Bid tab 170123

Let Mar 16, 2017 · · Jefferson Sign up free

‹ Mar 2017 results

BRIDGE AND APPROACHES SH -79: OVER THE RED RIVER , 0.5 MILES NORTH OF THE TEXAS STATE LINE. PROJECT LENGTH = 1.189 MILES

Let date
Thursday, March 16, 2017
Contract
170123
J/P numbers
27977(04)
District
County
Jefferson
Highway
Limits
BRIDGE AND APPROACHES SH -79: OVER THE RED RIVER , 0.5 MILES NORTH OF THE TEXAS STATE LINE. PROJECT LENGTH = 1.189 MILES
Project number
STP-234B(014)SS

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$14,377,042
1 Frontier Bridge, Inc. Low bidder $11,164,064 -22.3%
2 MANHATTAN ROAD & BRIDGE COMPANY, LLC $12,240,000 -14.9% +9.6%
3 EARTH BUILDERS, L.P. $13,140,870 -8.6% +17.7%
4 OVERLAND CORPORATION $13,273,139 -7.7% +18.9%
5 OBC, INC. $13,324,241 -7.3% +19.3%
6 JENSEN CONSTRUCTION COMPANY $14,609,255 +1.6% +30.9%
7 WEBBER, LLC $15,779,471 +9.8% +41.3%
8 ZACHRY CONSTRUCTION CORPORATION $17,574,046 +22.2% +57.4%

Bid tab: unit prices 149 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Frontier Bridge…#2 MANHATTAN ROAD …#3 EARTH BUILDERS,…#4 OVERLAND CORPOR…#5 OBC, INC.#6 JENSEN CONSTRUC…#7 WEBBER, LLC#8 ZACHRY CONSTRUC…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $231,593.00 $93,424.52 $25,000.00 $195,000.00 $17,040.00 $37,560.00 $150,000.00 $40,986.02
2202(A) 0183 UNCLASSIFIED EXCAVATION14,212CY $8.70 $5.81 $7.50 $8.00 $8.05 $6.98 $6.35 $13.50 $6.55
3202(D) 0184 UNCLASSIFIED BORROW27,604CY $9.60 $7.32 $9.00 $9.00 $11.75 $8.25 $8.73 $11.50 $7.75
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $20,000.00 $29,597.04 $21,000.00 $25,000.00 $105,000.00 $16,720.50 $20,280.00 $5,540.00 $15,700.00
5221(C) 2801 TEMPORARY SILT FENCE4,478LF $1.60 $1.02 $1.05 $1.30 $1.00 $1.08 $2.74 $1.55 $1.87
6221(F) 0100 TEMPORARY SILT DIKE800LF $7.60 $6.72 $6.90 $8.00 $6.65 $7.08 $9.95 $8.60 $8.81
7230(A) 2806 SOLID SLAB SODDING23,716SY $1.50 $1.14 $1.17 $1.40 $1.15 $1.20 $2.95 $1.30 $1.66
8232(B) 2814 SEEDING METHOD B4.9AC $650.00 $202.00 $215.00 $250.00 $210.00 $479.25 $795.00 $229.00 $1,437.50
9233(A) 2817 VEGETATIVE MULCHING4.9AC $300.00 $454.50 $465.00 $550.00 $450.00 $94.79 $595.00 $514.00 $450.00
10241 2832 MOWING37.6AC $650.00 $79.79 $95.00 $100.00 $80.00 $84.14 $130.00 $1,130.00 $79.00
11242 0400 (PL)STABILIZED CONSTRUCTION EXIT1EA $3,400.00 $1,073.63 $1,600.00 $3,500.00 $6,500.00 $4,995.99 $600.00 $5,660.00 $4,500.00
12303(A) 2100 AGGREGATE BASE TYPE A2,568CY $50.00 $45.45 $66.00 $44.00 $73.45 $58.58 $35.00 $60.00 $45.00
13307(K) 4300 STABILIZED SUBGRADE15,090SY $6.70 $4.04 $5.50 $5.00 $4.30 $6.12 $4.00 $7.50 $5.75
14325 5271 SEPARATOR FABRIC12,575SY $1.60 $1.26 $1.00 $1.80 $1.60 $1.49 $1.25 $0.9000 $1.35
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E2,821TON $30.00 $30.30 $28.00 $35.00 $39.80 $31.84 $30.00 $40.00 $30.00
16407(B) 0250 TACK COAT2,121GAL $3.30 $2.02 $4.15 $3.00 $0.0100 $4.26 $2.00 $2.25 $2.00
17408 5774 PRIME COAT8,322GAL $4.10 $3.03 $4.20 $4.00 $0.0100 $1.00 $3.00 $3.35 $3.00
18411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)4,597TON $72.00 $72.17 $74.00 $82.00 $74.60 $75.62 $71.45 $80.00 $71.45
19411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,626TON $82.00 $77.64 $79.00 $87.00 $76.05 $79.56 $76.87 $86.00 $76.87
20413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC4,556LF $0.1700 $1.26 $1.50 $2.00 $1.30 $1.07 $1.60 $2.35 $1.00
21501(G) 6315 CLSM BACKFILL143CY $180.00 $130.66 $100.00 $170.00 $235.60 $131.95 $200.00 $143.00 $183.35
22509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES4CY $820.00 $2,690.65 $785.00 $600.00 $292.10 $338.62 $900.00 $1,080.00 $1,800.00
23509(D) 0325 CLASS C CONCRETE15CY $450.00 $369.75 $440.00 $400.00 $281.40 $766.54 $600.00 $1,080.00 $1,000.00
24601(A) 0297 TYPE I PLAIN RIPRAP50TON $54.00 $53.15 $45.00 $50.00 $49.50 $52.19 $10.00 $116.00 $49.00
25611(G) 6002 INLET (SMD-TYPE 2)1EA $3,000.00 $4,322.97 $2,200.00 $3,500.00 $5,865.00 $2,606.89 $600.00 $2,700.00 $7,800.00
26611(L) 0487 JUNCTION BOXES237CF $64.00 $86.84 $60.00 $50.00 $154.60 $52.73 $34.00 $39.75 $31.00
27613(A) 0492 24" R.C.PIPE CLASS III172LF $76.00 $75.37 $140.00 $100.00 $166.30 $91.59 $60.00 $97.50 $86.00
28613(A) 4497 36" X 22" R.C.PIPE ARCH CLASS A-III45LF $120.00 $125.95 $128.00 $150.00 $246.25 $148.04 $45.00 $246.00 $139.00
29613(A) 4500 58" X 36" R.C.PIPE ARCH CLASS A-III109LF $250.00 $241.61 $235.00 $300.00 $388.05 $292.88 $32.00 $207.00 $275.00
30613(L) 4546 58" X 36" PREFAB. CULVERT END SECTION, ARCH2EA $2,400.00 $3,161.30 $2,600.00 $3,000.00 $5,120.00 $3,301.50 $400.00 $4,350.00 $3,100.00
31613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND1EA $920.00 $1,465.17 $1,253.00 $1,400.00 $1,920.00 $1,091.63 $400.00 $1,680.00 $1,025.00
32613(M) 7187 TYPE B4 CULVERT END TREATMENT1EA $1,300.00 $1,150.06 $885.00 $1,200.00 $1,050.00 $2,120.27 $1,500.00 $3,350.00 $2,945.54
33613(M) 7197 TYPE B6 CULVERT END TREATMENT1EA $1,700.00 $1,386.59 $1,050.00 $1,500.00 $1,575.00 $2,302.87 $2,000.00 $3,710.00 $2,945.54
34619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $20,000.00 $15,150.00 $15,000.00 $50,000.00 $37,300.00 $9,265.50 $18,700.00 $11,500.00 $8,700.00
35619(B) 4728 REMOVAL OF ASPHALT PAVEMENT11,124SY $4.40 $3.03 $2.05 $4.00 $2.60 $4.31 $3.00 $5.45 $3.60
36619(B) 4780 REMOVAL OF GUARDRAIL330LF $3.90 $5.05 $5.10 $4.00 $2.10 $3.20 $4.00 $4.70 $4.00
37619(C) 0924 SAWING PAVEMENT1,750LF $3.40 $5.05 $3.50 $6.00 $2.25 $5.33 $5.00 $3.95 $4.00
38623 0100 (PL)GUARDRAIL CURBING2EA $1,200.00 $1,622.57 $1,100.00 $1,500.00 $1,050.00 $2,107.26 $1,500.00 $1,700.00 $5,000.00
39623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE337LF $18.00 $19.19 $17.50 $25.00 $19.95 $18.05 $20.00 $19.20 $16.95
40623(G) 8590 GUARDRAIL END TREATMENT (31")2EA $2,400.00 $2,525.00 $2,150.00 $2,500.00 $2,625.00 $2,206.68 $2,300.00 $2,350.00 $2,072.00
41623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")2EA $1,900.00 $2,020.00 $2,500.00 $1,800.00 $2,100.00 $1,657.14 $1,600.00 $1,760.00 $1,556.00
42624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)1,766LF $4.80 $5.56 $5.60 $5.00 $5.75 $5.75 $8.98 $6.10 $7.59
43624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)166LF $5.30 $5.66 $14.50 $6.00 $5.85 $14.90 $9.20 $15.80 $16.18
44624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)1,776LF $5.80 $5.66 $6.40 $6.50 $5.85 $6.58 $9.20 $6.90 $11.61
45624(D) 4470 GATE, GALVANIZED STEEL3EA $880.00 $909.00 $775.00 $700.00 $945.00 $798.75 $1,000.00 $849.00 $750.00
46629(E) 5048 REMOVE AND RESET MAILBOX1EA $160.00 $202.00 $210.00 $250.00 $210.00 $213.00 $200.00 $226.00 $200.00
47201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $19,695.00 $31,000.00 $28,000.00 $195,000.00 $11,715.00 $31,500.00 $24,040.00 $11,000.00
48202(A) 0183 UNCLASSIFIED EXCAVATION3,372CY $8.70 $5.81 $7.50 $8.00 $8.05 $6.98 $6.35 $16.80 $6.55
49202(D) 0184 UNCLASSIFIED BORROW24,305CY $9.60 $7.93 $9.00 $9.00 $11.75 $11.45 $8.73 $13.50 $10.75
50205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $10,827.20 $13,500.00 $12,000.00 $105,000.00 $8,626.50 $6,600.00 $2,670.00 $8,100.00
51221(C) 2801 TEMPORARY SILT FENCE3,972LF $1.60 $1.02 $1.05 $1.30 $1.00 $1.08 $2.74 $1.55 $1.87
52230(A) 2806 SOLID SLAB SODDING9,196SY $1.50 $1.14 $1.17 $1.40 $1.15 $1.20 $2.95 $1.30 $1.81
53232(B) 2814 SEEDING METHOD B1.9AC $650.00 $213.11 $220.00 $250.00 $210.00 $224.72 $795.00 $241.00 $1,561.00
54233(A) 2817 VEGETATIVE MULCHING1.9AC $300.00 $454.50 $465.00 $550.00 $450.00 $479.25 $595.00 $514.00 $450.00
55241 2832 MOWING13.6AC $65.00 $79.79 $95.00 $100.00 $80.00 $94.79 $130.00 $150.00 $79.00
56242 0400 (PL)STABILIZED CONSTRUCTION EXIT1EA $3,400.00 $1,010.00 $1,600.00 $3,500.00 $6,500.00 $4,995.99 $600.00 $5,660.00 $12,000.00
57303(A) 2100 AGGREGATE BASE TYPE A1,742CY $50.00 $35.35 $57.00 $44.00 $73.35 $58.58 $35.00 $58.75 $45.00
58307(K) 4300 STABILIZED SUBGRADE7,948SY $6.70 $4.04 $5.50 $5.00 $4.60 $5.93 $4.00 $7.20 $5.57
59407(B) 0250 TACK COAT1,118GAL $3.30 $2.02 $4.15 $3.00 $0.0100 $4.26 $2.00 $2.25 $2.00
60408 5774 PRIME COAT4,808GAL $4.10 $3.03 $4.25 $4.00 $0.0100 $1.00 $3.00 $3.35 $3.00
61411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)2,505TON $72.00 $72.17 $74.00 $82.00 $74.60 $75.62 $71.45 $80.00 $71.45
62411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)827TON $82.00 $77.64 $79.00 $87.00 $76.05 $79.56 $76.87 $90.00 $76.87
63509(B) 0321 CLASS A CONCRETE157CY $480.00 $298.86 $375.00 $500.00 $424.70 $229.26 $550.00 $550.00 $750.00
64509(D) 0325 CLASS C CONCRETE10CY $450.00 $342.96 $425.00 $400.00 $425.25 $1,034.31 $600.00 $1,200.00 $1,000.00
65619(B) 4727 REMOVAL OF CONCRETE PAVEMENT1,593SY $5.60 $6.06 $8.25 $9.00 $8.80 $8.41 $8.00 $10.20 $7.90
66619(B) 4728 REMOVAL OF ASPHALT PAVEMENT7,546SY $4.40 $4.04 $2.05 $5.00 $2.60 $5.26 $4.00 $5.35 $4.60
67619(B) 4780 REMOVAL OF GUARDRAIL3,117LF $3.90 $2.02 $3.00 $4.00 $2.10 $4.26 $3.30 $4.70 $4.00
68619(C) 0924 SAWING PAVEMENT50LF $3.40 $15.15 $10.00 $6.00 $2.30 $7.46 $5.00 $3.95 $4.00
69623 0100 (PL)GUARDRAIL CURBING2EA $1,200.00 $1,499.42 $1,100.00 $2,000.00 $1,050.00 $2,107.26 $1,500.00 $1,700.00 $5,000.00
70623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE2,792LF $18.00 $19.19 $17.50 $20.00 $19.95 $18.05 $16.00 $19.20 $16.95
71623(F) 6028 GUARDRAIL ANCHOR UNIT2EA $690.00 $3,282.50 $2,250.00 $2,400.00 $3,415.00 $2,206.68 $2,000.00 $2,350.00 $2,072.00
72623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,600.00 $2,525.00 $2,200.00 $2,000.00 $2,625.00 $1,657.14 $1,600.00 $1,760.00 $1,556.00
73623(J) 8572 CURVED APPROACH GUARDRAIL2EA $1,700.00 $1,913.95 $2,014.00 $1,600.00 $1,785.00 $2,018.18 $1,300.00 $2,150.00 $1,895.00
74202(D) 1302 UNCLASSIFIED BORROW40CY $50.00 $41.60 $30.00 $20.00 $11.05 $81.55 $50.00 $45.50 $53.65
75501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON210CY $25.00 $15.60 $76.00 $12.00 $29.50 $28.47 $15.00 $24.90 $50.00
76501(G) 6309 CLSM BACKFILL366.2CY $180.00 $124.15 $140.00 $150.00 $181.60 $162.71 $170.00 $210.00 $155.00
77503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)12,120LF $275.00 $220.90 $230.00 $250.00 $226.00 $264.05 $205.00 $223.00 $330.00
78504(A) 1304 APPROACH SLAB318SY $235.00 $200.25 $160.00 $160.00 $164.94 $200.32 $150.00 $195.00 $175.00
79504(B) 1305 SAW-CUT GROOVING12,193SY $5.00 $2.50 $2.50 $3.20 $2.60 $2.34 $4.00 $2.55 $2.70
80504(C) 6250 SEALED EXPANSION JOINT330.4LF $320.00 $185.59 $207.00 $200.00 $252.20 $194.60 $200.00 $202.00 $181.51
81504(D) 6245 CONCRETE RAIL (TR4)4,987.4LF $90.00 $64.47 $56.00 $90.00 $97.30 $72.36 $80.00 $105.00 $69.00
82506(A) 1322 STRUCTURAL STEEL24,336LB $3.00 $1.68 $2.00 $3.00 $1.40 $1.39 $2.00 $3.45 $1.00
83507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY70EA $2,000.00 $1,387.59 $1,500.00 $1,500.00 $1,420.00 $1,312.07 $1,950.00 $1,870.00 $1,700.00
84507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY110EA $2,000.00 $1,387.59 $1,500.00 $1,500.00 $1,345.00 $1,312.07 $1,950.00 $1,870.00 $1,700.00
85509(A) 1326 CLASS AA CONCRETE3,406.6CY $600.00 $437.80 $500.00 $550.00 $591.74 $500.00 $500.00 $677.00 $1,200.09
86509(B) 1328 CLASS A CONCRETE1,012.2CY $600.00 $458.20 $550.00 $500.00 $584.65 $700.00 $700.00 $650.00 $1,000.00
87511(A) 1332 REINFORCING STEEL6,060LB $1.00 $1.02 $1.25 $0.8000 $1.30 $1.35 $1.10 $1.35 $1.00
88511(B) 6010 EPOXY COATED REINFORCING STEEL861,880LB $1.10 $0.8900 $1.00 $1.00 $0.8200 $0.9200 $0.9000 $1.05 $0.5500
89512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $450,000.00 $15,600.00 $30,000.00 $35,000.00 $17,975.00 $345,496.65 $30,000.00 $425,000.00 $324,410.00
90513(B) 6019 CLASS B BRIDGE DECK REPAIR90SY $500.00 $462.80 $380.00 $50.00 $584.95 $473.93 $600.00 $650.00 $445.00
91513(C) 6020 CLASS C BRIDGE DECK REPAIR45SY $700.00 $686.40 $480.00 $80.00 $990.83 $702.90 $800.00 $900.00 $660.00
92514(A) 6010 PILES, FURNISHED (HP 10X42)162LF $30.00 $26.88 $28.00 $25.00 $25.60 $27.06 $30.00 $28.80 $57.00
93514(A) 6011 PILES, FURNISHED (HP 12X53)782LF $40.00 $31.68 $34.00 $35.00 $31.30 $32.89 $40.00 $38.75 $63.65
94514(B) 6292 PILES, DRIVEN (HP 10X42)162LF $20.00 $10.40 $11.00 $25.00 $28.20 $39.52 $15.00 $14.90 $22.50
95514(B) 6294 PILES, DRIVEN (HP 12X53)782LF $20.00 $10.40 $11.00 $25.00 $25.50 $34.58 $20.00 $14.90 $25.20
96514(K) 6260 (PL)PILOT HOLES182LF $150.00 $96.65 $160.00 $65.00 $56.75 $117.37 $150.00 $99.50 $190.00
97514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
98515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)12,162.9SY $5.00 $2.60 $2.60 $4.00 $2.60 $3.51 $2.50 $3.15 $2.80
99516(A) 6096 DRILLED SHAFTS 60" DIAMETER1,642LF $900.00 $622.52 $855.00 $850.00 $755.60 $810.39 $2,400.00 $925.00 $645.18
100516(C) 6200 CROSSHOLE SONIC LOGGING6EA $3,000.00 $2,496.00 $3,000.00 $3,000.00 $1,740.00 $1,491.00 $2,500.00 $1,770.00 $1,400.00
101523(A) 6550 SEALER CRACK PREPARATION447.6LF $5.00 $4.16 $4.15 $5.00 $4.20 $5.96 $4.00 $4.55 $4.00
102523(B) 6560 SEALER RESIN5.6GAL $150.00 $104.00 $105.00 $150.00 $105.00 $213.00 $100.00 $113.00 $100.00
103535 6240 HAULING BEAMS1LSUM $10,000.00 $52,000.00 $23,500.00 $5,000.00 $24,500.00 $9,374.52 $10,000.00 $75,000.00 $25,000.00
104601(B) 1353 TYPE I-A PLAIN RIPRAP2,880TON $50.00 $37.98 $38.00 $50.00 $46.45 $42.95 $45.00 $85.00 $58.00
105601(C) 1355 TYPE I-A FILTER BLANKET655TON $40.00 $28.57 $27.00 $40.00 $46.60 $34.14 $35.00 $70.00 $65.00
106613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND94LF $30.00 $27.04 $18.00 $20.00 $61.50 $34.33 $20.00 $40.25 $25.00
107613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.100LF $30.00 $17.68 $18.00 $20.00 $42.70 $30.82 $20.00 $39.75 $24.00
108619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $500,000.00 $321,360.00 $385,000.00 $600,000.00 $451,300.00 $588,146.40 $250,000.00 $661,000.00 $906,000.00
109805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS4EA $67.00 $50.50 $52.00 $60.00 $52.50 $213.00 $100.00 $226.00 $200.00
110805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS5EA $220.00 $202.00 $207.00 $250.00 $210.00 $213.00 $240.00 $226.00 $200.00
111850(A) 8110 SHEET ALUMINUM SIGNS25SF $20.00 $20.20 $21.00 $25.00 $21.00 $26.63 $18.00 $27.90 $25.00
112851(C) 8324 2" SQUARE TUBE POST47LF $9.30 $8.08 $8.30 $10.00 $8.40 $15.98 $7.00 $17.00 $15.00
113853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)8EA $12.00 $12.12 $15.00 $18.00 $10.50 $13.31 $15.00 $17.00 $12.50
114856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)20,354LF $0.5400 $0.6000 $0.6100 $0.8000 $0.6000 $1.07 $0.5200 $1.15 $1.00
115857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)6,652LF $0.1300 $0.2500 $0.2600 $0.3000 $0.2500 $1.07 $0.4000 $1.15 $1.00
116857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1456EA $0.7200 $2.02 $2.05 $2.20 $2.10 $2.13 $1.00 $2.25 $2.00
117857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)3,900LF $0.2400 $1.01 $1.05 $1.10 $1.05 $1.07 $0.6000 $1.15 $1.00
118871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.160SD $11.00 $161.60 $10.40 $12.00 $10.50 $37.28 $50.00 $39.50 $35.00
119877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER4,422LF $24.00 $25.25 $25.00 $26.00 $17.00 $25.00 $35.00 $34.00 $31.00
120877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,145LF $3.90 $4.04 $2.00 $5.00 $3.75 $3.00 $15.00 $5.65 $3.00
121880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF3,000SD $0.3400 $0.7600 $0.8000 $1.00 $0.7500 $1.07 $0.0500 $1.15 $1.00
122880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,500SD $0.7600 $0.2500 $0.2600 $0.3000 $0.2500 $2.13 $0.0500 $2.25 $2.00
123880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,700SD $1.50 $0.5100 $0.5200 $0.6000 $0.5500 $3.20 $0.0500 $3.35 $3.00
124880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,100SD $0.9100 $1.01 $1.04 $1.10 $1.05 $2.66 $3.00 $2.85 $2.50
125880(C) 8848 WING BARRICADES720SD $1.40 $1.01 $1.04 $1.10 $1.05 $2.66 $4.00 $2.85 $2.50
126880(D) 8854 VERTICAL PANELS3,400SD $0.1300 $0.2000 $0.2100 $0.2500 $0.2000 $0.5300 $0.0500 $0.5500 $0.5000
127880(E) 8860 WARNING LIGHTS(TYPE A)1,480SD $0.2900 $2.02 $2.05 $2.20 $2.10 $0.5300 $0.5000 $0.5500 $0.5000
128880(F) 8878 DRUMS4,900SD $0.2800 $0.2000 $0.2100 $0.2500 $0.2000 $0.5300 $0.0500 $0.5500 $0.5000
129880(G) 8890 CHANNELIZER CONES4,900SD $0.3500 $0.2000 $0.2100 $0.2500 $0.2000 $0.5300 $0.0500 $0.5500 $0.5000
130882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN360SD $14.00 $10.10 $10.50 $12.00 $10.50 $61.77 $35.00 $65.75 $58.00
131805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS5EA $220.00 $510.00 $520.00 $500.00 $525.00 $213.00 $320.00 $226.00 $200.00
132823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM45SD $170.00 $127.50 $130.00 $150.00 $131.25 $319.50 $180.00 $340.00 $522.75
133853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)34EA $12.00 $10.20 $15.00 $18.00 $12.60 $13.31 $15.00 $17.00 $12.50
134856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)6,688LF $0.5400 $0.6000 $0.6500 $0.8000 $0.6000 $2.13 $0.5500 $2.25 $2.00
135857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1448EA $0.7200 $2.04 $2.10 $2.20 $2.10 $2.13 $1.00 $2.25 $2.00
136871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.120SD $11.00 $10.20 $10.50 $12.00 $10.50 $37.28 $50.00 $39.50 $35.00
137877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,418LF $24.00 $35.70 $25.00 $28.00 $17.00 $25.00 $35.00 $34.00 $31.00
138877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,875LF $3.90 $6.12 $2.00 $6.00 $3.75 $1.83 $15.00 $5.65 $3.00
139880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF3,000SD $0.3400 $0.5100 $0.5200 $0.6000 $0.5000 $1.07 $0.0500 $1.15 $1.00
140880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,500SD $0.7600 $0.2600 $0.2600 $0.3000 $0.2500 $2.13 $0.0500 $2.25 $2.00
141880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,700SD $1.50 $0.5100 $0.5200 $0.6000 $0.5000 $3.20 $0.0500 $3.35 $3.00
142880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,100SD $0.9100 $1.02 $1.05 $1.10 $1.05 $2.66 $3.00 $2.85 $2.50
143880(C) 8848 WING BARRICADES720SD $1.40 $1.02 $1.05 $1.10 $1.05 $0.5300 $4.00 $0.5500 $0.5000
144880(E) 8860 WARNING LIGHTS(TYPE A)1,480SD $0.2900 $2.04 $2.05 $2.20 $2.10 $0.5300 $0.5000 $0.5500 $0.5000
145882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN360SD $14.00 $10.20 $10.40 $12.00 $10.50 $61.77 $35.00 $65.75 $58.00
146642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $60,000.00 $49,572.00 $101,100.00 $50,000.00 $105,000.00 $32,482.50 $40,000.00 $200,000.00 $400,000.00
147220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,000.00 $6,120.00 $1,950.00 $15,000.00 $5,250.00 $1,993.93 $5,000.00 $14,960.00 $12,250.00
148640(A) 1398 FIELD OFFICE1EA $15,000.00 $17,340.00 $16,500.00 $25,000.00 $25,200.00 $38,852.29 $20,000.00 $300,000.00 $331,149.94
149641 1399 MOBILIZATION1LSUM $600,000.00 $503,709.50 $544,000.00 $600,000.00 $595,000.00 $575,000.00 $600,000.00 $800,000.00 $766,973.80