| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$8,374.00 |
$11,000.00 |
$15,000.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 17,115 | CY |
$4.00 |
$5.04 |
$5.15 |
$8.00 |
$5.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$6.00 |
$5.46 |
$6.70 |
$12.00 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$4,134.00 |
$8,500.00 |
$15,000.00 |
$20,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,072 | LF |
$2.00 |
$1.36 |
$1.95 |
$3.00 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 112 | LF |
$9.00 |
$4.32 |
$10.00 |
$10.00 |
$12.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 12.6 | CY |
$150.00 |
$58.70 |
$110.00 |
$100.00 |
$130.00 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 800 | LF |
$2.00 |
$1.55 |
$1.65 |
$3.00 |
$2.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 22,475 | SY |
$1.50 |
$1.18 |
$1.25 |
$1.25 |
$1.50 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 4.7 | AC |
$500.00 |
$577.70 |
$590.00 |
$500.00 |
$700.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.7 | AC |
$350.00 |
$577.70 |
$590.00 |
$500.00 |
$735.00 |
| 12 | 241 2832 |
MOWING | 9.4 | AC |
$80.00 |
$85.86 |
$85.00 |
$100.00 |
$100.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,274 | CY |
$33.00 |
$40.39 |
$43.00 |
$39.00 |
$60.00 |
| 14 | 307(A) 4200 |
FLY ASH | 252.7 | TON |
$90.00 |
$30.31 |
$74.00 |
$75.00 |
$130.00 |
| 15 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 4,681 | SY |
$3.50 |
$3.18 |
$3.60 |
$3.00 |
$1.00 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 4,189 | SY |
$2.50 |
$1.25 |
$2.50 |
$1.50 |
$2.50 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 425.5 | TON |
$28.00 |
$29.68 |
$25.00 |
$25.00 |
$45.00 |
| 18 | 407(B) 0250 |
TACK COAT | 645 | GAL |
$4.50 |
$3.18 |
$3.30 |
$3.00 |
$4.50 |
| 19 | 408 5774 |
PRIME COAT | 2,587 | GAL |
$6.00 |
$6.36 |
$6.60 |
$6.00 |
$4.50 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,301.3 | TON |
$69.00 |
$68.90 |
$73.00 |
$72.00 |
$100.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,043.1 | TON |
$72.00 |
$74.20 |
$79.00 |
$77.00 |
$100.00 |
| 22 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 1,638 | LF |
$0.2000 |
$0.5900 |
$4.00 |
$3.50 |
$3.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 164 | CY |
$280.00 |
$263.19 |
$325.00 |
$350.00 |
$350.00 |
| 24 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 84 | LF |
$240.00 |
$112.89 |
$175.00 |
$175.00 |
$160.00 |
| 25 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 128 | LF |
$200.00 |
$85.86 |
$90.00 |
$100.00 |
$110.00 |
| 26 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 250 | LF |
$12.00 |
$24.20 |
$24.00 |
$25.00 |
$15.00 |
| 27 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$12.00 |
$24.09 |
$24.00 |
$25.00 |
$15.00 |
| 28 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$800.00 |
$1,520.95 |
$1,650.00 |
$2,500.00 |
$1,300.00 |
| 29 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$1,399.31 |
$2,225.00 |
$3,000.00 |
$1,300.00 |
| 30 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$750.00 |
$477.65 |
$500.00 |
$300.00 |
$4,000.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$4,770.00 |
$8,000.00 |
$10,000.00 |
$5,000.00 |
| 32 | 619(B) 4725 |
REMOVAL OF FENCE | 2,411 | LF |
$1.00 |
$0.7400 |
$1.76 |
$2.00 |
$2.00 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,449 | SY |
$4.00 |
$2.92 |
$3.65 |
$3.00 |
$3.50 |
| 34 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 222 | LF |
$4.00 |
$20.14 |
$10.00 |
$15.00 |
$12.00 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 731 | LF |
$3.50 |
$3.18 |
$6.00 |
$3.00 |
$4.00 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 732 | LF |
$20.00 |
$15.37 |
$15.50 |
$14.30 |
$18.00 |
| 37 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,173.00 |
$2,300.00 |
$1,925.00 |
$2,500.00 |
| 38 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,500.00 |
$1,372.70 |
$1,600.00 |
$1,422.00 |
$1,900.00 |
| 39 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,663 | LF |
$4.00 |
$3.48 |
$3.65 |
$6.00 |
$6.50 |
| 40 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$10.00 |
$21.20 |
$12.50 |
$20.00 |
$10.00 |
| 41 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$125.00 |
$146.25 |
$125.00 |
$125.00 |
$160.00 |
| 42 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 398 | LF |
$170.00 |
$169.82 |
$173.50 |
$190.00 |
$210.00 |
| 43 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 339 | LF |
$180.00 |
$186.99 |
$185.00 |
$210.00 |
$240.00 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$150.00 |
$62.73 |
$160.00 |
$150.00 |
$160.00 |
| 45 | 504(B) 1305 |
SAW-CUT GROOVING | 1,046.8 | SY |
$4.00 |
$3.82 |
$4.00 |
$3.60 |
$3.50 |
| 46 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 467 | LF |
$65.00 |
$62.73 |
$70.00 |
$75.00 |
$85.00 |
| 47 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$2.50 |
$3.18 |
$2.50 |
$5.00 |
$4.00 |
| 48 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$500.00 |
$502.71 |
$450.00 |
$750.00 |
$900.00 |
| 49 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$3,000.00 |
$2,580.84 |
$2,675.00 |
$3,000.00 |
$3,300.00 |
| 50 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$300.00 |
$473.77 |
$675.00 |
$800.00 |
$900.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 249.7 | CY |
$450.00 |
$421.13 |
$470.00 |
$400.00 |
$580.00 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 126.6 | CY |
$400.00 |
$434.53 |
$480.00 |
$450.00 |
$360.00 |
| 53 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 72,600 | LB |
$1.00 |
$1.00 |
$0.9900 |
$1.15 |
$1.20 |
| 54 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 854 | LF |
$30.00 |
$23.85 |
$23.80 |
$25.00 |
$27.00 |
| 55 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 854 | LF |
$15.00 |
$12.72 |
$10.20 |
$20.00 |
$45.00 |
| 56 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 882 | SY |
$5.00 |
$3.18 |
$4.00 |
$3.50 |
$4.00 |
| 57 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 260 | LF |
$500.00 |
$445.90 |
$445.00 |
$400.00 |
$450.00 |
| 58 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$4.66 |
$4.40 |
$4.00 |
$5.00 |
| 59 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$250.00 |
$159.00 |
$150.00 |
$100.00 |
$130.00 |
| 60 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,000 | TON |
$30.00 |
$31.99 |
$28.80 |
$35.00 |
$60.00 |
| 61 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 210 | TON |
$30.00 |
$26.01 |
$22.50 |
$30.00 |
$60.00 |
| 62 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$25.00 |
$23.14 |
$20.00 |
$25.00 |
$15.00 |
| 63 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 73 | LF |
$25.00 |
$23.03 |
$30.00 |
$25.00 |
$15.00 |
| 64 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$15,900.00 |
$10,500.00 |
$35,000.00 |
$40,000.00 |
| 65 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,352 | LF |
$0.8000 |
$0.9600 |
$0.6600 |
$0.5000 |
$1.20 |
| 66 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 6,060 | LF |
$0.2500 |
$0.2200 |
$0.3500 |
$0.3000 |
$0.2500 |
| 67 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 1,340 | LF |
$0.7000 |
$0.9600 |
$0.5500 |
$0.2000 |
$1.10 |
| 68 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,200 | LF |
$0.4000 |
$0.2700 |
$0.3500 |
$0.2500 |
$0.3000 |
| 69 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,100 | SD |
$0.6000 |
$1.59 |
$0.6600 |
$0.2500 |
$2.00 |
| 70 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,520 | SD |
$1.00 |
$0.1100 |
$0.6600 |
$0.2500 |
$0.1500 |
| 71 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,360 | SD |
$1.50 |
$0.5300 |
$0.6600 |
$0.2500 |
$0.7500 |
| 72 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,100 | SD |
$0.5000 |
$1.33 |
$0.2300 |
$0.2500 |
$1.90 |
| 73 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$1.00 |
$1.06 |
$0.7700 |
$0.2500 |
$1.50 |
| 74 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,200 | SD |
$0.1500 |
$0.1100 |
$0.6600 |
$0.2500 |
$0.1500 |
| 75 | 880(F) 8878 |
DRUMS | 3,360 | SD |
$0.3000 |
$0.2700 |
$0.5000 |
$0.1400 |
$0.4000 |
| 76 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$11,000.00 |
$6,890.00 |
$7,250.00 |
$7,500.00 |
$15,000.00 |
| 77 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,650.00 |
$3,500.00 |
$3,000.00 |
$13,000.00 |
| 78 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$5,000.00 |
$8,480.00 |
$8,250.00 |
$12,500.00 |
$16,000.00 |
| 79 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$98,000.00 |
$76,271.98 |
$65,000.00 |
$75,000.00 |
$59,451.80 |