Filtered by: District: District 8 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 20, 2023 | 76R68 | MadisonDistrict 8 | Pavement patching on the ramps at I-255 and I-55/70 interchange. | — | Executed | Keeley & Sons, Inc. $396,963 · | ||
| Jan 20, 2023 | 76R70 | MadisonDistrict 8 | Partial and full depth patching on IL 160 from John Street in Grantfork to US 4. | — | Executed | Christ Bros. Asphalt, Inc. $544,881 · | ||
| Jan 20, 2023 | 76R71 | MadisonDistrict 8 | Partial and full depth patching on IL 3 from McKinley Bridge to New Poag Road. | — | Executed | Kinney Contractors, Inc. $516,396 · | ||
| Jan 20, 2023 | 76R86 | ClintonDistrict 8 | 160- of HMA surface removal and overlay on eastbound I-64 over Sugar Creek Overflow and Sugar Creek, west of Damiansville. (SN 014-0040 and SN 014-0042) | — | Executed | The Kilian Corporation $101,479 · | ||
| Jan 20, 2023 | 97785 | MadisonDistrict 8 | Reconstruct North Buchanan Street from East Union Street to Hillsboro Avenue in Edwaardsville. | — | Executed | Stutz Excavating, Inc. $1,291,558 · | ||
| Jan 20, 2023 | 97787 | MadisonDistrict 8 | Reconstruction of clay Street from North Main Street to North Dewey Street in Troy. | — | Rejected | Baxmeyer Construction, Inc. $1,536,288 · | ||
| Jan 20, 2023 | 97791 | MarionDistrict 8 | Pulverize and regarde existing pavement, aggregate base, HMA resurfacing, aggregate shoulders, pipe culverts, curb and gutter, and pavment markings on Gragg Street from Lincoln Boulevard to Country Club Road in Centralia. | — | Executed | Guinzy Construction,Inc. $1,778,437 · | ||
| Jan 20, 2023 | 97794 | St. ClairDistrict 8 | Resurfacing, curb and gutter replacement, sidewalks, and pavement markings on State Street/Old Vincennes Trail from Smiley Street to Scott Troy Road in O'Fallon. | — | Executed | The Kilian Corporation $987,743 · | ||
| Jan 20, 2023 | 97796 | JerseyDistrict 8 | Resurfcing, HMA shoulder widening, pipe under-drains, shoulder and centerline rumble strips, reshaping fore slopes, guardrail, and pavement markings on Otterville Road from IL 16 to Main Street in Otterville. | — | Executed | Charles E. Mahoney Co. $4,204,411 · | ||
| Jan 20, 2023 | 97797 | MonroeDistrict 8 | Replace the bridge carrying CH 12 over a drainage canal located 0.10 mile west of the Valmeyer corporate limits. | — | Executed | Keeley & Sons, Inc. $699,925 · | ||
| Mar 10, 2023 | 76M44 | ClintonDistrict 8 | Culvert replacement on Old US 50, 0.5 miles west of IL 160. (SN 014-2435) | — | Executed | Stutz Excavating, Inc. $141,088 · | ||
| Mar 10, 2023 | 76M53 | St. ClairDistrict 8 | 0.9 miles of resurfacing and ADA upgrades on IL 159 from Alexa Drive to 0.1 miles south of Douglas in Belleville. | — | Executed | The Kilian Corporation $2,891,486 · | ||
| Mar 10, 2023 | 76N83 | MadisonDistrict 8 | 0.59 miles of standard overlay and ADA improvements on IL 140 from Monument Avenue to Terra Drive in Alton. | — | Executed | Charles E. Mahoney Co. $1,689,154 · | ||
| Mar 10, 2023 | 76R42 | MarionDistrict 8 | 7.2 miles of crack and joint sealing on US 50 from 0.1 miles west of Metcalf Road to the Clay County line. | — | Executed | Freehill Asphalt, Inc. $101,522 · | ||
| Mar 10, 2023 | 76R45 | JerseyDistrict 8 | Crack and joint sealing on IL 3 from 0.1 miles north of Grafton Hills Drive in Grafton to IL 109. | — | Executed | Freehill Asphalt, Inc. $145,017 · | ||
| Mar 10, 2023 | 76R48 | St. ClairDistrict 8 | 4.7 miles of patching along I-64 from 0.5 miles west of IL 159 in Fairview Heights to 0.5 miles east of Greenmount Road in O-Fallon. | — | Executed | Christ Bros. Asphalt, Inc. $1,321,723 · | ||
| Mar 10, 2023 | 76R51 | St. ClairDistrict 8 | Mixer replacement at the Bowman Pump Station on Exchange Avenue in East St. Louis. | — | Executed | Haier Plumbing and Heating, Inc. $180,000 · | ||
| Mar 10, 2023 | 76R62 | MarionDistrict 8 | Resurfacing ramps at the I-57 and US 50 interchange. | — | Executed | Howell Paving, Inc. $889,143 · | ||
| Mar 10, 2023 | 76R81 | MadisonDistrict 8 | Bridge painting on SN 060-0210 carrying IL 4 over US 40 and a railroad, approximately 1.5 miles west of St. Jacob. | — | Executed | Civil Coatings and Construction Inc. $631,797 · | ||
| Mar 10, 2023 | 76R87 | MadisonSt. ClairDistrict 8 | Dynamic message sign replacement at various locations in Madison and St. Clair Counties. | — | Rejected | Wissehr Electric, Inc. $587,933 · | ||
| Mar 10, 2023 | 76R88 | VariousDistrict 8 | Highway lighting and traffic signal repair and maintenance at various locations throughout District 8. | — | Executed | Electrico, Inc. $1,181,335 · | ||
| Mar 10, 2023 | 97788 | St. ClairDistrict 8 | Reconstruction of Frank Scott Parkway West to establish left turn lanes. | — | Executed | Christ Bros. Asphalt, Inc. $299,566 · | ||
| Mar 10, 2023 | 97799 | St. ClairDistrict 8 | Replace existing structure carrying Simmons Road over Ogle Creek with a single span, PPC deck beam bridge with bituminous waterproofing system, HMA wearing surface and approach, and traffic barrier terminals in O'Fallon. | — | Executed | C-Hill Civil Contractors, Inc. and Sierra Bravo, LLC JV $1,106,940 · | ||
| Apr 28, 2023 | 76K86 | St. ClairDistrict 8 | Deck sealing on the Martin Luther King Bridge (SN 082-6001) carrying Illinois Avenue over the Mississippi River. | — | Executed | M & M Concrete, Inc. $78,829 · | ||
| Apr 28, 2023 | 76M82 | MadisonDistrict 8 | 1.7 miles of resurfacing and ADA improvements on IL 111 from 0.1 miles south of Pontoon Road to 0.1 miles south of Horseshoe Lake Road. | — | Executed | The Kilian Corporation $3,603,769 · | ||
| Apr 28, 2023 | 76M83 | MadisonDistrict 8 | 4.6 miles of resurfacing, ADA improvements and intersection improvements on IL 157 from St. Louis Street to South University Drive in Edwardsville. | — | Executed | Christ Bros. Asphalt, Inc. $8,186,958 · | ||
| Apr 28, 2023 | 76R41 | MarionDistrict 8 | 1.5 miles of pavement patching with ultra-thin bonded wearing course on IL 161 from Beech Street to Pleasant Avenue. | — | Rejected | |||
| Apr 28, 2023 | 76R60 | VariousDistrict 8 | Applying oil and chip at various maintenance yards in District 8. | — | Executed | DMS Contracting, Inc. $719,392 · | ||
| Apr 28, 2023 | 76R63 | MadisonDistrict 8 | Bridge joint repair and replacement on SN 060-0077 carrying US 40 over Silver Creek, 1.6 miles west of IL 4. | — | Executed | Keeley & Sons, Inc. $1,048,120 · | ||
| Apr 28, 2023 | 76R72 | JerseyDistrict 8 | 1.3 miles of partial and full depth patching on IL 16 from Mounds Street in Jerseyville to 1.3 miles east of Mounds Street. | — | Executed | Christ Bros. Asphalt, Inc. $267,960 · | ||
| Apr 28, 2023 | 76R75 | BondDistrict 8 | Resurfacing and patching on Pocahontas Avenue / Freys Meadow from Pokey Road to 1 mile west of Pokey Road. | — | Executed | The Kilian Corporation $272,518 · | ||
| Apr 28, 2023 | 76R76 | ClintonDistrict 8 | 0.8 miles of patching and resurfacing along Collins Street/Huey Road/County Highway 4 from US 50 to 0.2 miles south of Sherman Street. | — | Executed | Howell Paving, Inc. $413,967 · | ||
| Apr 28, 2023 | 76R90 | MadisonDistrict 8 | 19.6 miles of intermittent pavement patching on I-55 and its connecting ramps from I-270 to the Macoupin County line. | — | Executed | Keeley & Sons, Inc. $589,483 · | ||
| Apr 28, 2023 | 97782 | WashingtonDistrict 8 | Replace existing structure with a single span precast, prestressed concrete deck beam bridge with approach to carry Hoover Road over Archie Creek. | — | Executed | Lake Contracting, Inc. $319,999 · | ||
| Apr 28, 2023 | 97795 | St. ClairDistrict 8 | HMA resurfacing with ADA improvements on Lebanon Avenue from F Street to IL 161 in Belleville. | — | Executed | Christ Bros. Asphalt, Inc. $1,482,045 · | ||
| Apr 28, 2023 | 97798 | MonroeDistrict 8 | Construct a shared-use path along Centerville Road from Main Street to Ferkel Street to Cherry in Columbia. | — | Executed | DMS Contracting, Inc. $355,694 · | ||
| Apr 28, 2023 | 97802 | WashingtonDistrict 8 | HMA resurfacing with reflective crack control treatment on CH 10 from IL 153 to the east corporate limits of Elkton. | — | Executed | The Kilian Corporation $1,346,483 · | ||
| Jun 16, 2023 | 76L18 | GreeneDistrict 8 | 9.9 miles of resurfacing and ADA improvements on IL 267 from the Jersey County line to SN 031-0044, 0.4 miles south of Short Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $11,557,794 · | ||
| Jun 16, 2023 | 76L48 | St. ClairDistrict 8 | Pump replacement at the Keller Pump Station on I-255 south of Collinsville Road. | — | Executed | Davinroy Mechanical Contractor, Inc. $182,000 · | ||
| Jun 16, 2023 | 76M86 | St. ClairDistrict 8 | Lighting on I-55/70/64 from the Mississippi River to east of the I-64 (Tri-Level) Interchange. | — | Rejected | Gerstner Electric, Inc. $8,855,930 · | ||
| Jun 16, 2023 | 76P08 | St. ClairDistrict 8 | Storm water pump station rehab at the 25th Street Pump Station south of I-64. | — | Executed | Haier Plumbing and Heating, Inc. $2,785,320 · | ||
| Jun 16, 2023 | 76P65 | St. ClairDistrict 8 | 1.5 miles of resurfacing and ADA improvements on US 50 from 0.1 miles west of Schantz Road to Anne Avenue in O-Fallon. | — | Executed | Christ Bros. Asphalt, Inc. $2,744,682 · | ||
| Jun 16, 2023 | 76R00 | St. ClairDistrict 8 | New wiring and LED luminaires on I-255 at I-64. | — | Executed | Electrico, Inc. $932,109 · | ||
| Jun 16, 2023 | 76R01 | St. ClairDistrict 8 | New wiring and LED luminaires on I-255 at IL 15. | — | Executed | Electrico, Inc. $862,601 · | ||
| Jun 16, 2023 | 76R38 | BondDistrict 8 | 4.8 miles of crack and joint seal on I-70 from BN Railroad to the Fayette County line. | — | Executed | Complete Asphalt Service Co. $116,268 · | ||
| Jun 16, 2023 | 76R40 | MadisonDistrict 8 | 10 miles of resurfacing on IL 255 from IL 143 to 0.1 miles north of Seminary Road. | — | Executed | The Kilian Corporation $15,205,837 · | ||
| Jun 16, 2023 | 76R50 | VariousDistrict 8 | Pavement patching at various locations throughout District 8. | — | Executed | Keeley & Sons, Inc. $1,706,661 · | ||
| Jun 16, 2023 | 76R52 | VariousDistrict 8 | Highway lighting, traffic signal repair and maintenance at various locations throughout District 8. | — | Executed | Electrico, Inc. $1,529,701 · | ||
| Jun 16, 2023 | 76R53 | VariousDistrict 8 | Guardrail and cable median repair at various locations in District 8. | — | Executed | Illini Excavation & Reclamation, Inc. $3,352,376 · | ||
| Jun 16, 2023 | 76R54 | VariousDistrict 8 | Maintain and service all ITS equipment at various locations throughout District 8. | — | Executed | Electrico, Inc. $428,536 · | ||
| Jun 16, 2023 | 76R58 | RandolphDistrict 8 | Patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River to the Perry County line. | — | Executed | Keeley & Sons, Inc. $1,148,499 · | ||
| Jun 16, 2023 | 76R69 | MadisonDistrict 8 | Patching on the I-270 eastbound collector distributor at the I-270 and I-255 interchange. | — | Executed | The Kilian Corporation $201,360 · | ||
| Jun 16, 2023 | 76R73 | St. ClairDistrict 8 | 2.4 miles of patching on 6th Street from IL 161 to IL 177 in Mascoutah. | — | Executed | Kinney Contractors, Inc. $997,922 · | ||
| Jun 16, 2023 | 76R74 | ClintonDistrict 8 | Pavement patching and resurfacing on the ramp between US 50 and St. Rose Road. | — | Executed | Christ Bros. Asphalt, Inc. $263,913 · | ||
| Jun 16, 2023 | 76R80 | St. ClairDistrict 8 | Painting on SN 082-0144 at the Poplar Street Bridge Complex on I-55 / I-64. | — | Executed | Eagle Painting & Maintenance Company, Inc. $432,000 · | ||
| Jun 16, 2023 | 76R83 | WashingtonDistrict 8 | 8 miles of patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line. | — | Executed | The Kilian Corporation $2,704,152 · | ||
| Jun 16, 2023 | 76R92 | RandolphDistrict 8 | Bridge painting on SN 079-0036 carrying IL 3 over the Kaskaskia River. | — | Executed | Civil Coatings and Construction Inc. $1,432,548 · | ||
| Jun 16, 2023 | 76R93 | St. ClairDistrict 8 | Bridge joint replacement / repair on SN 082-0017 carrying I-55 / 70 over BandO, Conrail and TRRA Railroad in East St. Louis. | — | Executed | Keeley & Sons, Inc. $1,292,571 · | ||
| Jun 16, 2023 | 76T02 | VariousDistrict 8 | Pump station security project at various District 8 pump stations in various counties. | — | Executed | Pyramid Electrical Contractors, Inc. $451,300 · | ||
| Jun 16, 2023 | 76T05 | VariousDistrict 8 | Tree removal in various counties of District 8. | — | Rejected | Thor General Contracting LLC $126,725 · | ||
| Jun 16, 2023 | 76T08 | St. ClairDistrict 8 | 0.5 miles of pavement patching on 26th Street (CH 52) from IL 15 to Bond Avenue in East St. Louis. | — | Executed | Keeley & Sons, Inc. $154,903 · | ||
| Jun 16, 2023 | 76T12 | St. ClairDistrict 8 | Pump replacement at the Bowman Pump Station in East St. Louis, on the north side of I-70, at 728 Exchange Avenue. | — | Executed | Haier Plumbing and Heating, Inc. $346,610 · | ||
| Jun 16, 2023 | 97713 | MadisonDistrict 8 | Replace existing structure with a single span steel beam structure with poured concrete deck, aggregate approaches and guardrail on Silver Creek Road over a branch of Silver Creek. | — | Executed | Keller Construction, Inc. $1,097,790 · | ||
| Jun 16, 2023 | 97770 | MonroeDistrict 8 | Roadway reconstruction on Moore Street from IL 3 to 0.2 mile north of Columbia Avenue in Waterloo. | — | Executed | Baxmeyer Construction, Inc. $1,197,128 · | ||
| Jun 16, 2023 | 97800 | JerseyDistrict 8 | Full depth pavement reconstruction, storm sewer, combination curb and gutter, sidewalk, and pavement markings on Hollow Avenue from Hickory Street to Westlake Drive in Jerseyville. | — | Executed | Stutz Excavating, Inc. $2,034,135 · | ||
| Jun 16, 2023 | 97801 | MadisonDistrict 8 | Construction of a Shared-Use Path along Rock Springs Drive from Memorial Drive to Brown Street, and along College Avenue at the intersection of Rock Springs Drive in Alton. | — | Executed | Stutz Excavating, Inc. $642,226 · | ||
| Jun 16, 2023 | 97803 | St. ClairDistrict 8 | Resurfacing Market Place from east of Commerce Drive to west of Lanaghan Drive in Fairview. | — | Rejected | Stutz Excavating, Inc. $533,207 · | ||
| Jun 16, 2023 | 97804 | MonroeDistrict 8 | HMA Resurfacing and shoulders with rumble strips on Floraville Road from the Waterloo Corporate Limits to the St. Clair County Line. | — | Executed | Christ Bros. Asphalt, Inc. $1,435,980 · | ||
| Jun 16, 2023 | 97806 | MadisonDistrict 8 | HMA resurfacing, curb and gutter, driveways, storm sewers, and pavement markings on University Drive from IL 157 to Devon Court in Edwardsville. | — | Executed | Stutz Excavating, Inc. $842,773 · | ||
| Jun 16, 2023 | 97812 | St. ClairDistrict 8 | Replace existing structure with a three-span PPC deck beam bridge with concrete wearing surface, approach slabs, HMA approach pavement, and traffic barrier terminals, on IMBS Station Road over Prairie DuPont Creek, 2.0 miles west of IL 163. | — | Executed | C-Hill Civil Contractors, Inc. $1,717,889 · | ||
| Jun 16, 2023 | 97813 | St. ClairDistrict 8 | Resurfacing Sullivan Drive from south of Frank Scott Parkway to Huntwood Drive. | — | Executed | The Kilian Corporation $1,263,097 · | ||
| Aug 4, 2023 | 76L29 | MarionDistrict 8 | 2.7 miles of patching, ultra-thin bonded wearing course and ADA improvements IL 161 from Beech Street to Pleasant Avenue in Centralia. | — | Executed | The Kilian Corporation $4,015,807 · | ||
| Aug 4, 2023 | 76P67 | MadisonSt. ClairDistrict 8 | Installation of 2 dynamic message signs on butterfly trusses and fiber optic on northbound I-255 at mile marker 7.6 and southbound I-255 at mile marker 27.1. | — | Executed | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $3,386,988 · | ||
| Aug 4, 2023 | 76R27 | MadisonDistrict 8 | Lighting upgrades on I-55 at IL 140. | — | Executed | Gerstner Electric, Inc. $577,727 · | ||
| Aug 4, 2023 | 76R47 | MadisonDistrict 8 | Median removal and replacement on US 67 (Landmark Boulevard), near the intersection of Broadway Street, in Alton. | — | Executed | Stutz Excavating, Inc. $143,115 · | ||
| Aug 4, 2023 | 76R65 | RandolphDistrict 8 | Bridge deck overlay and bridge deck repairs on SN 079-0032 carrying IL 155 over a stream east of Bluff Road in Prairie Du Rocher. | — | Executed | Keeley & Sons, Inc. $554,302 · | ||
| Aug 4, 2023 | 76R82 | GreeneDistrict 8 | 0.09 miles of pavement patching on US 67 from Palm Street to Clay Street in Roodhouse. | — | Executed | G. M. Sipes Construction, Inc. $338,723 · | ||
| Aug 4, 2023 | 76R98 | VariousDistrict 8 | Weed spraying for Johnson Grass along various interstates throughout District 8. | — | Executed | The Daltons Inc. $121,088 · | ||
| Aug 4, 2023 | 76T09 | MadisonDistrict 8 | 9.6 miles of patching and resurfacing on IL 4 from 0.37 miles south of I-55 to IL 143. | — | Executed | Christ Bros. Asphalt, Inc. $4,788,328 · | ||
| Aug 4, 2023 | 97805 | BondDistrict 8 | Sidewalk Construction along various routes in Greenville. | — | Executed | DMS Contracting, Inc. $377,775 · | ||
| Aug 4, 2023 | 97810 | MonroeDistrict 8 | HMA Resurfacing with PCC Base Course widening, storm sewers, curb and gutter, and ADA Ramps on Ghent Road from south of Palmer Road to Christina Court in Columbia | — | Executed | DMS Contracting, Inc. $1,215,909 · | ||
| Aug 4, 2023 | 97811 | MadisonDistrict 8 | Construction of a Shared-Use Path along Erwin Plegge Boulevard, from Old Bethalto Road to Ashbrook Street in Bethalto. | — | Executed | Baxmeyer Construction, Inc. $907,108 · | ||
| Sep 22, 2023 | 76J97 | WashingtonDistrict 8 | 0.29 miles; Bridge replacement over Lunte Creek, 3.6 miles west of IL 127. | — | Executed | Plocher Construction Company, Inc. $1,919,510 · | ||
| Sep 22, 2023 | 76M43 | JerseyDistrict 8 | Culvert repairs on SN 042-2417 carrying Old US 67 over a Tributary to Little Piasa Creek, 0.1 miles north of New Delhi Road. | — | Executed | Stutz Excavating, Inc. $574,652 · | ||
| Sep 22, 2023 | 76P57 | MonroeDistrict 8 | 1.6 miles of resurfacing on Market Street / IL 156 in Waterloo from 0.1 miles north of Plaza Drive to IL 156 South Junction. | — | Executed | Christ Bros. Asphalt, Inc. $2,271,959 · | ||
| Sep 22, 2023 | 76R55 | VariousDistrict 8 | Repair and maintenance of electrical equipment at various pump stations at various locations in District 8. | — | Executed | Electrico, Inc. $169,753 · | ||
| Sep 22, 2023 | 76R56 | CalhounDistrict 8 | Repair and maintenance of electrical equipment at the Joe Page Bridge in Hardin (SN 031-0001). | — | Active | |||
| Sep 22, 2023 | 76R57 | MadisonSt. ClairDistrict 8 | Well treatment at various locations in East St. Louis and Venice. | — | Executed | Layne Christensen Company $856,535 · | ||
| Sep 22, 2023 | 76R64 | ClintonDistrict 8 | Bridge joint replacement and repair on SN 014-0015 carrying IL 127 over NS Railroad, 0.2 miles north of IL 161. | — | Executed | Keeley & Sons, Inc. $429,291 · | ||
| Nov 17, 2023 | 46629 | MadisonSt. ClairDistrict 8 | Installation of new ground-mounted signs on various routes in Madison and St. Clair Counties. | — | Executed | Kujo, Inc. $358,351 · | ||
| Nov 17, 2023 | 76M88 | WashingtonDistrict 8 | Culvert replacement on IL 127 at South Middle Tributary of Locust Creek, 6.7 miles south of IL 15 and the town of Nashville. (SN 095-2496) | — | Executed | E. T. Simonds Construction Company $747,934 · | ||
| Nov 17, 2023 | 76M90 | WashingtonDistrict 8 | Culvert replacement on IL 177 at West Tributary to Grand Point, 0.5 miles east of Hoyleton. (SN 095-2496) | — | Executed | Guinzy Construction,Inc. $490,747 · | ||
| Nov 17, 2023 | 76N16 | MadisonDistrict 8 | Bridge repairs, flood wall work and pavement reconstruction on IL 11 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270. | — | Executed | The Kilian Corporation $1,832,257 · | ||
| Nov 17, 2023 | 76N43 | MadisonDistrict 8 | Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City. | — | Executed | Baxmeyer Construction, Inc. $7,285,268 · | ||
| Nov 17, 2023 | 76T01 | VariousDistrict 8 | Traffic signal modernization at various locations within District 8. | — | Executed | Gerstner Electric, Inc. $1,564,128 · | ||
| Nov 17, 2023 | 76T39 | St. ClairDistrict 8 | 1.96 miles of patching and a standard overlay on I-55/64/US 40 from 0.9 miles east of the Mississippi River to I-64 (Tri-Level) Interchange in East St. Louis | — | Executed | The Kilian Corporation $5,220,980 · | ||
| Nov 17, 2023 | 97790 | MadisonDistrict 8 | Reconstruction of Lebanon Road on new alignment to facilitate closure of two underpass structures. Work includes structure removal, construction of a 6-span steel plate girder bridge, construction of a 1-span PC slabl bridge, box culverts, pavement removal, building removal, processing lime modified soil, PPC Pavement, HMA Pavement, HMA shoulders, combination curb and gutter, and storm sewer. Located 0.19 miles east of Clay School Road to 0.16 miles of Locmann Road over the CSX Railroad. | — | Executed | Keller Construction, Inc. $17,444,384 · | ||
| Nov 17, 2023 | 97793 | MadisonDistrict 8 | Reconstruction of the IL 159 and Glen Carbon Road intersection to establish north bound and east bound right turn lanes. Includes, HMA resurfacing, sidewalks, ADA ramps, traffic signal modifications, and drainage improvements. Located in Glen Carbon. | — | Rejected | Keller Construction, Inc. $1,439,471 · | ||
| Nov 17, 2023 | 97815 | St. ClairDistrict 8 | Resurfacing Jerome Lane from Nash Street to Range Lane in Cahokia. | — | Executed | Christ Bros. Asphalt, Inc. $897,940 · | ||
| Nov 17, 2023 | 97817 | St. ClairDistrict 8 | Construction of a PCC sidewalk from the Boul Avenue Trailhead entrance to the intersection of Boul Avenue and IL 159 in Swansea. | — | Rejected |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.