| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$100,000.00 |
$120,918.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 15,010 | CY |
$6.60 |
$10.00 |
$21.40 |
$7.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,995 | CY |
$10.00 |
$12.50 |
$17.98 |
$10.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$16,000.00 |
$10,100.00 |
$32,360.00 |
$8,200.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,125 | LF |
$1.90 |
$4.00 |
$3.43 |
$2.99 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 147 | LF |
$10.00 |
$11.25 |
$21.72 |
$18.95 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 8 | CY |
$110.00 |
$505.00 |
$110.24 |
$85.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 24,227 | SY |
$2.00 |
$4.00 |
$4.72 |
$3.95 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 5 | AC |
$240.00 |
$1,275.00 |
$1,433.00 |
$1,250.00 |
| 10 | 241 2832 |
MOWING | 10 | AC |
$125.00 |
$400.00 |
$453.00 |
$395.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,589 | CY |
$50.00 |
$46.00 |
$49.23 |
$33.50 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 7,649 | SY |
$8.00 |
$7.00 |
$6.74 |
$6.20 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 7,487 | SY |
$2.00 |
$3.05 |
$1.40 |
$2.60 |
| 14 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 7,487 | SY |
$2.00 |
$3.30 |
$1.40 |
$2.80 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 445 | TON |
$30.00 |
$26.00 |
$32.81 |
$24.00 |
| 16 | 407(B) 0250 |
TACK COAT | 1,060 | GAL |
$4.00 |
$3.65 |
$3.35 |
$3.50 |
| 17 | 408 5774 |
PRIME COAT | 2,252 | GAL |
$6.00 |
$5.50 |
$4.47 |
$5.50 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,516 | TON |
$75.00 |
$67.00 |
$85.05 |
$65.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 859 | TON |
$89.60 |
$93.00 |
$98.18 |
$89.00 |
| 20 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 18 | CY |
$20.00 |
$50.00 |
$30.62 |
$20.00 |
| 21 | 509(A) 0319 |
CLASS AA CONCRETE | 55 | CY |
$540.00 |
$750.00 |
$511.53 |
$700.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$300.00 |
$1,543.41 |
$300.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 9,480 | LB |
$1.20 |
$2.00 |
$1.10 |
$1.00 |
| 24 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 27 | TON |
$50.00 |
$35.00 |
$41.65 |
$27.50 |
| 25 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 138 | LF |
$85.00 |
$73.00 |
$105.13 |
$50.00 |
| 26 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 122 | LF |
$125.00 |
$83.00 |
$114.31 |
$60.00 |
| 27 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 450 | LF |
$17.80 |
$20.00 |
$16.07 |
$25.00 |
| 28 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 150 | LF |
$15.00 |
$20.00 |
$37.04 |
$25.00 |
| 29 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,600.00 |
$1,500.00 |
$1,392.00 |
$1,800.00 |
| 30 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 2 | EA |
$1,825.80 |
$1,700.00 |
$1,698.00 |
$2,000.00 |
| 31 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$750.00 |
$350.00 |
$413.00 |
$1,000.00 |
| 32 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,500.00 |
$6,500.00 |
$22,049.00 |
$5,000.00 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 48,259 | SY |
$4.50 |
$0.3000 |
$0.5700 |
$2.00 |
| 34 | 619(C) 0924 |
SAWING PAVEMENT | 66 | LF |
$7.50 |
$12.00 |
$16.70 |
$15.00 |
| 35 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 163 | LF |
$20.00 |
$23.00 |
$27.56 |
$22.50 |
| 36 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,275.00 |
$2,750.00 |
$2,966.00 |
$2,725.00 |
| 37 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,250.00 |
$1,900.00 |
$2,205.00 |
$1,850.00 |
| 38 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$190.00 |
$260.00 |
$220.00 |
$200.00 |
| 39 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 11 | EA |
$15.00 |
$15.50 |
$17.00 |
$15.00 |
| 40 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,400.00 |
$140,000.00 |
$2,205.00 |
$5,000.00 |
| 41 | 501(G) 6309 |
CLSM BACKFILL | 20 | CY |
$155.00 |
$1,050.00 |
$192.93 |
$150.00 |
| 42 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$2,600.00 |
$2,600.00 |
$6,890.00 |
$2,500.00 |
| 43 | 616(B) 5223 |
6" POLYVINYL CHLORIDE (PVC) PIPE | 750 | LF |
$13.00 |
$32.00 |
$33.07 |
$13.65 |
| 44 | 616(C) 0892 |
1" COPPER WATER SERVICE PIPE (LONG) | 1 | EA |
$500.00 |
$840.00 |
$2,977.00 |
$1,200.00 |
| 45 | 616(D) 1070 |
6" GATE VALVE | 3 | EA |
$2,600.00 |
$945.00 |
$1,654.00 |
$1,400.00 |
| 46 | 616(D) 5910 |
6" TAP | 2 | EA |
$500.00 |
$2,700.00 |
$717.00 |
$600.00 |
| 47 | 616(D) 8010 |
6" X 6" TAPPING SLEEVE | 2 | EA |
$1,200.00 |
$1,600.00 |
$1,323.00 |
$800.00 |
| 48 | 616(D) 8050 |
6" TAPPING VALVE AND BOX | 2 | EA |
$800.00 |
$840.00 |
$1,323.00 |
$1,400.00 |
| 49 | 616(F) 5208 |
METER INSTALLATION 1" | 1 | EA |
$800.00 |
$840.00 |
$1,268.00 |
$800.00 |
| 50 | 616(G) 1210 |
FLUSH FIRE HYDRANTS | 2 | EA |
$1,000.00 |
$2,800.00 |
$2,425.00 |
$2,500.00 |
| 51 | 616(J) 0175 |
BORE AND JACK 16" CASING | 1,050 | LF |
$75.00 |
$400.00 |
$322.60 |
$215.00 |
| 52 | 616(O) 0195 |
6" 22 1/2 DEGREE FITTING | 1 | EA |
$320.00 |
$165.00 |
$496.00 |
$400.00 |
| 53 | 616(P) 0200 |
6" HDPE PIPE | 1,150 | LF |
$20.00 |
$40.00 |
$22.05 |
$18.70 |
| 54 | 616(S) 0210 |
6" PLUG | 2 | EA |
$500.00 |
$300.00 |
$358.00 |
$500.00 |
| 55 | 616(T) 2500 |
6" X 6" X 6" TEE | 2 | EA |
$600.00 |
$300.00 |
$965.00 |
$1,200.00 |
| 56 | 616(V) 0100 |
HYDROSTATIC PRESSURE TESTING & DISINFECTION | 1 | LSUM |
$2,800.00 |
$3,000.00 |
$2,756.00 |
$4,000.00 |
| 57 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$40.00 |
$90.00 |
$34.81 |
$20.00 |
| 58 | 501(G) 6309 |
CLSM BACKFILL | 191.4 | CY |
$175.00 |
$195.00 |
$123.84 |
$150.00 |
| 59 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 2,990 | LF |
$220.00 |
$290.00 |
$396.00 |
$450.00 |
| 60 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$200.00 |
$175.00 |
$162.95 |
$250.00 |
| 61 | 504(B) 1305 |
SAW-CUT GROOVING | 2,940.9 | SY |
$5.00 |
$4.40 |
$4.50 |
$4.20 |
| 62 | 504(C) 6250 |
SEALED EXPANSION JOINT | 129.5 | LF |
$250.00 |
$245.00 |
$128.43 |
$230.00 |
| 63 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,323.4 | LF |
$85.00 |
$70.00 |
$95.77 |
$150.00 |
| 64 | 506(A) 1322 |
STRUCTURAL STEEL | 3,980 | LB |
$5.00 |
$3.00 |
$0.8800 |
$5.00 |
| 65 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 30 | EA |
$2,000.00 |
$3,250.00 |
$1,131.00 |
$2,550.00 |
| 66 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 30 | EA |
$2,000.00 |
$3,250.00 |
$1,131.00 |
$2,550.00 |
| 67 | 509 6152 |
SPECIAL CONCRETE FINISH | 187 | SY |
$70.00 |
$150.00 |
$144.69 |
$250.00 |
| 68 | 509(A) 1326 |
CLASS AA CONCRETE | 711.9 | CY |
$550.00 |
$700.00 |
$1,017.42 |
$995.00 |
| 69 | 509(B) 1328 |
CLASS A CONCRETE | 306.4 | CY |
$1,500.00 |
$1,350.00 |
$917.50 |
$995.00 |
| 70 | 511(A) 1332 |
REINFORCING STEEL | 1,090 | LB |
$1.50 |
$1.30 |
$0.9400 |
$1.70 |
| 71 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 197,640 | LB |
$1.30 |
$1.60 |
$0.9900 |
$1.80 |
| 72 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 90 | LF |
$35.00 |
$45.00 |
$30.86 |
$36.00 |
| 73 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 267 | LF |
$40.00 |
$55.00 |
$39.45 |
$46.00 |
| 74 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 90 | LF |
$20.00 |
$35.00 |
$154.34 |
$18.00 |
| 75 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 267 | LF |
$20.00 |
$40.00 |
$121.80 |
$23.00 |
| 76 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 77 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,592 | SY |
$4.50 |
$4.15 |
$3.40 |
$4.00 |
| 78 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 282 | LF |
$1,500.00 |
$2,300.00 |
$1,867.90 |
$3,750.00 |
| 79 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$3,000.00 |
$1,543.00 |
$10,000.00 |
| 80 | 523(A) 6550 |
SEALER CRACK PREPARATION | 85 | LF |
$10.00 |
$5.25 |
$10.38 |
$5.00 |
| 81 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$200.00 |
$210.00 |
$165.37 |
$200.00 |
| 82 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,320 | TON |
$50.00 |
$38.00 |
$38.11 |
$40.00 |
| 83 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 440 | TON |
$30.00 |
$30.00 |
$40.58 |
$35.00 |
| 84 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 86 | LF |
$30.00 |
$22.00 |
$21.79 |
$40.00 |
| 85 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 10 | LF |
$30.00 |
$22.00 |
$27.56 |
$40.00 |
| 86 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$230,000.00 |
$124,575.00 |
$15,000.00 |
| 87 | 804(A) 2915 |
STRUCTURAL CONCRETE | 2 | CY |
$650.00 |
$485.00 |
$165.37 |
$150.00 |
| 88 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$250.00 |
$255.00 |
$110.00 |
$100.00 |
| 89 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 91 | SF |
$20.00 |
$15.50 |
$22.05 |
$20.00 |
| 90 | 851(C) 8324 |
2" SQUARE TUBE POST | 223 | LF |
$12.00 |
$5.25 |
$8.82 |
$8.00 |
| 91 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 8,614 | LF |
$1.10 |
$0.5700 |
$0.6900 |
$0.6300 |
| 92 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 48 | LF |
$40.00 |
$51.00 |
$34.45 |
$75.00 |
| 93 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 16,560 | SD |
$0.3000 |
$0.2600 |
$0.1100 |
$0.1000 |
| 94 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 10,800 | SD |
$0.6000 |
$0.0600 |
$0.1100 |
$0.1000 |
| 95 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,080 | SD |
$1.40 |
$2.55 |
$2.20 |
$2.00 |
| 96 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,880 | SD |
$0.9000 |
$1.05 |
$2.20 |
$2.00 |
| 97 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.50 |
$2.05 |
$2.20 |
$2.00 |
| 98 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,840 | SD |
$0.6000 |
$0.2600 |
$0.2800 |
$0.2500 |
| 99 | 880(F) 8878 |
DRUMS | 3,600 | SD |
$0.3000 |
$0.5700 |
$0.2200 |
$0.2000 |
| 100 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$1,525.00 |
$1,654.00 |
$1,500.00 |
| 101 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$35.00 |
$60.00 |
$33.07 |
$30.00 |
| 102 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$53,742.00 |
$25,000.00 |
$24,733.00 |
$12,500.00 |
| 103 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,500.00 |
$2,606.36 |
$5,512.00 |
$12,000.00 |
| 104 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$9,425.00 |
$9,922.00 |
$8,500.00 |
| 105 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$232,508.00 |
$292,165.00 |
$279,941.00 |
$640,000.00 |