Bid tab 170218

Let Nov 16, 2017 · Division 7 · Caddo Sign up free

‹ Nov 2017 results

WIDEN AND RESURFACE SH -58: FROM SH-152, EXTEND NORTH NEAR EAKLEY . PROJECT LENGTH = 5.890 MILES

Let date
Thursday, November 16, 2017
Contract
170218
J/P numbers
24092(04)
District
Division 7
County
Caddo
Highway
Limits
WIDEN AND RESURFACE SH -58: FROM SH-152, EXTEND NORTH NEAR EAKLEY . PROJECT LENGTH = 5.890 MILES
Project number
STP-208C(052)SS

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$6,439,403
1 THE CUMMINS CONSTRUCTION CO., INC. Low bidder $5,338,037 -17.1%
2 T & G CONSTRUCTION, INC. $5,742,804 -10.8% +7.6%
3 CORNELL CONSTRUCTION COMPANY, INC. $5,818,115 -9.6% +9.0%
4 MARKWELL PAVING COMPANY, INC. $6,095,062 -5.3% +14.2%
5 HASKELL LEMON CONSTRUCTION CO. $6,385,774 -0.8% +19.6%
6 KOSS CONSTRUCTION COMPANY & SUBSIDIARY $6,543,729 +1.6% +22.6%
7 OVERLAND CORPORATION $6,572,268 +2.1% +23.1%

Bid tab: unit prices 81 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 THE CUMMINS CON…#2 T & G CONSTRUCT…#3 CORNELL CONSTRU…#4 MARKWELL PAVING…#5 HASKELL LEMON C…#6 KOSS CONSTRUCTI…#7 OVERLAND CORPOR…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $27,915.00 $10,000.00 $5,707.21 $9,350.00 $48,220.00 $10,000.00 $222,200.00
2202(A) 0183 UNCLASSIFIED EXCAVATION15,255CY $7.25 $8.25 $5.00 $11.00 $9.71 $8.30 $19.00 $14.40
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $54,415.00 $10,000.00 $32,497.83 $10,000.00 $101,630.00 $35,000.00 $150,000.00
4221(C) 2801 TEMPORARY SILT FENCE50,175LF $1.50 $1.25 $0.9000 $1.18 $0.9900 $1.20 $0.9000 $0.9500
5221(D) 2803 TEMPORARY SEDIMENT FILTER2EA $150.00 $270.30 $150.00 $255.00 $165.00 $257.50 $150.00 $150.00
6221(F) 0100 TEMPORARY SILT DIKE665LF $10.00 $8.35 $5.00 $7.89 $5.50 $7.95 $5.00 $5.00
7230(A) 2806 SOLID SLAB SODDING61,796SY $1.25 $1.35 $0.8600 $1.28 $0.9500 $1.30 $1.25 $0.9000
8230(F) 2812 WATERING4,944KGAL $5.00 $1.90 $2.50 $1.82 $2.75 $1.85 $2.50 $2.50
9233(A) 2817 VEGETATIVE MULCHING13AC $250.00 $341.50 $50.00 $322.00 $110.00 $325.50 $50.00 $50.00
10241 2832 MOWING26AC $65.00 $61.50 $35.00 $58.00 $110.00 $58.60 $35.00 $35.00
11307(K) 4300 STABILIZED SUBGRADE53,562SY $5.50 $5.40 $5.75 $6.50 $6.88 $11.90 $6.75 $3.90
12402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E221TON $35.00 $26.50 $31.55 $22.42 $30.00 $142.50 $50.00 $46.80
13407(B) 0250 TACK COAT29,162GAL $3.00 $3.15 $3.00 $2.10 $2.00 $3.55 $3.00 $0.0100
14408 5774 PRIME COAT20,852GAL $4.00 $2.85 $4.00 $3.83 $3.00 $7.00 $1.50 $0.0100
15409(A) 4242 FABRIC REINFORCEMENT27,645SY $1.50 $1.10 $1.25 $1.61 $1.00 $3.40 $1.83 $1.00
16409(B) 4268 BITUMINOUS BINDER5,529GAL $3.00 $2.95 $3.00 $3.49 $2.50 $8.55 $6.10 $2.65
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)48,460TON $65.00 $48.50 $58.85 $57.18 $56.19 $53.90 $65.00 $63.60
18411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)16,233TON $74.00 $56.60 $64.00 $63.81 $68.75 $58.00 $67.50 $61.40
19412 5267 COLD MILLING PAVEMENT82,934SY $1.75 $2.75 $1.50 $2.00 $2.00 $1.80 $2.20 $1.95
20501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED29CY $25.00 $18.00 $30.00 $35.00 $38.50 $20.20 $17.50 $31.60
21501(G) 6315 CLSM BACKFILL68CY $160.00 $190.00 $200.00 $144.00 $158.40 $131.50 $185.00 $118.85
22509(A) 0319 CLASS AA CONCRETE109CY $500.00 $630.00 $714.00 $560.00 $663.30 $393.00 $415.00 $751.85
23509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES6CY $1,200.00 $670.00 $1,000.00 $628.00 $690.80 $454.50 $650.00 $1,053.00
24511(A) 0332 REINFORCING STEEL12,138LB $1.00 $1.10 $1.12 $1.02 $1.15 $1.00 $1.06 $1.18
25601(A) 0297 TYPE I PLAIN RIPRAP167TON $45.00 $41.20 $45.00 $50.00 $55.00 $182.50 $50.00 $73.30
26609(B) 1524 2'-8" COMB. CURB & GUTTER (6" MNTBLE)34LF $25.00 $42.50 $35.00 $35.00 $38.50 $44.50 $41.25 $133.00
27610(B) 0604 6" CONCRETE DRIVEWAY301SY $55.00 $57.25 $58.00 $65.00 $71.50 $78.80 $55.60 $61.00
28610(C) 0609 6" CONCRETE DIVIDING STRIP3SY $65.00 $61.80 $60.00 $110.00 $121.00 $100.00 $150.00 $63.20
29611(G) 5704 INLET CDI RCP DES. 11EA $3,500.00 $3,862.00 $3,300.00 $1,590.00 $1,749.00 $3,030.00 $3,750.00 $3,765.00
30611(G) 6002 INLET (SMD-TYPE 2)1EA $3,300.00 $2,420.00 $3,100.00 $1,525.00 $1,677.50 $2,222.00 $2,350.00 $3,585.00
31611(L) 0487 JUNCTION BOXES120CF $65.00 $103.00 $50.00 $68.00 $74.80 $100.00 $100.00 $87.50
32613(A) 0491 18" R.C.PIPE CLASS III14LF $120.00 $45.35 $40.00 $55.00 $60.50 $121.00 $55.00 $89.65
33613(A) 0492 24" R.C.PIPE CLASS III96LF $150.00 $56.65 $65.00 $77.00 $84.70 $141.50 $85.00 $58.25
34613(A) 4506 29" X 45" R.C.PIPE ELLIPTICAL CLASS HE-III27LF $300.00 $198.00 $200.00 $170.00 $187.00 $161.50 $300.00 $88.85
35613(B) 0689 18" CORR. GALV. STEEL PIPE18LF $35.00 $26.75 $25.00 $45.00 $49.50 $83.30 $35.00 $74.20
36613(B) 0690 24" CORR. GALV. STEEL PIPE62LF $40.00 $32.50 $32.00 $51.50 $56.65 $67.90 $40.00 $64.15
37613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH2,157LF $30.00 $30.25 $28.00 $37.25 $40.98 $72.10 $30.00 $68.30
38613(B) 4528 28" X 20" CORR. GALV. STEEL PIPE ARCH418LF $40.00 $33.00 $35.00 $42.30 $46.53 $77.90 $40.00 $84.20
39613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND3EA $700.00 $980.00 $650.00 $1,000.00 $1,100.00 $707.00 $700.00 $525.00
40613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND4EA $900.00 $1,470.00 $875.00 $1,405.00 $1,545.50 $909.00 $900.00 $585.00
41613(L) 5830 29" X 45" PREFAB. CULVERT END SEC., ELLIPTICAL2EA $1,200.00 $1,831.00 $1,300.00 $2,445.00 $2,689.50 $2,881.00 $1,200.00 $645.00
42613(M) 7186 TYPE A4 CULVERT END TREATMENT21EA $1,000.00 $1,005.00 $1,300.00 $1,200.00 $1,320.00 $909.00 $975.00 $1,365.00
43613(M) 7187 TYPE B4 CULVERT END TREATMENT5EA $1,200.00 $1,210.00 $1,350.00 $1,500.00 $1,650.00 $1,010.00 $1,175.00 $1,420.00
44613(M) 7191 TYPE AA4 CULVERT END TREATMENT11EA $1,800.00 $1,700.00 $1,550.00 $1,750.00 $1,925.00 $1,414.00 $1,650.00 $1,630.00
45613(M) 7192 TYPE BB4 CULVERT END TREATMENT2EA $2,200.00 $2,035.00 $1,650.00 $2,175.00 $2,392.50 $1,616.00 $1,975.00 $1,735.00
46613(M) 7196 TYPE A6 CULVERT END TREATMENT21EA $1,200.00 $1,313.00 $1,300.00 $1,700.00 $1,870.00 $1,111.00 $1,275.00 $1,365.00
47613(M) 7197 TYPE B6 CULVERT END TREATMENT7EA $1,300.00 $1,210.00 $1,100.00 $2,145.00 $2,359.50 $1,515.00 $1,175.00 $1,160.00
48613(M) 7201 TYPE AA6 CULVERT END TREATMENT11EA $1,800.00 $2,009.00 $1,700.00 $2,250.00 $2,475.00 $2,020.00 $1,950.00 $1,790.00
49613(M) 7202 TYPE BB6 CULVERT END TREATMENT2EA $2,500.00 $2,550.00 $1,800.00 $2,780.00 $3,058.00 $2,222.00 $2,475.00 $1,895.00
50619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $8,962.00 $9,000.00 $36,604.09 $28,500.00 $57,645.00 $37,000.00 $173,600.00
51619(B) 0291 REMOVAL OF HEADWALL22EA $500.00 $515.00 $750.00 $800.00 $880.00 $1,111.00 $500.00 $750.00
52619(C) 0924 SAWING PAVEMENT62,224LF $2.75 $1.55 $2.00 $0.2900 $3.00 $0.7700 $2.50 $2.10
53624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)936LF $6.00 $7.70 $8.48 $5.00 $6.38 $4.15 $5.80 $7.85
54624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)1,122LF $6.00 $8.20 $7.12 $5.50 $7.48 $4.50 $6.80 $8.35
55629(A) 4958 MAILBOX INSTALLATION-SINGLE7EA $130.00 $124.00 $100.00 $100.00 $132.00 $121.00 $120.00 $105.00
56629(B) 4959 MAILBOX INSTALLATION-MULTIPLE1EA $200.00 $165.00 $200.00 $200.00 $176.00 $161.50 $160.00 $210.00
57629(C) 4960 MAILBOX9EA $40.00 $25.75 $75.00 $75.00 $27.50 $25.30 $25.00 $80.00
58629(D) 4961 REMOVAL OF MAILBOX INSTALLATION8EA $50.00 $28.90 $25.00 $25.00 $30.80 $28.30 $28.00 $25.00
59857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)124,400LF $0.1500 $0.1500 $0.1100 $0.1100 $0.1500 $0.1400 $0.1400 $0.1200
60857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-24,155EA $0.6000 $0.6000 $0.5000 $0.5000 $0.6800 $0.6300 $0.6200 $0.5300
61857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)2,000LF $0.2000 $1.45 $0.3000 $0.3000 $1.54 $1.40 $1.40 $0.3200
62876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR460SD $24.00 $6.20 $5.00 $5.00 $6.60 $6.05 $6.00 $5.00
63880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF1,380SD $0.3500 $0.2000 $0.7000 $0.7000 $0.2200 $0.2000 $0.2000 $0.7500
64880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF960SD $0.7000 $3.85 $1.00 $1.00 $4.13 $3.80 $3.75 $1.05
65880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,000SD $1.35 $4.00 $3.00 $3.00 $4.24 $3.90 $3.85 $3.15
66880(C) 8848 WING BARRICADES920SD $1.40 $1.00 $0.5000 $0.5000 $1.10 $1.00 $1.00 $0.5500
67880(E) 8860 WARNING LIGHTS(TYPE A)2,300SD $0.3000 $0.6000 $3.00 $3.00 $0.6100 $0.5600 $0.5500 $3.15
68880(F) 8878 DRUMS2,300SD $0.2500 $0.5200 $0.2500 $0.2500 $0.6000 $0.5100 $0.5000 $0.2500
69880(G) 8890 CHANNELIZER CONES42,000SD $0.3000 $0.0500 $0.2500 $0.2500 $0.0600 $0.0500 $0.0500 $0.2500
70880(I) 8902 FLAGGER230SD $135.00 $97.85 $400.00 $120.00 $135.00 $594.00 $50.00 $240.00
71882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN488SD $12.00 $17.50 $15.00 $15.00 $18.70 $17.20 $17.00 $15.80
72413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC62,200LF $0.2000 $0.1000 $0.1500 $0.1300 $0.1100 $0.1000 $0.1000 $0.1700
73805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS32EA $60.00 $51.50 $50.00 $50.00 $55.00 $50.50 $50.00 $52.65
74850(A) 8110 SHEET ALUMINUM SIGNS170.31SF $18.00 $37.08 $16.00 $16.00 $39.60 $36.40 $36.00 $16.85
75851(C) 8324 2" SQUARE TUBE POST482.5LF $11.00 $5.15 $10.00 $10.00 $5.50 $5.05 $5.00 $10.55
76856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)124,400LF $0.5000 $0.3500 $0.1800 $0.1800 $0.3100 $0.2800 $0.2800 $0.1900
77856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)120LF $7.50 $3.10 $5.00 $5.00 $3.30 $3.05 $3.00 $5.25
78642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $61,800.00 $47,000.00 $18,349.14 $106,700.00 $129,780.00 $97,000.00 $36,800.00
79220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $6,500.00 $15,450.00 $7,000.00 $1,198.82 $6,500.00 $3,535.00 $10,000.00 $3,650.00
80640(A) 1426 FIELD OFFICE1EA $7,000.00 $15,450.00 $8,000.00 $3,053.27 $7,500.00 $2,525.00 $9,600.00 $10,000.00
81641 1552 MOBILIZATION1LSUM $319,334.00 $242,000.00 $200,000.00 $297,724.62 $296,500.00 $197,030.04 $273,100.00 $325,000.00