| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$40,120.00 |
$81,305.00 |
$40,000.00 |
$76,494.39 |
$55,000.00 |
$42,130.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 198,819 | CY |
$6.00 |
$3.80 |
$3.85 |
$4.00 |
$4.62 |
$6.80 |
$4.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$38,715.00 |
$85,100.00 |
$40,000.00 |
$59,157.76 |
$38,715.00 |
$40,655.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,430 | LF |
$1.29 |
$1.65 |
$1.65 |
$1.65 |
$1.20 |
$1.65 |
$2.10 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$265.11 |
$344.00 |
$345.00 |
$344.00 |
$170.06 |
$344.00 |
$420.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,344 | LF |
$6.77 |
$9.50 |
$9.50 |
$9.50 |
$8.09 |
$9.50 |
$8.40 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 150 | CY |
$98.05 |
$73.00 |
$90.95 |
$73.00 |
$50.00 |
$73.00 |
$78.80 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 221,413 | SY |
$1.50 |
$1.98 |
$2.00 |
$1.98 |
$1.60 |
$1.98 |
$2.10 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 50 | AC |
$238.94 |
$325.00 |
$345.00 |
$325.00 |
$200.00 |
$325.00 |
$945.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 50 | AC |
$437.19 |
$437.00 |
$440.00 |
$437.00 |
$220.00 |
$437.00 |
$630.00 |
| 11 | 241 2832 |
MOWING | 92 | AC |
$62.85 |
$85.00 |
$85.65 |
$85.00 |
$60.00 |
$85.00 |
$105.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 117,731 | SY |
$5.86 |
$5.60 |
$4.95 |
$5.60 |
$4.72 |
$5.25 |
$9.25 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,562 | TON |
$32.09 |
$32.20 |
$26.70 |
$60.00 |
$36.68 |
$32.20 |
$33.80 |
| 14 | 407(B) 0250 |
TACK COAT | 25,567 | GAL |
$2.98 |
$2.00 |
$2.85 |
$2.00 |
$2.17 |
$3.00 |
$3.70 |
| 15 | 408 5774 |
PRIME COAT | 41,381 | GAL |
$3.51 |
$3.00 |
$2.55 |
$2.50 |
$2.00 |
$1.50 |
$7.30 |
| 16 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 13,839 | TON |
$80.89 |
$63.00 |
$65.00 |
$67.00 |
$77.38 |
$76.50 |
$72.40 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 49,846 | TON |
$78.20 |
$56.00 |
$57.15 |
$58.00 |
$67.48 |
$66.50 |
$67.00 |
| 18 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 9,226 | TON |
$99.74 |
$73.00 |
$71.30 |
$75.00 |
$80.53 |
$78.00 |
$79.50 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,001 | TON |
$77.22 |
$59.00 |
$68.70 |
$65.00 |
$71.49 |
$75.00 |
$73.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 24,148 | SY |
$2.79 |
$1.50 |
$3.55 |
$1.00 |
$1.00 |
$2.25 |
$2.00 |
| 21 | 509(A) 0319 |
CLASS AA CONCRETE | 13.34 | CY |
$502.14 |
$2,040.00 |
$743.00 |
$700.00 |
$798.00 |
$2,040.00 |
$2,371.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 51 | CY |
$382.98 |
$395.00 |
$353.00 |
$450.00 |
$275.00 |
$395.00 |
$459.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 2,151.9 | LB |
$1.34 |
$1.35 |
$4.15 |
$1.34 |
$1.50 |
$1.35 |
$1.55 |
| 24 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$2,450.70 |
$2,725.00 |
$1,630.00 |
$2,725.00 |
$1,615.00 |
$2,725.00 |
$2,862.00 |
| 25 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,097 | LF |
$66.01 |
$46.80 |
$40.00 |
$46.80 |
$56.00 |
$46.80 |
$49.10 |
| 26 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 602 | LF |
$66.37 |
$53.40 |
$54.65 |
$53.40 |
$74.00 |
$53.40 |
$56.10 |
| 27 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 456 | LF |
$69.76 |
$74.25 |
$70.25 |
$74.25 |
$97.00 |
$74.25 |
$78.00 |
| 28 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 478 | LF |
$97.37 |
$80.80 |
$99.50 |
$80.80 |
$132.00 |
$80.80 |
$84.90 |
| 29 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 46 | LF |
$53.21 |
$82.50 |
$65.45 |
$82.50 |
$75.00 |
$82.50 |
$86.60 |
| 30 | 613(A) 4506 |
29" X 45" R.C.PIPE ELLIPTICAL CLASS HE-III | 404 | LF |
$80.00 |
$135.00 |
$147.25 |
$135.00 |
$191.00 |
$135.00 |
$142.00 |
| 31 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$12.31 |
$8.00 |
$26.20 |
$20.00 |
$8.00 |
$22.50 |
$30.90 |
| 32 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$600.00 |
$1,085.00 |
$819.95 |
$1,085.00 |
$1,200.00 |
$1,085.00 |
$1,139.00 |
| 33 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,434.13 |
$1,395.00 |
$1,575.00 |
$1,395.00 |
$2,150.00 |
$1,395.00 |
$1,465.00 |
| 34 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$1,087.09 |
$1,070.00 |
$1,110.00 |
$1,087.09 |
$1,480.00 |
$1,070.00 |
$1,244.00 |
| 35 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 1 | EA |
$2,000.00 |
$1,986.00 |
$1,210.00 |
$2,000.00 |
$2,250.00 |
$1,986.00 |
$2,309.00 |
| 36 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 3 | EA |
$3,000.00 |
$1,767.00 |
$1,610.00 |
$3,000.00 |
$2,350.00 |
$1,767.00 |
$2,054.00 |
| 37 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 16 | EA |
$3,000.00 |
$2,237.00 |
$1,715.00 |
$3,000.00 |
$2,725.00 |
$2,237.00 |
$2,600.00 |
| 38 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 12 | EA |
$1,314.21 |
$1,347.00 |
$1,160.00 |
$1,314.21 |
$1,715.00 |
$1,347.00 |
$1,566.00 |
| 39 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,360.76 |
$1,587.00 |
$1,310.00 |
$1,360.76 |
$2,180.00 |
$1,587.00 |
$1,845.00 |
| 40 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$1,400.00 |
$1,745.00 |
$1,410.00 |
$1,400.00 |
$2,645.00 |
$1,745.00 |
$2,029.00 |
| 41 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 1 | EA |
$3,000.00 |
$2,147.00 |
$1,815.00 |
$3,000.00 |
$2,860.00 |
$2,147.00 |
$2,496.00 |
| 42 | 613(M) 7203 |
TYPE CC6 CULVERT END TREATMENT | 2 | EA |
$3,500.00 |
$2,843.00 |
$2,015.00 |
$3,500.00 |
$3,925.00 |
$2,843.00 |
$3,305.00 |
| 43 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,344.72 |
$5,950.00 |
$2,317.00 |
$7,500.00 |
$21,372.10 |
$5,950.00 |
$6,248.00 |
| 44 | 619(B) 0291 |
REMOVAL OF HEADWALL | 7 | EA |
$899.19 |
$645.00 |
$1,110.00 |
$850.00 |
$850.00 |
$645.00 |
$677.50 |
| 45 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 41,032.04 | SY |
$3.96 |
$5.60 |
$3.55 |
$5.00 |
$7.28 |
$5.50 |
$8.05 |
| 46 | 619(C) 0924 |
SAWING PAVEMENT | 5,983 | LF |
$4.21 |
$2.00 |
$2.75 |
$3.00 |
$1.00 |
$4.00 |
$1.85 |
| 47 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 26,157 | LF |
$3.99 |
$3.95 |
$4.00 |
$4.67 |
$3.50 |
$3.50 |
$4.15 |
| 48 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 140,000 | LF |
$0.0900 |
$0.0900 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0900 |
| 49 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 25,000 | EA |
$0.4400 |
$0.4800 |
$0.3500 |
$0.3500 |
$0.3500 |
$0.3500 |
$0.5000 |
| 50 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 10,000 | LF |
$0.2000 |
$0.5500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.5800 |
| 51 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 11,000 | SD |
$0.0700 |
$0.0200 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.0200 |
| 52 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 10,000 | SD |
$0.5100 |
$0.0500 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.0500 |
| 53 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,000 | SD |
$0.7500 |
$1.70 |
$1.50 |
$1.50 |
$1.50 |
$1.50 |
$1.80 |
| 54 | 880(C) 8836 |
CONSTRUCTION BARRICADES(TYPE II) | 2,000 | SD |
$1.00 |
$0.0200 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$0.0200 |
| 55 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,500 | SD |
$0.1400 |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
$2.10 |
| 56 | 880(C) 8848 |
WING BARRICADES | 1,500 | SD |
$0.2800 |
$0.0500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.0500 |
| 57 | 880(D) 8854 |
VERTICAL PANELS | 9,000 | SD |
$0.0800 |
$0.0500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.0500 |
| 58 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 19,000 | SD |
$0.1100 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 59 | 880(F) 8878 |
DRUMS | 3,500 | SD |
$0.2200 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5300 |
| 60 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$22.00 |
$20.00 |
$10.00 |
$10.00 |
$10.00 |
$10.00 |
$21.00 |
| 61 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 61,400 | LF |
$0.1400 |
$0.1000 |
$0.0700 |
$0.1400 |
$0.1100 |
$0.0700 |
$0.1100 |
| 62 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,401.83 |
$1,500.00 |
$1,007.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$1,575.00 |
| 63 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 493 | SF |
$19.30 |
$22.00 |
$15.15 |
$15.00 |
$15.00 |
$15.00 |
$23.10 |
| 64 | 851(C) 8324 |
2" SQUARE TUBE POST | 722 | LF |
$7.64 |
$10.50 |
$8.05 |
$8.00 |
$8.00 |
$8.00 |
$11.00 |
| 65 | 853 9048 |
DELINEATORS(TYPE 1, CODE 3, FLEXIBLE) | 50 | EA |
$50.00 |
$39.00 |
$0.0100 |
$10.00 |
$30.00 |
$30.00 |
$41.00 |
| 66 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 2,580 | LF |
$0.7000 |
$0.4000 |
$1.05 |
$1.00 |
$1.00 |
$1.00 |
$0.4200 |
| 67 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 1,560 | LF |
$3.00 |
$0.4200 |
$1.50 |
$1.50 |
$1.50 |
$1.50 |
$0.4400 |
| 68 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 100 | LF |
$10.92 |
$3.00 |
$10.10 |
$10.00 |
$10.00 |
$10.00 |
$3.15 |
| 69 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 84,900 | LF |
$0.4100 |
$0.3800 |
$0.3500 |
$0.3500 |
$0.3500 |
$0.3500 |
$0.4000 |
| 70 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 53 | EA |
$106.27 |
$185.00 |
$75.56 |
$75.00 |
$75.00 |
$75.00 |
$194.50 |
| 71 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$100,000.00 |
$48,000.00 |
$45,337.00 |
$88,000.00 |
$18,620.71 |
$88,000.00 |
$103,510.00 |
| 72 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,457.22 |
$5,000.00 |
$17,630.00 |
$15,000.00 |
$1,216.56 |
$2,500.00 |
$5,250.00 |
| 73 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$400,000.00 |
$190,000.00 |
$398,725.00 |
$400,000.00 |
$371,249.48 |
$446,275.00 |
$343,675.00 |