| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$26,000.00 |
$30,000.00 |
$57,250.00 |
$29,990.00 |
$27,000.00 |
$57,750.00 |
$75,000.00 |
$85,250.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 50,443 | CY |
$7.25 |
$4.15 |
$5.10 |
$5.45 |
$4.65 |
$6.45 |
$4.20 |
$6.00 |
$7.75 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 20,228 | CY |
$9.00 |
$5.20 |
$6.95 |
$6.50 |
$5.75 |
$6.90 |
$5.25 |
$5.00 |
$8.95 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$35,000.00 |
$19,240.00 |
$15,000.00 |
$51,475.00 |
$22,999.00 |
$29,000.00 |
$50,925.00 |
$45,947.00 |
$45,250.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 633 | LF |
$9.15 |
$20.80 |
$6.95 |
$18.95 |
$22.00 |
$18.95 |
$19.90 |
$20.00 |
$20.00 |
| 6 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 1,576 | CY |
$68.00 |
$156.00 |
$47.00 |
$70.00 |
$50.00 |
$40.00 |
$10.80 |
$40.00 |
$150.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 1,838 | LF |
$2.00 |
$2.10 |
$2.45 |
$4.95 |
$5.55 |
$4.95 |
$5.20 |
$5.00 |
$2.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 28,916 | SY |
$2.50 |
$3.10 |
$3.10 |
$2.95 |
$3.33 |
$2.95 |
$3.10 |
$3.00 |
$3.00 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 11.41 | AC |
$400.00 |
$2,600.00 |
$3,000.00 |
$2,950.00 |
$3,300.00 |
$2,950.00 |
$3,097.50 |
$2,500.00 |
$2,500.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 11.41 | AC |
$200.00 |
$1,560.00 |
$3,000.00 |
$2,950.00 |
$3,300.00 |
$2,950.00 |
$3,097.50 |
$2,500.00 |
$1,500.00 |
| 11 | 241 2832 |
MOWING | 37.82 | AC |
$80.50 |
$208.00 |
$50.00 |
$199.00 |
$225.00 |
$199.00 |
$208.95 |
$200.00 |
$200.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,636 | CY |
$44.00 |
$61.70 |
$49.50 |
$53.90 |
$57.50 |
$61.00 |
$58.80 |
$50.00 |
$56.00 |
| 13 | 307(D) 4230 |
LIME | 456 | TON |
$175.00 |
$65.00 |
$235.00 |
$165.00 |
$198.99 |
$164.00 |
$170.10 |
$160.00 |
$162.00 |
| 14 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 25,326 | SY |
$5.50 |
$3.45 |
$4.00 |
$3.35 |
$6.55 |
$4.65 |
$4.88 |
$4.00 |
$4.65 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 18,489 | SY |
$1.50 |
$1.85 |
$2.15 |
$1.20 |
$1.55 |
$1.00 |
$1.37 |
$1.00 |
$1.30 |
| 16 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 1,000 | SY |
$2.00 |
$6.85 |
$7.50 |
$4.70 |
$4.44 |
$1.40 |
$2.36 |
$2.00 |
$2.25 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,020 | TON |
$20.00 |
$29.60 |
$28.00 |
$25.75 |
$27.77 |
$35.00 |
$30.24 |
$30.00 |
$40.00 |
| 18 | 407(B) 0250 |
TACK COAT | 2,883 | GAL |
$2.00 |
$3.60 |
$3.80 |
$3.85 |
$3.99 |
$3.50 |
$3.83 |
$2.50 |
$3.65 |
| 19 | 408 5774 |
PRIME COAT | 13,101 | GAL |
$2.00 |
$3.50 |
$4.10 |
$3.40 |
$4.65 |
$5.00 |
$4.31 |
$2.50 |
$4.10 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,076 | TON |
$72.00 |
$66.90 |
$70.00 |
$68.60 |
$82.30 |
$67.00 |
$75.92 |
$65.00 |
$72.30 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,671 | TON |
$79.00 |
$79.30 |
$88.50 |
$83.20 |
$95.70 |
$84.50 |
$89.99 |
$75.00 |
$85.70 |
| 22 | 412 5267 |
COLD MILLING PAVEMENT | 2,507 | SY |
$2.15 |
$6.10 |
$7.00 |
$10.50 |
$8.88 |
$8.90 |
$11.39 |
$4.00 |
$12.00 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 2,247 | CY |
$20.00 |
$20.80 |
$15.00 |
$20.00 |
$7.77 |
$15.00 |
$15.75 |
$25.00 |
$25.00 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 462 | CY |
$470.00 |
$338.00 |
$330.00 |
$300.00 |
$395.00 |
$625.00 |
$564.13 |
$750.00 |
$541.26 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 331 | CY |
$300.00 |
$213.00 |
$345.00 |
$260.00 |
$295.00 |
$350.00 |
$344.13 |
$325.00 |
$352.15 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 74,738 | LB |
$0.8500 |
$1.05 |
$0.9500 |
$0.9500 |
$1.33 |
$1.15 |
$0.9900 |
$1.00 |
$0.9000 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 53 | LF |
$30.00 |
$29.90 |
$30.00 |
$34.10 |
$34.55 |
$23.00 |
$29.83 |
$50.00 |
$39.75 |
| 28 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 351 | LF |
$40.00 |
$34.30 |
$32.00 |
$38.95 |
$45.66 |
$30.00 |
$34.09 |
$55.00 |
$43.25 |
| 29 | 613(B) 0697 |
66" CORR. GALV. STEEL PIPE | 211 | LF |
$95.00 |
$137.50 |
$85.00 |
$117.50 |
$144.00 |
$98.00 |
$137.54 |
$110.00 |
$120.00 |
| 30 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 131 | LF |
$44.00 |
$30.40 |
$31.00 |
$34.25 |
$42.33 |
$23.00 |
$29.99 |
$50.00 |
$42.00 |
| 31 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 220 | LF |
$6.00 |
$20.80 |
$16.00 |
$7.00 |
$6.00 |
$13.00 |
$11.85 |
$10.00 |
$10.00 |
| 32 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 74 | LF |
$5.00 |
$10.40 |
$16.00 |
$15.00 |
$6.00 |
$13.00 |
$11.83 |
$10.00 |
$10.00 |
| 33 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 6 | EA |
$1,200.00 |
$2,392.00 |
$2,000.00 |
$900.00 |
$1,750.00 |
$1,650.00 |
$1,290.15 |
$1,000.00 |
$2,000.00 |
| 34 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 4 | EA |
$1,650.00 |
$2,912.00 |
$3,000.00 |
$1,800.00 |
$2,250.00 |
$1,750.00 |
$1,650.94 |
$1,300.00 |
$2,600.00 |
| 35 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$650.00 |
$500.00 |
$1,200.00 |
$900.00 |
$550.00 |
$1,000.00 |
$691.56 |
$1,200.00 |
$1,200.00 |
| 36 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$5,200.00 |
$7,500.00 |
$6,900.00 |
$7,250.00 |
$9,500.00 |
$5,250.00 |
$85,000.00 |
$35,000.00 |
| 37 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 9,075 | SY |
$4.00 |
$4.70 |
$5.75 |
$5.80 |
$5.25 |
$9.00 |
$4.73 |
$10.00 |
$15.00 |
| 38 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 430 | LF |
$5.00 |
$5.00 |
$2.00 |
$5.00 |
$4.75 |
$10.00 |
$4.20 |
$5.00 |
$5.00 |
| 39 | 619(C) 0924 |
SAWING PAVEMENT | 1,762 | LF |
$4.00 |
$3.50 |
$12.00 |
$4.00 |
$3.00 |
$10.00 |
$2.10 |
$5.00 |
$8.00 |
| 40 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 2,850 | LF |
$5.00 |
$10.20 |
$5.15 |
$5.00 |
$6.00 |
$5.00 |
$10.29 |
$10.00 |
$5.00 |
| 41 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,920 | LF |
$4.25 |
$10.90 |
$5.55 |
$5.30 |
$6.50 |
$5.30 |
$11.03 |
$11.00 |
$5.30 |
| 42 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$80.00 |
$151.00 |
$100.00 |
$100.00 |
$150.00 |
$100.00 |
$105.00 |
$110.00 |
$100.00 |
| 43 | 629(C) 4960 |
MAILBOX | 3 | EA |
$28.00 |
$31.20 |
$100.00 |
$50.00 |
$75.00 |
$50.00 |
$52.50 |
$100.00 |
$50.00 |
| 44 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$30.00 |
$29.10 |
$50.00 |
$5.00 |
$50.00 |
$5.00 |
$5.25 |
$100.00 |
$5.00 |
| 45 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,090 | CY |
$8.50 |
$8.30 |
$8.00 |
$20.00 |
$8.88 |
$6.40 |
$8.96 |
$25.00 |
$20.00 |
| 46 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 295 | CY |
$20.50 |
$20.80 |
$15.00 |
$20.00 |
$12.75 |
$16.00 |
$16.80 |
$30.00 |
$5.00 |
| 47 | 509(A) 1326 |
CLASS AA CONCRETE | 644 | CY |
$510.00 |
$338.00 |
$330.00 |
$331.00 |
$350.00 |
$500.00 |
$713.74 |
$750.00 |
$458.07 |
| 48 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 90,580 | LB |
$1.10 |
$1.05 |
$1.10 |
$1.10 |
$1.33 |
$1.35 |
$1.10 |
$1.50 |
$1.25 |
| 49 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$42,000.00 |
$20,800.00 |
$15,000.00 |
$25,000.00 |
$27,500.00 |
$50,000.00 |
$33,600.00 |
$135,000.00 |
$50,000.00 |
| 50 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 23,520 | LF |
$0.3000 |
$0.2000 |
$0.2100 |
$0.1000 |
$0.1300 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
| 51 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,000 | LF |
$0.1000 |
$2.60 |
$2.75 |
$1.00 |
$1.33 |
$1.00 |
$1.05 |
$1.10 |
$1.00 |
| 52 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 150 | SD |
$23.00 |
$4.15 |
$4.30 |
$5.00 |
$5.50 |
$5.00 |
$5.25 |
$5.50 |
$5.00 |
| 53 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,600 | SD |
$0.3500 |
$0.2600 |
$0.2800 |
$0.2500 |
$2.00 |
$0.2500 |
$0.2600 |
$0.2800 |
$0.2500 |
| 54 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,440 | SD |
$0.6500 |
$2.50 |
$2.50 |
$3.00 |
$3.66 |
$3.00 |
$3.15 |
$3.30 |
$3.00 |
| 55 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,000 | SD |
$1.35 |
$2.50 |
$2.50 |
$0.2500 |
$2.00 |
$0.2500 |
$0.2600 |
$0.2800 |
$0.2500 |
| 56 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,250 | SD |
$1.00 |
$0.0500 |
$0.1000 |
$1.00 |
$1.22 |
$1.00 |
$1.05 |
$1.10 |
$1.00 |
| 57 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$1.00 |
$7.30 |
$8.00 |
$0.2500 |
$0.3700 |
$0.2500 |
$0.2600 |
$0.2800 |
$0.2500 |
| 58 | 880(D) 8854 |
VERTICAL PANELS | 10,950 | SD |
$0.3500 |
$0.0200 |
$0.0400 |
$0.0500 |
$0.0800 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
| 59 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,200 | SD |
$0.3000 |
$0.0500 |
$0.0800 |
$0.0500 |
$0.0800 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
| 60 | 880(F) 8878 |
DRUMS | 8,250 | SD |
$0.3500 |
$0.0200 |
$0.0400 |
$0.1000 |
$0.1300 |
$0.1000 |
$0.1100 |
$0.2000 |
$0.1000 |
| 61 | 880(G) 8890 |
CHANNELIZER CONES | 6,150 | SD |
$0.3000 |
$0.0200 |
$0.0400 |
$0.0500 |
$0.0700 |
$0.0500 |
$0.0500 |
$0.1000 |
$0.0500 |
| 62 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 328 | SD |
$15.00 |
$14.60 |
$16.00 |
$10.00 |
$12.33 |
$10.00 |
$10.50 |
$15.00 |
$10.00 |
| 63 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$125.00 |
$104.00 |
$120.00 |
$25.00 |
$33.00 |
$25.00 |
$26.25 |
$50.00 |
$25.00 |
| 64 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$300.00 |
$208.00 |
$210.00 |
$150.00 |
$195.00 |
$150.00 |
$157.50 |
$200.00 |
$150.00 |
| 65 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 15 | SF |
$30.00 |
$46.80 |
$50.00 |
$25.00 |
$32.00 |
$25.00 |
$26.25 |
$30.00 |
$25.00 |
| 66 | 851(C) 8324 |
2" SQUARE TUBE POST | 30 | LF |
$15.00 |
$10.40 |
$12.00 |
$15.00 |
$20.00 |
$15.00 |
$15.75 |
$20.00 |
$15.00 |
| 67 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 13,800 | LF |
$0.6000 |
$0.6000 |
$0.6000 |
$0.5500 |
$0.6100 |
$0.5500 |
$0.5800 |
$0.6000 |
$0.5500 |
| 68 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$25,585.00 |
$15,000.00 |
$18,200.00 |
$27,500.00 |
$9,600.00 |
$33,180.00 |
$60,000.00 |
$20,000.00 |
| 69 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$3,000.00 |
$3,000.00 |
$25,750.00 |
$4,250.00 |
$1,275.00 |
$5,775.00 |
$5,500.00 |
$7,500.00 |
| 70 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$5,000.00 |
$5,000.00 |
$15,450.00 |
$12,750.00 |
$5,000.00 |
$8,400.00 |
$4,000.00 |
$6,000.00 |
| 71 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$180,000.00 |
$95,951.54 |
$185,000.00 |
$275,000.00 |
$125,000.00 |
$206,000.00 |
$198,184.19 |
$215,000.00 |
$331,011.12 |