BRIDGE AND APPROACHES US -69: OVER TAR CREEK , 7.7 MILES NORTH OF THE US -59 JCT. PROJECT LENGTH = 0.395 MILES

Let date
Thursday, October 18, 2012
Contract
120353
J/P numbers
21916(04)
District
Division 8
County
Ottawa
Highway
Limits
BRIDGE AND APPROACHES US -69: OVER TAR CREEK , 7.7 MILES NORTH OF THE US -59 JCT. PROJECT LENGTH = 0.395 MILES
Project number
BRFY-158B(071)

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,028,000
1 APAC-CENTRAL, INC. Low bidder $3,050,098 +0.7%
2 GLOVER & ASSOCIATES, INC. $3,228,743 +6.6% +5.9%
3 BECCO CONTRACTORS, INC. $3,281,008 +8.4% +7.6%
4 B & B BRIDGE COMPANY, LLC $3,312,748 +9.4% +8.6%
5 A. M. COHRON & SON, INC. $3,620,402 +19.6% +18.7%
6 EMERY SAPP & SONS, INC. $3,685,513 +21.7% +20.8%

Bid tab: unit prices 98 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 APAC-CENTRAL, I…#2 GLOVER & ASSOCI…#3 BECCO CONTRACTO…#4 B & B BRIDGE CO…#5 A. M. COHRON & …#6 EMERY SAPP & SO…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $3,000.00 $46,776.43 $22,973.68 $25,000.00 $30,000.00 $11,970.00 $4,700.00
2202(A) 0183 UNCLASSIFIED EXCAVATION27,290CY $4.00 $4.34 $6.92 $4.00 $4.50 $7.57 $10.85
3202(C) 0182 ROCK EXCAVATION5,736CY $5.50 $9.02 $4.00 $25.00 $52.50 $23.90 $17.40
4202(D) 0184 UNCLASSIFIED BORROW61,962CY $4.00 $5.07 $8.00 $6.50 $7.00 $10.28 $10.50
5205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $40,983.69 $13,272.31 $35,000.00 $30,000.00 $36,085.00 $24,350.00
6221(C) 2801 TEMPORARY SILT FENCE2,688LF $2.50 $1.92 $2.08 $2.00 $3.25 $2.75 $2.00
7221(F) 0100 TEMPORARY SILT DIKE469LF $7.00 $6.13 $5.52 $6.00 $9.00 $9.00 $9.00
8230(A) 2806 SOLID SLAB SODDING35,021SY $2.00 $1.66 $2.06 $1.75 $1.74 $1.74 $1.74
9232(B) 2814 SEEDING METHOD B14.48AC $500.00 $521.69 $833.45 $500.00 $495.00 $495.00 $495.00
10233(A) 2817 VEGETATIVE MULCHING7.24AC $500.00 $521.69 $611.20 $500.00 $495.00 $495.00 $495.00
11241 2832 MOWING14.48AC $100.00 $139.81 $222.25 $150.00 $134.00 $134.00 $134.00
12303(A) 2100 AGGREGATE BASE TYPE A3,411CY $35.00 $37.78 $31.84 $35.00 $26.00 $26.00 $33.00
13307(K) 4300 STABILIZED SUBGRADE19,960SY $5.00 $4.57 $5.45 $5.00 $5.90 $5.33 $6.30
14325 5271 SEPARATOR FABRIC11,248SY $1.50 $1.18 $1.57 $2.40 $2.50 $2.60 $2.25
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,689TON $22.50 $22.96 $15.75 $18.00 $17.00 $17.35 $16.50
16407(B) 0250 TACK COAT2,164GAL $2.00 $2.73 $2.58 $3.00 $3.00 $4.00 $3.00
17408 5774 PRIME COAT6,628GAL $5.00 $6.92 $0.5000 $4.00 $4.00 $6.10 $4.00
18411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)839TON $68.00 $78.65 $69.28 $80.00 $76.36 $87.00 $76.38
19411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)5,141TON $60.00 $70.87 $61.32 $75.00 $70.65 $76.00 $70.65
20411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)550TON $70.00 $94.98 $76.39 $100.00 $95.43 $87.00 $95.43
21411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,469TON $63.00 $78.51 $61.51 $83.00 $78.25 $77.00 $78.25
22412 5267 COLD MILLING PAVEMENT500SY $4.00 $10.72 $13.33 $10.00 $10.00 $17.50 $20.00
23613(B) 0688 12" CORR. GALV. STEEL PIPE100LF $22.50 $23.43 $44.45 $38.00 $20.00 $38.75 $38.00
24613(B) 0689 18" CORR. GALV. STEEL PIPE208LF $25.00 $33.95 $37.95 $45.00 $30.00 $45.75 $39.50
25613(B) 0690 24" CORR. GALV. STEEL PIPE112LF $35.00 $31.44 $41.56 $50.00 $40.00 $52.35 $37.50
26613(B) 0698 72" CORR. GALV. STEEL PIPE210LF $150.00 $70.26 $76.68 $100.00 $105.00 $142.40 $120.00
27613(B) 5075 108" CORR. GALV. STEEL PIPE230LF $300.00 $164.39 $175.11 $200.00 $225.00 $277.70 $245.00
28613(B) 5739 84" CORR. GALV. STEEL PIPE160LF $200.00 $85.14 $84.88 $135.00 $125.00 $183.20 $138.00
29613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND4EA $800.00 $356.31 $814.80 $500.00 $200.00 $365.00 $265.00
30613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND4EA $1,200.00 $407.49 $1,224.98 $550.00 $300.00 $1,695.00 $315.00
31613(M) 7186 TYPE A4 CULVERT END TREATMENT1EA $1,250.00 $2,044.78 $1,831.59 $900.00 $800.00 $900.00 $1,810.00
32613(M) 7196 TYPE A6 CULVERT END TREATMENT1EA $1,500.00 $2,577.93 $1,831.59 $1,300.00 $1,000.00 $1,200.00 $2,575.00
33619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $7,453.86 $33,112.08 $20,000.00 $15,000.00 $9,925.00 $3,500.00
34619(B) 4725 REMOVAL OF FENCE2,150LF $2.00 $2.35 $2.50 $2.50 $2.00 $1.13 $2.25
35619(B) 4728 REMOVAL OF ASPHALT PAVEMENT7,219SY $3.00 $4.29 $4.75 $3.00 $2.75 $2.13 $4.50
36619(B) 4763 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY9,108SY $5.00 $6.96 $5.34 $6.50 $7.50 $3.84 $6.50
37619(B) 4780 REMOVAL OF GUARDRAIL412LF $3.00 $2.97 $7.14 $3.00 $2.85 $7.63 $2.85
38619(C) 0924 SAWING PAVEMENT350LF $5.00 $2.17 $4.64 $5.00 $3.00 $5.53 $3.20
39623 0100 (PL)GUARDRAIL CURBING4EA $800.00 $2,117.24 $444.51 $500.00 $1,000.00 $1,500.00 $725.00
40623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE575LF $20.00 $16.17 $17.50 $17.00 $15.50 $15.75 $15.50
41623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $3,000.00 $2,347.59 $2,111.41 $2,000.00 $2,250.00 $2,150.00 $2,250.00
42623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,500.00 $1,565.06 $1,333.52 $1,300.00 $1,500.00 $1,600.00 $1,500.00
43624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,800LF $6.50 $3.55 $3.78 $4.00 $7.00 $3.50 $3.40
44629(A) 4958 MAILBOX INSTALLATION-SINGLE2EA $125.00 $104.34 $94.46 $110.00 $100.00 $100.00 $85.00
45629(B) 4959 MAILBOX INSTALLATION-MULTIPLE1EA $200.00 $130.43 $166.69 $135.00 $125.00 $125.00 $150.00
46629(C) 4960 MAILBOX4EA $50.00 $26.09 $50.01 $30.00 $25.00 $25.00 $45.00
47629(D) 4961 REMOVAL OF MAILBOX INSTALLATION3EA $50.00 $5.22 $222.25 $5.00 $5.00 $5.00 $50.00
48616 5000 (PL)WATER SYSTEM IMPROVEMENTS1LSUM $100,000.00 $40,859.00 $33,338.00 $35,000.00 $27,500.00 $32,500.00 $69,300.00
49619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $25,000.00 $29,214.41 $8,883.07 $15,000.00 $5,000.00 $7,993.65 $9,800.00
50501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON86.4CY $20.00 $52.56 $13.89 $12.00 $50.00 $12.50 $15.00
51501(G) 6309 CLSM BACKFILL178.2CY $125.00 $94.61 $151.30 $85.00 $90.00 $136.15 $98.50
52503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)1,068.6LF $190.00 $220.76 $246.97 $185.00 $210.00 $222.24 $186.50
53504(A) 1304 APPROACH SLAB246.4SY $175.00 $205.00 $156.91 $190.00 $195.00 $141.20 $132.00
54504(B) 1305 SAW-CUT GROOVING1,288.6SY $5.00 $3.78 $4.00 $4.00 $3.60 $3.60 $3.60
55504(D) 6245 CONCRETE RAIL (TR4)527LF $75.00 $73.59 $51.40 $85.00 $70.00 $46.25 $62.50
56506(A) 1322 STRUCTURAL STEEL1,707LB $4.00 $2.37 $1.83 $1.50 $2.36 $1.65 $2.50
57507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY10EA $500.00 $420.50 $239.24 $250.00 $400.00 $215.29 $635.00
58507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY30EA $2,500.00 $1,981.62 $1,798.09 $1,500.00 $1,885.00 $1,618.05 $1,910.00
59507(C) 6282 ELASTOMERIC BEARING PADS30EA $400.00 $504.60 $322.59 $400.00 $480.00 $290.29 $380.00
60509(A) 1326 CLASS AA CONCRETE309.6CY $500.00 $394.22 $424.83 $300.00 $375.00 $395.00 $506.00
61509(B) 1328 CLASS A CONCRETE156.2CY $500.00 $394.22 $371.76 $600.00 $375.00 $345.00 $337.00
62509(D) 1331 CLASS C CONCRETE18.9CY $400.00 $499.35 $405.11 $350.00 $475.00 $364.55 $915.00
63511(B) 6010 EPOXY COATED REINFORCING STEEL104,925LB $1.00 $0.9500 $0.9900 $1.00 $0.9000 $0.9800 $0.9500
64514(A) 6010 PILES, FURNISHED (HP 10X42)336LF $30.00 $31.54 $36.12 $28.00 $30.00 $32.50 $32.25
65514(B) 6292 PILES, DRIVEN (HP 10X42)336LF $15.00 $14.19 $6.40 $20.00 $13.50 $5.76 $30.50
66514(G) 6310 METAL PILE SHOES14EA $150.00 $42.05 $155.58 $140.00 $40.00 $140.00 $105.00
67514(K) 6260 (PL)PILOT HOLES140LF $125.00 $194.48 $179.37 $200.00 $185.00 $161.41 $127.50
68515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,034SY $4.00 $3.68 $3.89 $4.00 $3.50 $3.50 $3.50
69516(A) 6094 DRILLED SHAFTS 48" DIAMETER176LF $550.00 $946.13 $1,080.44 $1,000.00 $900.00 $972.26 $828.75
70523(A) 6550 SEALER CRACK PREPARATION277.2LF $5.00 $4.20 $4.45 $4.00 $4.00 $4.00 $4.00
71523(B) 6560 SEALER RESIN2.4GAL $250.00 $105.13 $111.13 $110.00 $100.00 $100.00 $100.00
72601(B) 1353 TYPE I-A PLAIN RIPRAP1,865TON $40.00 $26.28 $38.26 $28.00 $25.00 $29.00 $27.25
73601(C) 1355 TYPE I-A FILTER BLANKET274TON $40.00 $26.81 $33.62 $24.00 $25.50 $25.80 $21.25
74613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $20.00 $36.79 $21.93 $30.00 $35.00 $19.73 $25.00
75613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.20LF $20.00 $36.79 $32.96 $25.00 $35.00 $29.66 $49.50
76619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $65,000.00 $26,281.42 $27,380.24 $25,000.00 $25,000.00 $38,250.00 $37,000.00
77805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS8EA $100.00 $26.08 $55.56 $25.00 $25.00 $25.00 $50.00
78805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS2EA $150.00 $156.51 $222.26 $160.00 $150.00 $150.00 $200.00
79850(A) 8110 SHEET ALUMINUM SIGNS31.25SF $18.00 $12.52 $16.67 $13.00 $12.00 $12.00 $15.00
80851(C) 8327 2 1/4" SQUARE TUBE POST69.75LF $10.00 $6.26 $16.67 $7.00 $6.00 $6.00 $15.00
81853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)16EA $30.00 $15.65 $111.13 $16.00 $12.00 $15.00 $12.00
82855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)12,658LF $0.7000 $1.15 $0.9400 $1.20 $1.10 $1.10 $0.8500
83857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)11,712LF $0.2500 $0.1000 $0.5600 $0.1100 $0.1000 $0.1000 $0.5000
84857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)2,719LF $0.8000 $1.04 $2.22 $1.10 $1.00 $1.00 $2.00
85857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)4,675LF $0.2500 $0.2600 $0.2200 $0.3000 $0.2500 $0.2500 $0.2000
86876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR165SD $5.00 $5.22 $3.33 $5.50 $5.00 $5.00 $3.00
87880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF6,300SD $0.5000 $0.0200 $0.0600 $0.0200 $0.0200 $0.0200 $0.0500
88880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,695SD $1.00 $0.0200 $0.0600 $0.0200 $0.0200 $0.0200 $0.0500
89880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,970SD $1.00 $0.0200 $0.2800 $0.0200 $0.0200 $0.0200 $0.2500
90880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)4,860SD $0.5000 $0.0200 $0.1100 $0.0200 $0.0200 $0.0200 $0.1000
91880(C) 8848 WING BARRICADES1,020SD $0.5000 $0.0200 $0.0600 $0.0200 $0.0200 $0.0200 $0.0500
92880(D) 8854 VERTICAL PANELS16,335SD $0.1000 $0.0200 $0.0600 $0.0200 $0.0200 $0.0200 $0.0500
93880(E) 8860 WARNING LIGHTS(TYPE A)12,195SD $0.0500 $0.0200 $0.0200 $0.0200 $0.0200 $0.0200 $0.0200
94880(F) 8878 DRUMS8,160SD $0.1000 $0.0200 $0.0600 $0.0200 $0.0200 $0.0200 $0.0500
95642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $45,000.00 $21,389.12 $22,225.33 $25,000.00 $18,000.00 $18,500.00 $17,500.00
96220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $8,000.00 $818.61 $1,500.00 $3,500.00 $6,000.00 $5,200.00 $4,775.00
97640(A) 1398 FIELD OFFICE1EA $10,000.00 $682.36 $500.00 $7,000.00 $7,500.00 $6,500.00 $6,600.00
98641 1399 MOBILIZATION1LSUM $171,469.70 $90,644.00 $162,000.00 $188,000.00 $87,000.00 $230,000.00 $216,000.00