| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$7,000.00 |
$26,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 26,288 | CY |
$6.25 |
$7.00 |
$8.00 |
$8.65 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 8,644 | CY |
$8.00 |
$10.00 |
$11.50 |
$9.43 |
| 4 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 6,789 | CY |
$6.00 |
$8.00 |
$5.00 |
$4.80 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,368 | LF |
$2.00 |
$1.23 |
$2.00 |
$1.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$8.00 |
$6.95 |
$7.15 |
$7.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 20 | CY |
$105.00 |
$200.00 |
$110.00 |
$99.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 36,464 | SY |
$1.75 |
$1.30 |
$1.17 |
$1.32 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.7 | AC |
$435.00 |
$400.00 |
$398.00 |
$398.00 |
| 10 | 241 2832 |
MOWING | 28.5 | AC |
$90.00 |
$75.00 |
$69.00 |
$69.00 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 7,888 | SY |
$6.00 |
$7.00 |
$5.95 |
$6.90 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,412 | SY |
$2.00 |
$3.50 |
$2.10 |
$2.50 |
| 13 | 407(B) 0250 |
TACK COAT | 4,583 | GAL |
$3.00 |
$4.00 |
$3.63 |
$4.00 |
| 14 | 408 5774 |
PRIME COAT | 7,086 | GAL |
$5.00 |
$8.00 |
$7.27 |
$4.00 |
| 15 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 693 | TON |
$98.00 |
$91.00 |
$79.52 |
$106.54 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,342 | TON |
$88.00 |
$82.40 |
$74.41 |
$99.00 |
| 17 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 594 | TON |
$115.00 |
$94.80 |
$82.40 |
$121.39 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,272 | TON |
$106.00 |
$92.80 |
$82.66 |
$111.38 |
| 19 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 70 | LF |
$100.00 |
$100.00 |
$105.00 |
$105.00 |
| 20 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 96 | LF |
$115.00 |
$117.00 |
$113.00 |
$117.00 |
| 21 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 108 | LF |
$135.00 |
$160.00 |
$143.00 |
$155.00 |
| 22 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 32 | LF |
$30.00 |
$55.00 |
$28.00 |
$28.00 |
| 23 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 87 | LF |
$35.00 |
$60.00 |
$30.00 |
$30.00 |
| 24 | 613(B) 0697 |
66" CORR. GALV. STEEL PIPE | 203 | LF |
$80.00 |
$95.00 |
$80.00 |
$129.00 |
| 25 | 613(B) 5075 |
108" CORR. GALV. STEEL PIPE | 110 | LF |
$100.00 |
$270.00 |
$260.00 |
$292.00 |
| 26 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,408.00 |
$1,100.00 |
$1,200.00 |
$2,281.00 |
| 27 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 2 | EA |
$1,740.00 |
$1,200.00 |
$1,450.00 |
$3,582.00 |
| 28 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$8,000.00 |
$7,500.00 |
| 29 | 619(B) 4725 |
REMOVAL OF FENCE | 4,291 | LF |
$1.00 |
$1.00 |
$1.60 |
$2.50 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 12,876 | SY |
$3.00 |
$6.50 |
$6.00 |
$5.75 |
| 31 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 1,355 | SY |
$5.00 |
$6.50 |
$6.00 |
$10.50 |
| 32 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 566 | LF |
$3.00 |
$4.50 |
$5.00 |
$5.65 |
| 33 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 756.25 | LF |
$16.50 |
$17.50 |
$13.00 |
$17.60 |
| 34 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,200.00 |
$660.00 |
$375.00 |
$660.00 |
| 35 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,100.00 |
$2,420.00 |
$1,800.00 |
$2,420.00 |
| 36 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,800.00 |
$1,650.00 |
$1,500.00 |
$1,650.00 |
| 37 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,431 | LF |
$4.00 |
$4.30 |
$3.90 |
$4.50 |
| 38 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 3,495 | CY |
$12.00 |
$15.00 |
$25.00 |
$56.00 |
| 39 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$140.00 |
$150.00 |
$175.00 |
$157.50 |
| 40 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 995 | LF |
$225.00 |
$195.00 |
$245.00 |
$213.00 |
| 41 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$180.00 |
$220.00 |
$175.00 |
$215.50 |
| 42 | 504(B) 1305 |
SAW-CUT GROOVING | 1,104.4 | SY |
$5.00 |
$4.45 |
$5.00 |
$4.42 |
| 43 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 497 | LF |
$90.00 |
$85.00 |
$75.00 |
$93.00 |
| 44 | 506(A) 1322 |
STRUCTURAL STEEL | 1,100 | LB |
$3.70 |
$2.50 |
$3.00 |
$2.81 |
| 45 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,700.00 |
$355.00 |
$575.00 |
$525.00 |
| 46 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,700.00 |
$1,500.00 |
$1,750.00 |
$1,245.00 |
| 47 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$1,000.00 |
$380.00 |
$250.00 |
$375.00 |
| 48 | 509(A) 1326 |
CLASS AA CONCRETE | 492.7 | CY |
$550.00 |
$500.00 |
$475.00 |
$675.00 |
| 49 | 509(B) 1328 |
CLASS A CONCRETE | 128.8 | CY |
$570.00 |
$500.00 |
$750.00 |
$680.00 |
| 50 | 509(D) 1331 |
CLASS C CONCRETE | 11 | CY |
$350.00 |
$500.00 |
$345.00 |
$675.00 |
| 51 | 511(A) 1332 |
REINFORCING STEEL | 1,880 | LB |
$1.00 |
$0.9000 |
$2.00 |
$1.55 |
| 52 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 124,970 | LB |
$1.05 |
$0.9500 |
$1.00 |
$1.03 |
| 53 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,312 | LF |
$30.00 |
$23.00 |
$32.00 |
$29.40 |
| 54 | 514(A) 6016 |
PILES, FURNISHED (HP 14X89) | 3,424 | LF |
$65.00 |
$43.00 |
$62.00 |
$51.80 |
| 55 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,312 | LF |
$14.00 |
$15.00 |
$8.00 |
$12.60 |
| 56 | 514(B) 6297 |
PILES, DRIVEN (HP 14X89) | 3,424 | LF |
$15.00 |
$17.00 |
$11.00 |
$22.20 |
| 57 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 58 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 869 | SY |
$4.20 |
$3.50 |
$3.65 |
$4.00 |
| 59 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.00 |
$4.00 |
$4.40 |
| 60 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$200.00 |
$150.00 |
$150.00 |
| 61 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,458 | TON |
$38.00 |
$52.00 |
$55.00 |
$53.50 |
| 62 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 327 | TON |
$30.00 |
$43.00 |
$45.00 |
$43.50 |
| 63 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$23.00 |
$30.00 |
$20.00 |
$36.00 |
| 64 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$20.00 |
$30.00 |
$20.00 |
$53.00 |
| 65 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$80,000.00 |
$85,000.00 |
$140,000.00 |
| 66 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 28.36 | SF |
$20.00 |
$26.00 |
$25.00 |
$25.00 |
| 67 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 12 | LF |
$8.50 |
$11.00 |
$10.00 |
$11.00 |
| 68 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 48 | LF |
$10.00 |
$8.50 |
$8.00 |
$8.80 |
| 69 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 23 | EA |
$17.00 |
$11.00 |
$15.00 |
$11.00 |
| 70 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,481 | LF |
$1.00 |
$0.9200 |
$0.9000 |
$0.9900 |
| 71 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 11,692 | LF |
$0.2000 |
$0.1700 |
$0.1500 |
$0.1700 |
| 72 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,397 | LF |
$0.2000 |
$0.5500 |
$0.5000 |
$0.5500 |
| 73 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,800 | SD |
$1.20 |
$0.1200 |
$0.1000 |
$0.1100 |
| 74 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,800 | SD |
$1.60 |
$0.2700 |
$0.2500 |
$0.2800 |
| 75 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,360 | SD |
$0.5000 |
$1.05 |
$1.00 |
$1.10 |
| 76 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,880 | SD |
$0.8000 |
$1.05 |
$1.00 |
$1.10 |
| 77 | 880(C) 8848 |
WING BARRICADES | 960 | SD |
$0.8000 |
$1.05 |
$1.00 |
$1.10 |
| 78 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,680 | SD |
$0.3000 |
$0.1200 |
$1.00 |
$0.1100 |
| 79 | 880(G) 8890 |
CHANNELIZER CONES | 23,040 | SD |
$0.2000 |
$0.0700 |
$0.1000 |
$0.0600 |
| 80 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 14 | SD |
$15.00 |
$44.00 |
$40.00 |
$44.00 |
| 81 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$35,000.00 |
$27,000.00 |
$40,000.00 |
| 82 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$6,000.00 |
$15,000.00 |
| 83 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$289,800.00 |
$275,000.00 |
$310,000.00 |
$318,000.00 |
| 84 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$10,000.00 |
$23,500.00 |
| 85 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,667 | CY |
$6.50 |
$7.00 |
$8.00 |
$8.40 |
| 86 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,475 | CY |
$8.00 |
$10.00 |
$11.50 |
$9.83 |
| 87 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 4,804 | CY |
$6.00 |
$8.00 |
$5.00 |
$4.80 |
| 88 | 221(C) 2801 |
TEMPORARY SILT FENCE | 768 | LF |
$2.00 |
$1.23 |
$2.00 |
$1.30 |
| 89 | 221(F) 0100 |
TEMPORARY SILT DIKE | 161 | LF |
$8.00 |
$6.95 |
$7.15 |
$7.00 |
| 90 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 20 | CY |
$105.00 |
$200.00 |
$110.00 |
$99.00 |
| 91 | 230(A) 2806 |
SOLID SLAB SODDING | 22,990 | SY |
$1.75 |
$1.30 |
$1.17 |
$1.32 |
| 92 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.8 | AC |
$435.00 |
$400.00 |
$398.00 |
$398.00 |
| 93 | 241 2832 |
MOWING | 23.68 | AC |
$90.00 |
$75.00 |
$69.00 |
$69.00 |
| 94 | 307(K) 4300 |
STABILIZED SUBGRADE | 6,361 | SY |
$6.00 |
$7.00 |
$5.95 |
$6.90 |
| 95 | 310(B) 0149 |
SUBGRADE, METHOD B | 303 | SY |
$2.00 |
$10.00 |
$2.10 |
$2.50 |
| 96 | 407(B) 0250 |
TACK COAT | 3,678 | GAL |
$3.00 |
$4.00 |
$3.63 |
$4.00 |
| 97 | 408 5774 |
PRIME COAT | 5,753 | GAL |
$5.00 |
$8.00 |
$7.27 |
$4.00 |
| 98 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 531 | TON |
$98.00 |
$96.00 |
$83.17 |
$106.54 |
| 99 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,483 | TON |
$88.00 |
$81.00 |
$72.95 |
$99.00 |
| 100 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 344 | TON |
$125.00 |
$109.00 |
$92.54 |
$121.39 |
| 101 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,164 | TON |
$106.00 |
$99.00 |
$88.20 |
$111.38 |
| 102 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 96 | LF |
$135.00 |
$160.00 |
$143.00 |
$162.00 |
| 103 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 24 | LF |
$30.00 |
$55.00 |
$28.00 |
$28.00 |
| 104 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 204 | LF |
$85.00 |
$105.00 |
$145.00 |
$135.00 |
| 105 | 613(B) 4819 |
96" CORR. GALV. STEEL PIPE | 79 | LF |
$95.00 |
$170.00 |
$190.00 |
$219.00 |
| 106 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 2 | EA |
$1,740.00 |
$1,200.00 |
$1,450.00 |
$3,582.00 |
| 107 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$8,000.00 |
$8,750.00 |
| 108 | 619(B) 4725 |
REMOVAL OF FENCE | 2,539 | LF |
$1.00 |
$1.00 |
$1.60 |
$2.50 |
| 109 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 11,286 | SY |
$3.00 |
$6.50 |
$6.00 |
$5.75 |
| 110 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 215 | SY |
$5.00 |
$6.50 |
$6.00 |
$50.00 |
| 111 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 560 | LF |
$3.00 |
$2.00 |
$2.75 |
$4.83 |
| 112 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 750 | LF |
$16.50 |
$17.50 |
$13.00 |
$17.60 |
| 113 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,100.00 |
$2,420.00 |
$1,800.00 |
$2,420.00 |
| 114 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,800.00 |
$1,650.00 |
$1,500.00 |
$1,650.00 |
| 115 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 331 | LF |
$4.00 |
$4.30 |
$3.90 |
$4.50 |
| 116 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 3,600 | CY |
$12.00 |
$15.00 |
$25.00 |
$56.00 |
| 117 | 501(G) 6309 |
CLSM BACKFILL | 210 | CY |
$140.00 |
$150.00 |
$175.00 |
$172.50 |
| 118 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,495 | LF |
$250.00 |
$210.00 |
$265.00 |
$221.00 |
| 119 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$180.00 |
$220.00 |
$175.00 |
$215.50 |
| 120 | 504(B) 1305 |
SAW-CUT GROOVING | 1,607.6 | SY |
$5.00 |
$4.45 |
$5.00 |
$4.42 |
| 121 | 504(C) 6250 |
SEALED EXPANSION JOINT | 41.8 | LF |
$270.00 |
$250.00 |
$250.00 |
$290.00 |
| 122 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 723.3 | LF |
$80.00 |
$85.00 |
$75.00 |
$90.00 |
| 123 | 506(A) 1322 |
STRUCTURAL STEEL | 1,430 | LB |
$3.50 |
$2.50 |
$3.00 |
$2.81 |
| 124 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,700.00 |
$2,120.00 |
$1,250.00 |
$1,550.00 |
| 125 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,700.00 |
$2,120.00 |
$1,250.00 |
$1,550.00 |
| 126 | 509(A) 1326 |
CLASS AA CONCRETE | 580.6 | CY |
$550.00 |
$500.00 |
$475.00 |
$675.00 |
| 127 | 509(B) 1328 |
CLASS A CONCRETE | 168 | CY |
$570.00 |
$500.00 |
$750.00 |
$680.00 |
| 128 | 509(D) 1331 |
CLASS C CONCRETE | 9.3 | CY |
$350.00 |
$500.00 |
$345.00 |
$675.00 |
| 129 | 511(A) 1332 |
REINFORCING STEEL | 2,200 | LB |
$1.00 |
$0.9000 |
$2.00 |
$1.55 |
| 130 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 161,450 | LB |
$1.05 |
$0.9500 |
$1.00 |
$1.03 |
| 131 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 432 | LF |
$32.00 |
$23.00 |
$32.00 |
$29.40 |
| 132 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,887 | LF |
$35.00 |
$28.00 |
$40.00 |
$31.50 |
| 133 | 514(A) 6016 |
PILES, FURNISHED (HP 14X89) | 3,900 | LF |
$65.00 |
$43.00 |
$62.00 |
$51.80 |
| 134 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 432 | LF |
$15.00 |
$15.00 |
$8.00 |
$12.60 |
| 135 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,887 | LF |
$15.00 |
$15.00 |
$10.00 |
$13.50 |
| 136 | 514(B) 6297 |
PILES, DRIVEN (HP 14X89) | 3,900 | LF |
$15.00 |
$17.00 |
$11.00 |
$22.20 |
| 137 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 138 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,319 | SY |
$4.20 |
$3.50 |
$3.65 |
$4.00 |
| 139 | 523(A) 6550 |
SEALER CRACK PREPARATION | 41 | LF |
$5.50 |
$5.00 |
$4.00 |
$4.40 |
| 140 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$160.00 |
$200.00 |
$150.00 |
$150.00 |
| 141 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,283 | TON |
$38.00 |
$52.00 |
$55.00 |
$53.50 |
| 142 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 289 | TON |
$30.00 |
$43.00 |
$45.00 |
$43.50 |
| 143 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$23.00 |
$30.00 |
$20.00 |
$35.00 |
| 144 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 68 | LF |
$20.00 |
$30.00 |
$20.00 |
$40.00 |
| 145 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$80,000.00 |
$85,000.00 |
$185,000.00 |
| 146 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 26 | EA |
$17.00 |
$11.00 |
$15.00 |
$11.00 |
| 147 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 3,408 | LF |
$1.00 |
$0.9300 |
$0.9000 |
$0.9900 |
| 148 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,800 | LF |
$0.2000 |
$0.1200 |
$0.1000 |
$0.1100 |
| 149 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,322 | LF |
$0.2000 |
$0.5200 |
$0.5000 |
$0.5500 |
| 150 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,800 | SD |
$1.20 |
$0.1200 |
$0.1000 |
$0.1100 |
| 151 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,880 | SD |
$1.60 |
$0.2700 |
$0.2500 |
$0.2800 |
| 152 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,360 | SD |
$0.5000 |
$1.05 |
$1.00 |
$1.10 |
| 153 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$0.8000 |
$1.05 |
$1.00 |
$1.10 |
| 154 | 880(C) 8848 |
WING BARRICADES | 960 | SD |
$0.8000 |
$1.05 |
$1.00 |
$1.10 |
| 155 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,840 | SD |
$0.3000 |
$1.05 |
$1.00 |
$1.10 |
| 156 | 880(G) 8890 |
CHANNELIZER CONES | 23,040 | SD |
$0.2000 |
$0.1200 |
$0.1000 |
$0.1000 |
| 157 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 14 | SD |
$15.00 |
$44.00 |
$40.00 |
$44.00 |
| 158 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$6,000.00 |
$15,000.00 |