| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$65,000.00 |
$56,290.00 |
$21,000.00 |
$61,966.00 |
$217,500.00 |
$97,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 30,935 | CY |
$7.50 |
$8.90 |
$8.40 |
$9.00 |
$8.20 |
$7.80 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 21,335 | CY |
$9.00 |
$8.40 |
$10.50 |
$10.00 |
$9.00 |
$10.12 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$88,000.00 |
$48,925.00 |
$41,995.00 |
$45,000.00 |
$71,100.00 |
$119,576.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 12,683 | LF |
$1.50 |
$1.35 |
$1.20 |
$1.22 |
$1.20 |
$1.42 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$345.00 |
$303.85 |
$173.00 |
$173.93 |
$175.00 |
$275.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,788 | LF |
$7.00 |
$7.70 |
$7.50 |
$7.53 |
$7.60 |
$5.70 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 979 | LF |
$1.75 |
$2.60 |
$1.55 |
$1.58 |
$1.60 |
$2.75 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 80,484 | SY |
$2.00 |
$1.30 |
$1.40 |
$1.40 |
$1.40 |
$1.20 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 33.3 | AC |
$400.00 |
$97.85 |
$472.50 |
$474.35 |
$475.00 |
$110.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,055 | CY |
$60.00 |
$48.00 |
$61.20 |
$57.00 |
$62.50 |
$58.90 |
| 12 | 307(A) 4200 |
FLY ASH | 4,046 | TON |
$72.00 |
$73.70 |
$65.60 |
$48.00 |
$68.00 |
$99.00 |
| 13 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 80,084 | SY |
$3.50 |
$2.00 |
$3.10 |
$2.65 |
$3.10 |
$2.40 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,031 | TON |
$35.00 |
$25.35 |
$46.10 |
$43.00 |
$40.95 |
$21.00 |
| 15 | 407(B) 0250 |
TACK COAT | 9,424 | GAL |
$4.00 |
$3.45 |
$4.00 |
$1.05 |
$0.0100 |
$3.80 |
| 16 | 408 5774 |
PRIME COAT | 28,511 | GAL |
$5.00 |
$4.60 |
$4.25 |
$2.11 |
$0.0100 |
$5.85 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,717 | TON |
$74.00 |
$62.30 |
$61.10 |
$54.50 |
$69.20 |
$71.55 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,095 | TON |
$79.00 |
$68.00 |
$63.50 |
$63.21 |
$73.50 |
$77.45 |
| 19 | 412 5267 |
COLD MILLING PAVEMENT | 52,579 | SY |
$3.50 |
$2.20 |
$2.15 |
$0.8400 |
$2.00 |
$2.75 |
| 20 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 180 | CY |
$25.00 |
$30.90 |
$26.30 |
$31.55 |
$5.30 |
$39.50 |
| 21 | 509(B) 0321 |
CLASS A CONCRETE | 554 | CY |
$450.00 |
$325.00 |
$404.00 |
$515.51 |
$650.00 |
$550.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 57 | CY |
$300.00 |
$490.00 |
$288.50 |
$514.43 |
$385.00 |
$400.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 72,609 | LB |
$1.00 |
$1.00 |
$0.8900 |
$0.2800 |
$0.9000 |
$0.9000 |
| 24 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 491 | TON |
$55.00 |
$49.45 |
$42.60 |
$63.86 |
$61.00 |
$42.65 |
| 25 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 475 | SY |
$6.00 |
$5.15 |
$2.05 |
$7.96 |
$0.7000 |
$5.50 |
| 26 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 117 | SY |
$70.50 |
$75.20 |
$60.90 |
$66.55 |
$99.20 |
$65.00 |
| 27 | 611(G) 5388 |
INLET CDI RCB DES. 2 | 1 | EA |
$4,000.00 |
$1,880.00 |
$4,757.00 |
$3,231.81 |
$4,660.00 |
$4,600.00 |
| 28 | 611(G) 5473 |
INLET CDI 30SK RCB DES. 1 | 1 | EA |
$3,500.00 |
$2,345.00 |
$6,138.00 |
$2,868.47 |
$4,995.00 |
$4,700.00 |
| 29 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 2 | EA |
$3,500.00 |
$1,160.00 |
$5,967.00 |
$2,857.74 |
$3,420.00 |
$1,845.00 |
| 30 | 611(H) 5790 |
ADD'L DEPTH IN INLET CDI RCP DES. 2 | 3 | VF |
$350.00 |
$268.00 |
$486.00 |
$710.25 |
$373.20 |
$409.00 |
| 31 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 30 | LF |
$60.00 |
$49.30 |
$62.30 |
$38.86 |
$53.40 |
$55.00 |
| 32 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 275 | LF |
$75.00 |
$65.55 |
$88.90 |
$68.75 |
$59.35 |
$69.00 |
| 33 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 100 | LF |
$95.00 |
$79.05 |
$91.20 |
$72.89 |
$78.90 |
$91.00 |
| 34 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,592 | LF |
$35.00 |
$28.45 |
$16.20 |
$34.11 |
$31.50 |
$25.50 |
| 35 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 355 | LF |
$45.00 |
$36.55 |
$21.50 |
$39.61 |
$38.40 |
$35.00 |
| 36 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 30 | LF |
$65.00 |
$56.25 |
$32.00 |
$57.36 |
$53.30 |
$55.00 |
| 37 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 200 | LF |
$25.00 |
$16.50 |
$20.60 |
$23.98 |
$27.60 |
$25.00 |
| 38 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 200 | LF |
$25.00 |
$16.50 |
$20.60 |
$18.52 |
$27.60 |
$25.00 |
| 39 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$780.00 |
$875.50 |
$1,514.00 |
$883.60 |
$315.00 |
$825.00 |
| 40 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$970.00 |
$1,133.00 |
$2,848.00 |
$1,223.85 |
$375.00 |
$1,075.00 |
| 41 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,200.00 |
$1,190.00 |
$2,610.00 |
$1,450.83 |
$330.00 |
$1,225.00 |
| 42 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 104 | EA |
$300.00 |
$402.00 |
$126.00 |
$303.82 |
$210.00 |
$200.00 |
| 43 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 19 | EA |
$350.00 |
$464.00 |
$197.00 |
$370.03 |
$265.00 |
$337.00 |
| 44 | 613(P) 0763 |
36" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$600.00 |
$731.30 |
$567.00 |
$715.87 |
$570.00 |
$800.00 |
| 45 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 161 | CY |
$45.00 |
$65.70 |
$90.60 |
$27.85 |
$45.30 |
$90.00 |
| 46 | 613(V) 1180 |
TRENCH EXCAVATION | 261 | CY |
$11.00 |
$10.20 |
$75.80 |
$6.33 |
$21.20 |
$15.00 |
| 47 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$45,000.00 |
$30,130.00 |
$14,700.00 |
$30,000.00 |
$28,620.00 |
$35,000.00 |
| 48 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 175 | SY |
$15.00 |
$7.25 |
$12.60 |
$17.20 |
$27.30 |
$15.00 |
| 49 | 619(C) 0924 |
SAWING PAVEMENT | 293 | LF |
$6.00 |
$4.15 |
$21.50 |
$3.92 |
$6.35 |
$7.00 |
| 50 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 56 | EA |
$150.00 |
$103.00 |
$36.10 |
$201.09 |
$130.00 |
$150.00 |
| 51 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,305 | CY |
$7.50 |
$8.25 |
$8.40 |
$9.19 |
$4.25 |
$8.00 |
| 52 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 116 | CY |
$20.00 |
$36.05 |
$26.30 |
$24.08 |
$5.30 |
$25.00 |
| 53 | 504 6143 |
TUBULAR METAL TRAFFIC RAIL | 87.5 | LF |
$200.00 |
$82.50 |
$84.10 |
$84.43 |
$171.30 |
$110.00 |
| 54 | 509(A) 1326 |
CLASS AA CONCRETE | 293 | CY |
$500.00 |
$387.00 |
$404.00 |
$473.33 |
$428.30 |
$567.50 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 55,281 | LB |
$1.00 |
$1.00 |
$0.8900 |
$1.28 |
$0.9000 |
$0.8300 |
| 56 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 529 | TON |
$50.00 |
$56.65 |
$42.60 |
$63.86 |
$50.00 |
$42.15 |
| 57 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 373 | SY |
$6.00 |
$5.15 |
$2.25 |
$5.65 |
$0.7000 |
$6.00 |
| 58 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$18,000.00 |
$20,600.00 |
$26,250.00 |
$24,587.59 |
$21,200.00 |
$10,125.00 |
| 59 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$25.00 |
$17.80 |
$18.10 |
$18.18 |
$20.15 |
$18.70 |
| 60 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$895.00 |
$1,005.00 |
$1,024.00 |
$1,027.75 |
$690.00 |
$600.00 |
| 61 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$2,290.00 |
$2,365.00 |
$2,410.00 |
$2,419.18 |
$2,330.00 |
$2,375.00 |
| 62 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 973 | CY |
$7.50 |
$10.30 |
$8.40 |
$9.19 |
$4.25 |
$10.00 |
| 63 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 50 | CY |
$20.00 |
$36.05 |
$26.30 |
$24.07 |
$5.30 |
$35.00 |
| 64 | 504 6143 |
TUBULAR METAL TRAFFIC RAIL | 62.5 | LF |
$200.00 |
$82.50 |
$84.10 |
$84.43 |
$171.30 |
$110.00 |
| 65 | 509(A) 1326 |
CLASS AA CONCRETE | 130 | CY |
$500.00 |
$490.00 |
$404.00 |
$498.99 |
$952.00 |
$650.00 |
| 66 | 511(A) 1332 |
REINFORCING STEEL | 16,486 | LB |
$1.00 |
$1.05 |
$0.8900 |
$1.28 |
$0.9000 |
$0.9100 |
| 67 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 270 | TON |
$50.00 |
$56.65 |
$42.60 |
$63.86 |
$63.30 |
$43.40 |
| 68 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 192 | SY |
$6.00 |
$5.15 |
$2.25 |
$5.66 |
$0.7000 |
$8.00 |
| 69 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$14,000.00 |
$25,750.00 |
$7,139.00 |
$17,503.78 |
$21,200.00 |
$7,650.00 |
| 70 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$25.00 |
$17.80 |
$18.10 |
$18.18 |
$20.15 |
$18.70 |
| 71 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,290.00 |
$2,365.00 |
$2,410.00 |
$55,399.15 |
$2,330.00 |
$2,375.00 |
| 72 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 122 | SF |
$25.00 |
$35.05 |
$35.70 |
$35.84 |
$21.20 |
$20.00 |
| 73 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 308 | LF |
$8.00 |
$9.30 |
$9.45 |
$9.49 |
$10.60 |
$10.00 |
| 74 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 88,190 | LF |
$0.5500 |
$0.4000 |
$0.3800 |
$0.3800 |
$0.4000 |
$0.4200 |
| 75 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$47,000.00 |
$16,800.00 |
$17,115.00 |
$17,181.95 |
$9,010.00 |
$25,000.00 |
| 76 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$65,000.00 |
$78,000.00 |
$72,340.00 |
$99,349.64 |
$42,500.00 |
$92,000.00 |
| 77 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$4,635.00 |
$3,605.00 |
$9,033.97 |
$3,500.00 |
$24,000.00 |
| 78 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$270,000.00 |
$269,000.00 |
$245,750.71 |
$230,000.00 |
$229,025.00 |
$285,000.00 |