Bid tab 150074

Let Feb 19, 2015 · Division 3 · Pottawatomie Sign up free

‹ Feb 2015 results

WIDEN AND RESURFACE SH -102: FROM 3.06 MILES NORTH OF SH -9, EXTEND NORTH . PROJECT LENGTH = 4.596 MILES

Let date
Thursday, February 19, 2015
Contract
150074
J/P numbers
21788(04)
District
Division 3
County
Pottawatomie
Highway
Limits
WIDEN AND RESURFACE SH -102: FROM 3.06 MILES NORTH OF SH -9, EXTEND NORTH . PROJECT LENGTH = 4.596 MILES
Project number
STP-163C(165)SS

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$12,419,582
1 HASKELL LEMON CONSTRUCTION CO. Low bidder $11,209,225 -9.7%
2 ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) $12,224,328 -1.6% +9.1%
3 Silver Star Construction Company, Inc. $13,208,884 +6.4% +17.8%

Bid tab: unit prices 90 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 HASKELL LEMON C…#2 ALLEN CONTRACTI…#3 Silver Star Con…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $47,500.00 $103,298.94 $75,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION199,215CY $5.50 $3.70 $5.10 $7.50
3202(D) 0184 UNCLASSIFIED BORROW3,967CY $6.50 $5.30 $6.00 $15.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $30,000.00 $89,750.00 $134,154.66 $175,000.00
5221(C) 2801 TEMPORARY SILT FENCE1,250LF $2.00 $1.30 $1.50 $1.25
6221(F) 0100 TEMPORARY SILT DIKE1,372LF $8.00 $6.30 $7.75 $6.50
7221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 1109CY $90.00 $84.50 $109.91 $225.00
8230(A) 2806 SOLID SLAB SODDING275,680SY $1.50 $1.05 $1.10 $1.43
9233(A) 2817 VEGETATIVE MULCHING56.95AC $350.00 $323.00 $120.90 $437.46
10234(A) 2824 FERTILIZING (10-20-10)28TON $650.00 $685.75 $548.32 $382.78
11241 2832 MOWING56.95AC $80.00 $54.85 $35.42 $50.00
12303(A) 2100 AGGREGATE BASE TYPE A19,955CY $40.00 $37.00 $56.08 $61.00
13307(A) 4200 FLY ASH6,597TON $60.00 $58.05 $84.55 $82.00
14307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE122,150SY $2.50 $2.65 $2.50 $3.50
15325 5271 SEPARATOR FABRIC97,351SY $1.50 $1.00 $1.26 $1.08
16402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E11,797TON $25.00 $27.45 $33.35 $35.37
17407(B) 0250 TACK COAT20,852GAL $3.25 $2.50 $2.97 $3.50
18408 5774 PRIME COAT74,121GAL $5.00 $6.40 $3.56 $4.50
19409(A) 4242 FABRIC REINFORCEMENT7,583SY $1.25 $2.50 $1.90 $2.50
20409(B) 4268 BITUMINOUS BINDER1,517GAL $3.50 $27.45 $2.44 $7.00
21411(B) 5935 SUPERPAVE, TYPE S3(PG 76-28 OK)13,087TON $85.00 $73.50 $79.50 $78.50
22411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)36,228TON $80.00 $65.00 $70.00 $69.50
23411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)7,479TON $95.00 $83.00 $91.50 $92.00
24411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)8,538TON $90.00 $76.00 $80.00 $79.50
25412 5267 COLD MILLING PAVEMENT20,851SY $2.50 $1.65 $0.9900 $1.65
26501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED28CY $15.00 $12.70 $36.64 $10.94
27509(A) 0319 CLASS AA CONCRETE95CY $400.00 $422.00 $570.30 $328.10
28509(D) 0325 CLASS C CONCRETE2,101CY $280.00 $211.00 $221.04 $213.26
29511(A) 0332 REINFORCING STEEL15,181LB $1.00 $1.05 $1.26 $1.15
30610(B) 0604 6" CONCRETE DRIVEWAY133SY $55.00 $51.70 $75.14 $76.56
31613(A) 0493 30" R.C.PIPE CLASS III216LF $79.00 $60.15 $72.76 $164.05
32613(A) 0494 36" R.C.PIPE CLASS III1,082LF $90.00 $77.30 $91.09 $229.67
33613(A) 0495 42" R.C.PIPE CLASS III312LF $124.00 $100.25 $114.72 $328.10
34613(B) 0689 18" CORR. GALV. STEEL PIPE3,180LF $28.00 $27.45 $37.71 $21.87
35613(B) 0690 24" CORR. GALV. STEEL PIPE8,480LF $32.00 $31.65 $41.00 $27.34
36613(H) 0500 8" PERFORATED PIPE UNDERDRAIN ROUND1,724LF $10.00 $9.50 $11.67 $12.00
37613(I) 1097 8" NON-PERF.PIPE UNDERDRAIN RND.575LF $10.00 $13.75 $22.11 $14.00
38613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND13EA $1,200.00 $1,055.00 $1,532.34 $3,280.95
39613(M) 7193 TYPE CC4 CULVERT END TREATMENT1EA $2,900.00 $2,426.50 $2,797.92 $2,734.12
40613(M) 7194 TYPE DD4 CULVERT END TREATMENT1EA $3,000.00 $2,955.00 $4,444.08 $3,296.17
41613(M) 7196 TYPE A6 CULVERT END TREATMENT44EA $900.00 $1,480.00 $1,186.93 $889.73
42613(M) 7197 TYPE B6 CULVERT END TREATMENT126EA $1,000.00 $1,582.50 $1,199.43 $1,327.18
43613(M) 7199 TYPE D6 CULVERT END TREATMENT1EA $2,000.00 $1,900.00 $2,858.38 $1,655.69
44613(M) 7201 TYPE AA6 CULVERT END TREATMENT4EA $2,100.00 $1,350.00 $2,481.72 $2,187.30
45613(M) 7203 TYPE CC6 CULVERT END TREATMENT1EA $2,200.00 $2,532.00 $4,652.22 $3,296.17
46613(M) 7204 TYPE DD6 CULVERT END TREATMENT1EA $2,400.00 $2,850.00 $5,274.90 $3,842.99
47613(M) 7304 TYPE DDD6 CULVERT END TREATMENT2EA $2,600.00 $4,220.00 $8,321.28 $5,482.99
48613(Q) 5946 OUTLET LATERAL HEADWALL8EA $500.00 $211.00 $426.82 $546.83
49613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C2,039CY $25.00 $34.00 $38.09 $25.00
50613(U) 1100 PIPE UNDERDRAIN COVER MAT'L.187CY $44.00 $34.85 $82.08 $25.00
51613(V) 1180 TRENCH EXCAVATION2,457CY $9.00 $6.90 $10.38 $25.00
52619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $25,000.00 $36,925.00 $48,840.76 $50,000.00
53619(B) 4728 REMOVAL OF ASPHALT PAVEMENT45,407SY $3.30 $6.70 $1.78 $2.25
54619(C) 0924 SAWING PAVEMENT27,089LF $3.00 $5.50 $1.93 $1.75
55623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE450LF $18.00 $17.00 $20.15 $23.00
56623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,500.00 $2,215.50 $2,564.54 $2,296.67
57623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,600.00 $2,162.75 $2,014.99 $1,804.53
58624(A) 4281 FENCE-STYLE WWF496LF $5.00 $4.00 $4.52 $7.50
59624(B) 4464 GATES-STYLE WWF (4.5'HIGH X 14'LONG)3EA $1,000.00 $844.00 $976.97 $1,500.00
60624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)11,180LF $4.50 $4.00 $4.15 $8.75
61624(E) 4288 FENCE-STYLE CLF (4'HIGH, CLASS A)378LF $25.00 $17.35 $20.03 $8.75
62624(F) 5849 GATES-STYLE CLF (4'HIGH X 14'LONG)1EA $1,000.00 $1,055.00 $1,221.20 $2,800.00
63629(A) 4958 MAILBOX INSTALLATION-SINGLE37EA $90.00 $73.85 $122.12 $110.00
64629(B) 4959 MAILBOX INSTALLATION-MULTIPLE10EA $150.00 $190.00 $244.24 $205.00
65629(C) 4960 MAILBOX71EA $40.00 $31.65 $30.53 $55.00
66629(D) 4961 REMOVAL OF MAILBOX INSTALLATION71EA $25.00 $23.25 $6.11 $110.00
67853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)18EA $10.00 $8.40 $12.21 $80.00
68504(D) 6239 CONCRETE RAIL (TR3)40LF $75.00 $190.00 $195.19 $105.00
69509 6386 SILICONE CONSTRUCTION JOINT166LF $15.00 $19.65 $4.88 $25.00
70619(B) 6252 REMOVAL OF EXISTING PARAPET40LF $60.00 $89.70 $261.29 $75.00
71857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)22,000LF $0.1200 $0.2000 $0.1000 $0.0900
72857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-21,000EA $0.5900 $0.6500 $1.22 $1.13
73857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)5,100LF $0.1700 $0.4500 $0.3100 $0.2800
74880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF73,000SD $0.2200 $0.0500 $0.0600 $0.0600
75880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF70,080SD $0.8000 $0.0500 $0.0200 $0.0200
76880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF14,600SD $1.22 $0.0500 $3.66 $3.40
77880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)199,290SD $0.4100 $0.0500 $0.0100 $0.0100
78880(C) 8848 WING BARRICADES730SD $1.04 $5.30 $6.11 $5.67
79880(E) 8860 WARNING LIGHTS(TYPE A)410,990SD $0.1500 $0.0500 $0.0100 $0.0100
80880(F) 8878 DRUMS30,660SD $0.1100 $0.0500 $0.1200 $0.1100
81880(G) 8890 CHANNELIZER CONES65,700SD $0.1700 $0.0500 $0.1200 $0.1100
82882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN758SD $15.10 $10.55 $18.32 $17.00
83805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS19EA $160.61 $121.35 $91.59 $84.98
84850(A) 8110 SHEET ALUMINUM SIGNS125SF $15.96 $37.45 $19.54 $18.13
85851(C) 8324 2" SQUARE TUBE POST378LF $6.72 $9.50 $7.33 $6.80
86855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)98,000LF $0.5000 $0.4000 $0.5100 $0.4800
87642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $135,000.00 $195,000.00 $213,589.34 $120,000.00
88220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $25,000.00 $11,890.80 $22,000.00
89640(A) 1426 FIELD OFFICE1EA $15,000.00 $45,000.00 $16,242.07 $35,000.00
90641 1552 MOBILIZATION1LSUM $520,000.00 $504,000.84 $500,000.00 $525,000.00