| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,250.00 |
$22,000.00 |
$5,550.00 |
$10,000.00 |
$5,775.00 |
$45,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 28,795 | CY |
$4.20 |
$4.50 |
$4.75 |
$4.50 |
$4.95 |
$6.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 30,771 | CY |
$5.50 |
$7.20 |
$7.60 |
$7.00 |
$7.92 |
$9.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$21,200.00 |
$60,000.00 |
$22,000.00 |
$50,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,933 | LF |
$2.50 |
$1.19 |
$1.25 |
$1.19 |
$2.20 |
$2.20 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 805 | LF |
$6.00 |
$7.90 |
$9.40 |
$8.90 |
$8.80 |
$12.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 72,122 | SY |
$1.50 |
$1.29 |
$1.40 |
$1.29 |
$1.70 |
$1.75 |
| 8 | 230(D) 2810 |
BROADCAST SPRIGGING (METHOD A) | 12,579 | SY |
$0.7500 |
$0.1900 |
$0.6500 |
$0.1900 |
$0.6600 |
$1.00 |
| 9 | 230(F) 2812 |
WATERING | 3,388 | KGAL |
$5.00 |
$7.89 |
$8.35 |
$7.89 |
$7.15 |
$10.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 17.5 | AC |
$300.00 |
$508.00 |
$642.00 |
$608.00 |
$660.00 |
$700.00 |
| 11 | 241 2832 |
MOWING | 68.66 | AC |
$50.00 |
$62.00 |
$100.00 |
$92.00 |
$82.50 |
$75.00 |
| 12 | 307(A) 4200 |
FLY ASH | 1,552 | TON |
$66.00 |
$65.00 |
$67.50 |
$69.00 |
$36.30 |
$70.00 |
| 13 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 28,735 | SY |
$2.00 |
$2.50 |
$2.55 |
$2.60 |
$2.64 |
$2.75 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 1,609 | SY |
$1.50 |
$2.00 |
$3.60 |
$2.00 |
$2.40 |
$5.00 |
| 15 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 575 | TON |
$54.00 |
$40.00 |
$42.95 |
$47.00 |
$34.48 |
$60.00 |
| 16 | 407(B) 0250 |
TACK COAT | 5,407 | GAL |
$2.50 |
$4.50 |
$4.50 |
$4.50 |
$4.95 |
$2.25 |
| 17 | 408 5774 |
PRIME COAT | 6,570 | GAL |
$4.00 |
$7.10 |
$7.00 |
$7.10 |
$7.81 |
$3.50 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,285 | TON |
$70.00 |
$82.10 |
$80.00 |
$82.10 |
$90.30 |
$92.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,019 | TON |
$78.00 |
$97.00 |
$94.45 |
$97.00 |
$106.70 |
$106.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 18,510 | SY |
$2.70 |
$1.65 |
$1.60 |
$0.7300 |
$1.82 |
$2.50 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 4 | CY |
$20.00 |
$50.00 |
$52.75 |
$360.00 |
$110.00 |
$55.00 |
| 22 | 501(G) 6315 |
CLSM BACKFILL | 47 | CY |
$200.00 |
$160.00 |
$211.00 |
$160.00 |
$240.80 |
$175.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 22 | CY |
$500.00 |
$590.00 |
$425.00 |
$460.00 |
$715.75 |
$600.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 3,422 | LB |
$1.00 |
$1.20 |
$1.30 |
$1.15 |
$1.10 |
$1.20 |
| 25 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 116 | LF |
$60.00 |
$80.00 |
$85.00 |
$45.00 |
$88.00 |
$80.00 |
| 26 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 66 | LF |
$70.00 |
$95.00 |
$100.00 |
$58.00 |
$104.50 |
$95.00 |
| 27 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 138 | LF |
$95.00 |
$110.00 |
$116.00 |
$115.00 |
$121.00 |
$110.00 |
| 28 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 196 | LF |
$100.00 |
$100.00 |
$105.50 |
$95.00 |
$220.00 |
$100.00 |
| 29 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$500.00 |
$1,100.00 |
$1,162.00 |
$900.00 |
$1,760.00 |
$1,100.00 |
| 30 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$600.00 |
$1,350.00 |
$1,372.00 |
$1,000.00 |
$2,255.00 |
$1,300.00 |
| 31 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$1,600.00 |
$1,583.00 |
$2,500.00 |
$4,400.00 |
$1,500.00 |
| 32 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$30,000.00 |
$40,110.00 |
$25,000.00 |
$33,000.00 |
$60,000.00 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 10,057 | SY |
$4.00 |
$2.30 |
$2.30 |
$3.50 |
$2.53 |
$7.00 |
| 34 | 619(C) 0924 |
SAWING PAVEMENT | 14,836 | LF |
$3.00 |
$3.50 |
$2.30 |
$3.00 |
$2.75 |
$2.00 |
| 35 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,700 | LF |
$14.00 |
$16.50 |
$16.30 |
$15.45 |
$17.00 |
$15.45 |
| 36 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,000.00 |
$1,915.00 |
$2,000.00 |
$1,899.00 |
$2,088.90 |
$1,899.00 |
| 37 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$1,800.00 |
$1,350.00 |
$1,404.00 |
$1,330.00 |
$1,463.00 |
$1,330.00 |
| 38 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 15,132 | LF |
$4.00 |
$3.45 |
$3.25 |
$3.08 |
$3.40 |
$3.00 |
| 39 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$100.00 |
$500.00 |
$600.00 |
$500.00 |
$550.00 |
$500.00 |
| 40 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$22.00 |
$20.00 |
$7.40 |
$5.30 |
$22.00 |
$25.00 |
| 41 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$20.00 |
$21.15 |
$10.00 |
$21.25 |
$20.00 |
| 42 | 501(G) 6309 |
CLSM BACKFILL | 122 | CY |
$130.00 |
$155.00 |
$211.00 |
$150.00 |
$194.75 |
$155.00 |
| 43 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 597 | LF |
$190.00 |
$167.00 |
$185.00 |
$185.00 |
$316.30 |
$167.00 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 187.4 | SY |
$170.00 |
$170.00 |
$79.25 |
$165.00 |
$196.50 |
$170.00 |
| 45 | 504(B) 1305 |
SAW-CUT GROOVING | 855.6 | SY |
$10.00 |
$5.00 |
$5.25 |
$4.05 |
$3.90 |
$5.00 |
| 46 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 381 | LF |
$80.00 |
$68.00 |
$71.75 |
$90.00 |
$98.90 |
$68.00 |
| 47 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$4.00 |
$2.75 |
$2.65 |
$2.00 |
$3.40 |
$2.75 |
| 48 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$320.00 |
$530.00 |
$390.00 |
$793.75 |
$320.00 |
| 49 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$1,200.00 |
$1,600.00 |
$1,500.00 |
$2,073.00 |
$1,200.00 |
| 50 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$500.00 |
$500.00 |
$425.00 |
$360.00 |
$535.40 |
$500.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 199.2 | CY |
$500.00 |
$575.00 |
$507.00 |
$500.00 |
$644.80 |
$575.00 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 96.2 | CY |
$450.00 |
$575.00 |
$507.00 |
$500.00 |
$641.20 |
$575.00 |
| 53 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$300.00 |
$2,640.00 |
$765.00 |
$384.00 |
$300.00 |
| 54 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 58,500 | LB |
$1.05 |
$1.00 |
$1.20 |
$1.20 |
$1.12 |
$1.00 |
| 55 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 539 | LF |
$28.00 |
$50.00 |
$29.55 |
$21.00 |
$34.55 |
$50.00 |
| 56 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 539 | LF |
$15.00 |
$5.00 |
$16.00 |
$26.00 |
$9.52 |
$5.00 |
| 57 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 622.4 | SY |
$5.00 |
$5.00 |
$5.25 |
$3.15 |
$3.92 |
$5.00 |
| 58 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 198 | LF |
$550.00 |
$555.00 |
$760.00 |
$445.00 |
$602.15 |
$555.00 |
| 59 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.50 |
$15.85 |
$5.10 |
$4.50 |
$5.50 |
| 60 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$125.00 |
$230.00 |
$300.00 |
$200.00 |
$134.40 |
$230.00 |
| 61 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 700 | TON |
$45.00 |
$45.00 |
$52.80 |
$65.00 |
$45.20 |
$45.00 |
| 62 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 120 | TON |
$35.00 |
$45.00 |
$53.00 |
$55.00 |
$41.60 |
$45.00 |
| 63 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$15.00 |
$25.00 |
$53.00 |
$25.00 |
$29.60 |
$25.00 |
| 64 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 45 | LF |
$25.00 |
$25.00 |
$53.00 |
$25.00 |
$12.80 |
$25.00 |
| 65 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$23,000.00 |
$53,000.00 |
$25,000.00 |
$20,832.00 |
$50,000.00 |
| 66 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$20.00 |
$16.00 |
$10.00 |
$21.25 |
$20.00 |
| 67 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$130.00 |
$155.00 |
$211.00 |
$150.00 |
$194.75 |
$155.00 |
| 68 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 279 | LF |
$200.00 |
$192.00 |
$211.00 |
$205.00 |
$197.40 |
$192.00 |
| 69 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$170.00 |
$170.00 |
$80.00 |
$165.00 |
$207.60 |
$170.00 |
| 70 | 504(B) 1305 |
SAW-CUT GROOVING | 526.7 | SY |
$10.00 |
$5.00 |
$5.30 |
$4.05 |
$3.92 |
$5.00 |
| 71 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 237 | LF |
$80.00 |
$70.00 |
$74.00 |
$90.00 |
$98.90 |
$70.00 |
| 72 | 506(A) 1322 |
STRUCTURAL STEEL | 150 | LB |
$4.00 |
$4.00 |
$2.65 |
$2.00 |
$3.40 |
$4.00 |
| 73 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$350.00 |
$425.00 |
$390.00 |
$808.00 |
$350.00 |
| 74 | 509(A) 1326 |
CLASS AA CONCRETE | 113.8 | CY |
$500.00 |
$570.00 |
$510.00 |
$500.00 |
$700.00 |
$570.00 |
| 75 | 509(B) 1328 |
CLASS A CONCRETE | 52.4 | CY |
$450.00 |
$570.00 |
$510.00 |
$500.00 |
$697.50 |
$570.00 |
| 76 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$300.00 |
$265.00 |
$765.00 |
$384.00 |
$300.00 |
| 77 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 28,660 | LB |
$1.05 |
$1.00 |
$1.15 |
$1.20 |
$1.13 |
$1.00 |
| 78 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 592 | LF |
$28.00 |
$50.00 |
$30.00 |
$21.00 |
$33.85 |
$50.00 |
| 79 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 592 | LF |
$15.00 |
$5.00 |
$16.00 |
$26.00 |
$9.50 |
$5.00 |
| 80 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 332 | SY |
$5.00 |
$5.00 |
$4.75 |
$3.15 |
$4.00 |
$5.00 |
| 81 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 830 | TON |
$45.00 |
$45.00 |
$53.00 |
$65.00 |
$45.20 |
$45.00 |
| 82 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 145 | TON |
$35.00 |
$45.00 |
$53.00 |
$55.00 |
$41.60 |
$45.00 |
| 83 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$15.00 |
$25.00 |
$53.00 |
$25.00 |
$29.60 |
$25.00 |
| 84 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 46 | LF |
$25.00 |
$25.00 |
$53.00 |
$25.00 |
$12.80 |
$25.00 |
| 85 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$12,000.00 |
$16,000.00 |
$15,000.00 |
$13,900.00 |
$32,000.00 |
| 86 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 8 | EA |
$63.88 |
$75.00 |
$100.00 |
$20.00 |
$82.50 |
$100.00 |
| 87 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 56.72 | SF |
$16.25 |
$14.00 |
$15.85 |
$23.00 |
$15.40 |
$15.00 |
| 88 | 851(C) 8324 |
2" SQUARE TUBE POST | 114 | LF |
$8.06 |
$7.00 |
$7.50 |
$9.00 |
$7.70 |
$8.00 |
| 89 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 6 | EA |
$22.00 |
$26.00 |
$27.50 |
$23.00 |
$28.60 |
$27.00 |
| 90 | 853 9063 |
BARRIER DELINEATORS(TYPE 2, CODE 1) | 10 | EA |
$17.50 |
$20.00 |
$21.15 |
$12.00 |
$22.00 |
$25.00 |
| 91 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 33,800 | LF |
$0.6500 |
$0.4800 |
$0.5100 |
$0.4000 |
$0.5500 |
$0.5000 |
| 92 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 12,000 | LF |
$0.1800 |
$0.2500 |
$0.3000 |
$0.1600 |
$0.3000 |
$0.5000 |
| 93 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,200 | EA |
$0.3500 |
$1.00 |
$1.10 |
$0.5500 |
$2.00 |
$2.00 |
| 94 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,500 | LF |
$0.4000 |
$0.2500 |
$0.3000 |
$0.2600 |
$0.2800 |
$0.2500 |
| 95 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 230 | SD |
$20.00 |
$1.00 |
$1.10 |
$7.00 |
$11.00 |
$2.00 |
| 96 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 15,410 | SD |
$0.2500 |
$0.1000 |
$0.1500 |
$0.0200 |
$0.1000 |
$0.1100 |
| 97 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,140 | SD |
$0.7500 |
$0.5000 |
$0.5500 |
$1.45 |
$0.6000 |
$0.5500 |
| 98 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,980 | SD |
$1.25 |
$1.25 |
$1.35 |
$1.45 |
$1.40 |
$1.38 |
| 99 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,600 | SD |
$0.6000 |
$0.2500 |
$0.3000 |
$0.0200 |
$0.2500 |
$0.2800 |
| 100 | 880(C) 8848 |
WING BARRICADES | 920 | SD |
$1.22 |
$0.2500 |
$0.3000 |
$0.0200 |
$0.3000 |
$0.2800 |
| 101 | 880(D) 8854 |
VERTICAL PANELS | 20,700 | SD |
$0.0500 |
$0.1000 |
$0.1500 |
$0.0200 |
$0.1100 |
$0.1100 |
| 102 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 15,180 | SD |
$0.1300 |
$0.0500 |
$0.0500 |
$0.0200 |
$0.0500 |
$0.0600 |
| 103 | 880(F) 8878 |
DRUMS | 6,900 | SD |
$0.1500 |
$0.2500 |
$0.3000 |
$0.6000 |
$0.2800 |
$0.2800 |
| 104 | 880(G) 8890 |
CHANNELIZER CONES | 17,250 | SD |
$0.1200 |
$0.1000 |
$0.1500 |
$0.0200 |
$0.1100 |
$0.1100 |
| 105 | 880(I) 8902 |
FLAGGER | 102 | SD |
$153.73 |
$260.00 |
$260.00 |
$260.00 |
$165.00 |
$525.00 |
| 106 | 880(W) 8800 |
PILOT CAR | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$19,000.00 |
$10,000.00 |
$11,000.00 |
$18,000.00 |
| 107 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 460 | SD |
$14.75 |
$5.00 |
$5.30 |
$5.00 |
$5.50 |
$5.00 |
| 108 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$28,000.00 |
$21,000.00 |
$32,000.00 |
$18,750.00 |
$20,625.00 |
$80,000.00 |
| 109 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$4,000.00 |
$37,000.00 |
$8,000.00 |
$4,250.00 |
$40,000.00 |
| 110 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$208,500.00 |
$100,000.00 |
$354,000.00 |
$177,000.00 |
$235,000.00 |