
$2,101.00 |
| 33 | 611(H) 5375 |
ADD'L DEPTH IN INLET GPI TYPE 2 | 16 | VF |
$650.00 |
$537.54 |
$555.00 |
$285.00 |
$550.00 |
$285.50 |
| 34 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 258 | LF |
$60.00 |
$30.04 |
$31.00 |
$50.00 |
$35.00 |
$60.50 |
| 35 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 20 | LF |
$80.00 |
$56.90 |
$58.65 |
$90.00 |
$60.00 |
$91.00 |
| 36 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 64 | LF |
$90.00 |
$57.69 |
$59.45 |
$95.00 |
$61.00 |
$124.00 |
| 37 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,108 | LF |
$25.00 |
$22.11 |
$22.80 |
$22.11 |
$25.00 |
$43.81 |
| 38 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 490 | LF |
$35.00 |
$32.29 |
$33.30 |
$32.29 |
$36.00 |
$35.92 |
| 39 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 376 | LF |
$45.00 |
$42.10 |
$43.40 |
$42.10 |
$46.00 |
$33.69 |
| 40 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 80 | LF |
$40.00 |
$29.24 |
$30.15 |
$29.24 |
$33.00 |
$46.05 |
| 41 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 158 | LF |
$45.00 |
$38.71 |
$39.90 |
$38.71 |
$42.00 |
$44.00 |
| 42 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 42 | LF |
$60.00 |
$49.55 |
$51.05 |
$49.55 |
$54.00 |
$75.27 |
| 43 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$500.00 |
$722.72 |
$750.00 |
$918.00 |
$750.00 |
$1,505.00 |
| 44 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,400.00 |
$928.48 |
$1,000.00 |
$1,028.00 |
$950.00 |
$2,005.00 |
| 45 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$900.00 |
$1,424.53 |
$1,500.00 |
$1,218.00 |
$1,500.00 |
$3,015.00 |
| 46 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 14 | EA |
$950.00 |
$1,200.00 |
$1,100.00 |
$850.00 |
$1,100.00 |
$1,201.00 |
| 47 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 20 | EA |
$1,500.00 |
$1,700.00 |
$1,250.00 |
$975.00 |
$1,250.00 |
$1,406.00 |
| 48 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 6 | EA |
$1,800.00 |
$2,100.00 |
$1,600.00 |
$1,350.00 |
$1,600.00 |
$2,108.00 |
| 49 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 39 | CY |
$40.00 |
$24.43 |
$25.25 |
$60.00 |
$25.00 |
$75.00 |
| 50 | 613(V) 1180 |
TRENCH EXCAVATION | 109 | CY |
$10.00 |
$47.51 |
$49.00 |
$6.00 |
$48.00 |
$25.00 |
| 51 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$12,000.00 |
$47,688.61 |
$50,000.00 |
$47,688.61 |
$75,000.00 |
$14,351.68 |
| 52 | 619(B) 0291 |
REMOVAL OF HEADWALL | 30 | EA |
$400.00 |
$500.00 |
$521.00 |
$650.00 |
$800.00 |
$1,204.01 |
| 53 | 619(B) 4725 |
REMOVAL OF FENCE | 21,589 | LF |
$2.00 |
$0.8000 |
$2.35 |
$1.00 |
$1.00 |
$1.00 |
| 54 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 17,993 | SY |
$2.50 |
$4.50 |
$2.35 |
$4.91 |
$4.00 |
$5.80 |
| 55 | 619(C) 0924 |
SAWING PAVEMENT | 43,026 | LF |
$3.00 |
$1.80 |
$1.77 |
$2.00 |
$3.50 |
$2.82 |
| 56 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,463 | LF |
$20.00 |
$11.80 |
$12.15 |
$11.80 |
$15.45 |
$14.99 |
| 57 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 6 | EA |
$600.00 |
$1,210.00 |
$1,250.00 |
$1,210.00 |
$900.00 |
$1,211.00 |
| 58 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$2,600.00 |
$2,025.00 |
$2,100.00 |
$2,025.00 |
$1,899.00 |
$900.00 |
| 59 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 18,662 | LF |
$4.00 |
$3.65 |
$3.75 |
$3.65 |
$3.75 |
$3.65 |
| 60 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 100 | EA |
$20.00 |
$5.30 |
$5.50 |
$5.30 |
$10.00 |
$10.05 |
| 61 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 1,145 | SF |
$13.00 |
$15.70 |
$16.20 |
$15.70 |
$16.00 |
$16.01 |
| 62 | 851(C) 8324 |
2" SQUARE TUBE POST | 1,221 | LF |
$11.50 |
$8.00 |
$8.25 |
$8.00 |
$9.50 |
$9.55 |
| 63 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 127,390 | LF |
$0.3700 |
$0.3300 |
$0.3500 |
$0.3300 |
$0.3400 |
$0.3500 |
| 64 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 243 | LF |
$1.35 |
$0.7000 |
$0.7500 |
$0.7000 |
$1.00 |
$1.00 |
| 65 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 449 | LF |
$2.25 |
$1.00 |
$1.05 |
$1.00 |
$2.00 |
$2.50 |
| 66 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 560 | LF |
$3.66 |
$4.50 |
$4.65 |
$4.50 |
$4.75 |
$4.75 |
| 67 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 46,133 | LF |
$0.0800 |
$0.1100 |
$0.3500 |
$0.1100 |
$0.1200 |
$0.1300 |
| 68 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 310 | SD |
$11.10 |
$3.00 |
$3.10 |
$3.00 |
$5.00 |
$5.00 |
| 69 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 15,190 | SD |
$0.3200 |
$0.7000 |
$0.7500 |
$0.7000 |
$0.2000 |
$0.2000 |
| 70 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 16,895 | SD |
$0.1400 |
$0.7000 |
$0.7500 |
$0.7000 |
$0.3000 |
$0.3000 |
| 71 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,395 | SD |
$1.24 |
$2.00 |
$2.10 |
$2.00 |
$5.50 |
$6.05 |
| 72 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 17,980 | SD |
$0.1700 |
$0.0200 |
$0.1000 |
$0.0200 |
$0.1000 |
$0.1100 |
| 73 | 880(C) 8848 |
WING BARRICADES | 620 | SD |
$0.2800 |
$1.50 |
$2.00 |
$1.50 |
$1.00 |
$1.00 |
| 74 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 35,960 | SD |
$0.0300 |
$0.3000 |
$0.3500 |
$0.3000 |
$0.4000 |
$0.4000 |
| 75 | 880(F) 8878 |
DRUMS | 30,690 | SD |
$0.1000 |
$0.0500 |
$0.1000 |
$0.0500 |
$0.2000 |
$0.2500 |
| 76 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$76,000.00 |
$115,000.00 |
$76,000.00 |
$90,000.00 |
$15,858.13 |
| 77 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$41,000.00 |
$8,000.00 |
$15,000.00 |
$1,215.29 |
| 78 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$450,000.00 |
$300,000.00 |
$310,000.00 |
$517,852.42 |
$600,000.00 |
$504,269.00 |
| 79 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$50,000.00 |
$52,000.00 |
$105,000.00 |
$110,000.00 |
$90,000.00 |
$55,000.00 |