| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$12,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 15,807 | CY |
$10.00 |
$10.00 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 670 | CY |
$15.00 |
$15.00 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$18,000.00 |
$10,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,715 | LF |
$1.25 |
$1.15 |
$1.15 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 414 | LF |
$9.00 |
$6.25 |
$6.25 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 2,405 | LF |
$0.7500 |
$0.9000 |
$0.9000 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 24,866 | SY |
$1.40 |
$1.06 |
$1.06 |
| 9 | 230(F) 2812 |
WATERING | 995 | KGAL |
$2.20 |
$5.00 |
$5.00 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 6.14 | AC |
$300.00 |
$350.00 |
$350.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.14 | AC |
$400.00 |
$395.00 |
$395.00 |
| 12 | 241 2832 |
MOWING | 12.28 | AC |
$90.00 |
$45.00 |
$45.00 |
| 13 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 3,593 | CY |
$65.00 |
$41.55 |
$67.50 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 12,329 | SY |
$6.00 |
$6.00 |
$5.50 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 12,329 | SY |
$1.60 |
$1.50 |
$0.9000 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,917 | TON |
$25.00 |
$20.00 |
$22.76 |
| 17 | 407(B) 0250 |
TACK COAT | 3,606 | GAL |
$4.00 |
$2.25 |
$2.00 |
| 18 | 408 5774 |
PRIME COAT | 7,405 | GAL |
$6.00 |
$4.00 |
$3.00 |
| 19 | 409(A) 4242 |
FABRIC REINFORCEMENT | 16,762 | SY |
$2.25 |
$1.25 |
$1.50 |
| 20 | 409(B) 4268 |
BITUMINOUS BINDER | 3,353 | GAL |
$2.00 |
$2.00 |
$2.00 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,557 | TON |
$75.00 |
$51.70 |
$55.80 |
| 22 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,472 | TON |
$85.00 |
$72.35 |
$69.16 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,115 | TON |
$80.00 |
$75.00 |
$59.32 |
| 24 | 412 5267 |
COLD MILLING PAVEMENT | 14,875 | SY |
$2.50 |
$2.00 |
$1.00 |
| 25 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 28 | CY |
$25.00 |
$25.00 |
$26.25 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 75 | CY |
$155.00 |
$155.00 |
$126.00 |
| 27 | 509(A) 0319 |
CLASS AA CONCRETE | 78 | CY |
$470.00 |
$600.00 |
$908.00 |
| 28 | 509(D) 0325 |
CLASS C CONCRETE | 437 | CY |
$225.00 |
$210.00 |
$280.00 |
| 29 | 511(A) 0332 |
REINFORCING STEEL | 10,819 | LB |
$1.50 |
$0.8500 |
$1.26 |
| 30 | 609(B) 1501 |
1'-8" COMB. CURB & GUTTER (6" MNTBLE) | 69 | LF |
$20.00 |
$45.00 |
$33.60 |
| 31 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 1 | EA |
$4,000.00 |
$5,000.00 |
$2,572.50 |
| 32 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 90 | LF |
$75.00 |
$70.00 |
$66.15 |
| 33 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 96 | LF |
$35.00 |
$25.25 |
$43.05 |
| 34 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 198 | LF |
$30.00 |
$33.50 |
$45.15 |
| 35 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 78 | LF |
$40.00 |
$33.65 |
$47.25 |
| 36 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 302 | LF |
$12.00 |
$12.50 |
$10.00 |
| 37 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 101 | LF |
$12.50 |
$13.00 |
$10.00 |
| 38 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 8 | EA |
$1,200.00 |
$13.00 |
$1,837.50 |
| 39 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$1,700.00 |
$2,394.00 |
| 40 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$1,000.00 |
$1,200.00 |
$250.00 |
| 41 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$14,000.00 |
$15,000.00 |
$10,000.00 |
| 42 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 2,211 | SY |
$3.75 |
$3.75 |
$2.00 |
| 43 | 619(C) 0924 |
SAWING PAVEMENT | 4,376 | LF |
$4.00 |
$4.00 |
$1.50 |
| 44 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 800 | LF |
$17.50 |
$17.00 |
$17.00 |
| 45 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$750.00 |
$950.00 |
$950.00 |
| 46 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$2,700.00 |
$2,125.00 |
$2,125.00 |
| 47 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 750 | LF |
$5.00 |
$9.56 |
$9.56 |
| 48 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 179 | LF |
$30.00 |
$12.10 |
$12.10 |
| 49 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$185.00 |
$150.00 |
$150.00 |
| 50 | 629(C) 4960 |
MAILBOX | 2 | EA |
$55.00 |
$50.00 |
$50.00 |
| 51 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$20.00 |
$25.00 |
$25.00 |
| 52 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 17 | EA |
$15.00 |
$10.00 |
$15.00 |
| 53 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 34,000 | LF |
$0.1500 |
$0.1400 |
$0.1400 |
| 54 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 500 | EA |
$0.5600 |
$2.00 |
$2.00 |
| 55 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 17,000 | LF |
$0.2000 |
$0.2500 |
$0.2500 |
| 56 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,200 | SD |
$10.00 |
$3.00 |
$3.00 |
| 57 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,250 | LF |
$25.00 |
$23.00 |
$23.00 |
| 58 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,920 | SD |
$0.3500 |
$1.00 |
$1.00 |
| 59 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,160 | SD |
$0.7000 |
$1.00 |
$1.00 |
| 60 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,360 | SD |
$1.20 |
$0.5000 |
$0.5000 |
| 61 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$0.8000 |
$2.00 |
$2.00 |
| 62 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$1.40 |
$2.00 |
$2.00 |
| 63 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,360 | SD |
$0.3500 |
$0.2500 |
$0.2500 |
| 64 | 880(F) 8878 |
DRUMS | 3,600 | SD |
$0.2500 |
$0.5000 |
$0.5000 |
| 65 | 880(G) 8890 |
CHANNELIZER CONES | 1,800 | SD |
$0.3000 |
$0.5000 |
$0.5000 |
| 66 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 178 | SD |
$13.00 |
$20.00 |
$20.00 |
| 67 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 8,500 | LF |
$0.2000 |
$0.2600 |
$0.3000 |
| 68 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 15 | EA |
$55.00 |
$50.00 |
$50.00 |
| 69 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$235.00 |
$150.00 |
$150.00 |
| 70 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 72.56 | SF |
$18.00 |
$20.00 |
$20.00 |
| 71 | 851(C) 8324 |
2" SQUARE TUBE POST | 172.5 | LF |
$9.00 |
$8.00 |
$8.00 |
| 72 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 17,000 | LF |
$0.5000 |
$0.5000 |
$0.5000 |
| 73 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,135 | LF |
$2.00 |
$2.25 |
$2.25 |
| 74 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 8 | EA |
$195.00 |
$200.00 |
$200.00 |
| 75 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,067.84 |
$10,000.00 |
$19,820.00 |
| 76 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$5,000.00 |
| 77 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$115,000.00 |
$40,000.00 |
$124,999.37 |