| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,223 | CY |
$7.50 |
$23.70 |
$27.00 |
$5.07 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$1,170,650.00 |
|
$75,000.00 |
|
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 16,070 | LF |
$1.10 |
$1.23 |
$1.35 |
$1.24 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 7,900 | LF |
$6.50 |
$5.93 |
$6.90 |
$5.98 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 286,238 | SY |
$1.00 |
$0.9700 |
$1.35 |
$1.12 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 59.14 | AC |
$450.00 |
$407.40 |
$450.00 |
$599.21 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,667 | CY |
$50.00 |
$57.85 |
$117.50 |
$62.49 |
| 8 | 307(A) 4200 |
FLY ASH | 5,273 | TON |
$74.00 |
$115.50 |
$91.00 |
$129.80 |
| 9 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 104,270 | SY |
$2.60 |
$2.37 |
$6.00 |
$4.18 |
| 10 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 6,265 | LF |
$2.50 |
$2.53 |
$9.00 |
$5.30 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,586 | TON |
$28.00 |
$42.10 |
$63.50 |
$28.07 |
| 12 | 407(B) 0250 |
TACK COAT | 4,911 | GAL |
$3.00 |
$2.56 |
$3.00 |
$3.44 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 17,354 | TON |
$75.00 |
$61.39 |
$79.00 |
$74.67 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 12,109 | TON |
$82.00 |
$61.68 |
$91.00 |
$77.32 |
| 15 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 183 | CY |
$16.00 |
$42.00 |
$40.00 |
$5.30 |
| 16 | 509(B) 0321 |
CLASS A CONCRETE | 554.2 | CY |
$350.00 |
$723.45 |
$650.00 |
$841.11 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 1,292.61 | CY |
$275.00 |
$262.50 |
$275.00 |
$441.96 |
| 18 | 511(A) 0332 |
REINFORCING STEEL | 45,868.94 | LB |
$1.00 |
$1.00 |
$1.50 |
$0.9500 |
| 19 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 956 | TON |
$40.00 |
$47.25 |
$125.00 |
$67.38 |
| 20 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 290 | TON |
$32.00 |
$42.00 |
$150.00 |
$57.73 |
| 21 | 611(G) 5708 |
INLET CDI RCP DES. 5 | 1 | EA |
$2,500.00 |
$3,675.00 |
$2,500.00 |
$7,657.36 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 40 | LF |
$70.00 |
$63.00 |
$107.00 |
$165.22 |
| 23 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 42 | LF |
$75.00 |
$89.25 |
$125.00 |
$186.47 |
| 24 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 156 | LF |
$100.00 |
$119.70 |
$148.00 |
$169.75 |
| 25 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 142 | LF |
$110.00 |
$147.00 |
$180.00 |
$232.62 |
| 26 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 124 | LF |
$120.00 |
$152.25 |
$205.00 |
$256.62 |
| 27 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 292 | LF |
$70.00 |
$96.60 |
$140.00 |
$175.96 |
| 28 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 100 | LF |
$80.00 |
$129.15 |
$160.00 |
$193.04 |
| 29 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 38 | LF |
$100.00 |
$155.40 |
$187.50 |
$281.93 |
| 30 | 613(A) 4501 |
65" X 40" R.C.PIPE ARCH CLASS A-III | 46 | LF |
$220.00 |
$320.25 |
$315.00 |
$400.53 |
| 31 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 16 | LF |
$34.00 |
$42.00 |
$31.00 |
$93.35 |
| 32 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 3,662 | LF |
$36.00 |
$31.50 |
$38.00 |
$76.25 |
| 33 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 60 | LF |
$40.00 |
$52.50 |
$40.00 |
$101.42 |
| 34 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 10 | EA |
$900.00 |
$11,555.00 |
$1,120.00 |
$1,400.24 |
| 35 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,200.00 |
$1,260.00 |
$1,375.00 |
$1,742.04 |
| 36 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,400.00 |
$1,575.00 |
$1,575.00 |
$1,907.54 |
| 37 | 613(L) 4552 |
65" X 40" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$2,000.00 |
$3,675.00 |
$3,700.00 |
$4,522.00 |
| 38 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$700.00 |
$1,050.00 |
$950.00 |
$1,172.39 |
| 39 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$900.00 |
$1,260.00 |
$1,175.00 |
$1,370.99 |
| 40 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,250.00 |
$1,575.00 |
$1,485.00 |
$1,635.79 |
| 41 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 5 | EA |
$1,500.00 |
$1,785.00 |
$1,965.00 |
$2,066.11 |
| 42 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,700.00 |
$2,100.00 |
$2,260.00 |
$2,330.91 |
| 43 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 92 | EA |
$1,200.00 |
$997.50 |
$1,020.00 |
$1,316.25 |
| 44 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 4 | EA |
$1,800.00 |
$1,470.00 |
$1,300.00 |
$1,853.19 |
| 45 | 619(B) 0291 |
REMOVAL OF HEADWALL | 3 | EA |
$1,000.00 |
$1,260.00 |
$1,500.00 |
$3,093.00 |
| 46 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 2 | EA |
$500.00 |
$525.00 |
$2,500.00 |
$940.79 |
| 47 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 5 | EA |
$2,000.00 |
$1,050.00 |
$1,500.00 |
$19,258.12 |
| 48 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 392 | LF |
$9.00 |
$15.75 |
$250.00 |
$14.80 |
| 49 | 619(B) 8610 |
REMOVE AND RESET CATTLE GUARD | 2 | EA |
$2,000.00 |
$2,314.05 |
$2,750.00 |
$403.65 |
| 50 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 14 | EA |
$110.00 |
$231.41 |
$70.00 |
$92.08 |
| 51 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 105 | SF |
$20.00 |
$15.75 |
$16.50 |
$15.89 |
| 52 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 240 | LF |
$20.00 |
$12.60 |
$13.50 |
$12.71 |
| 53 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 153,251 | LF |
$0.5000 |
$0.3800 |
$0.5000 |
$0.3800 |
| 54 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$40,320.00 |
$43,012.35 |
$48,185.44 |
| 55 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,120 | CY |
$15.00 |
$10.50 |
$9.00 |
$15.30 |
| 56 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 110 | CY |
$10.00 |
$31.50 |
$40.00 |
$5.30 |
| 57 | 509(A) 1326 |
CLASS AA CONCRETE | 215.1 | CY |
$450.00 |
$582.75 |
$415.00 |
$563.47 |
| 58 | 511(A) 1332 |
REINFORCING STEEL | 34,000 | LB |
$1.00 |
$1.03 |
$1.25 |
$0.9500 |
| 59 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 956 | TON |
$40.00 |
$21.00 |
$125.00 |
$67.38 |
| 60 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 290 | TON |
$32.00 |
$21.00 |
$150.00 |
$57.73 |
| 61 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 40 | LF |
$15.00 |
$210.00 |
$16.50 |
$23.72 |
| 62 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$95,000.00 |
$102,385.12 |
$200,000.00 |
$83,050.97 |
| 63 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$9,256.20 |
$10,000.00 |
$47,721.13 |
| 64 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$310,000.00 |
$250,000.00 |
$250,000.00 |
$80,835.85 |