| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$80,000.00 |
$74,250.00 |
$100,000.00 |
$84,000.00 |
$100,000.00 |
$94,400.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 35,526 | CY |
$7.50 |
$14.50 |
$10.00 |
$13.20 |
$10.00 |
$15.10 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$15.00 |
$10.00 |
$1.50 |
$16.50 |
$1.50 |
$16.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$107,050.00 |
$73,600.00 |
$100,000.00 |
$103,000.00 |
$100,000.00 |
$73,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 11,334 | LF |
$2.00 |
$1.00 |
$1.03 |
$1.13 |
$1.13 |
$1.10 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 721 | LF |
$7.50 |
$5.10 |
$5.10 |
$5.61 |
$5.60 |
$5.40 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 96,335 | SY |
$1.50 |
$1.10 |
$1.08 |
$1.19 |
$1.18 |
$1.15 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 39.8 | AC |
$400.00 |
$100.00 |
$100.00 |
$110.00 |
$110.00 |
$106.50 |
| 9 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 5 | EA |
$2,600.00 |
$2,000.00 |
$3,000.00 |
$2,500.00 |
$3,000.00 |
$2,175.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 13,433 | CY |
$45.00 |
$57.25 |
$49.00 |
$60.50 |
$54.00 |
$59.40 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 88,415 | SY |
$5.25 |
$3.50 |
$5.50 |
$4.68 |
$5.50 |
$4.65 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,959 | TON |
$25.00 |
$30.05 |
$25.25 |
$32.89 |
$31.50 |
$32.00 |
| 13 | 408 5774 |
PRIME COAT | 21,676 | GAL |
$5.00 |
$0.0100 |
$3.45 |
$3.50 |
$3.80 |
$3.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 12,361 | TON |
$70.00 |
$69.80 |
$62.15 |
$57.27 |
$69.00 |
$68.77 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,190 | TON |
$78.00 |
$63.10 |
$67.05 |
$65.97 |
$75.00 |
$74.07 |
| 16 | 412 5267 |
COLD MILLING PAVEMENT | 65,044 | SY |
$2.00 |
$1.05 |
$1.80 |
$1.75 |
$2.00 |
$2.20 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 42 | CY |
$20.00 |
$43.00 |
$15.00 |
$17.27 |
$15.00 |
$34.61 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 69 | CY |
$500.00 |
$660.60 |
$400.00 |
$405.44 |
$400.00 |
$581.30 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$300.00 |
$335.00 |
$330.00 |
$330.00 |
$330.00 |
$341.20 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 11,288 | LB |
$1.00 |
$1.00 |
$0.7500 |
$1.14 |
$0.7500 |
$0.8000 |
| 21 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,805 | TON |
$40.00 |
$50.85 |
$45.00 |
$49.50 |
$45.00 |
$48.70 |
| 22 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 305 | TON |
$55.00 |
$63.95 |
$45.00 |
$49.50 |
$45.00 |
$48.65 |
| 23 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 99 | TON |
$50.00 |
$51.35 |
$35.00 |
$34.10 |
$35.00 |
$36.50 |
| 24 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 80 | LF |
$130.00 |
$138.70 |
$100.00 |
$101.20 |
$100.00 |
$99.50 |
| 25 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 196 | LF |
$175.00 |
$140.30 |
$160.00 |
$161.70 |
$160.00 |
$158.90 |
| 26 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 358 | LF |
$110.00 |
$107.20 |
$95.00 |
$97.90 |
$95.00 |
$96.20 |
| 27 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 104 | LF |
$130.00 |
$112.45 |
$115.00 |
$111.10 |
$115.00 |
$110.00 |
| 28 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 44 | LF |
$150.00 |
$166.50 |
$155.00 |
$150.70 |
$155.00 |
$148.00 |
| 29 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 926 | LF |
$40.00 |
$50.20 |
$25.00 |
$27.50 |
$25.00 |
$27.00 |
| 30 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 304 | LF |
$50.00 |
$57.15 |
$35.00 |
$29.70 |
$35.00 |
$29.20 |
| 31 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 152 | LF |
$45.00 |
$60.95 |
$30.00 |
$31.90 |
$30.00 |
$31.40 |
| 32 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 56 | EA |
$300.00 |
$435.00 |
$150.00 |
$191.40 |
$150.00 |
$188.00 |
| 33 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 8 | EA |
$1,000.00 |
$1,190.00 |
$1,000.00 |
$1,120.90 |
$1,000.00 |
$1,100.00 |
| 34 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 18 | EA |
$300.00 |
$465.00 |
$175.00 |
$236.50 |
$175.00 |
$232.00 |
| 35 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,500.00 |
$1,875.00 |
$1,850.00 |
$1,951.40 |
$1,850.00 |
$1,920.00 |
| 36 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$1,710.00 |
$2,200.00 |
$1,853.50 |
$2,200.00 |
$1,822.00 |
| 37 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 6 | EA |
$2,000.00 |
$3,125.00 |
$1,800.00 |
$2,172.50 |
$1,800.00 |
$1,730.00 |
| 38 | 613(M) 7195 |
TYPE EE4 CULVERT END TREATMENT | 2 | EA |
$3,500.00 |
$3,815.00 |
$2,000.00 |
$2,915.00 |
$2,000.00 |
$2,712.00 |
| 39 | 613(P) 7030 |
24" X 18" GALV. STEEL CULVERT END SECTION ARCH | 10 | EA |
$350.00 |
$445.95 |
$160.00 |
$246.40 |
$160.00 |
$242.00 |
| 40 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$38,300.00 |
$35,000.00 |
$25,190.00 |
$35,000.00 |
$110,000.00 |
| 41 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 25 | LF |
$20.00 |
$21.85 |
$25.00 |
$22.00 |
$22.00 |
$21.30 |
| 42 | 624 4100 |
(PL) ORNAMENTAL FENCE | 2,568 | LF |
$35.00 |
$7.25 |
$6.65 |
$7.32 |
$7.30 |
$7.45 |
| 43 | 624(A) 4281 |
FENCE-STYLE WWF | 5,506 | LF |
$6.50 |
$6.00 |
$5.65 |
$6.22 |
$6.20 |
$6.15 |
| 44 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 15,560 | LF |
$6.00 |
$5.10 |
$4.00 |
$4.40 |
$4.40 |
$5.25 |
| 45 | 624(H) 5920 |
(PL) GATE | 17 | EA |
$650.00 |
$1,040.00 |
$1,000.00 |
$1,100.00 |
$1,100.00 |
$532.00 |
| 46 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 15 | EA |
$250.00 |
$104.00 |
$100.00 |
$150.00 |
$100.00 |
$160.00 |
| 47 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 21 | EA |
$50.00 |
$31.20 |
$50.00 |
$55.00 |
$55.00 |
$31.95 |
| 48 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$150.00 |
$202.80 |
$250.00 |
$275.00 |
$250.00 |
$207.60 |
| 49 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 133.02 | SF |
$20.00 |
$24.95 |
$15.00 |
$16.50 |
$20.00 |
$25.50 |
| 50 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 336 | LF |
$10.00 |
$10.90 |
$11.00 |
$12.10 |
$13.00 |
$11.20 |
| 51 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 53,406 | LF |
$0.2500 |
$0.1000 |
$0.1300 |
$0.1400 |
$0.2200 |
$0.1500 |
| 52 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$30,000.00 |
$46,100.00 |
$14,500.00 |
$31,500.00 |
$12,000.00 |
$16,000.00 |
| 53 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,634 | CY |
$15.00 |
$12.65 |
$10.00 |
$13.20 |
$10.00 |
$6.30 |
| 54 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$20.00 |
$15.60 |
$15.00 |
$16.50 |
$15.00 |
$24.50 |
| 55 | 501(F) 6352 |
GRANULAR BACKFILL | 74 | CY |
$70.00 |
$78.00 |
$75.00 |
$82.50 |
$75.00 |
$99.00 |
| 56 | 504(B) 1305 |
SAW-CUT GROOVING | 193.3 | SY |
$5.00 |
$10.40 |
$14.00 |
$18.37 |
$14.00 |
$13.75 |
| 57 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 218.1 | LF |
$80.00 |
$86.30 |
$75.00 |
$91.30 |
$75.00 |
$130.00 |
| 58 | 506(A) 1322 |
STRUCTURAL STEEL | 47,300 | LB |
$5.00 |
$2.60 |
$3.00 |
$2.75 |
$3.00 |
$3.90 |
| 59 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,100.00 |
$1,315.00 |
$600.00 |
$1,391.50 |
$600.00 |
$1,863.00 |
| 60 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,200.00 |
$1,315.00 |
$600.00 |
$1,391.50 |
$600.00 |
$1,863.00 |
| 61 | 509(A) 1326 |
CLASS AA CONCRETE | 58.9 | CY |
$600.00 |
$735.80 |
$600.00 |
$778.25 |
$600.00 |
$758.00 |
| 62 | 509(B) 1328 |
CLASS A CONCRETE | 69.8 | CY |
$650.00 |
$743.60 |
$600.00 |
$786.50 |
$600.00 |
$580.00 |
| 63 | 511(A) 1332 |
REINFORCING STEEL | 26,250 | LB |
$1.00 |
$0.9000 |
$0.7500 |
$0.9600 |
$0.7500 |
$1.12 |
| 64 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 184 | LF |
$35.00 |
$34.25 |
$25.00 |
$36.19 |
$25.00 |
$57.00 |
| 65 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 431 | LF |
$40.00 |
$40.05 |
$30.00 |
$42.35 |
$30.00 |
$66.30 |
| 66 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 184 | LF |
$20.00 |
$14.65 |
$15.00 |
$15.51 |
$15.00 |
$44.30 |
| 67 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 431 | LF |
$20.00 |
$17.15 |
$15.00 |
$18.15 |
$15.00 |
$43.00 |
| 68 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 69 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 620 | TON |
$40.00 |
$49.40 |
$45.00 |
$52.25 |
$45.00 |
$52.20 |
| 70 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 200 | TON |
$35.00 |
$39.00 |
$35.00 |
$41.25 |
$35.00 |
$46.85 |
| 71 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$30.00 |
$31.20 |
$25.00 |
$33.00 |
$25.00 |
$35.10 |
| 72 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 150 | LF |
$30.00 |
$31.20 |
$25.00 |
$33.00 |
$25.00 |
$11.70 |
| 73 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$8,840.00 |
$10,000.00 |
$9,350.00 |
$10,000.00 |
$24,672.82 |
| 74 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,560.00 |
$1,500.00 |
$1,265.00 |
$1,265.00 |
$1,225.00 |
| 75 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,500.00 |
$1,765.00 |
$1,500.00 |
$1,485.00 |
$1,485.00 |
$1,440.00 |
| 76 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$39,300.00 |
$31,200.00 |
$55,000.00 |
$66,500.00 |
$141,000.00 |
$52,700.00 |
| 77 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,500.00 |
$10,000.00 |
$10,000.00 |
$8,000.00 |
$12,500.00 |
| 78 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$276,100.00 |
$235,450.00 |
$400,000.00 |
$250,000.00 |
$240,000.00 |
$260,000.00 |