| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$80,000.00 |
$220,000.00 |
$120,000.00 |
$100,000.00 |
$125,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 23,782 | CY |
$3.50 |
$5.50 |
$6.99 |
$5.50 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 9,793 | CY |
$4.00 |
$11.00 |
$6.76 |
$6.50 |
$12.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$25,000.00 |
$22,750.00 |
$45,000.00 |
$30,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 11,300 | LF |
$2.00 |
$1.95 |
$1.36 |
$1.40 |
$3.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 888 | LF |
$9.00 |
$7.50 |
$5.43 |
$5.50 |
$5.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 3,844 | LF |
$2.00 |
$1.40 |
$1.25 |
$1.25 |
$1.15 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 50,720 | SY |
$1.60 |
$1.40 |
$1.12 |
$1.15 |
$1.03 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.7 | AC |
$350.00 |
$350.00 |
$300.00 |
$375.00 |
$275.00 |
| 10 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 5,722 | CY |
$38.00 |
$52.00 |
$48.02 |
$43.00 |
$46.80 |
| 11 | 310(B) 0149 |
SUBGRADE, METHOD B | 21,168 | SY |
$6.00 |
$1.15 |
$4.00 |
$2.00 |
$3.00 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 21,580 | SY |
$2.00 |
$1.25 |
$1.59 |
$2.00 |
$2.25 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 962 | TON |
$40.00 |
$27.25 |
$24.10 |
$25.00 |
$24.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,795 | TON |
$65.00 |
$74.00 |
$76.30 |
$72.00 |
$70.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,910 | TON |
$70.00 |
$81.00 |
$82.77 |
$84.00 |
$76.85 |
| 16 | 509(B) 0321 |
CLASS A CONCRETE | 5 | CY |
$425.00 |
$900.00 |
$670.00 |
$500.00 |
$700.00 |
| 17 | 509(D) 1331 |
CLASS C CONCRETE | 242 | CY |
$225.00 |
$220.00 |
$250.00 |
$270.00 |
$240.00 |
| 18 | 511(A) 0332 |
REINFORCING STEEL | 350 | LB |
$2.00 |
$1.25 |
$1.05 |
$2.00 |
$1.00 |
| 19 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,064 | TON |
$45.00 |
$37.50 |
$28.26 |
$37.00 |
$40.00 |
| 20 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 411 | TON |
$42.00 |
$29.00 |
$24.80 |
$37.00 |
$34.00 |
| 21 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,627 | SY |
$2.00 |
$1.35 |
$2.98 |
$29.00 |
$8.00 |
| 22 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 2 | EA |
$1,500.00 |
$2,000.00 |
$2,658.34 |
$1,250.00 |
$1,800.00 |
| 23 | 611(H) 5196 |
ADDITIONAL DEPTH IN INLET | 3 | VF |
$250.00 |
$300.00 |
$245.91 |
$200.00 |
$350.00 |
| 24 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 267 | LF |
$60.00 |
$47.50 |
$49.78 |
$42.00 |
$51.00 |
| 25 | 613(A) 0583 |
24" R.C.PIPE CLASS IV | 128 | LF |
$70.00 |
$50.00 |
$52.25 |
$63.00 |
$59.00 |
| 26 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 681 | LF |
$30.00 |
$27.50 |
$23.09 |
$25.00 |
$24.00 |
| 27 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 646 | LF |
$50.00 |
$32.50 |
$28.20 |
$28.00 |
$27.00 |
| 28 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 7 | EA |
$740.00 |
$600.00 |
$732.89 |
$150.00 |
$780.00 |
| 29 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 26 | EA |
$775.00 |
$900.00 |
$750.00 |
$850.00 |
$601.00 |
| 30 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 24 | EA |
$1,100.00 |
$950.00 |
$800.00 |
$850.00 |
$887.00 |
| 31 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 153 | CY |
$20.00 |
$47.50 |
$55.38 |
$42.00 |
$28.00 |
| 32 | 613(V) 1180 |
TRENCH EXCAVATION | 235 | CY |
$20.00 |
$10.00 |
$19.56 |
$25.00 |
$10.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$25,000.00 |
$7,215.25 |
$40,000.00 |
$30,000.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,779 | SY |
$5.00 |
$2.00 |
$2.74 |
$3.50 |
$3.00 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 131 | LF |
$4.00 |
$4.00 |
$5.43 |
$5.00 |
$6.00 |
| 36 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 440 | CY |
$7.00 |
$8.00 |
$10.00 |
$7.00 |
$2.00 |
| 37 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 110 | CY |
$35.00 |
$20.00 |
$15.00 |
$10.00 |
$30.00 |
| 38 | 509(B) 1328 |
CLASS A CONCRETE | 280 | CY |
$275.00 |
$350.00 |
$320.00 |
$400.00 |
$366.00 |
| 39 | 511(A) 1332 |
REINFORCING STEEL | 29,340 | LB |
$0.8500 |
$0.8000 |
$0.8800 |
$1.00 |
$0.7500 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,070 | TON |
$38.00 |
$37.50 |
$28.26 |
$37.00 |
$37.00 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 225 | TON |
$35.00 |
$29.00 |
$24.80 |
$29.00 |
$31.00 |
| 42 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 898 | SY |
$2.00 |
$1.35 |
$2.98 |
$2.50 |
$8.00 |
| 43 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 240 | CY |
$27.00 |
$40.00 |
$10.85 |
$10.00 |
$15.00 |
| 44 | 501(G) 6309 |
CLSM BACKFILL | 148 | CY |
$120.00 |
$105.00 |
$136.71 |
$100.00 |
$125.00 |
| 45 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 5,208 | LF |
$250.00 |
$265.00 |
$280.00 |
$328.00 |
$272.00 |
| 46 | 504 6176 |
INSERTS | 280 | EA |
$45.00 |
$25.00 |
$41.18 |
$42.00 |
$25.00 |
| 47 | 504(A) 1304 |
APPROACH SLAB | 142 | SY |
$160.00 |
$160.00 |
$150.00 |
$220.00 |
$175.00 |
| 48 | 504(C) 6250 |
SEALED EXPANSION JOINT | 212 | LF |
$200.00 |
$232.50 |
$306.35 |
$275.00 |
$200.00 |
| 49 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 2,688 | LF |
$60.00 |
$57.50 |
$60.00 |
$65.00 |
$75.00 |
| 50 | 506(A) 1322 |
STRUCTURAL STEEL | 8,820 | LB |
$2.80 |
$2.00 |
$3.16 |
$3.00 |
$3.00 |
| 51 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 40 | EA |
$700.00 |
$1,000.00 |
$1,074.15 |
$1,000.00 |
$1,500.00 |
| 52 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 32 | EA |
$900.00 |
$1,000.00 |
$1,106.70 |
$1,000.00 |
$1,500.00 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 1,370 | CY |
$425.00 |
$375.00 |
$450.00 |
$450.00 |
$450.00 |
| 54 | 509(B) 1328 |
CLASS A CONCRETE | 392 | CY |
$425.00 |
$600.00 |
$500.00 |
$450.00 |
$550.00 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 285,570 | LB |
$0.8500 |
$0.9000 |
$0.9500 |
$0.9000 |
$1.00 |
| 56 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 76,030 | LB |
$0.9000 |
$0.9000 |
$0.8400 |
$1.00 |
$1.00 |
| 57 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 179 | LF |
$37.00 |
$40.00 |
$24.43 |
$38.00 |
$35.00 |
| 58 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 693 | LF |
$48.00 |
$45.00 |
$30.29 |
$45.00 |
$40.00 |
| 59 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 179 | LF |
$13.00 |
$11.00 |
$10.85 |
$17.00 |
$17.00 |
| 60 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 693 | LF |
$12.00 |
$11.00 |
$10.85 |
$20.00 |
$18.00 |
| 61 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 456 | SY |
$3.00 |
$6.00 |
$5.43 |
$4.00 |
$5.00 |
| 62 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 752 | LF |
$800.00 |
$550.00 |
$635.40 |
$1,200.00 |
$2,000.00 |
| 63 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 5,150 | TON |
$38.00 |
$37.50 |
$28.26 |
$37.00 |
$30.00 |
| 64 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 1,260 | TON |
$35.00 |
$29.00 |
$24.80 |
$29.00 |
$28.00 |
| 65 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 4,849 | SY |
$2.00 |
$1.35 |
$2.98 |
$2.50 |
$2.00 |
| 66 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$22.00 |
$22.00 |
$24.15 |
$24.00 |
$20.00 |
| 67 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$22.00 |
$20.00 |
$26.04 |
$24.00 |
$20.00 |
| 68 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$500,000.00 |
$70,000.00 |
$185,000.00 |
$500,000.00 |
$100,000.00 |
| 69 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,083 | LF |
$18.00 |
$17.00 |
$17.36 |
$18.00 |
$14.35 |
| 70 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,700.00 |
$1,350.00 |
$1,356.25 |
$1,375.00 |
$1,621.00 |
| 71 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,325.00 |
$2,300.00 |
$2,359.88 |
$2,400.00 |
$1,905.00 |
| 72 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 71 | SF |
$20.00 |
$16.00 |
$16.28 |
$17.00 |
$15.00 |
| 73 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 220 | LF |
$8.50 |
$11.00 |
$10.85 |
$11.00 |
$10.00 |
| 74 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 13 | EA |
$25.00 |
$17.50 |
$17.36 |
$17.00 |
$16.00 |
| 75 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 43,464 | LF |
$0.5500 |
$0.5500 |
$0.5700 |
$0.5800 |
$0.5200 |
| 76 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 65 | LF |
$3.30 |
$11.00 |
$10.85 |
$3.50 |
$10.00 |
| 77 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$13,000.00 |
$13,020.00 |
$22,000.00 |
$15,000.00 |
| 78 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$40,253.50 |
$41,000.00 |
$40,000.00 |
| 79 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$5,000.00 |
$5,425.00 |
$5,000.00 |
$5,000.00 |
| 80 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$238,000.00 |
$300,000.00 |
$190,000.00 |
$250,000.00 |
$285,000.00 |