Bid tab 140307

Let Sep 18, 2014 · Division 8 · Rogers Sign up free

‹ Sep 2014 results

BRIDGE AND APPROACHES SH -266: OVER VERDIGRIS OVERFLOW, 5.9 MILES EAST OF THE TULSA COUNTY LINE . PROJECT LENGTH = 0.184 MILES

Let date
Thursday, September 18, 2014
Contract
140307
J/P numbers
24957(04)
District
Division 8
County
Rogers
Highway
Limits
BRIDGE AND APPROACHES SH -266: OVER VERDIGRIS OVERFLOW, 5.9 MILES EAST OF THE TULSA COUNTY LINE . PROJECT LENGTH = 0.184 MILES
Project number
STPY-166C(208)

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,646,154
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $3,522,167 -3.4%
2 BECCO CONTRACTORS, INC. $3,621,389 -0.7% +2.8%
3 MANHATTAN ROAD & BRIDGE COMPANY, LLC $4,046,547 +11.0% +14.9%
4 B & B BRIDGE COMPANY, LLC $4,276,295 +17.3% +21.4%
5 C-GAWF CONSTRUCTION, INC. $4,307,855 +18.1% +22.3%

Bid tab: unit prices 83 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 BECCO CONTRACTO…#3 MANHATTAN ROAD …#4 B & B BRIDGE CO…#5 C-GAWF CONSTRUC…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $4,000.00 $39,022.05 $50,000.00 $20,000.00 $40,000.00 $22,500.00
2202(A) 0183 UNCLASSIFIED EXCAVATION19,883CY $7.00 $7.02 $8.00 $12.00 $7.00 $15.00
3202(D) 0184 UNCLASSIFIED BORROW13,000CY $10.00 $7.02 $15.00 $15.00 $8.50 $15.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $12,000.00 $18,450.38 $25,000.00 $12,500.00 $40,000.00 $37,500.00
5221(C) 2801 TEMPORARY SILT FENCE3,877LF $2.00 $2.72 $3.00 $1.25 $1.19 $2.00
6221(D) 2803 TEMPORARY SEDIMENT FILTER1EA $165.00 $232.41 $500.00 $155.00 $150.00 $500.00
7221(F) 0100 TEMPORARY SILT DIKE1,200LF $9.00 $7.39 $10.00 $6.05 $5.83 $10.00
8230(A) 2806 SOLID SLAB SODDING15,572SY $2.00 $1.46 $1.40 $1.25 $1.20 $1.65
9232(A) 2813 SEEDING METHOD A3.22AC $600.00 $176.21 $275.00 $150.00 $145.00 $550.00
10233(A) 2817 VEGETATIVE MULCHING3.22AC $500.00 $176.21 $400.00 $150.00 $145.00 $550.00
11241 2832 MOWING6.44AC $70.00 $54.69 $100.00 $48.00 $45.00 $100.00
12242 0400 (PL)STABILIZED CONSTRUCTION EXIT2EA $2,500.00 $1,434.50 $2,000.00 $2,750.00 $6,500.00 $5,500.00
13303(A) 2100 AGGREGATE BASE TYPE A1,278CY $45.00 $33.47 $35.00 $45.00 $45.00 $52.50
14307(K) 4300 STABILIZED SUBGRADE10,824SY $7.00 $6.30 $5.00 $6.65 $7.45 $7.77
15325 5271 SEPARATOR FABRIC4,223SY $2.00 $1.17 $1.50 $1.50 $2.00 $1.33
16402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,438TON $27.00 $15.85 $20.00 $24.00 $22.00 $31.25
17411(B) 5935 SUPERPAVE, TYPE S3(PG 76-28 OK)556TON $80.00 $86.85 $70.00 $88.00 $80.50 $95.00
18411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)3,708TON $75.00 $71.62 $60.00 $70.00 $67.75 $90.00
19411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)620TON $85.00 $105.07 $80.00 $114.00 $115.00 $125.00
20411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)722TON $85.00 $81.02 $65.00 $89.00 $91.00 $90.00
21613(B) 0689 18" CORR. GALV. STEEL PIPE44LF $35.00 $48.61 $50.00 $40.00 $35.00 $35.00
22613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $530.00 $394.95 $200.00 $240.00 $350.00 $275.00
23619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $2,000.00 $6,076.18 $15,000.00 $7,500.00 $6,000.00 $7,500.00
24619(B) 4728 REMOVAL OF ASPHALT PAVEMENT9,582SY $5.00 $3.29 $5.00 $6.75 $4.10 $5.00
25619(B) 4780 REMOVAL OF GUARDRAIL421LF $4.00 $3.65 $3.00 $4.00 $7.00 $3.00
26619(C) 0924 SAWING PAVEMENT446LF $5.00 $6.08 $5.00 $4.50 $5.00 $6.00
27623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE425LF $20.00 $20.05 $18.00 $17.00 $16.50 $18.00
28623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,500.00 $2,734.28 $2,300.00 $2,175.00 $2,250.00 $2,666.00
29623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $1,883.61 $1,800.00 $1,735.00 $1,550.00 $2,200.00
30624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)200LF $5.00 $18.23 $16.50 $15.50 $5.00 $15.00
31624(D) 4470 GATE, GALVANIZED STEEL1EA $850.00 $1,944.38 $1,700.00 $1,650.00 $1,000.00 $1,250.00
32501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON200CY $26.00 $21.89 $25.00 $60.00 $28.00 $20.00
33501(G) 6309 CLSM BACKFILL208CY $125.00 $160.17 $90.00 $145.00 $100.00 $155.00
34502(B) 6357 DETOUR BRIDGE1LSUM $195,000.00 $307,532.56 $458,800.00 $235,000.00 $400,000.00 $225,000.00
35504(A) 1304 APPROACH SLAB331.8SY $175.00 $199.61 $160.00 $155.00 $175.00 $155.00
36504(B) 1305 SAW-CUT GROOVING1,619.1SY $3.75 $4.86 $5.00 $4.50 $4.20 $5.00
37504(C) 6250 SEALED EXPANSION JOINT49.75LF $200.00 $245.43 $240.00 $250.00 $385.00 $255.00
38504(E) 6190 42" F-SHAPED PARAPET623.4LF $120.00 $57.64 $110.00 $60.00 $95.00 $85.00
39506(A) 1322 STRUCTURAL STEEL263,510LB $1.90 $1.69 $1.75 $2.30 $1.50 $1.99
40507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY10EA $2,300.00 $1,566.45 $1,500.00 $1,525.00 $2,000.00 $1,660.00
41507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY30EA $2,100.00 $1,566.45 $1,500.00 $1,525.00 $2,000.00 $1,660.00
42509(A) 1326 CLASS AA CONCRETE325CY $650.00 $673.40 $500.00 $575.00 $475.00 $525.00
43509(B) 1328 CLASS A CONCRETE190CY $530.00 $668.37 $500.00 $775.00 $475.00 $525.00
44511(A) 1332 REINFORCING STEEL1,110LB $0.9900 $0.9800 $2.50 $1.25 $2.50 $1.55
45511(B) 6010 EPOXY COATED REINFORCING STEEL142,640LB $1.09 $1.05 $1.00 $1.25 $1.00 $1.55
46514(A) 6010 PILES, FURNISHED (HP 10X42)292LF $31.00 $27.54 $30.00 $28.00 $28.50 $35.00
47514(A) 6011 PILES, FURNISHED (HP 12X53)848LF $36.00 $35.07 $35.00 $34.00 $36.50 $45.00
48514(B) 6292 PILES, DRIVEN (HP 10X42)292LF $19.00 $151.68 $30.00 $11.00 $150.00 $12.00
49514(B) 6294 PILES, DRIVEN (HP 12X53)848LF $22.00 $151.77 $20.00 $12.00 $200.00 $12.00
50514(G) 6310 METAL PILE SHOES16EA $125.00 $113.06 $60.00 $125.00 $165.00 $55.00
51514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
52515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)858SY $4.00 $4.50 $4.40 $4.15 $4.00 $5.22
53516(A) 6098 DRILLED SHAFTS 72" DIAMETER430LF $900.00 $923.70 $650.00 $1,350.00 $1,850.00 $1,652.00
54516(C) 6200 CROSSHOLE SONIC LOGGING2EA $2,000.00 $4,911.27 $15,000.00 $2,000.00 $2,750.00 $5,000.00
55523(A) 6550 SEALER CRACK PREPARATION100LF $4.50 $4.86 $4.40 $4.15 $4.00 $6.00
56523(B) 6560 SEALER RESIN1GAL $1,000.00 $121.52 $110.00 $105.00 $100.00 $155.00
57540 4515 (PL)REPAIR BRIDGE ITEM (TYPE A)8EA $6,500.00 $4,860.94 $1,000.00 $2,500.00 $2,000.00 $2,500.00
58601(B) 1353 TYPE I-A PLAIN RIPRAP260TON $40.00 $43.75 $30.00 $35.00 $38.00 $39.95
59613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND104LF $35.00 $26.62 $22.00 $20.00 $35.00 $25.00
60613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $15.00 $18.78 $10.00 $20.00 $35.00 $25.00
61619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $188,443.00 $69,891.39 $258,800.00 $120,000.00 $60,000.00 $52,500.00
62850(A) 8110 SHEET ALUMINUM SIGNS18SF $17.00 $17.01 $13.00 $12.50 $14.00 $29.00
63851(C) 8324 2" SQUARE TUBE POST16LF $10.95 $12.15 $11.00 $10.50 $10.00 $15.00
64853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)18EA $15.00 $12.15 $11.00 $16.00 $20.00 $25.00
65856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)8,389LF $0.5000 $0.6100 $0.6000 $0.5700 $0.5000 $0.6500
66857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)10,840LF $0.2000 $0.1200 $0.1000 $0.0900 $0.1000 $0.1000
67857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)5,000LF $0.7500 $0.9700 $0.5000 $0.5000 $0.8000 $0.5500
68857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)11,070LF $0.3500 $0.2400 $0.0200 $0.0300 $0.2000 $0.0300
69870(A) 8485 SAND FILLED IMPACT ATTENUATION MODULE13,680SD $0.7000 $0.2400 $0.1500 $0.1100 $0.2000 $0.1200
70877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER4,775LF $25.00 $14.23 $10.00 $32.00 $24.00 $32.50
71877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER4,650LF $5.00 $4.34 $6.00 $2.00 $3.00 $13.00
72880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF6,750SD $0.5000 $0.3000 $0.3000 $0.2600 $0.2500 $0.3300
73880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,680SD $0.9000 $1.22 $1.10 $1.05 $1.00 $1.33
74880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,700SD $1.40 $2.43 $2.00 $1.80 $2.00 $2.27
75880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,800SD $0.7000 $0.3000 $1.40 $1.30 $0.2500 $1.44
76880(C) 8848 WING BARRICADES1,080SD $1.10 $1.22 $1.40 $1.30 $1.00 $1.44
77880(E) 8860 WARNING LIGHTS(TYPE A)6,300SD $0.3000 $0.1200 $0.0200 $0.0300 $0.1000 $0.0400
78880(F) 8878 DRUMS6,300SD $0.2000 $0.1200 $0.3000 $0.2600 $0.1000 $0.3300
79882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN540SD $20.00 $6.08 $5.50 $5.20 $5.00 $10.00
80642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $35,000.00 $36,253.65 $25,000.00 $26,000.00 $12,500.00 $27,500.00
81220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,000.00 $3,038.09 $3,500.00 $2,546.00 $5,000.00 $7,500.00
82640(A) 1426 FIELD OFFICE1EA $10,000.00 $6,076.18 $2,500.00 $14,675.00 $7,000.00 $12,500.00
83641 1552 MOBILIZATION1LSUM $210,000.00 $140,890.36 $205,000.00 $226,500.00 $442,000.00 $222,000.00