| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$15,600.00 |
$15,000.00 |
$15,000.00 |
$20,000.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 87,168 | CY |
$6.00 |
$5.98 |
$5.75 |
$5.75 |
$6.00 |
$5.75 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 29,871 | CY |
$8.50 |
$7.28 |
$7.00 |
$7.00 |
$7.25 |
$7.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$500,000.00 |
$96,096.00 |
$205,400.00 |
$92,400.00 |
$100,000.00 |
$92,400.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 29,450 | LF |
$1.50 |
$1.02 |
$0.9800 |
$0.9800 |
$0.9800 |
$1.20 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,081 | LF |
$7.50 |
$6.08 |
$5.85 |
$5.85 |
$5.85 |
$7.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 306,711 | SY |
$1.00 |
$0.8700 |
$0.8400 |
$0.8400 |
$0.9000 |
$1.18 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 63.37 | AC |
$350.00 |
$20.80 |
$20.00 |
$20.00 |
$20.00 |
$225.00 |
| 9 | 307(A) 4200 |
FLY ASH | 5,586 | TON |
$77.00 |
$81.01 |
$82.75 |
$82.75 |
$90.00 |
$82.75 |
| 10 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 110,807 | SY |
$2.35 |
$1.82 |
$1.75 |
$1.75 |
$2.00 |
$1.75 |
| 11 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 39,521 | LF |
$5.50 |
$2.02 |
$3.50 |
$4.10 |
$3.50 |
$3.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 9,788 | TON |
$28.00 |
$37.19 |
$28.00 |
$31.00 |
$45.00 |
$35.00 |
| 13 | 407(B) 0250 |
TACK COAT | 10,942 | GAL |
$3.25 |
$2.67 |
$2.00 |
$2.50 |
$1.75 |
$3.50 |
| 14 | 408 5774 |
PRIME COAT | 38,813 | GAL |
$3.75 |
$2.76 |
$3.05 |
$2.60 |
$2.25 |
$3.05 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 24,479 | TON |
$70.00 |
$54.60 |
$59.95 |
$65.00 |
$59.00 |
$74.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 12,410 | TON |
$77.00 |
$56.00 |
$59.46 |
$72.00 |
$68.50 |
$78.00 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 118 | CY |
$15.00 |
$20.80 |
$5.00 |
$20.00 |
$20.00 |
$20.00 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 322.98 | CY |
$450.00 |
$511.33 |
$443.64 |
$491.66 |
$491.66 |
$491.66 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 1,169 | CY |
$275.00 |
$278.15 |
$367.70 |
$267.45 |
$267.45 |
$267.45 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 46,986 | LB |
$1.00 |
$0.9500 |
$0.8500 |
$0.9100 |
$0.9100 |
$0.9100 |
| 21 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 707 | TON |
$45.00 |
$54.08 |
$52.00 |
$52.00 |
$52.00 |
$52.00 |
| 22 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 215 | TON |
$38.00 |
$43.68 |
$42.00 |
$42.00 |
$42.00 |
$42.00 |
| 23 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 144 | LF |
$75.00 |
$72.80 |
$70.00 |
$70.00 |
$70.00 |
$70.00 |
| 24 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 224 | LF |
$89.00 |
$83.20 |
$80.00 |
$80.00 |
$80.00 |
$80.00 |
| 25 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 56 | LF |
$113.00 |
$104.00 |
$100.00 |
$100.00 |
$100.00 |
$100.00 |
| 26 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 48 | LF |
$125.00 |
$156.00 |
$150.00 |
$150.00 |
$150.00 |
$150.00 |
| 27 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 72 | LF |
$75.00 |
$130.00 |
$125.00 |
$125.00 |
$125.00 |
$125.00 |
| 28 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 88 | LF |
$118.00 |
$140.40 |
$135.00 |
$135.00 |
$135.00 |
$135.00 |
| 29 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 176 | LF |
$150.00 |
$260.00 |
$250.00 |
$250.00 |
$250.00 |
$250.00 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,072 | LF |
$26.00 |
$26.00 |
$25.00 |
$25.00 |
$25.00 |
$25.00 |
| 31 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 648 | LF |
$36.00 |
$41.60 |
$40.00 |
$40.00 |
$40.00 |
$40.00 |
| 32 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 64 | LF |
$50.00 |
$52.00 |
$50.00 |
$50.00 |
$50.00 |
$50.00 |
| 33 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 624 | LF |
$35.00 |
$41.60 |
$40.00 |
$40.00 |
$40.00 |
$40.00 |
| 34 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 64 | LF |
$55.00 |
$46.80 |
$45.00 |
$45.00 |
$45.00 |
$45.00 |
| 35 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 168 | LF |
$65.00 |
$57.20 |
$55.00 |
$55.00 |
$55.00 |
$55.00 |
| 36 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,000.00 |
$2,600.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
| 37 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,200.00 |
$2,600.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
| 38 | 613(L) 4546 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH | 8 | EA |
$2,400.00 |
$3,640.00 |
$3,500.00 |
$3,500.00 |
$3,500.00 |
$3,500.00 |
| 39 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$750.00 |
$1,248.00 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
| 40 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$850.00 |
$1,560.00 |
$1,500.00 |
$1,500.00 |
$1,500.00 |
$1,500.00 |
| 41 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,400.00 |
$2,080.00 |
$2,000.00 |
$2,000.00 |
$2,000.00 |
$2,000.00 |
| 42 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,200.00 |
$3,120.00 |
$3,000.00 |
$3,000.00 |
$3,000.00 |
$3,000.00 |
| 43 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 30 | EA |
$1,500.00 |
$1,170.00 |
$1,200.00 |
$1,125.00 |
$1,125.00 |
$1,125.00 |
| 44 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 28 | EA |
$1,500.00 |
$1,346.80 |
$1,300.00 |
$1,295.00 |
$1,295.00 |
$1,295.00 |
| 45 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 6 | EA |
$1,750.00 |
$1,924.00 |
$1,600.00 |
$1,850.00 |
$1,850.00 |
$1,850.00 |
| 46 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$2,470.00 |
$1,800.00 |
$2,375.00 |
$2,375.00 |
$2,375.00 |
| 47 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$900.00 |
$1,040.00 |
$500.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
| 48 | 619(B) 4725 |
REMOVAL OF FENCE | 36,491 | LF |
$2.20 |
$1.04 |
$1.00 |
$1.00 |
$0.3000 |
$1.00 |
| 49 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 4 | EA |
$5,000.00 |
$6,500.00 |
$6,250.00 |
$6,250.00 |
$6,250.00 |
$6,250.00 |
| 50 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 1,349 | LF |
$10.00 |
$15.60 |
$15.00 |
$15.00 |
$15.00 |
$15.00 |
| 51 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 1 | EA |
$2,500.00 |
$2,600.00 |
$2,500.00 |
$3,500.00 |
$1,000.00 |
$3,000.00 |
| 52 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 790 | LF |
$5.00 |
$5.72 |
$5.31 |
$5.50 |
$6.55 |
$10.00 |
| 53 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 25,675 | LF |
$5.50 |
$7.28 |
$7.39 |
$7.00 |
$6.55 |
$11.00 |
| 54 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 3 | EA |
$100.00 |
$156.00 |
$100.00 |
$250.00 |
$250.00 |
$350.00 |
| 55 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 164.92 | SF |
$20.00 |
$18.72 |
$19.00 |
$15.00 |
$18.00 |
$18.00 |
| 56 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 324 | LF |
$25.00 |
$8.32 |
$8.00 |
$15.00 |
$8.00 |
$8.00 |
| 57 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 30,927 | LF |
$0.5000 |
$0.6000 |
$0.5500 |
$0.6000 |
$0.6300 |
$0.6300 |
| 58 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$17,160.00 |
$29,050.00 |
$15,000.00 |
$16,500.00 |
$20,000.00 |
| 59 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 910 | CY |
$10.00 |
$3.12 |
$10.00 |
$3.00 |
$3.00 |
$3.00 |
| 60 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 45 | CY |
$15.00 |
$20.80 |
$5.00 |
$20.00 |
$20.00 |
$20.00 |
| 61 | 509(A) 1326 |
CLASS AA CONCRETE | 75.13 | CY |
$500.00 |
$467.81 |
$935.65 |
$449.82 |
$449.82 |
$449.82 |
| 62 | 511(A) 1332 |
REINFORCING STEEL | 5,607 | LB |
$1.00 |
$0.9500 |
$0.8500 |
$0.9100 |
$0.9100 |
$0.9100 |
| 63 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 258 | TON |
$45.00 |
$51.77 |
$55.00 |
$49.78 |
$52.00 |
$49.78 |
| 64 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 78 | TON |
$38.00 |
$40.04 |
$43.00 |
$38.50 |
$42.00 |
$38.50 |
| 65 | 619(B) 2505 |
REMOVAL OF BRIDGE ITEMS | 2 | EA |
$2,500.00 |
$5,200.00 |
$5,000.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
| 66 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 835 | CY |
$10.00 |
$3.12 |
$10.00 |
$3.00 |
$3.00 |
$3.00 |
| 67 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 64 | CY |
$15.00 |
$20.80 |
$5.00 |
$20.00 |
$20.00 |
$20.00 |
| 68 | 509(A) 1326 |
CLASS AA CONCRETE | 139.32 | CY |
$500.00 |
$467.81 |
$468.01 |
$449.82 |
$449.82 |
$449.82 |
| 69 | 511(A) 1332 |
REINFORCING STEEL | 19,303 | LB |
$1.00 |
$0.9500 |
$0.8500 |
$0.9100 |
$0.9100 |
$0.9100 |
| 70 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 180 | TON |
$45.00 |
$51.77 |
$55.00 |
$49.78 |
$52.00 |
$49.78 |
| 71 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 55 | TON |
$38.00 |
$40.04 |
$45.00 |
$38.50 |
$42.00 |
$38.50 |
| 72 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,400.00 |
$10,000.00 |
$6,000.00 |
$6,000.00 |
$6,000.00 |
| 73 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 835 | CY |
$10.00 |
$3.12 |
$10.00 |
$3.00 |
$3.00 |
$3.00 |
| 74 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 64 | CY |
$15.00 |
$20.80 |
$5.00 |
$20.00 |
$20.00 |
$20.00 |
| 75 | 509(A) 1326 |
CLASS AA CONCRETE | 139.32 | CY |
$500.00 |
$467.81 |
$468.01 |
$449.82 |
$449.82 |
$449.82 |
| 76 | 511(A) 1332 |
REINFORCING STEEL | 19,303 | LB |
$1.00 |
$0.9500 |
$0.8500 |
$0.9100 |
$0.9100 |
$0.9100 |
| 77 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 224 | TON |
$45.00 |
$51.77 |
$55.00 |
$49.78 |
$52.00 |
$49.78 |
| 78 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 68 | TON |
$38.00 |
$40.04 |
$45.00 |
$38.50 |
$42.00 |
$38.50 |
| 79 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,400.00 |
$10,000.00 |
$6,000.00 |
$6,000.00 |
$6,000.00 |
| 80 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$36,696.40 |
$69,000.00 |
$69,000.00 |
$70,000.00 |
$100,000.00 |
| 81 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$10,000.00 |
$10,000.00 |
$30,000.00 |
$50,000.00 |
| 82 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$350,000.00 |
$237,995.60 |
$100,000.00 |
$316,000.00 |
$331,000.00 |
$650,000.00 |