| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$5,700.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,460 | CY |
$8.00 |
$11.00 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,968 | CY |
$13.00 |
$17.00 |
$12.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,800.00 |
$11,000.00 |
$6,040.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,643 | LF |
$2.00 |
$1.98 |
$1.24 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$210.00 |
$165.00 |
$150.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 161 | LF |
$8.00 |
$8.80 |
$10.22 |
| 8 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 93 | CY |
$90.00 |
$135.00 |
$125.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 7,768 | SY |
$2.00 |
$2.25 |
$1.98 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.6 | AC |
$600.00 |
$600.00 |
$500.00 |
| 11 | 241 2832 |
MOWING | 3.2 | AC |
$115.00 |
$165.00 |
$98.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 283 | CY |
$65.00 |
$115.00 |
$76.50 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 6,251 | SY |
$10.00 |
$7.15 |
$10.00 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 844 | SY |
$3.00 |
$4.90 |
$2.50 |
| 15 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 907 | SY |
$10.00 |
$5.90 |
$6.50 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 377 | TON |
$49.00 |
$58.00 |
$46.00 |
| 17 | 407(B) 0250 |
TACK COAT | 2,245 | GAL |
$3.00 |
$3.45 |
$5.00 |
| 18 | 408 5774 |
PRIME COAT | 1,938 | GAL |
$7.00 |
$8.05 |
$7.00 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 973 | TON |
$103.00 |
$118.00 |
$110.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,559 | TON |
$100.00 |
$115.00 |
$105.00 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 649 | TON |
$115.00 |
$132.00 |
$125.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 2 | CY |
$400.00 |
$1,200.00 |
$800.00 |
| 23 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 132 | LF |
$30.00 |
$70.00 |
$45.00 |
| 24 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 84 | SY |
$80.00 |
$135.00 |
$95.00 |
| 25 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 41 | LF |
$51.00 |
$140.00 |
$95.50 |
| 26 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 10 | LF |
$35.00 |
$130.00 |
$29.35 |
| 27 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$267.00 |
$2,000.00 |
$400.00 |
| 28 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$750.00 |
$600.00 |
$400.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$6,500.00 |
$3,565.00 |
| 30 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 132 | LF |
$6.00 |
$6.50 |
$5.23 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,759 | SY |
$6.00 |
$8.50 |
$10.00 |
| 32 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 85 | SY |
$16.00 |
$8.00 |
$7.31 |
| 33 | 619(C) 0924 |
SAWING PAVEMENT | 673 | LF |
$4.00 |
$7.00 |
$8.00 |
| 34 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$211.00 |
$220.00 |
$300.00 |
| 35 | 629(C) 4960 |
MAILBOX | 10 | EA |
$35.00 |
$100.00 |
$200.00 |
| 36 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$25.00 |
$100.00 |
$100.00 |
| 37 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 290 | CY |
$8.00 |
$12.75 |
$7.50 |
| 38 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 215 | CY |
$15.00 |
$22.00 |
$10.00 |
| 39 | 509(A) 1326 |
CLASS AA CONCRETE | 407.5 | CY |
$525.00 |
$610.00 |
$522.36 |
| 40 | 511(A) 1332 |
REINFORCING STEEL | 67,390 | LB |
$1.00 |
$0.9300 |
$0.9000 |
| 41 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$13,265.00 |
$42,500.00 |
$20,355.00 |
| 42 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 85 | SF |
$24.00 |
$22.00 |
$23.00 |
| 43 | 851(C) 8324 |
2" SQUARE TUBE POST | 139 | LF |
$10.00 |
$12.00 |
$11.00 |
| 44 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,936 | LF |
$0.7500 |
$1.95 |
$0.7500 |
| 45 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 51 | LF |
$3.00 |
$10.00 |
$3.00 |
| 46 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 24 | LF |
$11.00 |
$27.50 |
$11.00 |
| 47 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 3 | EA |
$275.00 |
$250.00 |
$275.00 |
| 48 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 865 | LF |
$0.6500 |
$1.20 |
$0.6000 |
| 49 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 865 | LF |
$0.5000 |
$1.20 |
$0.4500 |
| 50 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,896 | SD |
$0.7000 |
$0.2000 |
$0.7300 |
| 51 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,454 | SD |
$1.20 |
$0.6000 |
$1.10 |
| 52 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,032 | SD |
$3.00 |
$1.20 |
$2.90 |
| 53 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$0.6000 |
$3.30 |
$1.00 |
| 54 | 880(C) 8848 |
WING BARRICADES | 988 | SD |
$0.7000 |
$0.3000 |
$0.6500 |
| 55 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,432 | SD |
$0.3000 |
$0.6000 |
$0.4000 |
| 56 | 880(F) 8878 |
DRUMS | 940 | SD |
$0.4000 |
$1.10 |
$0.5000 |
| 57 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 300 | SD |
$13.00 |
$22.00 |
$20.00 |
| 58 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,500.00 |
$8,500.00 |
$5,500.00 |
| 59 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$8,000.00 |
| 60 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$77,000.00 |
$75,000.00 |
$210,545.88 |