| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$19,607.50 |
$22,000.00 |
$4,250.00 |
$4,756.45 |
$10,000.00 |
$8,240.00 |
$18,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 22,089 | CY |
$7.70 |
$6.00 |
$7.00 |
$5.95 |
$5.50 |
$4.38 |
$7.55 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,992 | CY |
$13.90 |
$7.00 |
$1.00 |
$7.73 |
$7.50 |
$6.18 |
$7.70 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$26,775.10 |
$21,647.10 |
$4,250.00 |
$21,404.02 |
$10,000.00 |
$13,390.00 |
$22,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 458 | LF |
$1.90 |
$3.27 |
$2.50 |
$2.68 |
$1.30 |
$2.32 |
$2.40 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 154 | LF |
$8.40 |
$9.45 |
$10.65 |
$10.73 |
$7.00 |
$9.29 |
$10.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 23 | CY |
$98.00 |
$83.08 |
$125.00 |
$21.40 |
$75.00 |
$103.00 |
$90.00 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 1,620 | LF |
$1.50 |
$4.67 |
$2.25 |
$2.38 |
$1.50 |
$2.06 |
$2.50 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 29,590 | SY |
$1.40 |
$2.10 |
$2.65 |
$3.03 |
$2.10 |
$2.63 |
$2.70 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.9 | AC |
$295.10 |
$3,486.06 |
$650.00 |
$659.96 |
$550.00 |
$571.65 |
$650.00 |
| 11 | 241 2832 |
MOWING | 14 | AC |
$62.50 |
$116.99 |
$155.00 |
$148.64 |
$50.00 |
$128.75 |
$135.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,349 | CY |
$56.00 |
$57.00 |
$53.22 |
$29.91 |
$48.75 |
$59.74 |
$58.00 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 9,980 | SY |
$2.00 |
$1.72 |
$1.00 |
$2.85 |
$2.25 |
$1.55 |
$1.60 |
| 14 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 4,475 | SY |
$2.30 |
$4.84 |
$4.95 |
$4.85 |
$4.00 |
$2.58 |
$4.80 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 506 | TON |
$35.50 |
$29.00 |
$29.40 |
$29.91 |
$46.00 |
$30.90 |
$29.50 |
| 16 | 407(B) 0250 |
TACK COAT | 1,889 | GAL |
$3.40 |
$2.00 |
$4.00 |
$4.16 |
$3.50 |
$3.61 |
$3.65 |
| 17 | 408 5774 |
PRIME COAT | 4,606 | GAL |
$6.10 |
$0.5000 |
$4.50 |
$4.76 |
$3.50 |
$4.12 |
$5.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,691 | TON |
$81.30 |
$62.50 |
$66.00 |
$72.54 |
$65.00 |
$62.83 |
$65.25 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,399 | TON |
$99.80 |
$65.00 |
$76.00 |
$84.43 |
$75.00 |
$73.13 |
$74.40 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 3,779 | SY |
$3.30 |
$3.12 |
$5.50 |
$5.77 |
$8.50 |
$5.00 |
$9.00 |
| 21 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 1,600 | LF |
$1.80 |
$4.66 |
$0.7500 |
$0.7700 |
$0.8500 |
$0.5900 |
$1.50 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 295 | CY |
$248.00 |
$270.00 |
$275.00 |
$265.17 |
$295.00 |
$309.00 |
$300.00 |
| 23 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 14 | LF |
$44.00 |
$15.36 |
$27.00 |
$22.83 |
$40.00 |
$25.75 |
$42.50 |
| 24 | 613(B) 4819 |
96" CORR. GALV. STEEL PIPE | 80 | LF |
$100.00 |
$140.47 |
$155.00 |
$155.41 |
$130.00 |
$154.50 |
$175.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,429.30 |
$20,405.63 |
$12,750.00 |
$3,567.34 |
$7,000.00 |
$4,120.00 |
$8,000.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 8,171 | SY |
$3.90 |
$3.79 |
$2.00 |
$2.97 |
$8.00 |
$4.12 |
$6.00 |
| 27 | 619(C) 0924 |
SAWING PAVEMENT | 1,027 | LF |
$4.10 |
$5.91 |
$2.00 |
$3.57 |
$2.25 |
$5.15 |
$6.00 |
| 28 | 624(A) 4281 |
FENCE-STYLE WWF | 122 | LF |
$9.60 |
$7.09 |
$15.00 |
$7.13 |
$25.00 |
$5.15 |
$5.50 |
| 29 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,614 | LF |
$6.50 |
$5.99 |
$4.65 |
$6.24 |
$6.00 |
$4.22 |
$4.60 |
| 30 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$234.40 |
$53.18 |
$155.00 |
$237.82 |
$150.00 |
$231.75 |
$250.00 |
| 31 | 629(C) 4960 |
MAILBOX | 7 | EA |
$58.10 |
$118.17 |
$100.00 |
$59.46 |
$100.00 |
$36.05 |
$60.00 |
| 32 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 7 | EA |
$43.60 |
$118.17 |
$50.00 |
$59.46 |
$50.00 |
$20.60 |
$60.00 |
| 33 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 5,905 | CY |
$7.00 |
$6.00 |
$7.00 |
$5.95 |
$5.00 |
$6.18 |
$6.00 |
| 34 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,270 | CY |
$13.50 |
$9.00 |
$7.00 |
$7.13 |
$12.00 |
$20.60 |
$12.00 |
| 35 | 509(A) 1326 |
CLASS AA CONCRETE | 1,148.6 | CY |
$375.00 |
$325.00 |
$355.00 |
$309.17 |
$280.00 |
$360.50 |
$375.00 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 231,525 | LB |
$1.00 |
$0.9000 |
$0.9000 |
$0.6700 |
$1.00 |
$1.03 |
$0.8100 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$21,270.85 |
$27,500.00 |
$16,647.57 |
$12,000.00 |
$24,014.45 |
$20,000.00 |
| 38 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,520 | LF |
$0.8000 |
$0.5500 |
$0.6600 |
$0.7100 |
$0.6500 |
$0.7500 |
$0.6500 |
| 39 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,000 | LF |
$0.2000 |
$0.1200 |
$0.1600 |
$0.1700 |
$0.1600 |
$0.1100 |
$0.1600 |
| 40 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,000 | LF |
$0.6000 |
$0.3000 |
$0.2500 |
$0.2400 |
$0.2500 |
$0.3300 |
$0.2200 |
| 41 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 720 | SD |
$0.2000 |
$0.5900 |
$1.00 |
$1.19 |
$1.05 |
$0.1000 |
$1.10 |
| 42 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$0.4000 |
$1.18 |
$1.00 |
$0.1800 |
$0.1800 |
$0.1000 |
$0.1800 |
| 43 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,520 | SD |
$1.90 |
$2.36 |
$1.00 |
$0.3000 |
$0.3000 |
$0.1000 |
$0.2800 |
| 44 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$0.6000 |
$2.36 |
$1.12 |
$1.19 |
$1.10 |
$9.79 |
$1.10 |
| 45 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$0.9000 |
$2.36 |
$1.12 |
$1.19 |
$1.10 |
$0.0200 |
$1.10 |
| 46 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,160 | SD |
$0.4000 |
$0.4100 |
$3.33 |
$3.57 |
$3.20 |
$0.4600 |
$3.30 |
| 47 | 880(F) 8878 |
DRUMS | 4,680 | SD |
$0.2000 |
$0.3000 |
$0.1500 |
$0.1200 |
$0.1500 |
$0.0500 |
$0.1200 |
| 48 | 880(G) 8890 |
CHANNELIZER CONES | 4,500 | SD |
$0.1000 |
$0.3000 |
$0.1500 |
$0.1200 |
$0.1500 |
$0.0500 |
$0.1200 |
| 49 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$12.30 |
$11.82 |
$12.50 |
$11.89 |
$12.00 |
$6.18 |
$11.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$65,000.00 |
$29,542.84 |
$7,500.00 |
$26,160.47 |
$27,500.00 |
$31,827.00 |
$29,300.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,429.60 |
$1,772.57 |
$3,250.00 |
$1,783.67 |
$3,000.00 |
$3,090.00 |
$4,000.00 |
| 52 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,785.70 |
$1,772.57 |
$2,500.00 |
$5,351.00 |
$5,000.00 |
$2,575.00 |
$9,000.00 |
| 53 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$95,000.00 |
$145,000.00 |
$160,000.00 |
$196,203.50 |
$180,000.00 |
$183,386.99 |
$180,000.00 |
| 54 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$19,607.50 |
$16,452.22 |
$4,250.00 |
$7,134.67 |
$15,000.00 |
$10,300.00 |
$55,000.00 |
| 55 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 27,215 | CY |
$7.40 |
$5.63 |
$7.00 |
$5.95 |
$6.75 |
$8.24 |
$9.40 |
| 56 | 202(C) 0182 |
ROCK EXCAVATION | 14,000 | CY |
$19.70 |
$13.00 |
$12.88 |
$19.62 |
$22.00 |
$18.54 |
$9.85 |
| 57 | 202(D) 0184 |
UNCLASSIFIED BORROW | 200 | CY |
$22.60 |
$14.10 |
$12.88 |
$8.32 |
$14.00 |
$8.24 |
$12.00 |
| 58 | 202(G) 0189 |
PRESPLITTING OF ROCK | 1,500 | F DR |
$39.70 |
$27.18 |
$1.00 |
$160.53 |
$10.00 |
$20.60 |
$155.00 |
| 59 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$26,775.10 |
$18,575.06 |
$4,250.00 |
$8,323.78 |
$15,000.00 |
$18,540.00 |
$25,000.00 |
| 60 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,397 | LF |
$1.80 |
$2.80 |
$2.50 |
$2.68 |
$1.30 |
$2.32 |
$2.40 |
| 61 | 221(F) 0100 |
TEMPORARY SILT DIKE | 196 | LF |
$8.20 |
$4.73 |
$10.56 |
$10.73 |
$7.00 |
$9.29 |
$10.00 |
| 62 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 29 | CY |
$98.00 |
$69.17 |
$125.00 |
$21.40 |
$65.00 |
$103.00 |
$90.00 |
| 63 | 229 4318 |
DITCH LINER PROTECTION | 1,174 | LF |
$1.50 |
$4.67 |
$2.50 |
$2.38 |
$1.50 |
$2.06 |
$2.20 |
| 64 | 230(A) 2806 |
SOLID SLAB SODDING | 41,659 | SY |
$1.40 |
$2.10 |
$2.65 |
$3.03 |
$2.10 |
$2.63 |
$2.70 |
| 65 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.2 | AC |
$279.40 |
$3,486.05 |
$650.00 |
$659.96 |
$550.00 |
$571.65 |
$650.00 |
| 66 | 241 2832 |
MOWING | 21 | AC |
$58.50 |
$116.99 |
$155.00 |
$148.64 |
$50.00 |
$128.75 |
$150.00 |
| 67 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,130 | CY |
$51.90 |
$57.00 |
$49.00 |
$31.10 |
$48.75 |
$59.74 |
$64.50 |
| 68 | 310(B) 0149 |
SUBGRADE, METHOD B | 18,558 | SY |
$1.60 |
$1.55 |
$1.00 |
$2.85 |
$2.25 |
$1.55 |
$2.00 |
| 69 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 9,412 | SY |
$3.00 |
$4.50 |
$4.95 |
$4.85 |
$4.00 |
$2.58 |
$5.10 |
| 70 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 771 | TON |
$34.40 |
$23.69 |
$27.55 |
$31.10 |
$45.00 |
$30.90 |
$33.00 |
| 71 | 407(B) 0250 |
TACK COAT | 3,623 | GAL |
$3.30 |
$2.00 |
$4.00 |
$4.16 |
$3.50 |
$3.61 |
$3.65 |
| 72 | 408 5774 |
PRIME COAT | 8,788 | GAL |
$5.60 |
$0.5000 |
$4.50 |
$4.76 |
$3.50 |
$4.12 |
$5.00 |
| 73 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,220 | TON |
$78.90 |
$62.50 |
$66.00 |
$72.54 |
$65.00 |
$62.83 |
$65.80 |
| 74 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,674 | TON |
$92.60 |
$65.00 |
$77.00 |
$84.43 |
$75.00 |
$73.13 |
$74.97 |
| 75 | 412 5267 |
COLD MILLING PAVEMENT | 4,701 | SY |
$3.00 |
$2.84 |
$5.50 |
$5.77 |
$8.50 |
$5.00 |
$9.00 |
| 76 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 3,360 | LF |
$0.5000 |
$2.67 |
$0.7100 |
$0.7700 |
$0.8500 |
$0.3300 |
$1.50 |
| 77 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 12 | CY |
$20.40 |
$66.18 |
$25.00 |
$17.84 |
$22.00 |
$25.75 |
$50.00 |
| 78 | 509(A) 0319 |
CLASS AA CONCRETE | 28 | CY |
$558.70 |
$472.69 |
$550.00 |
$279.44 |
$580.00 |
$515.00 |
$800.00 |
| 79 | 509(D) 0325 |
CLASS C CONCRETE | 68 | CY |
$269.40 |
$450.00 |
$300.00 |
$265.17 |
$410.00 |
$412.00 |
$350.00 |
| 80 | 511(A) 0332 |
REINFORCING STEEL | 4,206 | LB |
$1.20 |
$0.7100 |
$0.9900 |
$0.6700 |
$1.00 |
$1.03 |
$2.00 |
| 81 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 154 | LF |
$40.10 |
$45.49 |
$35.00 |
$36.60 |
$36.00 |
$28.84 |
$42.00 |
| 82 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 242 | LF |
$64.00 |
$55.65 |
$48.00 |
$55.29 |
$48.00 |
$51.50 |
$70.15 |
| 83 | 613(B) 0695 |
54" CORR. GALV. STEEL PIPE | 81 | LF |
$88.00 |
$85.69 |
$75.00 |
$71.82 |
$74.00 |
$72.10 |
$88.10 |
| 84 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$967.70 |
$438.40 |
$475.00 |
$457.81 |
$1,200.00 |
$231.75 |
$490.00 |
| 85 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,429.30 |
$11,797.04 |
$12,500.00 |
$2,616.05 |
$7,500.00 |
$2,575.00 |
$14,000.00 |
| 86 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,407.60 |
$775.18 |
$5,250.00 |
$1,783.67 |
$1,500.00 |
$1,545.00 |
$3,200.00 |
| 87 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 17,809 | SY |
$3.30 |
$2.60 |
$2.00 |
$2.97 |
$8.00 |
$3.91 |
$5.27 |
| 88 | 619(C) 0924 |
SAWING PAVEMENT | 1,192 | LF |
$4.00 |
$5.91 |
$2.00 |
$3.57 |
$3.00 |
$5.15 |
$6.00 |
| 89 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 641 | LF |
$7.00 |
$6.20 |
$4.40 |
$7.13 |
$9.00 |
$4.02 |
$4.90 |
| 90 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,592 | LF |
$6.00 |
$6.20 |
$4.65 |
$6.24 |
$9.00 |
$4.22 |
$4.50 |
| 91 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,465 | CY |
$6.00 |
$6.00 |
$7.00 |
$5.95 |
$4.00 |
$6.18 |
$9.50 |
| 92 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 360 | CY |
$12.50 |
$9.45 |
$7.00 |
$7.73 |
$12.00 |
$20.60 |
$12.00 |
| 93 | 509(A) 1326 |
CLASS AA CONCRETE | 479.8 | CY |
$400.00 |
$325.00 |
$355.00 |
$309.17 |
$295.00 |
$406.85 |
$475.00 |
| 94 | 511(A) 1332 |
REINFORCING STEEL | 94,205 | LB |
$1.00 |
$0.9000 |
$1.00 |
$0.6700 |
$1.00 |
$1.03 |
$0.8500 |
| 95 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$21,861.70 |
$27,500.00 |
$11,534.39 |
$10,000.00 |
$16,086.54 |
$14,000.00 |
| 96 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 4,775 | CY |
$4.00 |
$9.45 |
$7.00 |
$5.95 |
$4.00 |
$6.18 |
$9.50 |
| 97 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 665 | CY |
$12.50 |
$9.45 |
$7.00 |
$7.73 |
$12.00 |
$20.60 |
$12.00 |
| 98 | 509(A) 1326 |
CLASS AA CONCRETE | 791.3 | CY |
$400.00 |
$325.00 |
$355.00 |
$309.17 |
$290.00 |
$386.25 |
$450.00 |
| 99 | 511(A) 1332 |
REINFORCING STEEL | 149,320 | LB |
$1.00 |
$0.9000 |
$0.9000 |
$0.6700 |
$1.00 |
$1.03 |
$0.8200 |
| 100 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$21,861.70 |
$27,500.00 |
$11,534.39 |
$10,000.00 |
$21,082.04 |
$16,000.00 |
| 101 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 9,422 | LF |
$0.7000 |
$0.5500 |
$0.6600 |
$0.7100 |
$0.6500 |
$0.5800 |
$0.7000 |
| 102 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 13,760 | LF |
$0.1000 |
$0.1200 |
$0.1400 |
$0.1700 |
$0.6500 |
$0.1100 |
$0.2000 |
| 103 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,400 | LF |
$0.6000 |
$0.3000 |
$0.2500 |
$0.2900 |
$0.2500 |
$0.3300 |
$0.3000 |
| 104 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 840 | SD |
$0.2000 |
$0.5900 |
$1.25 |
$1.19 |
$1.15 |
$0.1000 |
$1.50 |
| 105 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,100 | SD |
$0.4000 |
$1.18 |
$1.25 |
$0.3000 |
$0.3000 |
$0.1000 |
$0.3500 |
| 106 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,940 | SD |
$1.90 |
$2.36 |
$1.25 |
$0.3000 |
$0.3000 |
$0.1000 |
$0.3500 |
| 107 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 840 | SD |
$0.6000 |
$2.36 |
$2.25 |
$2.38 |
$2.25 |
$9.79 |
$3.00 |
| 108 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$0.8000 |
$2.36 |
$0.1500 |
$0.1200 |
$0.2000 |
$0.0200 |
$0.2000 |
| 109 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,520 | SD |
$0.3000 |
$0.4100 |
$3.33 |
$3.57 |
$3.25 |
$0.4600 |
$3.30 |
| 110 | 880(F) 8878 |
DRUMS | 5,880 | SD |
$0.2000 |
$0.3000 |
$0.1500 |
$0.1200 |
$0.1500 |
$0.0500 |
$0.1500 |
| 111 | 880(G) 8890 |
CHANNELIZER CONES | 6,300 | SD |
$0.1000 |
$0.3000 |
$0.1500 |
$0.1200 |
$0.1500 |
$0.0500 |
$0.1500 |
| 112 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$12.00 |
$11.82 |
$12.50 |
$11.89 |
$12.00 |
$6.18 |
$11.00 |