Filtered by: District: District 1 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 60J13 | CookDistrict 1 | Culvert replacement and improvements to ADA pedestrian ramps and the retaining wall in the Village of Northbrook. | — | Executed | Copenhaver Construction, Inc. $6,214,342 · | ||
| Jan 19, 2018 | 60X59 | WillDistrict 1 | Intersection improvement and signal installation at the intersection of North Bolingbrook Drive and Royce Road in the Village of Bolingbrook. | — | Executed | P. T. Ferro Construction Co. $774,315 · | ||
| Jan 19, 2018 | 60Y25 | CookDistrict 1 | Reconstruct the intersection of IL 83 and IL 171, including new traffic signals, roadway lighting and box and pipe culvert replacements east of the Village of Lemont. | — | Executed | D. Construction, Inc. $6,665,294 · | ||
| Jan 19, 2018 | 61D87 | CookDistrict 1 | Resurfacing Harding Avenue from Brainard Avenue to Kemman Avenue in the Village of LaGrange Park. | — | Executed | Arrow Road Construction Co. $857,459 · | ||
| Jan 19, 2018 | 61E13 | LakeDistrict 1 | Resurfacing 21st Street from Sheridan Road east for 1,600 ft., and 29th Street from Lewis Avenue to Galilee Avenue in the City of Zion. | — | Executed | Peter Baker & Son Co. $456,777 · | ||
| Jan 19, 2018 | 61E18 | KaneDistrict 1 | Reconstruct the intersection of IL 25 at Spring Street including traffic signal improvements, street lighting, and curb, gutter and sidewalks; construction of a pedestrian bridge over the Fox River; reconfiguration of the multi-modal access for pedestrians and vehicular traffic; relocation of the Pace bus staging area and the expansion of the existing commuter parking lot. Project is located in the City of Aurora. | — | Executed | Judlau Contracting, Inc. $14,271,674 · | ||
| Jan 19, 2018 | 61E19 | CookDistrict 1 | Resurfacing Oketo Avenue from Lawrence Avenue to Montrose Avenue, and Wilson Avenue from Oketo Avenue to Harlem Avenue in the Village of Harwood Heights. | — | Executed | J. A. Johnson Paving Company $498,777 · | ||
| Jan 19, 2018 | 61E20 | CookDistrict 1 | Pedestrian path from 135th Street to College Drive in the City of Palos Heights. | — | Executed | Davis Concrete Construction Co. $553,985 · | ||
| Jan 19, 2018 | 61E21 | CookDistrict 1 | Tree planting along IL 50 from 167th Street to 163rd Street in the City of Oak Forest. | — | Executed | McGinty Bros., Inc. $49,965 · | ||
| Jan 19, 2018 | 61E25 | CookDistrict 1 | Resurfacing, traffic signals, sidewalks, and street lighting on FAU 3723 (JFK Blvd.) from Arlington Heights Rd. to Elk Grove Blvd., and on FAU 3724 (Elk Grove Blvd.) from Arlington Heights Rd. to Victoria Ln. in Elk Grove Village. The sidewalk and railing on the structure carrying JFK Blvd. over Salt Creek will be removed and replaced. | — | Executed | K-Five Construction Corporation $2,989,961 · | ||
| Jan 19, 2018 | 61E26 | DuPageDistrict 1 | Resurfacing Fullerton Avenue from Bloomingdale Road to Glen Elleyn Road in the Village of Glendale Heights. | — | Executed | J. A. Johnson Paving Company $1,453,953 · | ||
| Jan 19, 2018 | 61E28 | LakeDistrict 1 | Replace the bridge carrying Forest Avenue over Ravine Ditch #7, south of Hazel Avenue in the City of Highland Park. | — | Executed | Lorig Construction Company $2,655,120 · | ||
| Jan 19, 2018 | 61E30 | WillDistrict 1 | Reconstruct Rathje Road from Joliet Road to Corning Avenue in the Village of Peotone. | — | Executed | P. T. Ferro Construction Co. $1,623,160 · | ||
| Jan 19, 2018 | 61E31 | DuPageDistrict 1 | Resurfacing Poplar Avenue from Park Avenue to Vallette Street in the City of Elmhurst. | — | Executed | J. A. Johnson Paving Company $596,413 · | ||
| Jan 19, 2018 | 61E33 | LakeDistrict 1 | Traffic signal improvement on US 12 from IL 176 to IL 22. | — | Executed | Home Towne Electric, Inc. $898,265 · | ||
| Jan 19, 2018 | 61E36 | McHenryDistrict 1 | Resurfacing Ringwood Road from Spring Grove Road to IL 120, and Barnard Mill Road from Ringwood Road to Illinois Route 31 in the Village of Ringwood. | — | Executed | Curran Contracting Company $1,610,135 · | ||
| Jan 19, 2018 | 62B16 | CookDistrict 1 | Reconstruction and signing at the intersection of Golf Road and Cumberland Circle in the city of Des Plaines. | — | Executed | Martam Construction Incorporated $4,574,690 · | ||
| Jan 19, 2018 | 62C34 | McHenryDistrict 1 | Intersection improvement on IL 47 at O'Brien/Vanderkarr Road and Thayer Road between the City of Woodstock and the village of Hebron. | — | Executed | Curran Contracting Company $2,047,474 · | ||
| Jan 19, 2018 | 62C90 | VariousDistrict 1 | Shoulder repair at various locations in the villages of South Elgin, Sugar Grove, Bensenville, North Aurora, West Dundee, Carpentersville, Elburn, Lily Lake, Huntley, and the cities of Batavia, Elgin, Geneva, St. Charles and Aurora. | — | Executed | Phoenix Corporation of the Quad Cities $228,844 · | ||
| Jan 19, 2018 | 62D54 | CookDuPageWillDistrict 1 | Guardrail and traffic barrier terminal removal and replacement on various arterial and expressway routes. | — | Executed | Kujo, Inc. $537,608 · | ||
| Jan 19, 2018 | 62F78 | CookDistrict 1 | Bridge substructure repairs to SN 016-0669 on I-90/94 at Addison in Chicago, SN 016-0511 and SN 016-0512 on I-190 at Des Plaines River Road in Rosemont. | — | Executed | F. H. Paschen, S.N. Nielsen & Associates LLC $589,497 · | ||
| Jan 19, 2018 | 62F79 | CookDuPageDistrict 1 | Cleaning and painting existing steel structures at various locations in the villages of Elmhurst, Wood Dale, Oakbrook, Westchester and LaGrange Park. | — | Executed | ERA-Valdivia Contractors, Inc. $679,108 · | ||
| Jan 19, 2018 | 62F80 | CookDistrict 1 | Cleaning and painting existing steel structures at various locations in the villages of Hodgkins, Willow Springs, Cicero and the city of Chicago. | — | Executed | ERA-Valdivia Contractors, Inc. $1,258,379 · | ||
| Jan 19, 2018 | 62G04 | VariousDistrict 1 | Pavement patching, miscellaneous traffic control and deck slab repairs on various expressways in District 1. | — | Executed | Copenhaver Construction, Inc. $2,180,500 · | ||
| Mar 9, 2018 | 46474 | VariousDistrict 1 | Place various widths of modified urethane, thermoplastic and hot-spray thermoplastic pavement marking line, letter and symbols as specified by individual work orders. | — | Executed | STF, LLC d/b/a Traffic Control Company $458,790 · | ||
| Mar 9, 2018 | 60T44 | CookDistrict 1 | Rehabilitation of bridge SN 016-1014 carrying IL 50 (Cicero Avenue) over I-57 in the City of Country Club Hills. | — | Executed | D. Construction, Inc. $2,814,624 · | ||
| Mar 9, 2018 | 60V22 | CookDistrict 1 | Remove three cell cast-in-place box culvert SN:016-1036 and replace with a slab bridge to carry US 12/45 over Addison Creek in the Village of Stone Park. | — | Executed | D. Construction, Inc. $2,497,679 · | ||
| Mar 9, 2018 | 60X10 | WillDistrict 1 | Interchange reconstruction of I-55 at Weber Road and roadway reconstruction of Weber Road from Normantown Road to Rodeo Drive in the municipalities of Bolingbrook and Romeoville. | — | Executed | Judlau Contracting, Inc. $47,970,125 · | ||
| Mar 9, 2018 | 60X51 | LakeDistrict 1 | Remove and replace the bridge carrying westbound US 12 over southbound IL 59 in the village of Fox Lake. | — | Executed | Areatha Construction Co., Inc. $2,853,198 · | ||
| Mar 9, 2018 | 61D22 | WillDistrict 1 | Reconstruction, resurfacing, bike/ped path, rehabilitate the structure over over Union Ditch and construction of pedestrian structure over Union Ditch, on St. Francis Road from 88th Avenue to 80th Avenue in the Village of Frankfort. | — | Executed | Iroquois Paving Corporation $3,351,885 · | ||
| Mar 9, 2018 | 61D29 | McHenryDistrict 1 | Remove two bridges, and the construction of a single bridge to carry Deerpass Road over the north branch of the Kishwaukee River, 0.7 miles north of Illinois Route 176. | — | Executed | Dunnet Bay Construction Company $3,789,351 · | ||
| Mar 9, 2018 | 61D42 | CookDistrict 1 | Intersection improvement, channelization and traffic signals on FAP Route 876 (CH 1) from Interstate 80 ramp to 170th Street in the Village of East Hazel Crest. | — | Executed | D. Construction, Inc. $2,425,620 · | ||
| Mar 9, 2018 | 61D47 | WillDistrict 1 | Reconstruction of Weber Road from Normantown Road to 135th Street in Romeoville. | — | Executed | R. W. Dunteman Company $20,364,790 · | ||
| Mar 9, 2018 | 61E23 | McHenryDistrict 1 | Replace bridge carrying Oak Grove Road over drainage ditch, .7 mile southwest of US 14. | — | Executed | Alliance Contractors, Inc. $491,679 · | ||
| Mar 9, 2018 | 61E27 | CookDistrict 1 | Lighting, landscaping and sidewalk improvements along Norhtwest Highway from Touhy Avenue to Washington Avenue in the city of Park Ridge. | — | Executed | Lorusso Cement Contractors, Inc. $1,750,505 · | ||
| Mar 9, 2018 | 61E32 | CookDistrict 1 | Sidewalk and lighting improvements on FAU Route 1602 (147th Street) from Pulaski Road to Homan Avenue in the Village of Midlothian. | — | Executed | Davis Concrete Construction Co. $762,257 · | ||
| Mar 9, 2018 | 61E35 | DuPageDistrict 1 | Resurfacing and reconstruction on Park Boulevard from IL Route 38 to Crescent Boulevard, and on Main Street from IL Route 38 to Fairview Avenue in the Village of Glen Ellyn. | — | Executed | R. W. Dunteman Company $2,944,990 · | ||
| Mar 9, 2018 | 61E37 | DuPageDistrict 1 | resurfacing improvments on West Street from IL 38 (Roosevelt Road) to Wesley Street in the City of Wheaton. | — | Executed | Geneva Construction Company $375,759 · | ||
| Mar 9, 2018 | 61E38 | LakeDistrict 1 | Resurfacing from Fairfield Road to Gilmer Road in the Village of Hawthorn Woods. | — | Executed | Peter Baker & Son Co. $430,262 · | ||
| Mar 9, 2018 | 61E41 | CookDistrict 1 | Resurfacing on Austin Avenue from 111th Street to 107th Street in the Village of Chicago Ridge. | — | Executed | Iroquois Paving Corporation $511,990 · | ||
| Mar 9, 2018 | 61E43 | DuPageDistrict 1 | Construction of a multi-use path along Great Western Trail from Sassafras Drive to Prince Crossing Road. | — | Executed | Chicagoland Paving Contractors, Inc. $224,900 · | ||
| Mar 9, 2018 | 61E48 | CookDistrict 1 | Construction of a roundabout at 147th Street and Ravinia Avenue in the Village of Orland Park. | — | Executed | R. W. Dunteman Company $1,988,192 · | ||
| Mar 9, 2018 | 61E49 | McHenryDistrict 1 | Replace the bridge carrying Main Street over Crystal Creek in the Village of Algonquin. | — | Executed | Martam Construction Incorporated $2,482,796 · | ||
| Mar 9, 2018 | 61E50 | CookDistrict 1 | Resurfacing, sidewalks and pavement markings on various routes in the Village of Orland Hills. | — | Executed | Iroquois Paving Corporation $755,069 · | ||
| Mar 9, 2018 | 62A93 | CookDistrict 1 | Landscaping along FAI Route 55 (Stevenson Expressway) from just east of FAI Route I-94 (Dan Ryan Expressway) near Prairie Avenue to US 41 (Lake Shore Drive), in the city of Chicago. | — | Rejected | Nettle Creek Nursery, Inc. $1,388,898 · | ||
| Mar 9, 2018 | 62A95 | WillDistrict 1 | Culvert replacement on US Route 45/52, approximately 1.4 miles south of US Route 52 in unincorporated Will County. | — | Executed | Iroquois Paving Corporation $644,048 · | ||
| Mar 9, 2018 | 62B99 | CookDistrict 1 | Removal of the existing superstructure at Old Willow Road over the Des Plaines River, substructure modification and construction of a new pedestrian truss superstructure. | — | Executed | Rausch Infrastructure LLC $2,169,410 · | ||
| Mar 9, 2018 | 62C95 | CookDistrict 1 | Resurfacing and pedestrian ramps on Cicero Avenue from Chicago, Central and Pacific Railroad to Congress Parkway in the city of Chicago and the township of Cicero. | — | Executed | K-Five Construction Corporation $1,959,484 · | ||
| Mar 9, 2018 | 62F04 | WillDistrict 1 | Embankment stabilization along both sides of US 45 between I-80 and the METRA Railroad. | — | Executed | D. Construction, Inc. $1,115,027 · | ||
| Mar 9, 2018 | 62F33 | CookDistrict 1 | Bridge deck repairs on the structure carrying IL 58 over Poplar Creek in Hanover Township. | — | Executed | Areatha Construction Co., Inc. $125,051 · | ||
| Mar 9, 2018 | 62F40 | CookDistrict 1 | Replace the existing Programmable Logic Controllers for the Kennedy Expressway Reversible Lane Control system. | — | Rejected | Meade Inc. $1,321,070 · | ||
| Mar 9, 2018 | 62F70 | CookDistrict 1 | Pavement grooving of existing PCC pavement on Kennedy Expressway from south of Kimball Avenue to north of Addison Street in the city of Chicago. | — | Rejected | |||
| Mar 9, 2018 | 62F89 | VariousDistrict 1 | Tree removal in various locations in various counties in District 1. | — | Executed | McGinty Bros., Inc. $203,800 · | ||
| Mar 9, 2018 | 62F93 | WillDistrict 1 | Cleaning and painting existing steel structures at various locations in the villages of Monee, Peotone and the city of Joliet. | — | Executed | Eagle Painting & Maintenance Company, Inc. $524,711 · | ||
| Mar 9, 2018 | 62F96 | VariousDistrict 1 | Mowing the medians and roadsides of expressways and access controlled arterial routes in District One. | — | Executed | Endrizzi Contracting, Inc $290,800 · | ||
| Mar 9, 2018 | 62F97 | VariousDistrict 1 | Mowing the medians and roadsides of expressways and access controlled arterial routes in District One. | — | Executed | McGinty Bros., Inc. $144,120 · | ||
| Mar 9, 2018 | 62G05 | VariousDistrict 1 | Remove and replace signs along various expressways and arterial routes in various counties. | — | Executed | Western Remac, Inc. $612,825 · | ||
| Mar 9, 2018 | 62G09 | VariousDistrict 1 | Weed control at various locations throughout District 1. | — | Executed | McGinty Bros., Inc. $153,250 · | ||
| Apr 27, 2018 | 60C48 | CookDistrict 1 | Relocation of Pump station 8 on US 14 in the City of Des Plaines. | — | Executed | Herlihy Mid-Continent Company $7,098,601 · | ||
| Apr 27, 2018 | 60K78 | CookDistrict 1 | Replace bridge SN 016-1302 carrying US Route 6/IL 83 over the little Calumet River. | — | Executed | D. Construction, Inc. $5,453,097 · | ||
| Apr 27, 2018 | 60P55 | WillDistrict 1 | Local centralized control and operation of the six movable bridges from Ruby Street to Brandon Road in the City of Joliet | — | Rejected | Meade Inc. $21,260,736 · | ||
| Apr 27, 2018 | 60T75 | LakeDistrict 1 | Reconstruct US 45 on a new alignment and re-align Grass Lake Road to create a four-legged intersection with US 45 and Millburn Road in the Villages of Old Mill Creek and Lindenhurst. | — | Executed | Berger Excavating Contractors, Inc. $15,577,444 · | ||
| Apr 27, 2018 | 60V18 | WillDistrict 1 | Resurfacing and pedestrian ramps on US 30 from Collins Street to I-80 in the City of Joliet. | — | Executed | D. Construction, Inc. $1,753,921 · | ||
| Apr 27, 2018 | 60Y26 | CookDistrict 1 | Intersection improvement, horizontal realignment and culvert replacement at US 6 and 179th Street in the village of Orland Park. | — | Executed | Iroquois Paving Corporation $2,478,965 · | ||
| Apr 27, 2018 | 60Y83 | LakeDistrict 1 | Resurfacing, pedestrian ramps and drainage work in the villages of Island Lake and Wauconda. | — | Executed | Lorig Construction Company $1,105,951 · | ||
| Apr 27, 2018 | 61B91 | CookDistrict 1 | Sidewalk construction adjacent to Ballard Road, from Bender Road to Good Avenue in the City of Des Plaines. | — | Executed | Martam Construction Incorporated $462,764 · | ||
| Apr 27, 2018 | 61C48 | LakeDistrict 1 | Reconstruction, drainage improvements, and bike/pedestrian path construction on Sayton Road from US 12 to Rollins Road, and from Rollins Road to Industrial Avenue in the Village of Fox Lake. | — | Executed | Berger Excavating Contractors, Inc. $1,769,565 · | ||
| Apr 27, 2018 | 61C86 | KaneDistrict 1 | Widening and reconstruction of Huntley Road from Sleepy Hollow Road to Elm Avenue in the Village of West Dundee. | — | Executed | Plote Construction, Inc. $7,831,951 · | ||
| Apr 27, 2018 | 61D92 | DuPageDistrict 1 | Resurfacing on Central Avenue from Gary Avenue to Roselle Road in the Village of Roselle. | — | Executed | Arrow Road Construction Co. $888,255 · | ||
| Apr 27, 2018 | 61E22 | LakeDistrict 1 | Reconstruction and widening to add one thru lane in each direction and bicycle/pedestrian accommodations on Quentin Road from IL 22 to White Pine Road. | — | Executed | Lake County Grading Company, LLC $20,129,203 · | ||
| Apr 27, 2018 | 61E34 | McHenryDistrict 1 | Resurface Pearl Street from IL 31 to North River Road, and resurfacing Lincoln Road from North River Road to Chapel Hill Road in the City of McHenry. | — | Executed | Lorig Construction Company $2,551,352 · | ||
| Apr 27, 2018 | 61E40 | DuPageDistrict 1 | Construction of a multi-use trail along Taylor Avenue from Walnut Street to Willis Street, and the Construction of a tunnel under the Union Pacific Railroad, in the Village of Glen Ellyn. | — | Executed | D. Construction, Inc. $2,745,521 · | ||
| Apr 27, 2018 | 61E42 | DuPageDistrict 1 | Resurfacing on Army Trail Bouldevard from Mill Road to Rohlwing Road in the Village of Addison. | — | Executed | R. W. Dunteman Company $3,624,672 · | ||
| Apr 27, 2018 | 61E45 | CookDistrict 1 | Platform and ramp improvements, sidewalks and pedestrian lighting at the Stone Avenue METRA Station in the Village of La Grange. | — | Executed | Kovilic Construction Company, Inc. $1,349,623 · | ||
| Apr 27, 2018 | 61E47 | WillDistrict 1 | Intersection improvement at West 167th Street and Gougar Road in the City of Lockport. | — | Executed | D. Construction, Inc. $1,576,688 · | ||
| Apr 27, 2018 | 61E51 | CookDistrict 1 | Resurfacing with curb and gutter on Custer Avenue from 47th Avenue to Ogden Avenue in the Village of Brookfield. | — | Executed | K-Five Construction Corporation $1,624,937 · | ||
| Apr 27, 2018 | 61E54 | CookDistrict 1 | Resurfacing Chicago Avenue from Thatcher Avenue to Harlem Avenue in the Village of River Forest. | — | Executed | J. A. Johnson Paving Company $1,642,246 · | ||
| Apr 27, 2018 | 61E55 | DuPageDistrict 1 | Resurfacing, sidewalk construction and roadway reconstruction on Railroad Avenue from York Avenue to Addison Street in the Village of Bensenville. | — | Executed | R. W. Dunteman Company $1,290,683 · | ||
| Apr 27, 2018 | 61E57 | CookDistrict 1 | Reconstruction of Oak Park Avenue from 167th Street to 159th Street in the Village of Tinley Park. | — | Executed | Iroquois Paving Corporation $1,655,722 · | ||
| Apr 27, 2018 | 61E58 | DuPageDistrict 1 | Resurfacing Internationale Parkway from Beaudin Boulevard to Woodward Avenue in the Village of Woodridge. | — | Executed | D. Construction, Inc. $807,962 · | ||
| Apr 27, 2018 | 61E59 | LakeDistrict 1 | Resurfacing Golf Road from Butterfield road to Milwaukee Avenue in the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $1,240,026 · | ||
| Apr 27, 2018 | 61E60 | CookDistrict 1 | Construction of a multi-use trail, located east of Stony Island, from 97th Street to 103rd Street in the City of Chicago. | — | Executed | Pan-Oceanic Engineering Co., Inc. $1,393,925 · | ||
| Apr 27, 2018 | 61E61 | DuPageDistrict 1 | Resurfacing Main Street from Franklin Street to Ogden Avenue in the Village of Downers Grove. | — | Executed | J. A. Johnson Paving Company $591,945 · | ||
| Apr 27, 2018 | 61E62 | DuPageDistrict 1 | Resurfacing and ADA improvements on York Street from North Avenue to First Street in the City of Elmhurst. | — | Executed | K-Five Construction Corporation $666,667 · | ||
| Apr 27, 2018 | 61E63 | CookDistrict 1 | Resurfacing Wolf Road from North Avenue to Winters Drive in the City of Northlake. | — | Executed | Plote Construction, Inc. $1,938,532 · | ||
| Apr 27, 2018 | 61E65 | DuPageDistrict 1 | Resurfacing, curb, gutter and sidewalks on North Main Street from Seminary Avenue to Cole Avenue in the City of Wheaton. | — | Executed | R. W. Dunteman Company $892,096 · | ||
| Apr 27, 2018 | 61E66 | LakeDistrict 1 | Construction of a multi-use path adjacent to Molidor Road, from 0.5 mile west of Fish Lake Road to Fish Lake Road in Grant Township. | — | Executed | Campanella and Sons, Inc. $313,595 · | ||
| Apr 27, 2018 | 61E68 | CookDistrict 1 | Construction of a multi-use path adjacent to Roselle Road from Hillcrest Boulevard to Central Road in the Village of Schaumburg. A new structure will be constructed to carry the path over Central Road. | — | Executed | Lorig Construction Company $3,865,086 · | ||
| Apr 27, 2018 | 61E70 | LakeDistrict 1 | Sidewalk construction algon Clavey Road from Barberry Road to the Skokie Valley Bike Path in the City of Highland Park. | — | Executed | Sumit Construction Co., Inc. $54,111 · | ||
| Apr 27, 2018 | 61E71 | CookDistrict 1 | Intersection improvement at North Avenue and US 20 (Lake Street) in the Village of Streamwood. | — | Executed | Martam Construction Incorporated $809,831 · | ||
| Apr 27, 2018 | 61E72 | CookDistrict 1 | Intersection improvement, signal replacement, channelization, and reconstruction of East Avenue in the Village of Streamwood. | — | Executed | Alliance Contractors, Inc. $478,629 · | ||
| Apr 27, 2018 | 61E73 | KaneDistrict 1 | Intersection reConstruction at Huntley Road and IL 31 in the Village of Carpentersville. | — | Executed | Plote Construction, Inc. $9,637,830 · | ||
| Apr 27, 2018 | 62A14 | LakeDistrict 1 | ADA ramp improvement on various routes in the villages of Deerfield and Lake Bluff and the cities of Highland park and Lake Forest. | — | Executed | Sumit Construction Co., Inc. $539,989 · | ||
| Apr 27, 2018 | 62B13 | CookDistrict 1 | Joint reconstruction and repair of the bridge structure SN 016-0153 carrying NB I-94 over SB Stony Island Avenue in the City of Chicago. | — | Executed | Path Construction Company, Inc. $407,750 · | ||
| Apr 27, 2018 | 62B45 | WillDistrict 1 | Shoulder widening, milled rumble strips and guardrail replacement on US 52 from Spencer Road to US 45 in the village of Manhattan and unincorporated Will County. | — | Executed | D. Construction, Inc. $1,555,085 · | ||
| Apr 27, 2018 | 62B84 | LakeDistrict 1 | Repair culvert carrying IL 22 over East Tributary to Flint Creek, 1.2 miles West of IL 59. | — | Executed | D. Construction, Inc. $360,217 · | ||
| Apr 27, 2018 | 62B94 | McHenryDistrict 1 | Rehabilatation of the existing culvert structures over unnamed ditches in the townships of Dunham and Hartland. | — | Executed | Phoenix Corporation of the Quad Cities $188,777 · | ||
| Apr 27, 2018 | 62C15 | CookDistrict 1 | Fiber optic cable and PTZ camera installation in Schaumburg. | — | Executed | Hecker and Company, Inc. $910,414 · | ||
| Apr 27, 2018 | 62C17 | KaneDistrict 1 | Resurfacing, centerline rumble strips and pedestrian ramp upgrades on IL 72 from Reinking Road to Van Buren Street in the Villages of Pingree Grove, Gilberts, River West Dundee, Elgin and Sleepy Hollow. | — | Executed | Lorig Construction Company $2,978,656 · | ||
| Apr 27, 2018 | 62C24 | DuPageDistrict 1 | Remove and replace bridge structure SN 022-0103 carrying I-290 over Salt Creek. | — | Executed | Dunnet Bay Construction Company $14,397,932 · |
1–100 of 2,975Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.