| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$18,000.00 |
$15,000.00 |
$18,105.00 |
$16,348.33 |
$285,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,917 | CY |
$10.00 |
$8.00 |
$7.10 |
$8.52 |
$11.36 |
$7.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 23,623 | CY |
$8.00 |
$12.00 |
$13.10 |
$18.00 |
$11.36 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$26,000.00 |
$20,000.00 |
$15,000.00 |
$6,466.68 |
$17,873.08 |
$12,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,890 | LF |
$3.00 |
$1.15 |
$2.00 |
$1.22 |
$3.03 |
$1.75 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$250.00 |
$75.00 |
$300.00 |
$79.88 |
$265.96 |
$135.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 35 | LF |
$10.00 |
$6.11 |
$20.00 |
$6.51 |
$8.83 |
$7.88 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 585 | LF |
$2.50 |
$1.17 |
$4.00 |
$1.25 |
$1.64 |
$2.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 12,486 | SY |
$2.50 |
$0.9800 |
$2.00 |
$1.04 |
$1.37 |
$1.65 |
| 10 | 230(F) 2812 |
WATERING | 500 | KGAL |
$10.00 |
$1.98 |
$0.0600 |
$2.11 |
$2.77 |
$5.88 |
| 11 | 232(B) 2814 |
SEEDING METHOD B | 2.6 | AC |
$700.00 |
$288.00 |
$650.00 |
$306.72 |
$403.37 |
$588.00 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.6 | AC |
$600.00 |
$288.00 |
$650.00 |
$306.72 |
$403.37 |
$511.00 |
| 13 | 234(A) 2824 |
FERTILIZING (10-20-10) | 1.27 | TON |
$1,000.00 |
$695.00 |
$850.00 |
$740.17 |
$973.42 |
$1,000.00 |
| 14 | 234(A) 4409 |
FERTILIZING (18-46-0) | 0.21 | TON |
$1,500.00 |
$700.00 |
$850.00 |
$745.52 |
$973.42 |
$2,000.00 |
| 15 | 241 2832 |
MOWING | 5.2 | AC |
$75.00 |
$52.00 |
$55.00 |
$55.38 |
$72.83 |
$100.00 |
| 16 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$2,500.00 |
$5,000.00 |
$2,000.00 |
$5,964.00 |
$3,934.83 |
$3,000.00 |
| 17 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,410 | CY |
$50.00 |
$50.00 |
$51.00 |
$54.32 |
$53.21 |
$55.00 |
| 18 | 325 5271 |
SEPARATOR FABRIC | 11,128 | SY |
$2.00 |
$1.00 |
$1.75 |
$1.48 |
$1.25 |
$1.50 |
| 19 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 618 | TON |
$30.00 |
$30.00 |
$31.00 |
$23.06 |
$26.75 |
$31.00 |
| 20 | 407(B) 0250 |
TACK COAT | 1,460 | GAL |
$4.00 |
$5.00 |
$6.00 |
$5.33 |
$4.27 |
$3.25 |
| 21 | 408 5774 |
PRIME COAT | 6,871 | GAL |
$5.00 |
$4.20 |
$4.95 |
$4.47 |
$4.27 |
$3.25 |
| 22 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,456 | TON |
$85.00 |
$92.00 |
$110.00 |
$97.98 |
$122.40 |
$90.00 |
| 23 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,816 | TON |
$82.00 |
$87.93 |
$105.93 |
$93.65 |
$122.40 |
$90.00 |
| 24 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,158 | TON |
$100.00 |
$129.74 |
$147.74 |
$138.17 |
$142.33 |
$107.50 |
| 25 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 175 | TON |
$115.00 |
$126.46 |
$144.46 |
$134.68 |
$227.72 |
$175.00 |
| 26 | 412 5267 |
COLD MILLING PAVEMENT | 1,303 | SY |
$6.00 |
$3.50 |
$25.87 |
$3.89 |
$9.96 |
$8.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 66 | CY |
$350.00 |
$420.00 |
$300.00 |
$381.27 |
$340.96 |
$300.00 |
| 28 | 510(D) 6341 |
MSE RETAINING WALL | 158.2 | SY |
$700.00 |
$750.00 |
$990.00 |
$838.06 |
$770.32 |
$900.00 |
| 29 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 1,392 | LF |
$35.00 |
$22.00 |
$22.00 |
$31.95 |
$46.90 |
$26.50 |
| 30 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 317 | LF |
$35.00 |
$35.00 |
$21.00 |
$34.08 |
$46.90 |
$28.50 |
| 31 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 2 | EA |
$4,000.00 |
$3,000.00 |
$1,350.00 |
$3,195.00 |
$2,786.06 |
$3,200.00 |
| 32 | 611(G) 5113 |
INLET CI DES. 2 (B) | 2 | EA |
$4,500.00 |
$4,000.00 |
$1,350.00 |
$3,727.50 |
$3,690.35 |
$6,000.00 |
| 33 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 9.6 | VF |
$400.00 |
$250.00 |
$294.00 |
$585.75 |
$231.55 |
$200.00 |
| 34 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 194 | LF |
$50.00 |
$45.00 |
$66.00 |
$143.78 |
$102.88 |
$60.00 |
| 35 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 833 | LF |
$10.00 |
$6.00 |
$8.00 |
$17.04 |
$10.30 |
$12.00 |
| 36 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 120 | LF |
$15.00 |
$10.00 |
$8.00 |
$17.04 |
$13.12 |
$12.00 |
| 37 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$750.00 |
$500.00 |
$1,100.00 |
$985.13 |
$699.96 |
$625.00 |
| 38 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$500.00 |
$350.00 |
$450.00 |
$532.50 |
$212.37 |
$375.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,500.00 |
$6,000.00 |
$20,000.00 |
$17,572.50 |
$9,141.03 |
$12,000.00 |
| 40 | 619(B) 4725 |
REMOVAL OF FENCE | 630 | LF |
$2.00 |
$1.50 |
$3.00 |
$3.73 |
$3.54 |
$1.50 |
| 41 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,948 | LF |
$5.00 |
$1.50 |
$5.00 |
$7.46 |
$2.05 |
$5.00 |
| 42 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,836 | SY |
$4.00 |
$5.80 |
$6.00 |
$4.35 |
$5.48 |
$6.75 |
| 43 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 882 | LF |
$3.50 |
$3.50 |
$2.50 |
$3.20 |
$9.55 |
$3.00 |
| 44 | 619(C) 0924 |
SAWING PAVEMENT | 1,083 | LF |
$5.00 |
$3.00 |
$10.00 |
$6.39 |
$3.69 |
$3.50 |
| 45 | 622(A) 4746 |
PIPE RAILING | 129 | LF |
$100.00 |
$100.00 |
$101.00 |
$103.88 |
$295.63 |
$110.00 |
| 46 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,500.00 |
$2,400.00 |
$3,195.00 |
$2,556.00 |
$3,273.30 |
$2,500.00 |
| 47 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,800.00 |
$1,875.00 |
$2,662.00 |
$1,996.88 |
$2,557.27 |
$3,250.00 |
| 48 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 194 | LF |
$8.00 |
$7.00 |
$7.60 |
$4.90 |
$6.27 |
$5.00 |
| 49 | 624(E) 4293 |
FENCE-STYLE CLF (6'HIGH, CLASS B) | 221 | LF |
$40.00 |
$40.00 |
$43.90 |
$41.43 |
$53.05 |
$40.00 |
| 50 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 1,011.1 | CY |
$20.00 |
$80.00 |
$20.00 |
$16.29 |
$27.29 |
$40.00 |
| 51 | 501(G) 6309 |
CLSM BACKFILL | 721.6 | CY |
$150.00 |
$100.00 |
$99.00 |
$111.25 |
$137.98 |
$127.50 |
| 52 | 504(A) 1304 |
APPROACH SLAB | 548 | SY |
$460.00 |
$225.00 |
$165.00 |
$424.57 |
$262.97 |
$165.00 |
| 53 | 504(B) 1305 |
SAW-CUT GROOVING | 3,657.2 | SY |
$5.00 |
$3.20 |
$4.40 |
$3.41 |
$5.46 |
$3.75 |
| 54 | 504(C) 6250 |
SEALED EXPANSION JOINT | 332.8 | LF |
$325.00 |
$220.00 |
$255.00 |
$300.92 |
$282.02 |
$235.00 |
| 55 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 824.4 | LF |
$85.00 |
$110.00 |
$75.00 |
$110.54 |
$93.27 |
$107.50 |
| 56 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 857,505 | LB |
$2.00 |
$1.61 |
$1.75 |
$1.38 |
$1.76 |
$1.67 |
| 57 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 60 | EA |
$2,000.00 |
$1,750.00 |
$1,620.00 |
$1,626.99 |
$1,919.37 |
$2,050.00 |
| 58 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 60 | EA |
$2,000.00 |
$1,750.00 |
$1,620.00 |
$1,569.10 |
$1,919.37 |
$2,050.00 |
| 59 | 509 6152 |
SPECIAL CONCRETE FINISH | 384 | SY |
$80.00 |
$35.00 |
$100.00 |
$76.88 |
$98.20 |
$95.00 |
| 60 | 509(A) 1326 |
CLASS AA CONCRETE | 731.6 | CY |
$525.00 |
$600.00 |
$560.00 |
$545.83 |
$752.26 |
$500.00 |
| 61 | 509(B) 1328 |
CLASS A CONCRETE | 732.3 | CY |
$550.00 |
$600.00 |
$560.00 |
$574.20 |
$612.06 |
$650.00 |
| 62 | 509(D) 1331 |
CLASS C CONCRETE | 6.8 | CY |
$500.00 |
$1,000.00 |
$875.00 |
$464.34 |
$1,005.66 |
$600.00 |
| 63 | 510(C) 6138 |
SLOPE WALL (5") | 1,532.3 | SY |
$95.00 |
$80.00 |
$90.00 |
$122.47 |
$104.63 |
$100.00 |
| 64 | 511(A) 1332 |
REINFORCING STEEL | 5,062 | LB |
$1.00 |
$1.00 |
$2.15 |
$1.05 |
$1.02 |
$1.25 |
| 65 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 357,136 | LB |
$1.10 |
$1.10 |
$1.25 |
$1.10 |
$0.9600 |
$1.00 |
| 66 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,874 | LF |
$35.00 |
$21.00 |
$25.42 |
$26.34 |
$31.03 |
$35.00 |
| 67 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,722 | LF |
$40.00 |
$29.00 |
$30.27 |
$33.11 |
$42.57 |
$40.00 |
| 68 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,874 | LF |
$20.00 |
$6.30 |
$10.00 |
$18.86 |
$16.52 |
$15.00 |
| 69 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,722 | LF |
$20.00 |
$8.70 |
$10.00 |
$17.76 |
$16.62 |
$15.00 |
| 70 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 71 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 921 | SY |
$4.00 |
$3.00 |
$3.45 |
$3.20 |
$4.02 |
$4.00 |
| 72 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 528 | LF |
$1,100.00 |
$1,200.00 |
$1,049.00 |
$928.99 |
$845.05 |
$1,200.00 |
| 73 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$1,500.00 |
$3,350.00 |
$2,500.00 |
$958.50 |
$9,313.34 |
$2,500.00 |
| 74 | 523(A) 6550 |
SEALER CRACK PREPARATION | 164.4 | LF |
$4.00 |
$4.00 |
$5.55 |
$4.26 |
$6.55 |
$5.00 |
| 75 | 523(B) 6560 |
SEALER RESIN | 1.4 | GAL |
$100.00 |
$120.00 |
$230.00 |
$127.80 |
$272.78 |
$200.00 |
| 76 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 511 | LF |
$30.00 |
$14.00 |
$30.00 |
$34.45 |
$20.37 |
$15.00 |
| 77 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 206 | LF |
$25.00 |
$10.00 |
$30.00 |
$34.63 |
$13.14 |
$18.00 |
| 78 | 619(B) 2505 |
REMOVAL OF BRIDGE ITEMS | 3 | EA |
$5,000.00 |
$4,000.00 |
$2,500.00 |
$5,900.77 |
$5,455.50 |
$17,500.00 |
| 79 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$165,000.00 |
$100,000.00 |
$70,000.00 |
$290,584.12 |
$94,034.94 |
$205,000.00 |
| 80 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 12 | EA |
$50.00 |
$25.00 |
$60.00 |
$26.63 |
$34.09 |
$50.00 |
| 81 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 6 | EA |
$150.00 |
$20.00 |
$225.00 |
$21.30 |
$27.28 |
$100.00 |
| 82 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 1 | EA |
$300.00 |
$1,000.00 |
$575.00 |
$1,065.00 |
$1,363.88 |
$1,250.00 |
| 83 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 96.49 | SF |
$25.00 |
$20.00 |
$20.00 |
$21.30 |
$27.28 |
$25.00 |
| 84 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 140 | LF |
$12.00 |
$20.00 |
$20.00 |
$21.30 |
$27.28 |
$20.50 |
| 85 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 6 | EA |
$20.00 |
$20.00 |
$20.00 |
$14.91 |
$27.28 |
$20.00 |
| 86 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 8,472 | LF |
$0.7500 |
$0.4000 |
$1.25 |
$0.4300 |
$0.5500 |
$0.4200 |
| 87 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 562 | LF |
$1.50 |
$2.00 |
$2.50 |
$2.13 |
$2.73 |
$2.55 |
| 88 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 17 | LF |
$6.00 |
$25.00 |
$7.50 |
$26.63 |
$34.09 |
$26.01 |
| 89 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 8 | EA |
$100.00 |
$65.00 |
$250.00 |
$69.23 |
$88.66 |
$100.00 |
| 90 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 5 | EA |
$150.00 |
$85.00 |
$300.00 |
$90.53 |
$115.93 |
$150.00 |
| 91 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 255 | DAY |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 92 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 5,668 | LF |
$0.2500 |
$0.1000 |
$0.3500 |
$0.1100 |
$0.1400 |
$0.1000 |
| 93 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 14,185 | LF |
$1.00 |
$0.2500 |
$0.6500 |
$0.2700 |
$0.3400 |
$0.2600 |
| 94 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.3000 |
$1.00 |
$1.00 |
$1.07 |
$1.36 |
$1.04 |
| 95 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 475 | SD |
$10.00 |
$10.00 |
$4.00 |
$10.65 |
$13.64 |
$10.00 |
| 96 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,838 | LF |
$25.00 |
$38.00 |
$15.00 |
$40.47 |
$20.11 |
$35.00 |
| 97 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,573 | LF |
$5.00 |
$3.85 |
$12.00 |
$4.10 |
$5.14 |
$2.50 |
| 98 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,265 | SD |
$0.3000 |
$0.5000 |
$0.5000 |
$0.5300 |
$0.6800 |
$0.5200 |
| 99 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,815 | SD |
$0.7000 |
$1.50 |
$1.25 |
$1.60 |
$2.05 |
$1.56 |
| 100 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,785 | SD |
$1.25 |
$1.00 |
$3.00 |
$1.07 |
$1.36 |
$1.04 |
| 101 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,915 | SD |
$0.5000 |
$0.2500 |
$1.75 |
$0.2700 |
$0.3400 |
$0.2600 |
| 102 | 880(C) 8848 |
WING BARRICADES | 4,320 | SD |
$1.00 |
$0.2500 |
$0.0700 |
$0.2700 |
$0.3400 |
$0.2600 |
| 103 | 880(D) 8854 |
VERTICAL PANELS | 1,890 | SD |
$0.1500 |
$0.5000 |
$0.4400 |
$0.5300 |
$0.6800 |
$0.5200 |
| 104 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,785 | SD |
$0.2500 |
$3.00 |
$0.3500 |
$3.20 |
$4.09 |
$3.12 |
| 105 | 880(F) 8878 |
DRUMS | 11,165 | SD |
$0.2000 |
$0.2000 |
$0.5100 |
$0.2100 |
$0.2700 |
$0.2100 |
| 106 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 990 | SD |
$15.00 |
$5.00 |
$6.00 |
$5.33 |
$6.82 |
$15.00 |
| 107 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$20,000.00 |
$46,500.00 |
$39,351.75 |
$59,925.74 |
$21,000.00 |
| 108 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$16,250.00 |
$6,776.90 |
$3,409.69 |
$2,000.00 |
| 109 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$10,500.00 |
$12,500.00 |
$11,797.50 |
$6,819.38 |
$20,000.00 |
| 110 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$325,000.00 |
$305,000.00 |
$225,000.00 |
$351,576.75 |
$270,861.66 |
$335,000.00 |