| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,000.00 |
$8,477.25 |
$11,000.00 |
$10,600.00 |
$22,500.00 |
$16,000.00 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 34,346 | CY |
$8.00 |
$7.42 |
$7.00 |
$5.30 |
$7.00 |
$8.70 |
$7.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,112 | CY |
$10.00 |
$8.74 |
$10.05 |
$8.48 |
$8.00 |
$12.00 |
$11.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$17,000.00 |
$14,835.19 |
$14,000.00 |
$10,600.00 |
$15,000.00 |
$23,000.00 |
$51,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,656 | LF |
$1.80 |
$1.27 |
$1.35 |
$1.27 |
$1.30 |
$1.80 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 406 | LF |
$9.00 |
$5.46 |
$5.75 |
$5.46 |
$5.65 |
$7.25 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 46,907 | SY |
$1.70 |
$1.19 |
$1.30 |
$1.19 |
$1.23 |
$1.40 |
$1.55 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.7 | AC |
$1,200.00 |
$211.93 |
$200.00 |
$212.00 |
$220.00 |
$300.00 |
$500.00 |
| 9 | 241 2832 |
MOWING | 21.4 | AC |
$90.00 |
$84.77 |
$100.00 |
$84.80 |
$88.00 |
$100.00 |
$100.00 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 16,979 | SY |
$2.00 |
$2.65 |
$2.60 |
$1.75 |
$1.76 |
$2.60 |
$1.80 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 108 | TON |
$55.00 |
$37.62 |
$43.65 |
$33.92 |
$36.00 |
$45.00 |
$35.00 |
| 12 | 407(B) 0250 |
TACK COAT | 2,446 | GAL |
$3.50 |
$2.65 |
$4.60 |
$4.51 |
$4.65 |
$3.40 |
$3.50 |
| 13 | 408 5774 |
PRIME COAT | 6,633 | GAL |
$6.00 |
$7.41 |
$5.50 |
$5.30 |
$5.50 |
$11.75 |
$14.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,827 | TON |
$82.00 |
$70.58 |
$86.50 |
$83.21 |
$87.00 |
$91.00 |
$90.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,942 | TON |
$95.00 |
$86.91 |
$88.00 |
$84.80 |
$89.00 |
$110.75 |
$110.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 58 | CY |
$600.00 |
$342.02 |
$337.50 |
$315.76 |
$300.00 |
$300.00 |
$300.00 |
| 17 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 206 | LF |
$30.00 |
$21.19 |
$32.00 |
$30.74 |
$22.00 |
$35.00 |
$25.00 |
| 18 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 55 | LF |
$35.00 |
$27.55 |
$55.00 |
$34.98 |
$30.00 |
$40.00 |
$35.00 |
| 19 | 613(B) 4819 |
96" CORR. GALV. STEEL PIPE | 376 | LF |
$215.00 |
$165.31 |
$125.00 |
$217.58 |
$175.00 |
$240.00 |
$250.00 |
| 20 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 142 | LF |
$30.00 |
$24.06 |
$35.00 |
$12.27 |
$25.00 |
$25.00 |
$24.00 |
| 21 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 48 | LF |
$20.00 |
$13.97 |
$34.00 |
$12.27 |
$25.00 |
$25.00 |
$20.00 |
| 22 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$800.00 |
$1,671.37 |
$1,825.00 |
$1,242.36 |
$1,400.00 |
$1,850.00 |
$1,700.00 |
| 23 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$1,796.57 |
$2,200.00 |
$2,061.43 |
$1,595.00 |
$2,100.00 |
$1,600.00 |
| 24 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$6,357.94 |
$6,750.00 |
$6,890.00 |
$5,000.00 |
$12,000.00 |
$10,000.00 |
| 25 | 619(B) 4725 |
REMOVAL OF FENCE | 5,729 | LF |
$1.00 |
$1.06 |
$2.25 |
$1.06 |
$1.00 |
$1.50 |
$1.50 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 14,112 | SY |
$5.50 |
$7.66 |
$4.70 |
$7.16 |
$6.00 |
$9.50 |
$6.00 |
| 27 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 664 | LF |
$4.50 |
$3.71 |
$5.95 |
$2.12 |
$5.00 |
$3.50 |
$3.50 |
| 28 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,075 | LF |
$25.00 |
$15.31 |
$16.50 |
$15.32 |
$17.00 |
$17.50 |
$18.00 |
| 29 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,000.00 |
$2,103.42 |
$2,200.00 |
$2,104.10 |
$2,090.00 |
$2,450.00 |
$2,200.00 |
| 30 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,750.00 |
$1,986.86 |
$1,600.00 |
$1,987.50 |
$1,540.00 |
$1,925.00 |
$1,700.00 |
| 31 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 3,859 | LF |
$3.50 |
$3.81 |
$4.00 |
$3.82 |
$3.80 |
$4.90 |
$4.00 |
| 32 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,415 | LF |
$4.00 |
$4.11 |
$4.50 |
$4.11 |
$3.85 |
$5.00 |
$4.00 |
| 33 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 170 | CY |
$20.00 |
$16.67 |
$10.38 |
$13.20 |
$15.00 |
$20.00 |
$18.00 |
| 34 | 501(G) 6309 |
CLSM BACKFILL | 180 | CY |
$175.00 |
$155.73 |
$140.00 |
$147.91 |
$150.00 |
$185.00 |
$150.00 |
| 35 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 757 | LF |
$200.00 |
$205.71 |
$198.00 |
$200.72 |
$200.00 |
$225.00 |
$235.00 |
| 36 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$250.00 |
$205.09 |
$194.00 |
$200.87 |
$200.00 |
$205.00 |
$200.00 |
| 37 | 504(B) 1305 |
SAW-CUT GROOVING | 1,118.5 | SY |
$5.00 |
$4.24 |
$4.40 |
$4.40 |
$4.40 |
$7.00 |
$4.50 |
| 38 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.2 | LF |
$350.00 |
$286.75 |
$280.00 |
$240.24 |
$260.00 |
$265.00 |
$250.00 |
| 39 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 503.4 | LF |
$95.00 |
$102.44 |
$87.00 |
$99.07 |
$80.00 |
$105.00 |
$140.00 |
| 40 | 506(A) 1322 |
STRUCTURAL STEEL | 1,350 | LB |
$3.00 |
$3.90 |
$3.00 |
$3.18 |
$2.00 |
$2.35 |
$2.00 |
| 41 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,500.00 |
$1,583.01 |
$1,325.00 |
$1,476.19 |
$1,400.00 |
$1,400.00 |
$1,500.00 |
| 42 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$1,568.28 |
$1,325.00 |
$1,421.19 |
$1,400.00 |
$1,400.00 |
$1,500.00 |
| 43 | 509(A) 1326 |
CLASS AA CONCRETE | 224.2 | CY |
$600.00 |
$535.11 |
$630.00 |
$573.14 |
$600.00 |
$670.00 |
$1,000.00 |
| 44 | 509(B) 1328 |
CLASS A CONCRETE | 158.6 | CY |
$600.00 |
$634.49 |
$650.00 |
$600.64 |
$600.00 |
$690.00 |
$700.00 |
| 45 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$476.18 |
$562.50 |
$413.64 |
$300.00 |
$450.00 |
$600.00 |
| 46 | 511(A) 1332 |
REINFORCING STEEL | 580 | LB |
$1.00 |
$3.16 |
$1.50 |
$1.68 |
$1.10 |
$1.00 |
$1.00 |
| 47 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 72,770 | LB |
$1.10 |
$0.9600 |
$0.9800 |
$1.03 |
$0.9000 |
$1.00 |
$1.00 |
| 48 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 180 | LF |
$40.00 |
$36.33 |
$33.60 |
$30.52 |
$25.00 |
$45.00 |
$22.00 |
| 49 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 592 | LF |
$50.00 |
$37.75 |
$36.40 |
$36.42 |
$28.00 |
$50.00 |
$28.00 |
| 50 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 180 | LF |
$25.00 |
$16.41 |
$14.40 |
$18.70 |
$15.00 |
$27.00 |
$20.00 |
| 51 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 592 | LF |
$25.00 |
$22.96 |
$15.60 |
$13.20 |
$15.00 |
$29.00 |
$12.00 |
| 52 | 514(K) 6260 |
(PL)PILOT HOLES | 140 | LF |
$120.00 |
$84.79 |
$80.00 |
$71.79 |
$125.00 |
$80.00 |
$80.00 |
| 53 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 54 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 902 | SY |
$5.00 |
$3.71 |
$3.85 |
$3.85 |
$3.50 |
$5.00 |
$4.00 |
| 55 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 180 | LF |
$900.00 |
$673.62 |
$667.00 |
$754.29 |
$860.00 |
$735.00 |
$1,250.00 |
| 56 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$1,748.43 |
$2,500.00 |
$2,310.00 |
$3,300.00 |
$4,500.00 |
$2,000.00 |
| 57 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$5.00 |
$5.30 |
$5.50 |
$5.50 |
$5.00 |
$6.00 |
$6.00 |
| 58 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$150.00 |
$158.95 |
$165.00 |
$165.00 |
$200.00 |
$175.00 |
$180.00 |
| 59 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$10,000.00 |
$6,233.53 |
$6,500.00 |
$2,750.00 |
$7,000.00 |
$11,000.00 |
$4,000.00 |
| 60 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,800 | TON |
$50.00 |
$49.32 |
$47.75 |
$49.09 |
$45.00 |
$81.00 |
$55.00 |
| 61 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 380 | TON |
$40.00 |
$39.97 |
$38.90 |
$39.25 |
$38.00 |
$73.00 |
$55.00 |
| 62 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$47.54 |
$30.00 |
$28.14 |
$25.00 |
$20.00 |
$20.00 |
| 63 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 90 | LF |
$30.00 |
$12.54 |
$30.00 |
$21.54 |
$25.00 |
$20.00 |
$12.50 |
| 64 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$28,918.86 |
$14,500.00 |
$44,000.00 |
$25,000.00 |
$37,500.00 |
$159,000.00 |
| 65 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 5,200 | LF |
$0.2500 |
$0.2500 |
$0.4400 |
$0.2600 |
$0.4400 |
$0.4700 |
$0.3000 |
| 66 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,040 | EA |
$0.5300 |
$0.6900 |
$0.5500 |
$0.7200 |
$0.5300 |
$0.9300 |
$0.7700 |
| 67 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 400 | LF |
$0.2700 |
$3.18 |
$1.10 |
$3.30 |
$1.10 |
$0.5800 |
$3.50 |
| 68 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 45 | SD |
$18.85 |
$3.18 |
$55.00 |
$11.00 |
$55.00 |
$87.45 |
$3.50 |
| 69 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,600 | SD |
$0.2500 |
$0.0800 |
$0.5500 |
$0.0900 |
$0.5200 |
$0.5800 |
$0.1000 |
| 70 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,600 | SD |
$0.5600 |
$0.1100 |
$0.5500 |
$0.1100 |
$0.5200 |
$1.17 |
$0.1500 |
| 71 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,000 | SD |
$1.37 |
$3.97 |
$1.10 |
$4.13 |
$1.05 |
$1.17 |
$4.00 |
| 72 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,200 | SD |
$0.8500 |
$0.0500 |
$0.5500 |
$0.0600 |
$0.5200 |
$1.46 |
$0.1000 |
| 73 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$1.00 |
$5.30 |
$1.10 |
$5.50 |
$1.05 |
$1.46 |
$6.00 |
| 74 | 880(D) 8854 |
VERTICAL PANELS | 9,600 | SD |
$0.2000 |
$0.0200 |
$0.2800 |
$0.0400 |
$0.2700 |
$0.5800 |
$0.1000 |
| 75 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 10,500 | SD |
$0.2500 |
$0.0500 |
$0.2800 |
$0.0700 |
$0.2700 |
$0.1700 |
$0.1000 |
| 76 | 880(F) 8878 |
DRUMS | 4,500 | SD |
$0.5400 |
$0.5300 |
$0.2800 |
$0.5500 |
$0.2700 |
$0.7000 |
$0.6000 |
| 77 | 880(G) 8890 |
CHANNELIZER CONES | 3,900 | SD |
$0.3500 |
$0.0500 |
$0.2800 |
$0.1100 |
$0.2700 |
$0.7000 |
$0.1000 |
| 78 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 300 | SD |
$16.15 |
$21.19 |
$27.50 |
$22.00 |
$27.00 |
$17.49 |
$23.00 |
| 79 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$90.00 |
$185.44 |
$1,650.00 |
$185.50 |
$1,700.00 |
$1,200.00 |
$201.00 |
| 80 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$20.00 |
$37.09 |
$33.00 |
$37.10 |
$33.00 |
$34.98 |
$40.00 |
| 81 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 28 | LF |
$12.00 |
$9.54 |
$11.00 |
$9.54 |
$11.00 |
$17.49 |
$10.50 |
| 82 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 11,220 | LF |
$0.5500 |
$0.2800 |
$0.3900 |
$0.2800 |
$0.3700 |
$0.9700 |
$0.3100 |
| 83 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$18,967.86 |
$17,500.00 |
$19,822.00 |
$16,000.00 |
$17,000.00 |
$30,000.00 |
| 84 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,443.88 |
$7,500.00 |
$4,950.00 |
$4,000.00 |
$14,000.00 |
$6,000.00 |
| 85 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$165,000.00 |
$92,860.10 |
$89,000.00 |
$153,270.53 |
$150,000.00 |
$47,000.00 |
$186,000.00 |