IDOT Jobs

All dates · 2,975 jobs · $6,684,498,000 Sign up free
★ My Jobs

Filtered by: District: District 1 Clear all

2,975 jobs · $6,684,498,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 60J13 CookDistrict 1 Culvert replacement and improvements to ADA pedestrian ramps and the retaining wall in the Village of Northbrook. — Executed Nov 26 New Copenhaver Construction, Inc. $6,214,342 ·
Jan 19, 2018 60X59 WillDistrict 1 Intersection improvement and signal installation at the intersection of North Bolingbrook Drive and Royce Road in the Village of Bolingbrook. — Executed Nov 26 New P. T. Ferro Construction Co. $774,315 ·
Jan 19, 2018 60Y25 CookDistrict 1 Reconstruct the intersection of IL 83 and IL 171, including new traffic signals, roadway lighting and box and pipe culvert replacements east of the Village of Lemont. — Executed Nov 26 New D. Construction, Inc. $6,665,294 ·
Jan 19, 2018 61D87 CookDistrict 1 Resurfacing Harding Avenue from Brainard Avenue to Kemman Avenue in the Village of LaGrange Park. — Executed Nov 26 New Arrow Road Construction Co. $857,459 ·
Jan 19, 2018 61E13 LakeDistrict 1 Resurfacing 21st Street from Sheridan Road east for 1,600 ft., and 29th Street from Lewis Avenue to Galilee Avenue in the City of Zion. — Executed Nov 26 New Peter Baker & Son Co. $456,777 ·
Jan 19, 2018 61E18 KaneDistrict 1 Reconstruct the intersection of IL 25 at Spring Street including traffic signal improvements, street lighting, and curb, gutter and sidewalks; construction of a pedestrian bridge over the Fox River; reconfiguration of the multi-modal access for pedestrians and vehicular traffic; relocation of the Pace bus staging area and the expansion of the existing commuter parking lot. Project is located in the City of Aurora. — Executed Nov 26 New Judlau Contracting, Inc. $14,271,674 ·
Jan 19, 2018 61E19 CookDistrict 1 Resurfacing Oketo Avenue from Lawrence Avenue to Montrose Avenue, and Wilson Avenue from Oketo Avenue to Harlem Avenue in the Village of Harwood Heights. — Executed Nov 26 New J. A. Johnson Paving Company $498,777 ·
Jan 19, 2018 61E20 CookDistrict 1 Pedestrian path from 135th Street to College Drive in the City of Palos Heights. — Executed Nov 26 New Davis Concrete Construction Co. $553,985 ·
Jan 19, 2018 61E21 CookDistrict 1 Tree planting along IL 50 from 167th Street to 163rd Street in the City of Oak Forest. — Executed Nov 26 New McGinty Bros., Inc. $49,965 ·
Jan 19, 2018 61E25 CookDistrict 1 Resurfacing, traffic signals, sidewalks, and street lighting on FAU 3723 (JFK Blvd.) from Arlington Heights Rd. to Elk Grove Blvd., and on FAU 3724 (Elk Grove Blvd.) from Arlington Heights Rd. to Victoria Ln. in Elk Grove Village. The sidewalk and railing on the structure carrying JFK Blvd. over Salt Creek will be removed and replaced. — Executed Nov 26 New K-Five Construction Corporation $2,989,961 ·
Jan 19, 2018 61E26 DuPageDistrict 1 Resurfacing Fullerton Avenue from Bloomingdale Road to Glen Elleyn Road in the Village of Glendale Heights. — Executed Nov 26 New J. A. Johnson Paving Company $1,453,953 ·
Jan 19, 2018 61E28 LakeDistrict 1 Replace the bridge carrying Forest Avenue over Ravine Ditch #7, south of Hazel Avenue in the City of Highland Park. — Executed Nov 26 New Lorig Construction Company $2,655,120 ·
Jan 19, 2018 61E30 WillDistrict 1 Reconstruct Rathje Road from Joliet Road to Corning Avenue in the Village of Peotone. — Executed Nov 26 New P. T. Ferro Construction Co. $1,623,160 ·
Jan 19, 2018 61E31 DuPageDistrict 1 Resurfacing Poplar Avenue from Park Avenue to Vallette Street in the City of Elmhurst. — Executed Nov 26 New J. A. Johnson Paving Company $596,413 ·
Jan 19, 2018 61E33 LakeDistrict 1 Traffic signal improvement on US 12 from IL 176 to IL 22. — Executed Nov 26 New Home Towne Electric, Inc. $898,265 ·
Jan 19, 2018 61E36 McHenryDistrict 1 Resurfacing Ringwood Road from Spring Grove Road to IL 120, and Barnard Mill Road from Ringwood Road to Illinois Route 31 in the Village of Ringwood. — Executed Nov 26 New Curran Contracting Company $1,610,135 ·
Jan 19, 2018 62B16 CookDistrict 1 Reconstruction and signing at the intersection of Golf Road and Cumberland Circle in the city of Des Plaines. — Executed Nov 26 New Martam Construction Incorporated $4,574,690 ·
Jan 19, 2018 62C34 McHenryDistrict 1 Intersection improvement on IL 47 at O'Brien/Vanderkarr Road and Thayer Road between the City of Woodstock and the village of Hebron. — Executed Nov 26 New Curran Contracting Company $2,047,474 ·
Jan 19, 2018 62C90 VariousDistrict 1 Shoulder repair at various locations in the villages of South Elgin, Sugar Grove, Bensenville, North Aurora, West Dundee, Carpentersville, Elburn, Lily Lake, Huntley, and the cities of Batavia, Elgin, Geneva, St. Charles and Aurora. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $228,844 ·
Jan 19, 2018 62D54 CookDuPageWillDistrict 1 Guardrail and traffic barrier terminal removal and replacement on various arterial and expressway routes. — Executed Nov 26 New Kujo, Inc. $537,608 ·
Jan 19, 2018 62F78 CookDistrict 1 Bridge substructure repairs to SN 016-0669 on I-90/94 at Addison in Chicago, SN 016-0511 and SN 016-0512 on I-190 at Des Plaines River Road in Rosemont. — Executed Nov 26 New F. H. Paschen, S.N. Nielsen & Associates LLC $589,497 ·
Jan 19, 2018 62F79 CookDuPageDistrict 1 Cleaning and painting existing steel structures at various locations in the villages of Elmhurst, Wood Dale, Oakbrook, Westchester and LaGrange Park. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $679,108 ·
Jan 19, 2018 62F80 CookDistrict 1 Cleaning and painting existing steel structures at various locations in the villages of Hodgkins, Willow Springs, Cicero and the city of Chicago. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $1,258,379 ·
Jan 19, 2018 62G04 VariousDistrict 1 Pavement patching, miscellaneous traffic control and deck slab repairs on various expressways in District 1. — Executed Nov 26 New Copenhaver Construction, Inc. $2,180,500 ·
Mar 9, 2018 46474 VariousDistrict 1 Place various widths of modified urethane, thermoplastic and hot-spray thermoplastic pavement marking line, letter and symbols as specified by individual work orders. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $458,790 ·
Mar 9, 2018 60T44 CookDistrict 1 Rehabilitation of bridge SN 016-1014 carrying IL 50 (Cicero Avenue) over I-57 in the City of Country Club Hills. — Executed Nov 26 New D. Construction, Inc. $2,814,624 ·
Mar 9, 2018 60V22 CookDistrict 1 Remove three cell cast-in-place box culvert SN:016-1036 and replace with a slab bridge to carry US 12/45 over Addison Creek in the Village of Stone Park. — Executed Nov 26 New D. Construction, Inc. $2,497,679 ·
Mar 9, 2018 60X10 WillDistrict 1 Interchange reconstruction of I-55 at Weber Road and roadway reconstruction of Weber Road from Normantown Road to Rodeo Drive in the municipalities of Bolingbrook and Romeoville. — Executed Nov 26 New Judlau Contracting, Inc. $47,970,125 ·
Mar 9, 2018 60X51 LakeDistrict 1 Remove and replace the bridge carrying westbound US 12 over southbound IL 59 in the village of Fox Lake. — Executed Nov 26 New Areatha Construction Co., Inc. $2,853,198 ·
Mar 9, 2018 61D22 WillDistrict 1 Reconstruction, resurfacing, bike/ped path, rehabilitate the structure over over Union Ditch and construction of pedestrian structure over Union Ditch, on St. Francis Road from 88th Avenue to 80th Avenue in the Village of Frankfort. — Executed Nov 26 New Iroquois Paving Corporation $3,351,885 ·
Mar 9, 2018 61D29 McHenryDistrict 1 Remove two bridges, and the construction of a single bridge to carry Deerpass Road over the north branch of the Kishwaukee River, 0.7 miles north of Illinois Route 176. — Executed Nov 26 New Dunnet Bay Construction Company $3,789,351 ·
Mar 9, 2018 61D42 CookDistrict 1 Intersection improvement, channelization and traffic signals on FAP Route 876 (CH 1) from Interstate 80 ramp to 170th Street in the Village of East Hazel Crest. — Executed Nov 26 New D. Construction, Inc. $2,425,620 ·
Mar 9, 2018 61D47 WillDistrict 1 Reconstruction of Weber Road from Normantown Road to 135th Street in Romeoville. — Executed Nov 26 New R. W. Dunteman Company $20,364,790 ·
Mar 9, 2018 61E23 McHenryDistrict 1 Replace bridge carrying Oak Grove Road over drainage ditch, .7 mile southwest of US 14. — Executed Nov 26 New Alliance Contractors, Inc. $491,679 ·
Mar 9, 2018 61E27 CookDistrict 1 Lighting, landscaping and sidewalk improvements along Norhtwest Highway from Touhy Avenue to Washington Avenue in the city of Park Ridge. — Executed Nov 26 New Lorusso Cement Contractors, Inc. $1,750,505 ·
Mar 9, 2018 61E32 CookDistrict 1 Sidewalk and lighting improvements on FAU Route 1602 (147th Street) from Pulaski Road to Homan Avenue in the Village of Midlothian. — Executed Nov 26 New Davis Concrete Construction Co. $762,257 ·
Mar 9, 2018 61E35 DuPageDistrict 1 Resurfacing and reconstruction on Park Boulevard from IL Route 38 to Crescent Boulevard, and on Main Street from IL Route 38 to Fairview Avenue in the Village of Glen Ellyn. — Executed Nov 26 New R. W. Dunteman Company $2,944,990 ·
Mar 9, 2018 61E37 DuPageDistrict 1 resurfacing improvments on West Street from IL 38 (Roosevelt Road) to Wesley Street in the City of Wheaton. — Executed Nov 26 New Geneva Construction Company $375,759 ·
Mar 9, 2018 61E38 LakeDistrict 1 Resurfacing from Fairfield Road to Gilmer Road in the Village of Hawthorn Woods. — Executed Nov 26 New Peter Baker & Son Co. $430,262 ·
Mar 9, 2018 61E41 CookDistrict 1 Resurfacing on Austin Avenue from 111th Street to 107th Street in the Village of Chicago Ridge. — Executed Nov 26 New Iroquois Paving Corporation $511,990 ·
Mar 9, 2018 61E43 DuPageDistrict 1 Construction of a multi-use path along Great Western Trail from Sassafras Drive to Prince Crossing Road. — Executed Nov 26 New Chicagoland Paving Contractors, Inc. $224,900 ·
Mar 9, 2018 61E48 CookDistrict 1 Construction of a roundabout at 147th Street and Ravinia Avenue in the Village of Orland Park. — Executed Nov 26 New R. W. Dunteman Company $1,988,192 ·
Mar 9, 2018 61E49 McHenryDistrict 1 Replace the bridge carrying Main Street over Crystal Creek in the Village of Algonquin. — Executed Nov 26 New Martam Construction Incorporated $2,482,796 ·
Mar 9, 2018 61E50 CookDistrict 1 Resurfacing, sidewalks and pavement markings on various routes in the Village of Orland Hills. — Executed Nov 26 New Iroquois Paving Corporation $755,069 ·
Mar 9, 2018 62A93 CookDistrict 1 Landscaping along FAI Route 55 (Stevenson Expressway) from just east of FAI Route I-94 (Dan Ryan Expressway) near Prairie Avenue to US 41 (Lake Shore Drive), in the city of Chicago. — Rejected Nov 26 New Nettle Creek Nursery, Inc. $1,388,898 ·
Mar 9, 2018 62A95 WillDistrict 1 Culvert replacement on US Route 45/52, approximately 1.4 miles south of US Route 52 in unincorporated Will County. — Executed Nov 26 New Iroquois Paving Corporation $644,048 ·
Mar 9, 2018 62B99 CookDistrict 1 Removal of the existing superstructure at Old Willow Road over the Des Plaines River, substructure modification and construction of a new pedestrian truss superstructure. — Executed Nov 26 New Rausch Infrastructure LLC $2,169,410 ·
Mar 9, 2018 62C95 CookDistrict 1 Resurfacing and pedestrian ramps on Cicero Avenue from Chicago, Central and Pacific Railroad to Congress Parkway in the city of Chicago and the township of Cicero. — Executed Nov 26 New K-Five Construction Corporation $1,959,484 ·
Mar 9, 2018 62F04 WillDistrict 1 Embankment stabilization along both sides of US 45 between I-80 and the METRA Railroad. — Executed Nov 26 New D. Construction, Inc. $1,115,027 ·
Mar 9, 2018 62F33 CookDistrict 1 Bridge deck repairs on the structure carrying IL 58 over Poplar Creek in Hanover Township. — Executed Nov 26 New Areatha Construction Co., Inc. $125,051 ·
Mar 9, 2018 62F40 CookDistrict 1 Replace the existing Programmable Logic Controllers for the Kennedy Expressway Reversible Lane Control system. — Rejected Nov 26 New Meade Inc. $1,321,070 ·
Mar 9, 2018 62F70 CookDistrict 1 Pavement grooving of existing PCC pavement on Kennedy Expressway from south of Kimball Avenue to north of Addison Street in the city of Chicago. — Rejected Nov 26 New
Mar 9, 2018 62F89 VariousDistrict 1 Tree removal in various locations in various counties in District 1. — Executed Nov 26 New McGinty Bros., Inc. $203,800 ·
Mar 9, 2018 62F93 WillDistrict 1 Cleaning and painting existing steel structures at various locations in the villages of Monee, Peotone and the city of Joliet. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $524,711 ·
Mar 9, 2018 62F96 VariousDistrict 1 Mowing the medians and roadsides of expressways and access controlled arterial routes in District One. — Executed Nov 26 New Endrizzi Contracting, Inc $290,800 ·
Mar 9, 2018 62F97 VariousDistrict 1 Mowing the medians and roadsides of expressways and access controlled arterial routes in District One. — Executed Nov 26 New McGinty Bros., Inc. $144,120 ·
Mar 9, 2018 62G05 VariousDistrict 1 Remove and replace signs along various expressways and arterial routes in various counties. — Executed Nov 26 New Western Remac, Inc. $612,825 ·
Mar 9, 2018 62G09 VariousDistrict 1 Weed control at various locations throughout District 1. — Executed Nov 26 New McGinty Bros., Inc. $153,250 ·
Apr 27, 2018 60C48 CookDistrict 1 Relocation of Pump station 8 on US 14 in the City of Des Plaines. — Executed Nov 26 New Herlihy Mid-Continent Company $7,098,601 ·
Apr 27, 2018 60K78 CookDistrict 1 Replace bridge SN 016-1302 carrying US Route 6/IL 83 over the little Calumet River. — Executed Nov 26 New D. Construction, Inc. $5,453,097 ·
Apr 27, 2018 60P55 WillDistrict 1 Local centralized control and operation of the six movable bridges from Ruby Street to Brandon Road in the City of Joliet — Rejected Nov 26 New Meade Inc. $21,260,736 ·
Apr 27, 2018 60T75 LakeDistrict 1 Reconstruct US 45 on a new alignment and re-align Grass Lake Road to create a four-legged intersection with US 45 and Millburn Road in the Villages of Old Mill Creek and Lindenhurst. — Executed Nov 26 New Berger Excavating Contractors, Inc. $15,577,444 ·
Apr 27, 2018 60V18 WillDistrict 1 Resurfacing and pedestrian ramps on US 30 from Collins Street to I-80 in the City of Joliet. — Executed Nov 26 New D. Construction, Inc. $1,753,921 ·
Apr 27, 2018 60Y26 CookDistrict 1 Intersection improvement, horizontal realignment and culvert replacement at US 6 and 179th Street in the village of Orland Park. — Executed Nov 26 New Iroquois Paving Corporation $2,478,965 ·
Apr 27, 2018 60Y83 LakeDistrict 1 Resurfacing, pedestrian ramps and drainage work in the villages of Island Lake and Wauconda. — Executed Nov 26 New Lorig Construction Company $1,105,951 ·
Apr 27, 2018 61B91 CookDistrict 1 Sidewalk construction adjacent to Ballard Road, from Bender Road to Good Avenue in the City of Des Plaines. — Executed Nov 26 New Martam Construction Incorporated $462,764 ·
Apr 27, 2018 61C48 LakeDistrict 1 Reconstruction, drainage improvements, and bike/pedestrian path construction on Sayton Road from US 12 to Rollins Road, and from Rollins Road to Industrial Avenue in the Village of Fox Lake. — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,769,565 ·
Apr 27, 2018 61C86 KaneDistrict 1 Widening and reconstruction of Huntley Road from Sleepy Hollow Road to Elm Avenue in the Village of West Dundee. — Executed Nov 26 New Plote Construction, Inc. $7,831,951 ·
Apr 27, 2018 61D92 DuPageDistrict 1 Resurfacing on Central Avenue from Gary Avenue to Roselle Road in the Village of Roselle. — Executed Nov 26 New Arrow Road Construction Co. $888,255 ·
Apr 27, 2018 61E22 LakeDistrict 1 Reconstruction and widening to add one thru lane in each direction and bicycle/pedestrian accommodations on Quentin Road from IL 22 to White Pine Road. — Executed Nov 26 New Lake County Grading Company, LLC $20,129,203 ·
Apr 27, 2018 61E34 McHenryDistrict 1 Resurface Pearl Street from IL 31 to North River Road, and resurfacing Lincoln Road from North River Road to Chapel Hill Road in the City of McHenry. — Executed Nov 26 New Lorig Construction Company $2,551,352 ·
Apr 27, 2018 61E40 DuPageDistrict 1 Construction of a multi-use trail along Taylor Avenue from Walnut Street to Willis Street, and the Construction of a tunnel under the Union Pacific Railroad, in the Village of Glen Ellyn. — Executed Nov 26 New D. Construction, Inc. $2,745,521 ·
Apr 27, 2018 61E42 DuPageDistrict 1 Resurfacing on Army Trail Bouldevard from Mill Road to Rohlwing Road in the Village of Addison. — Executed Nov 26 New R. W. Dunteman Company $3,624,672 ·
Apr 27, 2018 61E45 CookDistrict 1 Platform and ramp improvements, sidewalks and pedestrian lighting at the Stone Avenue METRA Station in the Village of La Grange. — Executed Nov 26 New Kovilic Construction Company, Inc. $1,349,623 ·
Apr 27, 2018 61E47 WillDistrict 1 Intersection improvement at West 167th Street and Gougar Road in the City of Lockport. — Executed Nov 26 New D. Construction, Inc. $1,576,688 ·
Apr 27, 2018 61E51 CookDistrict 1 Resurfacing with curb and gutter on Custer Avenue from 47th Avenue to Ogden Avenue in the Village of Brookfield. — Executed Nov 26 New K-Five Construction Corporation $1,624,937 ·
Apr 27, 2018 61E54 CookDistrict 1 Resurfacing Chicago Avenue from Thatcher Avenue to Harlem Avenue in the Village of River Forest. — Executed Nov 26 New J. A. Johnson Paving Company $1,642,246 ·
Apr 27, 2018 61E55 DuPageDistrict 1 Resurfacing, sidewalk construction and roadway reconstruction on Railroad Avenue from York Avenue to Addison Street in the Village of Bensenville. — Executed Nov 26 New R. W. Dunteman Company $1,290,683 ·
Apr 27, 2018 61E57 CookDistrict 1 Reconstruction of Oak Park Avenue from 167th Street to 159th Street in the Village of Tinley Park. — Executed Nov 26 New Iroquois Paving Corporation $1,655,722 ·
Apr 27, 2018 61E58 DuPageDistrict 1 Resurfacing Internationale Parkway from Beaudin Boulevard to Woodward Avenue in the Village of Woodridge. — Executed Nov 26 New D. Construction, Inc. $807,962 ·
Apr 27, 2018 61E59 LakeDistrict 1 Resurfacing Golf Road from Butterfield road to Milwaukee Avenue in the Village of Libertyville. — Executed Nov 26 New Peter Baker & Son Co. $1,240,026 ·
Apr 27, 2018 61E60 CookDistrict 1 Construction of a multi-use trail, located east of Stony Island, from 97th Street to 103rd Street in the City of Chicago. — Executed Nov 26 New Pan-Oceanic Engineering Co., Inc. $1,393,925 ·
Apr 27, 2018 61E61 DuPageDistrict 1 Resurfacing Main Street from Franklin Street to Ogden Avenue in the Village of Downers Grove. — Executed Nov 26 New J. A. Johnson Paving Company $591,945 ·
Apr 27, 2018 61E62 DuPageDistrict 1 Resurfacing and ADA improvements on York Street from North Avenue to First Street in the City of Elmhurst. — Executed Nov 26 New K-Five Construction Corporation $666,667 ·
Apr 27, 2018 61E63 CookDistrict 1 Resurfacing Wolf Road from North Avenue to Winters Drive in the City of Northlake. — Executed Nov 26 New Plote Construction, Inc. $1,938,532 ·
Apr 27, 2018 61E65 DuPageDistrict 1 Resurfacing, curb, gutter and sidewalks on North Main Street from Seminary Avenue to Cole Avenue in the City of Wheaton. — Executed Nov 26 New R. W. Dunteman Company $892,096 ·
Apr 27, 2018 61E66 LakeDistrict 1 Construction of a multi-use path adjacent to Molidor Road, from 0.5 mile west of Fish Lake Road to Fish Lake Road in Grant Township. — Executed Nov 26 New Campanella and Sons, Inc. $313,595 ·
Apr 27, 2018 61E68 CookDistrict 1 Construction of a multi-use path adjacent to Roselle Road from Hillcrest Boulevard to Central Road in the Village of Schaumburg. A new structure will be constructed to carry the path over Central Road. — Executed Nov 26 New Lorig Construction Company $3,865,086 ·
Apr 27, 2018 61E70 LakeDistrict 1 Sidewalk construction algon Clavey Road from Barberry Road to the Skokie Valley Bike Path in the City of Highland Park. — Executed Nov 26 New Sumit Construction Co., Inc. $54,111 ·
Apr 27, 2018 61E71 CookDistrict 1 Intersection improvement at North Avenue and US 20 (Lake Street) in the Village of Streamwood. — Executed Nov 26 New Martam Construction Incorporated $809,831 ·
Apr 27, 2018 61E72 CookDistrict 1 Intersection improvement, signal replacement, channelization, and reconstruction of East Avenue in the Village of Streamwood. — Executed Nov 26 New Alliance Contractors, Inc. $478,629 ·
Apr 27, 2018 61E73 KaneDistrict 1 Intersection reConstruction at Huntley Road and IL 31 in the Village of Carpentersville. — Executed Nov 26 New Plote Construction, Inc. $9,637,830 ·
Apr 27, 2018 62A14 LakeDistrict 1 ADA ramp improvement on various routes in the villages of Deerfield and Lake Bluff and the cities of Highland park and Lake Forest. — Executed Nov 26 New Sumit Construction Co., Inc. $539,989 ·
Apr 27, 2018 62B13 CookDistrict 1 Joint reconstruction and repair of the bridge structure SN 016-0153 carrying NB I-94 over SB Stony Island Avenue in the City of Chicago. — Executed Nov 26 New Path Construction Company, Inc. $407,750 ·
Apr 27, 2018 62B45 WillDistrict 1 Shoulder widening, milled rumble strips and guardrail replacement on US 52 from Spencer Road to US 45 in the village of Manhattan and unincorporated Will County. — Executed Nov 26 New D. Construction, Inc. $1,555,085 ·
Apr 27, 2018 62B84 LakeDistrict 1 Repair culvert carrying IL 22 over East Tributary to Flint Creek, 1.2 miles West of IL 59. — Executed Nov 26 New D. Construction, Inc. $360,217 ·
Apr 27, 2018 62B94 McHenryDistrict 1 Rehabilatation of the existing culvert structures over unnamed ditches in the townships of Dunham and Hartland. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $188,777 ·
Apr 27, 2018 62C15 CookDistrict 1 Fiber optic cable and PTZ camera installation in Schaumburg. — Executed Nov 26 New Hecker and Company, Inc. $910,414 ·
Apr 27, 2018 62C17 KaneDistrict 1 Resurfacing, centerline rumble strips and pedestrian ramp upgrades on IL 72 from Reinking Road to Van Buren Street in the Villages of Pingree Grove, Gilberts, River West Dundee, Elgin and Sleepy Hollow. — Executed Nov 26 New Lorig Construction Company $2,978,656 ·
Apr 27, 2018 62C24 DuPageDistrict 1 Remove and replace bridge structure SN 022-0103 carrying I-290 over Salt Creek. — Executed Nov 26 New Dunnet Bay Construction Company $14,397,932 ·
1–100 of 2,975Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.