IDOT Jobs

All dates · 1,073 jobs · $3,468,536,000 Sign up free
★ My Jobs

Filtered by: District: District 8 Clear all

1,073 jobs · $3,468,536,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 20, 2023 76R68 MadisonDistrict 8 Pavement patching on the ramps at I-255 and I-55/70 interchange. — Executed Nov 26 New Keeley & Sons, Inc. $396,963 ·
Jan 20, 2023 76R70 MadisonDistrict 8 Partial and full depth patching on IL 160 from John Street in Grantfork to US 4. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $544,881 ·
Jan 20, 2023 76R71 MadisonDistrict 8 Partial and full depth patching on IL 3 from McKinley Bridge to New Poag Road. — Executed Nov 26 New Kinney Contractors, Inc. $516,396 ·
Jan 20, 2023 76R86 ClintonDistrict 8 160- of HMA surface removal and overlay on eastbound I-64 over Sugar Creek Overflow and Sugar Creek, west of Damiansville. (SN 014-0040 and SN 014-0042) — Executed Nov 26 New The Kilian Corporation $101,479 ·
Jan 20, 2023 97785 MadisonDistrict 8 Reconstruct North Buchanan Street from East Union Street to Hillsboro Avenue in Edwaardsville. — Executed Nov 26 New Stutz Excavating, Inc. $1,291,558 ·
Jan 20, 2023 97787 MadisonDistrict 8 Reconstruction of clay Street from North Main Street to North Dewey Street in Troy. — Rejected Nov 26 New Baxmeyer Construction, Inc. $1,536,288 ·
Jan 20, 2023 97791 MarionDistrict 8 Pulverize and regarde existing pavement, aggregate base, HMA resurfacing, aggregate shoulders, pipe culverts, curb and gutter, and pavment markings on Gragg Street from Lincoln Boulevard to Country Club Road in Centralia. — Executed Nov 26 New Guinzy Construction,Inc. $1,778,437 ·
Jan 20, 2023 97794 St. ClairDistrict 8 Resurfacing, curb and gutter replacement, sidewalks, and pavement markings on State Street/Old Vincennes Trail from Smiley Street to Scott Troy Road in O'Fallon. — Executed Nov 26 New The Kilian Corporation $987,743 ·
Jan 20, 2023 97796 JerseyDistrict 8 Resurfcing, HMA shoulder widening, pipe under-drains, shoulder and centerline rumble strips, reshaping fore slopes, guardrail, and pavement markings on Otterville Road from IL 16 to Main Street in Otterville. — Executed Nov 26 New Charles E. Mahoney Co. $4,204,411 ·
Jan 20, 2023 97797 MonroeDistrict 8 Replace the bridge carrying CH 12 over a drainage canal located 0.10 mile west of the Valmeyer corporate limits. — Executed Nov 26 New Keeley & Sons, Inc. $699,925 ·
Mar 10, 2023 76M44 ClintonDistrict 8 Culvert replacement on Old US 50, 0.5 miles west of IL 160. (SN 014-2435) — Executed Nov 26 New Stutz Excavating, Inc. $141,088 ·
Mar 10, 2023 76M53 St. ClairDistrict 8 0.9 miles of resurfacing and ADA upgrades on IL 159 from Alexa Drive to 0.1 miles south of Douglas in Belleville. — Executed Nov 26 New The Kilian Corporation $2,891,486 ·
Mar 10, 2023 76N83 MadisonDistrict 8 0.59 miles of standard overlay and ADA improvements on IL 140 from Monument Avenue to Terra Drive in Alton. — Executed Nov 26 New Charles E. Mahoney Co. $1,689,154 ·
Mar 10, 2023 76R42 MarionDistrict 8 7.2 miles of crack and joint sealing on US 50 from 0.1 miles west of Metcalf Road to the Clay County line. — Executed Nov 26 New Freehill Asphalt, Inc. $101,522 ·
Mar 10, 2023 76R45 JerseyDistrict 8 Crack and joint sealing on IL 3 from 0.1 miles north of Grafton Hills Drive in Grafton to IL 109. — Executed Nov 26 New Freehill Asphalt, Inc. $145,017 ·
Mar 10, 2023 76R48 St. ClairDistrict 8 4.7 miles of patching along I-64 from 0.5 miles west of IL 159 in Fairview Heights to 0.5 miles east of Greenmount Road in O-Fallon. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,321,723 ·
Mar 10, 2023 76R51 St. ClairDistrict 8 Mixer replacement at the Bowman Pump Station on Exchange Avenue in East St. Louis. — Executed Nov 26 New Haier Plumbing and Heating, Inc. $180,000 ·
Mar 10, 2023 76R62 MarionDistrict 8 Resurfacing ramps at the I-57 and US 50 interchange. — Executed Nov 26 New Howell Paving, Inc. $889,143 ·
Mar 10, 2023 76R81 MadisonDistrict 8 Bridge painting on SN 060-0210 carrying IL 4 over US 40 and a railroad, approximately 1.5 miles west of St. Jacob. — Executed Nov 26 New Civil Coatings and Construction Inc. $631,797 ·
Mar 10, 2023 76R87 MadisonSt. ClairDistrict 8 Dynamic message sign replacement at various locations in Madison and St. Clair Counties. — Rejected Nov 26 New Wissehr Electric, Inc. $587,933 ·
Mar 10, 2023 76R88 VariousDistrict 8 Highway lighting and traffic signal repair and maintenance at various locations throughout District 8. — Executed Nov 26 New Electrico, Inc. $1,181,335 ·
Mar 10, 2023 97788 St. ClairDistrict 8 Reconstruction of Frank Scott Parkway West to establish left turn lanes. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $299,566 ·
Mar 10, 2023 97799 St. ClairDistrict 8 Replace existing structure carrying Simmons Road over Ogle Creek with a single span, PPC deck beam bridge with bituminous waterproofing system, HMA wearing surface and approach, and traffic barrier terminals in O'Fallon. — Executed Nov 26 New C-Hill Civil Contractors, Inc. and Sierra Bravo, LLC JV $1,106,940 ·
Apr 28, 2023 76K86 St. ClairDistrict 8 Deck sealing on the Martin Luther King Bridge (SN 082-6001) carrying Illinois Avenue over the Mississippi River. — Executed Nov 26 New M & M Concrete, Inc. $78,829 ·
Apr 28, 2023 76M82 MadisonDistrict 8 1.7 miles of resurfacing and ADA improvements on IL 111 from 0.1 miles south of Pontoon Road to 0.1 miles south of Horseshoe Lake Road. — Executed Nov 26 New The Kilian Corporation $3,603,769 ·
Apr 28, 2023 76M83 MadisonDistrict 8 4.6 miles of resurfacing, ADA improvements and intersection improvements on IL 157 from St. Louis Street to South University Drive in Edwardsville. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $8,186,958 ·
Apr 28, 2023 76R41 MarionDistrict 8 1.5 miles of pavement patching with ultra-thin bonded wearing course on IL 161 from Beech Street to Pleasant Avenue. — Rejected Nov 26 New
Apr 28, 2023 76R60 VariousDistrict 8 Applying oil and chip at various maintenance yards in District 8. — Executed Nov 26 New DMS Contracting, Inc. $719,392 ·
Apr 28, 2023 76R63 MadisonDistrict 8 Bridge joint repair and replacement on SN 060-0077 carrying US 40 over Silver Creek, 1.6 miles west of IL 4. — Executed Nov 26 New Keeley & Sons, Inc. $1,048,120 ·
Apr 28, 2023 76R72 JerseyDistrict 8 1.3 miles of partial and full depth patching on IL 16 from Mounds Street in Jerseyville to 1.3 miles east of Mounds Street. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $267,960 ·
Apr 28, 2023 76R75 BondDistrict 8 Resurfacing and patching on Pocahontas Avenue / Freys Meadow from Pokey Road to 1 mile west of Pokey Road. — Executed Nov 26 New The Kilian Corporation $272,518 ·
Apr 28, 2023 76R76 ClintonDistrict 8 0.8 miles of patching and resurfacing along Collins Street/Huey Road/County Highway 4 from US 50 to 0.2 miles south of Sherman Street. — Executed Nov 26 New Howell Paving, Inc. $413,967 ·
Apr 28, 2023 76R90 MadisonDistrict 8 19.6 miles of intermittent pavement patching on I-55 and its connecting ramps from I-270 to the Macoupin County line. — Executed Nov 26 New Keeley & Sons, Inc. $589,483 ·
Apr 28, 2023 97782 WashingtonDistrict 8 Replace existing structure with a single span precast, prestressed concrete deck beam bridge with approach to carry Hoover Road over Archie Creek. — Executed Nov 26 New Lake Contracting, Inc. $319,999 ·
Apr 28, 2023 97795 St. ClairDistrict 8 HMA resurfacing with ADA improvements on Lebanon Avenue from F Street to IL 161 in Belleville. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,482,045 ·
Apr 28, 2023 97798 MonroeDistrict 8 Construct a shared-use path along Centerville Road from Main Street to Ferkel Street to Cherry in Columbia. — Executed Nov 26 New DMS Contracting, Inc. $355,694 ·
Apr 28, 2023 97802 WashingtonDistrict 8 HMA resurfacing with reflective crack control treatment on CH 10 from IL 153 to the east corporate limits of Elkton. — Executed Nov 26 New The Kilian Corporation $1,346,483 ·
Jun 16, 2023 76L18 GreeneDistrict 8 9.9 miles of resurfacing and ADA improvements on IL 267 from the Jersey County line to SN 031-0044, 0.4 miles south of Short Road. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $11,557,794 ·
Jun 16, 2023 76L48 St. ClairDistrict 8 Pump replacement at the Keller Pump Station on I-255 south of Collinsville Road. — Executed Nov 26 New Davinroy Mechanical Contractor, Inc. $182,000 ·
Jun 16, 2023 76M86 St. ClairDistrict 8 Lighting on I-55/70/64 from the Mississippi River to east of the I-64 (Tri-Level) Interchange. — Rejected Nov 26 New Gerstner Electric, Inc. $8,855,930 ·
Jun 16, 2023 76P08 St. ClairDistrict 8 Storm water pump station rehab at the 25th Street Pump Station south of I-64. — Executed Nov 26 New Haier Plumbing and Heating, Inc. $2,785,320 ·
Jun 16, 2023 76P65 St. ClairDistrict 8 1.5 miles of resurfacing and ADA improvements on US 50 from 0.1 miles west of Schantz Road to Anne Avenue in O-Fallon. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $2,744,682 ·
Jun 16, 2023 76R00 St. ClairDistrict 8 New wiring and LED luminaires on I-255 at I-64. — Executed Nov 26 New Electrico, Inc. $932,109 ·
Jun 16, 2023 76R01 St. ClairDistrict 8 New wiring and LED luminaires on I-255 at IL 15. — Executed Nov 26 New Electrico, Inc. $862,601 ·
Jun 16, 2023 76R38 BondDistrict 8 4.8 miles of crack and joint seal on I-70 from BN Railroad to the Fayette County line. — Executed Nov 26 New Complete Asphalt Service Co. $116,268 ·
Jun 16, 2023 76R40 MadisonDistrict 8 10 miles of resurfacing on IL 255 from IL 143 to 0.1 miles north of Seminary Road. — Executed Nov 26 New The Kilian Corporation $15,205,837 ·
Jun 16, 2023 76R50 VariousDistrict 8 Pavement patching at various locations throughout District 8. — Executed Nov 26 New Keeley & Sons, Inc. $1,706,661 ·
Jun 16, 2023 76R52 VariousDistrict 8 Highway lighting, traffic signal repair and maintenance at various locations throughout District 8. — Executed Nov 26 New Electrico, Inc. $1,529,701 ·
Jun 16, 2023 76R53 VariousDistrict 8 Guardrail and cable median repair at various locations in District 8. — Executed Nov 26 New Illini Excavation & Reclamation, Inc. $3,352,376 ·
Jun 16, 2023 76R54 VariousDistrict 8 Maintain and service all ITS equipment at various locations throughout District 8. — Executed Nov 26 New Electrico, Inc. $428,536 ·
Jun 16, 2023 76R58 RandolphDistrict 8 Patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River to the Perry County line. — Executed Nov 26 New Keeley & Sons, Inc. $1,148,499 ·
Jun 16, 2023 76R69 MadisonDistrict 8 Patching on the I-270 eastbound collector distributor at the I-270 and I-255 interchange. — Executed Nov 26 New The Kilian Corporation $201,360 ·
Jun 16, 2023 76R73 St. ClairDistrict 8 2.4 miles of patching on 6th Street from IL 161 to IL 177 in Mascoutah. — Executed Nov 26 New Kinney Contractors, Inc. $997,922 ·
Jun 16, 2023 76R74 ClintonDistrict 8 Pavement patching and resurfacing on the ramp between US 50 and St. Rose Road. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $263,913 ·
Jun 16, 2023 76R80 St. ClairDistrict 8 Painting on SN 082-0144 at the Poplar Street Bridge Complex on I-55 / I-64. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $432,000 ·
Jun 16, 2023 76R83 WashingtonDistrict 8 8 miles of patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line. — Executed Nov 26 New The Kilian Corporation $2,704,152 ·
Jun 16, 2023 76R92 RandolphDistrict 8 Bridge painting on SN 079-0036 carrying IL 3 over the Kaskaskia River. — Executed Nov 26 New Civil Coatings and Construction Inc. $1,432,548 ·
Jun 16, 2023 76R93 St. ClairDistrict 8 Bridge joint replacement / repair on SN 082-0017 carrying I-55 / 70 over BandO, Conrail and TRRA Railroad in East St. Louis. — Executed Nov 26 New Keeley & Sons, Inc. $1,292,571 ·
Jun 16, 2023 76T02 VariousDistrict 8 Pump station security project at various District 8 pump stations in various counties. — Executed Nov 26 New Pyramid Electrical Contractors, Inc. $451,300 ·
Jun 16, 2023 76T05 VariousDistrict 8 Tree removal in various counties of District 8. — Rejected Nov 26 New Thor General Contracting LLC $126,725 ·
Jun 16, 2023 76T08 St. ClairDistrict 8 0.5 miles of pavement patching on 26th Street (CH 52) from IL 15 to Bond Avenue in East St. Louis. — Executed Nov 26 New Keeley & Sons, Inc. $154,903 ·
Jun 16, 2023 76T12 St. ClairDistrict 8 Pump replacement at the Bowman Pump Station in East St. Louis, on the north side of I-70, at 728 Exchange Avenue. — Executed Nov 26 New Haier Plumbing and Heating, Inc. $346,610 ·
Jun 16, 2023 97713 MadisonDistrict 8 Replace existing structure with a single span steel beam structure with poured concrete deck, aggregate approaches and guardrail on Silver Creek Road over a branch of Silver Creek. — Executed Nov 26 New Keller Construction, Inc. $1,097,790 ·
Jun 16, 2023 97770 MonroeDistrict 8 Roadway reconstruction on Moore Street from IL 3 to 0.2 mile north of Columbia Avenue in Waterloo. — Executed Nov 26 New Baxmeyer Construction, Inc. $1,197,128 ·
Jun 16, 2023 97800 JerseyDistrict 8 Full depth pavement reconstruction, storm sewer, combination curb and gutter, sidewalk, and pavement markings on Hollow Avenue from Hickory Street to Westlake Drive in Jerseyville. — Executed Nov 26 New Stutz Excavating, Inc. $2,034,135 ·
Jun 16, 2023 97801 MadisonDistrict 8 Construction of a Shared-Use Path along Rock Springs Drive from Memorial Drive to Brown Street, and along College Avenue at the intersection of Rock Springs Drive in Alton. — Executed Nov 26 New Stutz Excavating, Inc. $642,226 ·
Jun 16, 2023 97803 St. ClairDistrict 8 Resurfacing Market Place from east of Commerce Drive to west of Lanaghan Drive in Fairview. — Rejected Nov 26 New Stutz Excavating, Inc. $533,207 ·
Jun 16, 2023 97804 MonroeDistrict 8 HMA Resurfacing and shoulders with rumble strips on Floraville Road from the Waterloo Corporate Limits to the St. Clair County Line. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,435,980 ·
Jun 16, 2023 97806 MadisonDistrict 8 HMA resurfacing, curb and gutter, driveways, storm sewers, and pavement markings on University Drive from IL 157 to Devon Court in Edwardsville. — Executed Nov 26 New Stutz Excavating, Inc. $842,773 ·
Jun 16, 2023 97812 St. ClairDistrict 8 Replace existing structure with a three-span PPC deck beam bridge with concrete wearing surface, approach slabs, HMA approach pavement, and traffic barrier terminals, on IMBS Station Road over Prairie DuPont Creek, 2.0 miles west of IL 163. — Executed Nov 26 New C-Hill Civil Contractors, Inc. $1,717,889 ·
Jun 16, 2023 97813 St. ClairDistrict 8 Resurfacing Sullivan Drive from south of Frank Scott Parkway to Huntwood Drive. — Executed Nov 26 New The Kilian Corporation $1,263,097 ·
Aug 4, 2023 76L29 MarionDistrict 8 2.7 miles of patching, ultra-thin bonded wearing course and ADA improvements IL 161 from Beech Street to Pleasant Avenue in Centralia. — Executed Nov 26 New The Kilian Corporation $4,015,807 ·
Aug 4, 2023 76P67 MadisonSt. ClairDistrict 8 Installation of 2 dynamic message signs on butterfly trusses and fiber optic on northbound I-255 at mile marker 7.6 and southbound I-255 at mile marker 27.1. — Executed Nov 26 New Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $3,386,988 ·
Aug 4, 2023 76R27 MadisonDistrict 8 Lighting upgrades on I-55 at IL 140. — Executed Nov 26 New Gerstner Electric, Inc. $577,727 ·
Aug 4, 2023 76R47 MadisonDistrict 8 Median removal and replacement on US 67 (Landmark Boulevard), near the intersection of Broadway Street, in Alton. — Executed Nov 26 New Stutz Excavating, Inc. $143,115 ·
Aug 4, 2023 76R65 RandolphDistrict 8 Bridge deck overlay and bridge deck repairs on SN 079-0032 carrying IL 155 over a stream east of Bluff Road in Prairie Du Rocher. — Executed Nov 26 New Keeley & Sons, Inc. $554,302 ·
Aug 4, 2023 76R82 GreeneDistrict 8 0.09 miles of pavement patching on US 67 from Palm Street to Clay Street in Roodhouse. — Executed Nov 26 New G. M. Sipes Construction, Inc. $338,723 ·
Aug 4, 2023 76R98 VariousDistrict 8 Weed spraying for Johnson Grass along various interstates throughout District 8. — Executed Nov 26 New The Daltons Inc. $121,088 ·
Aug 4, 2023 76T09 MadisonDistrict 8 9.6 miles of patching and resurfacing on IL 4 from 0.37 miles south of I-55 to IL 143. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $4,788,328 ·
Aug 4, 2023 97805 BondDistrict 8 Sidewalk Construction along various routes in Greenville. — Executed Nov 26 New DMS Contracting, Inc. $377,775 ·
Aug 4, 2023 97810 MonroeDistrict 8 HMA Resurfacing with PCC Base Course widening, storm sewers, curb and gutter, and ADA Ramps on Ghent Road from south of Palmer Road to Christina Court in Columbia — Executed Nov 26 New DMS Contracting, Inc. $1,215,909 ·
Aug 4, 2023 97811 MadisonDistrict 8 Construction of a Shared-Use Path along Erwin Plegge Boulevard, from Old Bethalto Road to Ashbrook Street in Bethalto. — Executed Nov 26 New Baxmeyer Construction, Inc. $907,108 ·
Sep 22, 2023 76J97 WashingtonDistrict 8 0.29 miles; Bridge replacement over Lunte Creek, 3.6 miles west of IL 127. — Executed Nov 26 New Plocher Construction Company, Inc. $1,919,510 ·
Sep 22, 2023 76M43 JerseyDistrict 8 Culvert repairs on SN 042-2417 carrying Old US 67 over a Tributary to Little Piasa Creek, 0.1 miles north of New Delhi Road. — Executed Nov 26 New Stutz Excavating, Inc. $574,652 ·
Sep 22, 2023 76P57 MonroeDistrict 8 1.6 miles of resurfacing on Market Street / IL 156 in Waterloo from 0.1 miles north of Plaza Drive to IL 156 South Junction. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $2,271,959 ·
Sep 22, 2023 76R55 VariousDistrict 8 Repair and maintenance of electrical equipment at various pump stations at various locations in District 8. — Executed Nov 26 New Electrico, Inc. $169,753 ·
Sep 22, 2023 76R56 CalhounDistrict 8 Repair and maintenance of electrical equipment at the Joe Page Bridge in Hardin (SN 031-0001). — Active Nov 26 New
Sep 22, 2023 76R57 MadisonSt. ClairDistrict 8 Well treatment at various locations in East St. Louis and Venice. — Executed Nov 26 New Layne Christensen Company $856,535 ·
Sep 22, 2023 76R64 ClintonDistrict 8 Bridge joint replacement and repair on SN 014-0015 carrying IL 127 over NS Railroad, 0.2 miles north of IL 161. — Executed Nov 26 New Keeley & Sons, Inc. $429,291 ·
Nov 17, 2023 46629 MadisonSt. ClairDistrict 8 Installation of new ground-mounted signs on various routes in Madison and St. Clair Counties. — Executed Nov 26 New Kujo, Inc. $358,351 ·
Nov 17, 2023 76M88 WashingtonDistrict 8 Culvert replacement on IL 127 at South Middle Tributary of Locust Creek, 6.7 miles south of IL 15 and the town of Nashville. (SN 095-2496) — Executed Nov 26 New E. T. Simonds Construction Company $747,934 ·
Nov 17, 2023 76M90 WashingtonDistrict 8 Culvert replacement on IL 177 at West Tributary to Grand Point, 0.5 miles east of Hoyleton. (SN 095-2496) — Executed Nov 26 New Guinzy Construction,Inc. $490,747 ·
Nov 17, 2023 76N16 MadisonDistrict 8 Bridge repairs, flood wall work and pavement reconstruction on IL 11 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270. — Executed Nov 26 New The Kilian Corporation $1,832,257 ·
Nov 17, 2023 76N43 MadisonDistrict 8 Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City. — Executed Nov 26 New Baxmeyer Construction, Inc. $7,285,268 ·
Nov 17, 2023 76T01 VariousDistrict 8 Traffic signal modernization at various locations within District 8. — Executed Nov 26 New Gerstner Electric, Inc. $1,564,128 ·
Nov 17, 2023 76T39 St. ClairDistrict 8 1.96 miles of patching and a standard overlay on I-55/64/US 40 from 0.9 miles east of the Mississippi River to I-64 (Tri-Level) Interchange in East St. Louis — Executed Nov 26 New The Kilian Corporation $5,220,980 ·
Nov 17, 2023 97790 MadisonDistrict 8 Reconstruction of Lebanon Road on new alignment to facilitate closure of two underpass structures. Work includes structure removal, construction of a 6-span steel plate girder bridge, construction of a 1-span PC slabl bridge, box culverts, pavement removal, building removal, processing lime modified soil, PPC Pavement, HMA Pavement, HMA shoulders, combination curb and gutter, and storm sewer. Located 0.19 miles east of Clay School Road to 0.16 miles of Locmann Road over the CSX Railroad. — Executed Nov 26 New Keller Construction, Inc. $17,444,384 ·
Nov 17, 2023 97793 MadisonDistrict 8 Reconstruction of the IL 159 and Glen Carbon Road intersection to establish north bound and east bound right turn lanes. Includes, HMA resurfacing, sidewalks, ADA ramps, traffic signal modifications, and drainage improvements. Located in Glen Carbon. — Rejected Nov 25 New Keller Construction, Inc. $1,439,471 ·
Nov 17, 2023 97815 St. ClairDistrict 8 Resurfacing Jerome Lane from Nash Street to Range Lane in Cahokia. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $897,940 ·
Nov 17, 2023 97817 St. ClairDistrict 8 Construction of a PCC sidewalk from the Boul Avenue Trailhead entrance to the intersection of Boul Avenue and IL 159 in Swansea. — Rejected Nov 26 New
501–600 of 1,073‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.