| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$7,000.00 |
$20,000.00 |
$10,000.00 |
$10,000.00 |
$21,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,725 | CY |
$7.00 |
$7.00 |
$7.15 |
$14.00 |
$15.00 |
$10.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$5,000.00 |
$7,000.00 |
$5,000.00 |
$5,500.00 |
$25,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 300 | LF |
$2.00 |
$1.50 |
$4.00 |
$3.00 |
$2.50 |
$1.55 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 550 | LF |
$8.00 |
$8.00 |
$7.25 |
$7.00 |
$6.50 |
$7.95 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 2,812 | SY |
$2.50 |
$1.70 |
$2.40 |
$2.25 |
$2.75 |
$1.60 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.6 | AC |
$500.00 |
$200.00 |
$530.00 |
$500.00 |
$500.00 |
$1,265.00 |
| 8 | 307(B) 4210 |
CEMENT KILN DUST | 175 | TON |
$54.00 |
$55.00 |
$48.00 |
$60.40 |
$65.00 |
$44.00 |
| 9 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 3,150 | SY |
$3.10 |
$4.25 |
$3.66 |
$3.00 |
$3.35 |
$11.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 111 | TON |
$30.00 |
$32.50 |
$42.00 |
$33.00 |
$40.00 |
$77.85 |
| 11 | 407(B) 0250 |
TACK COAT | 231 | GAL |
$4.00 |
$3.40 |
$3.00 |
$3.50 |
$3.60 |
$2.50 |
| 12 | 408 5774 |
PRIME COAT | 1,105 | GAL |
$7.00 |
$3.00 |
$2.50 |
$4.00 |
$12.50 |
$9.35 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 528 | TON |
$85.00 |
$86.00 |
$75.00 |
$90.00 |
$168.75 |
$132.50 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 360 | TON |
$90.00 |
$105.00 |
$91.50 |
$98.00 |
$184.50 |
$145.50 |
| 15 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 22 | LF |
$30.00 |
$30.00 |
$55.00 |
$35.00 |
$30.00 |
$115.50 |
| 16 | 613(L) 5722 |
12" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$250.00 |
$275.00 |
$600.00 |
$200.00 |
$350.00 |
$368.50 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$4,000.00 |
$3,000.00 |
$4,000.00 |
$8,000.00 |
$7,567.00 |
| 18 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,160 | SY |
$6.00 |
$4.00 |
$3.00 |
$7.00 |
$20.00 |
$9.00 |
| 19 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 1 | EA |
$2,000.00 |
$1,500.00 |
$2,500.00 |
$2,000.00 |
$2,500.00 |
$4,350.00 |
| 20 | 619(C) 0924 |
SAWING PAVEMENT | 40 | LF |
$4.00 |
$10.00 |
$5.30 |
$5.00 |
$5.00 |
$150.50 |
| 21 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,700.00 |
$1,400.00 |
$1,400.00 |
$1,600.00 |
$1,860.00 |
$1,350.00 |
| 22 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,600.00 |
$2,100.00 |
$2,200.00 |
$1,450.00 |
$1,650.00 |
$2,200.00 |
| 23 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,000 | LF |
$5.00 |
$11.50 |
$8.00 |
$10.00 |
$12.00 |
$5.20 |
| 24 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,500.00 |
$3,800.00 |
$3,000.00 |
$4,000.00 |
$3,600.00 |
$2,645.00 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$18.00 |
$9.00 |
$25.00 |
$30.00 |
$12.00 |
$18.00 |
| 26 | 501(F) 6352 |
GRANULAR BACKFILL | 74.6 | CY |
$60.00 |
$63.00 |
$97.00 |
$75.00 |
$80.00 |
$92.50 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 254.4 | SY |
$4.50 |
$12.10 |
$12.00 |
$10.00 |
$15.00 |
$12.50 |
| 28 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 268.1 | LF |
$77.00 |
$74.00 |
$70.00 |
$85.00 |
$125.00 |
$95.50 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 90,550 | LB |
$2.00 |
$1.63 |
$1.90 |
$2.10 |
$1.75 |
$1.60 |
| 30 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$900.00 |
$1,300.00 |
$1,170.00 |
$1,100.00 |
$1,500.00 |
$1,750.00 |
| 31 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,100.00 |
$1,300.00 |
$1,170.00 |
$1,100.00 |
$1,500.00 |
$1,750.00 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 76.9 | CY |
$600.00 |
$645.00 |
$480.00 |
$700.00 |
$800.00 |
$680.00 |
| 33 | 509(B) 1328 |
CLASS A CONCRETE | 69.8 | CY |
$625.00 |
$642.50 |
$480.00 |
$700.00 |
$750.00 |
$845.00 |
| 34 | 511(A) 1332 |
REINFORCING STEEL | 30,300 | LB |
$1.00 |
$0.8700 |
$0.8000 |
$1.00 |
$1.00 |
$1.10 |
| 35 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 288 | LF |
$30.00 |
$28.00 |
$26.50 |
$40.00 |
$38.00 |
$46.00 |
| 36 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 726 | LF |
$36.00 |
$30.80 |
$31.80 |
$55.00 |
$45.00 |
$50.50 |
| 37 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 288 | LF |
$16.00 |
$12.00 |
$23.35 |
$10.00 |
$23.00 |
$28.50 |
| 38 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 726 | LF |
$18.00 |
$13.20 |
$28.65 |
$10.00 |
$23.00 |
$19.00 |
| 39 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 770 | TON |
$35.00 |
$40.00 |
$45.75 |
$45.00 |
$51.00 |
$51.00 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 200 | TON |
$35.00 |
$32.26 |
$46.15 |
$35.00 |
$43.00 |
$42.00 |
| 42 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$25.00 |
$32.00 |
$26.50 |
$30.00 |
$25.00 |
$30.00 |
| 43 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$32.00 |
$26.50 |
$30.00 |
$25.00 |
$19.00 |
| 44 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$31,000.00 |
$28,321.45 |
$15,000.00 |
$15,000.00 |
$6,900.00 |
| 45 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$750.00 |
$165.00 |
$530.00 |
$500.00 |
$12.00 |
$115.00 |
| 46 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,200 | LF |
$0.5000 |
$0.7000 |
$0.6000 |
$0.6000 |
$1.15 |
$0.6500 |
| 47 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$7,600.00 |
$16,324.00 |
$10,000.00 |
$8,000.00 |
$11,825.00 |
| 48 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$3,400.00 |
$5,000.00 |
$2,700.00 |
$10,000.00 |
$5,000.00 |
| 49 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$60,000.00 |
$62,000.00 |
$68,000.00 |
$35,000.00 |
$99,750.00 |