| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$16,380.00 |
$20,000.00 |
$30,000.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 46,226 | CY |
$5.00 |
$6.20 |
$5.00 |
$7.00 |
$8.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$22,000.00 |
$32,392.50 |
$20,000.00 |
$40,000.00 |
$5,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,405 | LF |
$1.25 |
$1.21 |
$2.35 |
$3.00 |
$1.50 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 238 | LF |
$7.75 |
$8.03 |
$8.00 |
$7.00 |
$10.00 |
| 6 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 14 | CY |
$50.00 |
$72.19 |
$100.00 |
$50.00 |
$100.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 53,024 | SY |
$1.25 |
$1.04 |
$1.40 |
$1.50 |
$1.25 |
| 8 | 230(F) 2812 |
WATERING | 2,121 | KGAL |
$8.00 |
$6.04 |
$6.00 |
$10.00 |
$8.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 19.15 | AC |
$348.00 |
$409.50 |
$425.00 |
$300.00 |
$500.00 |
| 10 | 234(A) 2824 |
FERTILIZING (10-20-10) | 5.3 | TON |
$660.00 |
$750.88 |
$725.00 |
$800.00 |
$800.00 |
| 11 | 241 2832 |
MOWING | 19.15 | AC |
$65.00 |
$65.10 |
$65.00 |
$10.00 |
$65.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,627 | CY |
$22.00 |
$46.16 |
$38.50 |
$45.00 |
$32.00 |
| 13 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 2,000 | SY |
$3.50 |
$3.53 |
$4.50 |
$3.00 |
$3.00 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,849 | TON |
$18.00 |
$19.05 |
$21.25 |
$25.00 |
$20.00 |
| 15 | 407(B) 0250 |
TACK COAT | 3,906 | GAL |
$2.50 |
$3.94 |
$3.40 |
$4.00 |
$4.25 |
| 16 | 408 5774 |
PRIME COAT | 10,055 | GAL |
$3.50 |
$7.14 |
$6.25 |
$5.00 |
$5.00 |
| 17 | 409(A) 4242 |
FABRIC REINFORCEMENT | 22,872 | SY |
$1.50 |
$1.70 |
$1.35 |
$1.50 |
$1.00 |
| 18 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 1,592 | TON |
$63.00 |
$80.17 |
$82.00 |
$90.00 |
$95.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,094 | TON |
$58.00 |
$68.83 |
$70.25 |
$88.00 |
$90.00 |
| 20 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 1,062 | TON |
$59.00 |
$84.74 |
$86.50 |
$120.00 |
$115.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,915 | TON |
$60.00 |
$77.60 |
$79.25 |
$96.00 |
$90.00 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 45 | CY |
$20.00 |
$52.50 |
$25.00 |
$25.00 |
$10.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 177 | CY |
$400.00 |
$317.88 |
$360.00 |
$450.00 |
$400.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 356 | CY |
$216.00 |
$285.69 |
$290.00 |
$250.00 |
$325.00 |
| 25 | 511(A) 0332 |
REINFORCING STEEL | 25,686 | LB |
$0.7500 |
$0.7500 |
$0.9500 |
$0.8500 |
$1.00 |
| 26 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 398 | LF |
$20.00 |
$26.18 |
$26.50 |
$25.00 |
$50.00 |
| 27 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 524 | LF |
$30.00 |
$30.85 |
$31.00 |
$30.00 |
$60.00 |
| 28 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 375 | LF |
$10.00 |
$7.46 |
$10.00 |
$5.00 |
$10.00 |
| 29 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 125 | LF |
$9.00 |
$7.46 |
$10.00 |
$5.00 |
$10.00 |
| 30 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$650.00 |
$841.79 |
$850.00 |
$650.00 |
$1,500.00 |
| 31 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 12 | EA |
$750.00 |
$1,055.85 |
$950.00 |
$950.00 |
$1,500.00 |
| 32 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$425.00 |
$351.42 |
$350.00 |
$600.00 |
$1,000.00 |
| 33 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 113 | CY |
$30.00 |
$41.67 |
$40.00 |
$50.00 |
$50.00 |
| 34 | 613(V) 1180 |
TRENCH EXCAVATION | 150 | CY |
$15.00 |
$8.19 |
$6.00 |
$6.00 |
$10.00 |
| 35 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,250.00 |
$10,000.00 |
$10,000.00 |
$25,000.00 |
| 36 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$1,500.00 |
$2,100.00 |
$2,000.00 |
$1,500.00 |
$1,000.00 |
| 37 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 21,069 | SY |
$3.50 |
$1.10 |
$1.25 |
$3.00 |
$3.00 |
| 38 | 619(C) 0924 |
SAWING PAVEMENT | 4,140 | LF |
$2.25 |
$3.15 |
$2.10 |
$5.00 |
$1.00 |
| 39 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 963 | LF |
$17.00 |
$15.33 |
$15.50 |
$20.00 |
$15.00 |
| 40 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$1,950.00 |
$2,152.50 |
$2,100.00 |
$2,200.00 |
$2,000.00 |
| 41 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,265.00 |
$1,359.75 |
$1,600.00 |
$1,900.00 |
$1,500.00 |
| 42 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 5,870 | LF |
$6.00 |
$3.45 |
$6.00 |
$5.00 |
$4.50 |
| 43 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$75.00 |
$3.15 |
$80.48 |
$100.00 |
$100.00 |
| 44 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$125.00 |
$194.25 |
$112.66 |
$125.00 |
$125.00 |
| 45 | 629(C) 4960 |
MAILBOX | 5 | EA |
$25.00 |
$47.25 |
$21.46 |
$30.00 |
$40.00 |
| 46 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$20.00 |
$52.50 |
$21.46 |
$30.00 |
$25.00 |
| 47 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 27 | EA |
$2.00 |
$8.40 |
$15.02 |
$20.00 |
$15.00 |
| 48 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 196 | CY |
$13.00 |
$21.00 |
$50.00 |
$12.00 |
$10.00 |
| 49 | 501(G) 6309 |
CLSM BACKFILL | 298 | CY |
$100.00 |
$126.82 |
$125.00 |
$150.00 |
$125.00 |
| 50 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,395 | LF |
$195.00 |
$206.76 |
$225.00 |
$225.00 |
$200.00 |
| 51 | 504(A) 1304 |
APPROACH SLAB | 313.4 | SY |
$145.00 |
$131.95 |
$150.00 |
$160.00 |
$80.00 |
| 52 | 504(B) 1305 |
SAW-CUT GROOVING | 1,519 | SY |
$4.00 |
$3.78 |
$5.00 |
$4.50 |
$4.00 |
| 53 | 504(C) 6250 |
SEALED EXPANSION JOINT | 47 | LF |
$260.00 |
$302.99 |
$250.00 |
$250.00 |
$250.00 |
| 54 | 504(E) 6190 |
42" F-SHAPED PARAPET | 683.4 | LF |
$70.00 |
$67.25 |
$65.00 |
$75.00 |
$70.00 |
| 55 | 506(A) 1322 |
STRUCTURAL STEEL | 1,560 | LB |
$2.10 |
$3.18 |
$2.50 |
$1.50 |
$4.00 |
| 56 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$2,900.00 |
$2,874.70 |
$1,500.00 |
$2,400.00 |
$2,250.00 |
| 57 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 10 | EA |
$2,900.00 |
$2,874.70 |
$3,000.00 |
$2,400.00 |
$2,250.00 |
| 58 | 509(A) 1326 |
CLASS AA CONCRETE | 353.4 | CY |
$400.00 |
$423.33 |
$400.00 |
$450.00 |
$600.00 |
| 59 | 509(B) 1328 |
CLASS A CONCRETE | 199.2 | CY |
$350.00 |
$417.67 |
$500.00 |
$475.00 |
$550.00 |
| 60 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 96,820 | LB |
$0.9000 |
$0.9700 |
$1.00 |
$1.10 |
$1.25 |
| 61 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 98 | LF |
$30.00 |
$27.41 |
$37.50 |
$35.00 |
$35.00 |
| 62 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 445 | LF |
$35.00 |
$33.60 |
$42.50 |
$45.00 |
$45.00 |
| 63 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 98 | LF |
$15.00 |
$15.75 |
$12.00 |
$15.00 |
$10.00 |
| 64 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 445 | LF |
$17.00 |
$15.75 |
$12.00 |
$15.00 |
$10.00 |
| 65 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,380 | SY |
$3.50 |
$3.68 |
$4.00 |
$5.00 |
$4.00 |
| 66 | 516(A) 6089 |
DRILLED SHAFTS 18" DIAMETER | 18 | LF |
$200.00 |
$163.14 |
$400.00 |
$175.00 |
$250.00 |
| 67 | 516(A) 6091 |
DRILLED SHAFTS 30" DIAMETER | 80 | LF |
$450.00 |
$258.44 |
$500.00 |
$325.00 |
$350.00 |
| 68 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 282 | LF |
$650.00 |
$412.78 |
$600.00 |
$675.00 |
$500.00 |
| 69 | 523(A) 6550 |
SEALER CRACK PREPARATION | 141 | LF |
$4.00 |
$3.15 |
$5.00 |
$6.00 |
$5.00 |
| 70 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$200.00 |
$105.00 |
$150.00 |
$200.00 |
$125.00 |
| 71 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,350 | TON |
$32.00 |
$27.64 |
$29.25 |
$35.00 |
$60.00 |
| 72 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 205 | TON |
$27.00 |
$34.03 |
$24.50 |
$32.00 |
$50.00 |
| 73 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 94 | LF |
$16.00 |
$22.70 |
$20.00 |
$25.00 |
$10.00 |
| 74 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 42 | LF |
$16.00 |
$24.39 |
$20.00 |
$25.00 |
$10.00 |
| 75 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$26,250.00 |
$88,000.00 |
$20,000.00 |
$100,000.00 |
| 76 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 24,800 | LF |
$0.1600 |
$0.1300 |
$0.1600 |
$0.1800 |
$0.2000 |
| 77 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,000 | EA |
$0.5600 |
$0.5300 |
$0.5400 |
$0.6000 |
$0.5000 |
| 78 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 800 | LF |
$0.1400 |
$0.4700 |
$1.07 |
$1.10 |
$1.00 |
| 79 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,800 | SD |
$0.2200 |
$0.2600 |
$2.15 |
$2.25 |
$2.00 |
| 80 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,900 | SD |
$0.6300 |
$0.2600 |
$0.0500 |
$0.0500 |
$0.1000 |
| 81 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,100 | SD |
$0.8500 |
$1.95 |
$2.15 |
$2.25 |
$2.00 |
| 82 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,100 | SD |
$0.4900 |
$0.8400 |
$0.1100 |
$0.1000 |
$0.2000 |
| 83 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$0.7100 |
$2.10 |
$1.07 |
$1.20 |
$1.00 |
| 84 | 880(D) 8854 |
VERTICAL PANELS | 10,500 | SD |
$0.0600 |
$0.0900 |
$0.1100 |
$0.1000 |
$0.1000 |
| 85 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 11,700 | SD |
$0.1100 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1000 |
| 86 | 880(F) 8878 |
DRUMS | 10,200 | SD |
$0.1100 |
$0.1300 |
$0.1100 |
$0.1000 |
$0.1000 |
| 87 | 880(G) 8890 |
CHANNELIZER CONES | 25,800 | SD |
$0.1100 |
$0.0900 |
$0.0500 |
$0.0500 |
$0.1000 |
| 88 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 300 | SD |
$13.05 |
$10.50 |
$5.37 |
$6.00 |
$6.00 |
| 89 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$167.81 |
$105.00 |
$268.26 |
$300.00 |
$300.00 |
| 90 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 45.36 | SF |
$15.08 |
$12.60 |
$12.88 |
$15.00 |
$15.00 |
| 91 | 851(C) 8324 |
2" SQUARE TUBE POST | 109 | LF |
$7.43 |
$8.40 |
$10.73 |
$12.00 |
$15.00 |
| 92 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 15,760 | LF |
$0.4400 |
$0.5800 |
$0.6800 |
$0.6500 |
$0.7000 |
| 93 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$18,250.00 |
$18,500.00 |
$35,000.00 |
$10,000.00 |
| 94 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,625.00 |
$3,500.00 |
$5,500.00 |
$5,000.00 |
| 95 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$6,300.00 |
$15,000.00 |
$5,000.00 |
$10,000.00 |
| 96 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$180,000.00 |
$166,907.13 |
$200,000.00 |
$100,000.00 |
$115,000.00 |