| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$21,000.00 |
$73,500.00 |
$115,617.50 |
$225,000.00 |
$50,000.00 |
$361,228.00 |
$500,000.00 |
$156,486.43 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 141,552 | CY |
$4.00 |
$8.75 |
$8.70 |
$6.00 |
$6.95 |
$8.34 |
$9.00 |
$5.86 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 5,000 | CY |
$8.00 |
$18.80 |
$19.30 |
$12.00 |
$20.00 |
$30.01 |
$9.00 |
$19.40 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$65,000.00 |
$35,535.00 |
$50,000.00 |
$23,769.01 |
$150,065.00 |
$20,000.00 |
$43,440.72 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 9,802 | LF |
$1.50 |
$1.21 |
$1.17 |
$1.50 |
$2.48 |
$1.24 |
$2.50 |
$1.65 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 289 | LF |
$8.00 |
$8.67 |
$8.38 |
$10.00 |
$9.09 |
$8.86 |
$8.50 |
$7.37 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 65 | CY |
$85.00 |
$79.88 |
$103.00 |
$180.00 |
$59.18 |
$49.69 |
$75.00 |
$51.33 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 81,179 | SY |
$2.00 |
$1.26 |
$1.22 |
$1.30 |
$1.65 |
$1.29 |
$1.20 |
$1.50 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 33.58 | AC |
$500.00 |
$210.87 |
$203.94 |
$300.00 |
$382.58 |
$215.00 |
$205.00 |
$352.47 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 16.79 | AC |
$350.00 |
$420.67 |
$406.85 |
$300.00 |
$377.46 |
$430.00 |
$405.00 |
$347.76 |
| 11 | 241 2832 |
MOWING | 33.58 | AC |
$50.00 |
$94.78 |
$91.67 |
$85.00 |
$101.08 |
$97.00 |
$90.00 |
$93.13 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,892 | CY |
$42.00 |
$35.00 |
$35.04 |
$33.00 |
$38.92 |
$41.85 |
$39.00 |
$37.37 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 22,601 | SY |
$4.50 |
$5.89 |
$5.70 |
$7.00 |
$5.13 |
$5.19 |
$7.50 |
$6.00 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 25,002 | SY |
$1.50 |
$1.26 |
$1.22 |
$1.00 |
$1.00 |
$0.9600 |
$1.25 |
$1.00 |
| 15 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 1,125 | SY |
$5.00 |
$4.42 |
$4.28 |
$2.00 |
$1.69 |
$2.00 |
$1.75 |
$2.70 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,717 | TON |
$22.50 |
$18.66 |
$18.05 |
$20.00 |
$19.26 |
$19.73 |
$22.00 |
$13.99 |
| 17 | 407(B) 0250 |
TACK COAT | 4,513 | GAL |
$3.25 |
$3.09 |
$3.09 |
$2.20 |
$4.62 |
$3.11 |
$3.25 |
$2.00 |
| 18 | 408 5774 |
PRIME COAT | 14,503 | GAL |
$5.00 |
$4.90 |
$5.15 |
$1.00 |
$7.37 |
$4.93 |
$5.05 |
$2.00 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,854 | TON |
$75.00 |
$80.78 |
$74.16 |
$56.00 |
$81.66 |
$89.00 |
$73.00 |
$65.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 8,633 | TON |
$70.00 |
$68.75 |
$60.36 |
$50.00 |
$69.48 |
$65.80 |
$60.00 |
$59.00 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,216 | TON |
$85.00 |
$90.31 |
$82.92 |
$63.00 |
$89.77 |
$87.00 |
$83.00 |
$67.00 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,258 | TON |
$80.00 |
$80.94 |
$78.80 |
$57.00 |
$76.25 |
$77.50 |
$78.00 |
$60.00 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 1,646 | SY |
$4.00 |
$5.10 |
$4.69 |
$10.00 |
$12.79 |
$18.22 |
$6.20 |
$5.00 |
| 24 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 20 | CY |
$15.00 |
$34.41 |
$10.30 |
$25.00 |
$64.79 |
$42.88 |
$50.00 |
$50.00 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 64 | CY |
$550.00 |
$562.59 |
$514.32 |
$700.00 |
$579.75 |
$371.81 |
$650.00 |
$700.00 |
| 26 | 510(D) 6341 |
MSE RETAINING WALL | 564 | SY |
$600.00 |
$357.92 |
$426.88 |
$520.00 |
$879.51 |
$540.00 |
$525.00 |
$550.00 |
| 27 | 511(A) 0332 |
REINFORCING STEEL | 10,136 | LB |
$1.00 |
$0.8000 |
$0.8500 |
$1.00 |
$1.27 |
$0.8600 |
$1.10 |
$1.12 |
| 28 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 474 | TON |
$45.00 |
$28.96 |
$27.10 |
$45.00 |
$36.54 |
$31.66 |
$25.00 |
$28.44 |
| 29 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 93 | TON |
$30.00 |
$25.71 |
$19.09 |
$25.00 |
$32.73 |
$39.19 |
$22.00 |
$34.37 |
| 30 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 341 | SY |
$2.50 |
$2.16 |
$0.5200 |
$2.00 |
$6.85 |
$2.55 |
$3.00 |
$15.89 |
| 31 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$2,500.00 |
$5,502.51 |
$2,987.00 |
$5,000.00 |
$2,413.76 |
$2,535.00 |
$2,400.00 |
$4,032.89 |
| 32 | 611(L) 0487 |
JUNCTION BOXES | 88.5 | CF |
$45.00 |
$120.44 |
$62.86 |
$60.00 |
$33.42 |
$32.70 |
$35.00 |
$99.43 |
| 33 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 153 | LF |
$75.00 |
$272.67 |
$124.52 |
$130.00 |
$161.49 |
$185.83 |
$100.00 |
$89.71 |
| 34 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 30 | LF |
$175.00 |
$404.72 |
$134.39 |
$230.00 |
$234.83 |
$237.07 |
$140.00 |
$163.27 |
| 35 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 322 | LF |
$25.00 |
$89.79 |
$27.90 |
$50.00 |
$76.70 |
$74.83 |
$29.00 |
$52.20 |
| 36 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$700.00 |
$4,814.49 |
$2,585.30 |
$2,000.00 |
$2,369.86 |
$1,663.00 |
$1,950.00 |
$3,763.96 |
| 37 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$850.00 |
$3,547.27 |
$1,905.50 |
$2,000.00 |
$1,628.11 |
$1,069.00 |
$1,350.00 |
$3,306.53 |
| 38 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 4 | EA |
$400.00 |
$2,311.81 |
$437.75 |
$210.00 |
$231.95 |
$188.00 |
$180.00 |
$390.17 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,500.00 |
$14,910.00 |
$14,420.00 |
$65,000.00 |
$34,814.51 |
$30,000.00 |
$10,500.00 |
$50,000.00 |
| 40 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 27,160 | SY |
$3.50 |
$3.87 |
$5.61 |
$5.00 |
$3.80 |
$3.24 |
$3.00 |
$1.75 |
| 41 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 649 | LF |
$2.50 |
$7.46 |
$3.09 |
$10.00 |
$4.20 |
$4.79 |
$3.00 |
$3.54 |
| 42 | 619(C) 0924 |
SAWING PAVEMENT | 2,319 | LF |
$2.25 |
$4.17 |
$4.12 |
$5.00 |
$3.52 |
$5.36 |
$3.50 |
$4.72 |
| 43 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 675 | LF |
$20.00 |
$18.64 |
$18.03 |
$19.00 |
$19.19 |
$14.47 |
$15.50 |
$17.68 |
| 44 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,000.00 |
$2,343.00 |
$2,266.00 |
$2,500.00 |
$2,686.98 |
$2,358.00 |
$2,175.00 |
$2,475.57 |
| 45 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,500.00 |
$1,544.25 |
$1,545.00 |
$2,000.00 |
$1,919.27 |
$1,554.00 |
$2,400.00 |
$1,768.27 |
| 46 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 3,410 | LF |
$4.00 |
$4.37 |
$4.22 |
$5.00 |
$4.16 |
$3.48 |
$4.20 |
$3.83 |
| 47 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,467 | LF |
$5.00 |
$4.85 |
$5.15 |
$5.50 |
$4.48 |
$3.75 |
$4.25 |
$4.13 |
| 48 | 624(H) 5920 |
(PL) GATE | 1 | EA |
$800.00 |
$1,917.00 |
$1,854.00 |
$5,000.00 |
$4,350.35 |
$1,179.00 |
$1,150.00 |
$1,768.26 |
| 49 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 294.2 | CY |
$18.00 |
$22.02 |
$11.00 |
$25.00 |
$16.20 |
$31.33 |
$60.00 |
$22.70 |
| 50 | 501(G) 6309 |
CLSM BACKFILL | 480.2 | CY |
$125.00 |
$117.49 |
$104.16 |
$110.00 |
$166.80 |
$130.58 |
$120.00 |
$154.79 |
| 51 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 2,243.6 | LF |
$300.00 |
$250.00 |
$280.28 |
$300.00 |
$277.60 |
$264.74 |
$310.00 |
$288.95 |
| 52 | 504(A) 1304 |
APPROACH SLAB | 508.8 | SY |
$225.00 |
$147.63 |
$188.81 |
$175.00 |
$227.42 |
$126.49 |
$145.00 |
$108.35 |
| 53 | 504(B) 1305 |
SAW-CUT GROOVING | 2,506.1 | SY |
$5.00 |
$4.47 |
$4.62 |
$5.00 |
$5.37 |
$4.07 |
$4.30 |
$4.33 |
| 54 | 504(C) 6250 |
SEALED EXPANSION JOINT | 116.4 | LF |
$300.00 |
$203.59 |
$222.75 |
$250.00 |
$200.80 |
$139.42 |
$175.00 |
$283.79 |
| 55 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,128.4 | LF |
$90.00 |
$70.19 |
$73.80 |
$75.00 |
$101.87 |
$126.37 |
$55.00 |
$92.88 |
| 56 | 506(A) 1322 |
STRUCTURAL STEEL | 6,380 | LB |
$4.00 |
$2.00 |
$1.49 |
$6.00 |
$4.37 |
$1.21 |
$2.00 |
$1.55 |
| 57 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,439.36 |
$1,650.55 |
$3,000.00 |
$1,505.90 |
$1,394.00 |
$2,000.00 |
$1,857.51 |
| 58 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,439.36 |
$1,690.29 |
$3,000.00 |
$1,505.90 |
$1,433.00 |
$2,000.00 |
$1,754.31 |
| 59 | 509(A) 1326 |
CLASS AA CONCRETE | 679.6 | CY |
$550.00 |
$590.00 |
$494.86 |
$700.00 |
$700.77 |
$823.32 |
$500.00 |
$825.56 |
| 60 | 509(B) 1328 |
CLASS A CONCRETE | 385.7 | CY |
$600.00 |
$680.00 |
$549.86 |
$700.00 |
$625.63 |
$593.34 |
$650.00 |
$515.97 |
| 61 | 509(D) 1331 |
CLASS C CONCRETE | 19.3 | CY |
$500.00 |
$1,178.54 |
$426.59 |
$700.00 |
$569.98 |
$921.94 |
$550.00 |
$567.57 |
| 62 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 210,751 | LB |
$1.10 |
$1.20 |
$0.9300 |
$1.40 |
$1.00 |
$0.7300 |
$1.10 |
$1.08 |
| 63 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 140 | SY |
$450.00 |
$231.10 |
$537.08 |
$300.00 |
$254.67 |
$497.67 |
$400.00 |
$619.17 |
| 64 | 513(E) 6030 |
EARLY STRENGTH CONCRETE | 30 | CY |
$700.00 |
$398.53 |
$627.00 |
$225.00 |
$227.32 |
$580.61 |
$120.00 |
$340.54 |
| 65 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,377 | SY |
$4.00 |
$3.89 |
$4.02 |
$5.00 |
$4.67 |
$3.91 |
$3.90 |
$3.77 |
| 66 | 516(A) 6089 |
DRILLED SHAFTS 18" DIAMETER | 241 | LF |
$325.00 |
$390.36 |
$197.08 |
$145.00 |
$211.09 |
$134.14 |
$500.00 |
$361.18 |
| 67 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 320 | LF |
$425.00 |
$452.04 |
$360.84 |
$625.00 |
$441.66 |
$289.94 |
$800.00 |
$1,135.14 |
| 68 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 375 | LF |
$700.00 |
$834.29 |
$798.75 |
$900.00 |
$980.75 |
$648.68 |
$1,700.00 |
$2,992.65 |
| 69 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 5 | EA |
$1,600.00 |
$1,491.00 |
$2,640.00 |
$6,500.00 |
$2,047.22 |
$1,501.00 |
$2,250.00 |
$1,031.95 |
| 70 | 523(A) 6550 |
SEALER CRACK PREPARATION | 58.2 | LF |
$5.00 |
$6.39 |
$6.60 |
$7.00 |
$7.68 |
$5.62 |
$6.25 |
$6.19 |
| 71 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$100.00 |
$213.00 |
$220.00 |
$220.00 |
$255.90 |
$167.22 |
$205.00 |
$206.38 |
| 72 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,520 | TON |
$50.00 |
$28.96 |
$37.74 |
$45.00 |
$30.10 |
$26.49 |
$23.00 |
$36.12 |
| 73 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 567 | TON |
$40.00 |
$22.80 |
$22.58 |
$25.00 |
$24.28 |
$26.66 |
$20.00 |
$28.89 |
| 74 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 116 | LF |
$25.00 |
$20.01 |
$23.10 |
$20.00 |
$16.88 |
$24.95 |
$20.00 |
$12.38 |
| 75 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 36 | LF |
$25.00 |
$12.24 |
$22.00 |
$15.00 |
$8.93 |
$25.01 |
$20.00 |
$10.32 |
| 76 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$90,000.00 |
$100,347.04 |
$137,500.00 |
$120,000.00 |
$145,182.33 |
$117,855.00 |
$62,000.00 |
$196,070.44 |
| 77 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 9,489 | LF |
$5.00 |
$0.5900 |
$2.02 |
$1.00 |
$0.2600 |
$0.2100 |
$0.4000 |
$0.4200 |
| 78 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 9 | EA |
$50.00 |
$53.25 |
$50.50 |
$200.00 |
$31.98 |
$26.80 |
$26.00 |
$29.47 |
| 79 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 45 | SF |
$15.00 |
$15.98 |
$15.15 |
$16.00 |
$15.35 |
$12.86 |
$12.50 |
$14.15 |
| 80 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 78 | LF |
$10.00 |
$12.78 |
$12.12 |
$13.00 |
$7.68 |
$6.43 |
$6.25 |
$7.07 |
| 81 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$20.00 |
$12.78 |
$16.16 |
$30.00 |
$12.79 |
$10.72 |
$11.00 |
$29.47 |
| 82 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 21,600 | LF |
$0.5000 |
$0.4300 |
$0.4000 |
$0.4400 |
$0.4700 |
$0.4000 |
$0.3800 |
$0.4400 |
| 83 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 13,729 | LF |
$0.1500 |
$0.1600 |
$0.1500 |
$0.2000 |
$0.2600 |
$0.2100 |
$0.2100 |
$0.2400 |
| 84 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 22,515 | LF |
$0.6500 |
$0.1600 |
$0.1500 |
$0.2000 |
$0.3200 |
$0.2700 |
$0.2600 |
$0.2900 |
| 85 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 420 | LF |
$0.2000 |
$1.97 |
$1.87 |
$2.00 |
$1.28 |
$1.07 |
$1.05 |
$1.18 |
| 86 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 241 | SD |
$10.00 |
$5.33 |
$5.05 |
$6.00 |
$12.79 |
$10.72 |
$10.35 |
$11.79 |
| 87 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,000 | LF |
$40.00 |
$25.00 |
$36.87 |
$25.00 |
$16.92 |
$23.58 |
$25.00 |
$9.43 |
| 88 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 4,087.5 | LF |
$4.00 |
$1.50 |
$2.02 |
$5.00 |
$4.93 |
$1.88 |
$2.00 |
$1.00 |
| 89 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,729 | SD |
$0.5000 |
$0.5300 |
$0.5100 |
$0.5500 |
$2.56 |
$2.14 |
$2.05 |
$2.36 |
| 90 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,235 | SD |
$1.25 |
$1.07 |
$1.01 |
$1.10 |
$0.1900 |
$0.1600 |
$0.1600 |
$0.1800 |
| 91 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,398 | SD |
$2.50 |
$1.07 |
$1.01 |
$1.10 |
$0.6400 |
$0.5400 |
$0.5200 |
$0.5900 |
| 92 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,658 | SD |
$1.50 |
$1.60 |
$1.52 |
$1.60 |
$1.92 |
$1.61 |
$1.55 |
$1.77 |
| 93 | 880(C) 8848 |
WING BARRICADES | 1,555 | SD |
$1.00 |
$0.3700 |
$0.3500 |
$0.5000 |
$1.28 |
$1.07 |
$1.05 |
$1.18 |
| 94 | 880(D) 8854 |
VERTICAL PANELS | 10,254 | SD |
$0.1500 |
$0.3200 |
$0.3000 |
$0.4000 |
$0.1300 |
$0.1100 |
$0.1100 |
$0.1200 |
| 95 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,188 | SD |
$0.0500 |
$0.2700 |
$0.2500 |
$0.3000 |
$1.28 |
$1.07 |
$1.05 |
$1.18 |
| 96 | 880(F) 8878 |
DRUMS | 14,575 | SD |
$0.2500 |
$0.3200 |
$0.3000 |
$0.3500 |
$0.1300 |
$0.1100 |
$0.1100 |
$0.1200 |
| 97 | 880(I) 8902 |
FLAGGER | 45 | SD |
$60.00 |
$272.98 |
$202.00 |
$100.00 |
$211.12 |
$214.38 |
$500.00 |
$218.71 |
| 98 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$83,000.00 |
$23,323.50 |
$29,138.50 |
$60,000.00 |
$66,099.72 |
$43,763.00 |
$58,743.00 |
$35,365.27 |
| 99 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$660.36 |
$6,565.00 |
$10,000.00 |
$3,198.79 |
$5,359.00 |
$1,850.00 |
$1,500.00 |
| 100 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$21,004.50 |
$15,150.00 |
$7,213.50 |
$5,000.00 |
$16,507.00 |
$10,000.00 |
$5,000.00 |
| 101 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$310,000.00 |
$200,000.00 |
$329,209.81 |
$340,000.00 |
$285,779.33 |
$325,000.00 |
$374,000.00 |
$375,000.00 |